FD FD FD FD FD FD FD FD FD FD FD FD FD FD FD FD DW REF. UP DW REF. UP X X Phase 1 - Construct Classroom Wing "N" Phase 3A - Construct Classroom Wing "M" Phase 2 Demolish - Classroom Wing "E" Phase 5A - Demolish Classroom Wing "F" Phase 3B - Addition to and Renovation of Building "B" Phase 4 - Renovation of Building "C" (Additive Alternate No. 3) New Canopy "K" Wing (Shop) "J" Wing (Home Economics) "H" Wing (Girl's Gym) "M" Wing "N" Wing "D" Wing "B" Wing (Administration / Media) "C" Wing "G" Wing (Boy's Gym) "A" Wing (Auditorium) Cafeteria Kitchen Covered Outdoor Dining "F" Wing "E" Wing Modular Building 60' 60' Additive Alternate No. 2 Additive Alternate No.1 425 Days 850 Days 775 Days 775 Days Notes: Phase 1 includes: 1. Modification to existing subsurface drainage, Re: Civil. 2. Modification to existing electrical services, Re: Electrical Phasing Drawing. 3. Modification to existing underground plumbing, Re: Plumbing. 4. Construction of new 3-story Classroom Wing N. 5. Modification to existing walkway where new Classroom Wing N ties into existing walkway. 6. Construct upgrades to West Cafeteria wall to provide 2 hour-rated separation. 7. Modification of existing walkways were buildings is demolished and walkways remain. 8. Removal of a section of existing parking lot at south side of new Classroom Wing N. 9. The work included in this phase is to be Substantially Complete in 425 days. Phase 2 includes: 1. Abatement of Classroom Wing E (Not In Contract, work to be performed under a separate contract by Owner). Allow 35 days for the abatement of Classroom Wing E. 2. Full demolition of existing 2-story Classroom Wing E. Demolition of Classroom Wing E must be completed during Summer of 2016. 3. Modifications required at first and second floors of Buildings A and B where Classroom Wing E was removed. 4. Removal of trees in courtyard. 5. Removal and salvage of "Garden of Angels" monument to be reinstalled in Phase 5B of the project. 6. Removal of sidewalks in courtyard. 7. Modification of subsurface drainage, Re: Civil. Phase 3A includes (Work in Phases 3A and 3B is concurrent): 1. Additional electrical service work, Re: Electrical. 2. Construction of new 3-story Classroom Wing M. 3. New connections to subsurface drainage for new courtyard. 4. Upgrade of openings in East Building H (Girl's Gym) wall to provide 2-hour rated separation. 5. Modification of existing covered walkway for construction of new Classroom Wing M. 6. New covered walkway connection at East end of Classroom Wing M. 7. The work included in this phase is to be Substantially Complete in 850 days. Phase 3B includes (Work in Phases 3A and 3B is concurrent): 1. Abatement of Building B (Not In Contract, to be performed by separate contract by Owner). 2. As Additive Alternates No. 1 and No. 2, selective demolition of areas of Building B (Administrative/Media). 3. As Additive Alternates No. 1 and No. 2, renovation of Building B (Administrative/Media). 4. As Additive Alternate No. 1, addition to Building B (Administrative/Media). 5. As Additive Alternate No. 1, addition of new entrance to school at Building B (Administrative/Media) including new sidewalks and planters. 6. The work included in this phase is to be Substantially Complete in 775 days. Phase 4 includes: 1. Abatement of Building C (Not In Contract, to be performed by separate contract by Owner). 2. As Additive Alternate No. 3, selective demolition of Building C and subsequent renovation of Building C. Also included is an new canopy to the South of Building C. 3. The work included in this phase is to be Substantially Complete in 775 days. Phase 5A includes: 1. Abatement of Classroom Wing F (Not In Contract, work to be performed under a separate contract by Owner). Allow 35 days for the abatement of Classroom Wing F. 2. Complete demolition of Classroom F building and foundation. Demolition of Classroom Wing F must be completed during Summer of 2017. 3. Modifications required at Building B where Classroom Wing F was removed. 4. Final site grading. 5. Implementation of new landscaping. Phase 5B includes: 1. Construction of new pad for "Garden of Angels" monument. 2. Construction of new sidewalks in courtyard. 3. The work included in this phase is to be Substantially Complete in 850 days. General Notes for All Phases: 1. During all phases of work school will be fully operational during regular school calendar year. The school maintains use of some facilities during the summer break for camps, etc. Safety of students, staff, and visitors is very important. Fencing and barricades as required to keep non-work personnel out of the construction site will be Contractor's responsibility. 2. Coordinate with Owner to move out of existing spaces that are to be demolished or renovated prior to Contractor needing to obtain that space to work if necessary. 3. Reference instructions to bidders Article 11 Completion Time for milestone time frames for each phase of work listed above. Sheet No. Sheet Title Date Project No. Seal Consultant 333 Texas Street Suite 1200 Shreveport, LA 71101 O F smbbarchitects.com Issue 318.221.1623 318.221.1626 January 15, 2015 Bid Documents A0.10 Airline High School Classroom Wings 2801 Airline Drive, Bossier City, LA 71111 BPSB Project No. CM1211−C Phasing Plan February 4, 2015 1303.03 32' 1 Phasing Plan North

A0.10 Phasing Plan - Color Coded Rev 061416 (1)

Embed Size (px)

DESCRIPTION

A0.10 Phasing Plan - Color Coded Rev 061416 (1)

Citation preview

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

DW

RE

F.

UP

DW

RE

F.

UP

XX

Phase 1 - ConstructClassroom Wing "N"

Phase 3A - ConstructClassroom Wing "M"

Phase 2 Demolish -Classroom Wing "E"

Phase 5A - DemolishClassroom Wing "F"

Phase 3B - Addition to andRenovation of Building "B"

Phase 4 - Renovation of Building"C" (Additive Alternate No. 3)

New Canopy

"K" Wing (Shop)

"J" Wing(Home

Economics)

"H" Wing(Girl's Gym)

"M" Wing

"N" Wing

"D" Wing

"B" Wing(Administration

/ Media)

"C"Wing

"G" Wing(Boy's Gym)

"A" Wing(Auditorium)

Cafeteria

Kitchen

CoveredOutdoorDining

"F" Wing

"E" Wing

ModularBuilding

60'

60'

AdditiveAlternate

No. 2

AdditiveAlternate

No.1

425 Days

850 Days 775 Days

775 Days

Notes:Phase 1 includes:1. Modification to existing subsurface drainage, Re: Civil.2. Modification to existing electrical services, Re: Electrical

Phasing Drawing.3. Modification to existing underground plumbing, Re:

Plumbing.4. Construction of new 3-story Classroom Wing N.5. Modification to existing walkway where new Classroom

Wing N ties into existing walkway.6. Construct upgrades to West Cafeteria wall to provide 2

hour-rated separation.7. Modification of existing walkways were buildings is

demolished and walkways remain.8. Removal of a section of existing parking lot at south side

of new Classroom Wing N.9. The work included in this phase is to be Substantially

Complete in 425 days.

Phase 2 includes:1. Abatement of Classroom Wing E (Not In Contract, work to

be performed under a separate contract by Owner). Allow35 days for the abatement of Classroom Wing E.

2. Full demolition of existing 2-story Classroom Wing E.Demolition of Classroom Wing E must be completedduring Summer of 2016.

3. Modifications required at first and second floors ofBuildings A and B where Classroom Wing E wasremoved.

4. Removal of trees in courtyard.5. Removal and salvage of "Garden of Angels" monument to

be reinstalled in Phase 5B of the project.6. Removal of sidewalks in courtyard.7. Modification of subsurface drainage, Re: Civil.

Phase 3A includes (Work in Phases 3A and 3B is concurrent):1. Additional electrical service work, Re: Electrical.2. Construction of new 3-story Classroom Wing M.3. New connections to subsurface drainage for new

courtyard.4. Upgrade of openings in East Building H (Girl's Gym) wall

to provide 2-hour rated separation.5. Modification of existing covered walkway for construction

of new Classroom Wing M.6. New covered walkway connection at East end of

Classroom Wing M.7. The work included in this phase is to be Substantially

Complete in 850 days.

Phase 3B includes (Work in Phases 3A and 3B is concurrent):1. Abatement of Building B (Not In Contract, to be performed

by separate contract by Owner).2. As Additive Alternates No. 1 and No. 2, selective

demolition of areas of Building B (Administrative/Media).3. As Additive Alternates No. 1 and No. 2, renovation of

Building B (Administrative/Media).4. As Additive Alternate No. 1, addition to Building B

(Administrative/Media).5. As Additive Alternate No. 1, addition of new entrance to

school at Building B (Administrative/Media) including newsidewalks and planters.

6. The work included in this phase is to be SubstantiallyComplete in 775 days.

Phase 4 includes:1. Abatement of Building C (Not In Contract, to be performed

by separate contract by Owner).2. As Additive Alternate No. 3, selective demolition of

Building C and subsequent renovation of Building C. Alsoincluded is an new canopy to the South of Building C.

3. The work included in this phase is to be SubstantiallyComplete in 775 days.

Phase 5A includes:1. Abatement of Classroom Wing F (Not In Contract, work to

be performed under a separate contract by Owner). Allow35 days for the abatement of Classroom Wing F.

2. Complete demolition of Classroom F building andfoundation. Demolition of Classroom Wing F must becompleted during Summer of 2017.

3. Modifications required at Building B where ClassroomWing F was removed.

4. Final site grading.5. Implementation of new landscaping.

Phase 5B includes:1. Construction of new pad for "Garden of Angels"

monument.2. Construction of new sidewalks in courtyard.3. The work included in this phase is to be Substantially

Complete in 850 days.

General Notes for All Phases:1. During all phases of work school will be fully operational

during regular school calendar year. The schoolmaintains use of some facilities during the summer breakfor camps, etc. Safety of students, staff, and visitors isvery important. Fencing and barricades as required tokeep non-work personnel out of the construction site willbe Contractor's responsibility.

2. Coordinate with Owner to move out of existing spacesthat are to be demolished or renovated prior to Contractorneeding to obtain that space to work if necessary.

3. Reference instructions to bidders Article 11 CompletionTime for milestone time frames for each phase of worklisted above.

Sheet No.

Sheet Title

Date

Project No.

Seal

Consultant

333 Texas StreetSuite 1200Shreveport, LA 71101

OF

smbbarchitects.com

Issue

318.221.1623318.221.1626

January 15, 2015 BidDocuments

A0.10

Air

line

Hig

h S

cho

ol C

lass

roo

m W

ing

s28

01 A

irlin

e D

rive,

Bos

sier

City

, LA

711

11

BP

SB

Pro

ject

No.

CM

1211

−C

Phasing Plan

February 4,2015

1303.03

32'1Phasing Plan

North

Keith.Norwood
Line
Keith.Norwood
Line
Keith.Norwood
Text Box
Additive Alternate 3 not taken