Screen Australia have taken great care to ensure that the formulas in this budget are correct. However, as
the formulas are not locked, errors can occur when numbers are entered to override formulas and/or when
lines are added or subtracted. Screen Australia can take no responsibility for the accuracy of your budget.
Please check each line where you have entered figures and ensure the accuracy of the sub totals and
totals lines and columns.
Helpful Excel Instructions:
Budget font style is Arial Narrow -Size 9
How to use the Budget
1
Full Feature Film Short Film Interactive Digital Media Animation
2
If adding a category, you will also need to add a line for it in the summary sheet and link the formula.
Please complete the COVER page first, some of this information will automatically feed through to the body of the
budget
If you prefer that the zero values do not appear on the budget you should do the following: Tools - Options - View at the
bottom of the box under Window options, delete the tick for displaying the Zero Values.
To print onto one sheet, ( portrait or landscape) as formatted, change the scaling percentage: File - Page Setup - Page -
Scaling - adjust to ..% (for each affected worksheet)
To change the viewing size of the document (if you find the font too small for working on): View - Zoom - Custom - 120% or
as required
SCREEN AUSTRALIA A-Z BUDGET DOCUMENTARY
Welcome to the updated Documentary Excel Budget Template.
Please be sure to use the correct template: other budgets available on the Screen Australia Website are:
DISCLAIMER
This is a base format - add, delete or amend categories and line items as required by your project, however please be
aware that you may affect formulas in the budget if you do so. So as a precaution, always work from the 'formula bar'
at the top of the spreadsheet, that way you will see if you are about to eliminate formulas.
INTRODUCTION AND INSTRUCTIONS FOR USE
If inserting or deleting rows, ensure you do whole rows by selecting the row numbers down the left hand column of the page
otherwise the rest of the worksheet will move out of alignment.
If deleting a category, you will also need to delete its line in the Summary worksheet as #ref will appear on the workbook and
negate the formulas
AMENDED 30 January 2008 Version 3 Dated 17 June 2008
A reasonable knowledge of EXCEL is required to complete the budget.
If your film is a dramatised documentary, we recommend that you use the Feature Budget Template as it has a lot
more information to help you budget your film accurately (this can be downloaded from the Screen Australia
website)
To link a formula, go to the cell in the summary sheet, hit 'equals' then switch to the detailed budget, select the cell to be
copied and hit 'enter'. Same process to link between budget and worksheets.
Do not delete columns. Column A of the Budget has been left blank to use for a Code reference if required.
3
4 The Summary Sheet will automatically fill from the Budget as you enter data
5
This workbook comprises of the following worksheets: (Coloured Tabs at bottom of page) pls note colours don't show up on Macs, only PCs
INFO Introduction and instruction page
COVER SHEET Production Details and budget assumptions
BUDGET A-Z detail
BUDGET SUMMARY
1 Travel & Accommodation Worksheet for Crew & Cast - Budget Categories M & N2 Delivery Requirements - Budget Category X.2
Fringes (should be calculated on both PAYG and ABN staff)
Fringes are the expenses associated with employment. For a budget assume that at least 80% of your crew
and cast are employees (PAYG or ABN). By law the nature of the relationship that you have with them is that of
an employer rather than a contractor. If a crew member is contracted through a Pty Ltd company fringes are
usually not payable but they may want to negotiate a higher fee that compensates them for holiday pay and
superannuation so at the budgeting stage you could even assume fringes on all crew and cast.
Payable to any crew member employed on a weekly basis. Per the award it is one-twelfth of the contracted wage or
8.33%, representing a pro-rata payment of four weeks annual holiday. For Cast refer BNF calculations. For
preliminary budgeting include calculation on overtime estimates.
A percentage set by Federal Superannuation Guarantee legislation and payable on the contracted Base wage and
allowances of any employee who earns in excess of $450 per month. It is not paid on Holiday Pay or overtime. As
of October 2007 the rate is 9% for crew and 10% for cast, however as this rate is variable it is recommended that
you double check the rate closer to your production start date.
The rates for both payroll tax and workers compensation are determined by each State so check the rates
appropriate to the State in which you expect to shoot, as they will apply at the time that you expect to go into
production. They may be calculated on the contracted wage plus Holiday Pay, Overtime, Superannuation and
allowances including per diems, kilometerage and vehicle allowances. These inclusions vary from State to State.
Payroll tax is payable when the Company Payroll exceed a nominated threshold per month. This threshold varies
from State to State. If your budget is tight include a credit or negative cost in the budget for the appropriate
threshold x the number of months from employment of the first person to termination of the last person. If the film
is to be produced by an existing production company, that threshold or part thereof may be used already, in which
case the production can not take the full credit.
NB. Workers Compensation estimates are included in Fringes Category D, not with Insurances Category O.
G.S.T
NOTES are included throughout the Budget to assist you (Column N) - this column will not print out with the body
of your budget
Super-
annuation
Payroll
Tax &
Workers
Comp.
No matter how small the budget every film maker is advised to register the entity through which they produce their film for GST.
In all likelihood they would be legally required to register. Once registered you may claim back all the GST that has been
included in payments made. This being the case always budget the production expenses net of GST.
Please refer to MEAA and SPAA for current Crew and Cast rates and agreements before completing the budget
Holiday
Pay
Crew &
Cast
WORKSHEETS are provided to help you, however they are not linked to the budget as standard. They are there to
help breakdown costs associated with travel, accommodation and per diems as well as Deliverables. Additional
Worksheets can be included and linked: Insert - Worksheet
UPDATES
Please Check the Screen Australia website regularly for updates or corrections to this budget
If you discover any formula errors in the budget, please email us at [email protected] so that we can inform other users.
Invariably the funding that you achieve for your film is considered a taxable supply and you are required to invoice the funding
body, network, distributor etc for your cashflow + GST. This is not a reason to put a line in the budget for GST
Do not include GST in your budget. GST will be dealt with contractually and by invoice
A-Z Budget Version 3 June 2008
TITLE:
PRODUCTION TYPE: Documentary/ Documentary series
No. of Episodes (if applicable):
PRODUCTION COMPANY:
ABN: TFN:
Address: T'phone: Fax:
E-mail:
DIRECTOR:
PRODUCER:
D.O.P:
EDITOR:
FINAL BUDGET DATE:
THIS BUDGET IS BASED ON THE FOLLOWING ASSUMPTIONS:
Running Time estimate: Shoot Gauge:
Finish on:
Ratio:
Finished Aspect Ratio:
SCHEDULE
PREPRODUCTION: Start: Finish: Weeks: Days:
SHOOT: (…. hr days/ ….day weeks. Start: Finish: Weeks: Days:
Statutory Holidays:
POSTPRODUCTION: Start: Finish: Weeks: Days:
SHOOTING LOCATIONS (or Episode shoot periods, if applicable)
Location 1 From: To: Weeks: Days:
Location 2 From: To: Weeks: Days:
Location 3 From: To: Weeks: Days:
Location 4 From: To: Weeks: Days:
Studio (if applicable) From: To: Weeks: Days:
POST PRODUCTION PATHWAY: (pls explain the proposed pathway and supplier)
offline
autoconform, grade, online
audio post
FRINGES & INSURANCE - RATES APPLIED:
Payroll Tax State: …………….. % Note: If payroll tax is applicable to your budget, check the threshold in your state.
Superannuation Year: ……………… % Note: Check the current rate of superannuation (this is consistent across the states)
Fringe Benefits Tax %
Workers Compensation State: …………….. % Note: This tax amount varies from state to state. Check the rate in your state.
ARCHIVAL FOOTAGE
minutes
List:
List:
CURRENCY: (list exchange rate and effective date where foreign currency rates have been used)
Currency: as at:
Currency as at:
FINANCING:
Source 1 $0.00
Source 2 $0.00
Source 3 $0.00
TOTAL $0.00
DEVELOPMENT FUNDS/LOANS: Repayments due: (date to which buyouts are calculated)
Source 1 $0.00
Source 2 $0.00
Contingency: 10% of Below Line costs
List any quotations that are attached:
Budget prepared by:
Date:
" ..film title ... "
Approximate minutes of stock footage to be be purchased:
Terrritories to be purchased (Australia only, worldwide, etc):
Media to be purchased (free to air TV, cable, internet, etc):
AFC Budget-221046233.xls.ms_office-Production SummaryPrinted: 4/7/2014 4:29 AM
BUDGET as at 4/7/2014
PRE-PRODN. SHOOT POST-PRODN. Sub-total
TOTAL
PRODUCTION
EXPENDITURE
Code Description Rate Wks Amount Wks Amount Wks Amount
NO. OF WEEKS/days SHOOT - 0 Running total: 0
ABOVE THE LINE COSTSA.1 STORY & SCRIPT
Story Rights (incl.Options) Australia 0 0
Story Rights (incl.Options) Overseas 0 0
Writers Fees Australia 0 0
Writers Fees Overseas 0 0
Researcher(s) Australia 0 0
Researcher(s) Overseas 0 0
Sub-total 0 0 0 0 0
A.2 DEVELOPMENT
Development Funds
Source 1 ( ) 0 0
Interest/Premium Source 1 0 0
Source 2 ( ) 0 0
Interest/Premium Source 2 0 0
Development Loans
Source ( ) 0 0
Interest/Premium Source ( ) 0 0
Consultancy Fees/Expenses Australia 0 0
Consultancy Fees/Expenses Overseas 0 0
Budgets and Schedules 0 0
Pitch Reel editing 0 0
Pitch Reel filming 0 0
Research Expenses Australia 0 0
Research Expenses Overseas 0 0
Secretarial & Office Expenses 0 0
Location Surveys Australia 0 0
Location Surveys Overseas 0 0
Travel & Transport Australia 0 0
Travel & Transport Overseas 0 0
Accom'n & Living Exps Australia 0 0
Accom'n & Living Exps Overseas 0 0
Legal Expenses - Financing 0 0
Overheads 0 0
Sub-total 0 0 0 0 0
B.1 PRODUCERS
Fees
Executive Producer(s) Australia 0 0 0 0
Executive Producer(s) Foreign National 0 0 0 0
Producer(s) 0 0 0 0
Co-Producer(s) 0 0 0 0
Associate Producer 0 0 0 0
Line Producer 0 0 0 0
Sub-total 0 0 0 0 0
B.2 DIRECTORS
Fees
Director(s) 0 0 0 0
Sub-total 0 0 0 0 0
E(a) PRINCIPAL CAST
E(a)1 OFFSHORE CAST 0 0 0 0
0 0 0 0
E(a)2 AUSTRALIAN CAST 0 0 0 0
0 0 0 0
Sub-total 0 0 0 0 0
TOTAL 'ABOVE THE LINE' COSTS 0
BELOW THE LINE COSTS
PRODUCTION COSTS:C. PRODUCTION UNIT FEES & SALARIES.
C.1 PRODUCTION MANAGEMENT
Production Manager 0 0 0 0
Production Co-ordinator 0 0 0 0
Production Secretary 0 0 0 0
Production Assistant(s) 0 0 0 0
Production - Casuals 0 0 0 0
Local Liason 0 0 0 0
Location Manager(s) 0 0 0 0
Location Assistant(s) 0 0 0 0
Unit Manager 0 0 0 0
Runner(s) 0 0 0 0
Sub-total 0 0 0 0 0
C.2 PRODUCTION ACCOUNTANCY
Production Accountant 0 0 0 0
Computer fees 0 0 0 0
Sub-total 0 0 0 0 0
C.3 ASSISTANT DIRECTORS & SCRIPT SUPERVISION (DRAMA)
1st Assistant Director 0 0 0
Continuity 0 0 0
Sub-total 0 0 0 0 0
" ..film title ... "
AFC Budget-221046233.xls.ms_office-4/7/2014 Page 5/18
BUDGET as at 4/7/2014
PRE-PRODN. SHOOT POST-PRODN. Sub-total
TOTAL
PRODUCTION
EXPENDITURE
Code Description Rate Wks Amount Wks Amount Wks Amount
" ..film title ... "
C.4 CAMERA CREW
D. O. P. 0 0 0 0
Camera Assistant(s) 0 0 0 0
Camera - Casual 0 0 0 0
Specialist Camera Operator(s) 0 0 0 0
(Steadicam, Aerial, Underwater) 0 0 0 0
Rostrum Camera (stills/artwork) 0 0 0 0
Camera Crew Travel Days 0 0 0 0
Sub-total 0 0 0 0 0
C.5 SOUND CREW
Recordist 0 0 0 0
Sound - Casual 0 0 0 0
Sound Crew Travel Days 0 0 0 0
Sub-total 0 0 0 0 0
C.6 LIGHTING CREW
Gaffer 0 0 0 0
Best Boy 0 0 0 0
Electricians - Casual 0 0 0 0
Pre-light/Rigging Crew 0 0 0 0
Lighting Crew Travel Days 0 0 0 0
Sub-total 0 0 0 0 0
C.7 GRIPS CREW
Key Grip 0 0 0 0
Assistant Grip 0 0 0 0
Grips Crew Travel Days 0 0 0 0
Sub-total 0 0 0 0 0
C.8 COSTUME CREW (DRAMA)
Costume Supervisor 0 0 0 0
Costume Buyer(s)/Standby 0 0 0 0
Costume - Casual 0 0 0 0
Costume Crew travel days 0 0 0 0
Sub-total 0 0 0 0 0
C.9 MAKE-UP CREW (DRAMA)
Make-up Artist 0 0 0 0
Assistant(s) 0 0 0 0
Makeup Crew travel days 0 0 0 0
Sub-total 0 0 0 0 0
C.10 HAIRDRESSING CREW (DRAMA)
Hairdresser 0 0 0 0
Assistant(s) 0 0 0 0
Hairdressing Crew Travel days 0 0 0 0
Sub-total 0 0 0 0 0
C.11 ART DEPARTMENT CREW (DRAMA)
Production Designer 0 0 0 0
Art Director 0 0 0 0
Props Buyer(s) 0 0 0 0
Set Dresser(s) 0 0 0 0
Standby Props(s) 0 0 0 0
Art Dept. Runner(s) 0 0 0 0
Art Department Crew Travel days 0 0 0 0
Sub-total 0 0 0 0 0
C.12 ACTION VEHICLES CREW (DRAMA)
Action Vehicle Co-ordinator. 0 0 0 0
Marine Co-ordinator 0 0 0 0
Travel days 0 0 0 0
Sub-total 0 0 0 0 0
C.13 LIVESTOCK CREW (DRAMA)
Animal Trainer(s) 0 0 0 0
Horse Wrangler 0 0 0 0
Veterinary Fees 0 0 0 0
Travel days 0 0 0 0
Sub-total 0 0 0 0 0
C.14 CONSTRUCTION CREW (DRAMA)
Construction Manager(s) 0 0 0 0
Labourer(s) 0 0 0 0
Carpenter(s) 0 0 0 0
Painter(s) 0 0 0 0
Travel days 0 0 0 0
Sub-total 0 0 0 0 0
C.15 SPECIAL EFFECTS & ARMOURY CREW (DRAMA)
Sp. Fx. Manager 0 0 0 0
Pyro Fx. Co-ordinator(s) 0 0 0 0
Armourer 0 0 0 0
Model Maker(s) 0 0 0 0
Travel days 0 0 0 0
Sub-total 0 0 0 0 0
C.16 VISUAL EFFECTS & ANIMATION
Visual Fx. Supervisor 0 0 0 0
Visual Fx. Co-ordinator 0 0 0 0
Artist(s) 0 0 0 0
Travel days 0 0 0 0
Sub-total 0 0 0 0 0
C.17 OCCUPATIONAL HEALTH & SAFETY CREW
Safety Report 0 0 0 0
Safety Supervisor 0 0 0 0
Police 0 0 0 0
AFC Budget-221046233.xls.ms_office-4/7/2014 Page 6/18
BUDGET as at 4/7/2014
PRE-PRODN. SHOOT POST-PRODN. Sub-total
TOTAL
PRODUCTION
EXPENDITURE
Code Description Rate Wks Amount Wks Amount Wks Amount
" ..film title ... "
Security 0 0 0 0
Fire Officer(s) 0 0 0 0
Traffic & Pedestrian Control 0 0 0 0
Registered Nurse(s) or Doctor(s) 0 0 0 0
Sub-total 0 0 0 0 0
C.18 TECHNICAL ADVISERS
Researcher(s) 0 0 0 0
Interpreter(s) Translators Australia 0 0 0 0
Interpreter(s) Translators Overseas 0 0 0 0
Story Consultant 0 0 0 0
Post Story Consultant 0 0 0 0
Consultant(s)/Advisor(s) 0 0 0 0
Interviewee(s)/Onscreen Expert(s) Overseas 0 0 0 0
Interviewee(s)/Onscreen Expert(s) Australia 0 0 0 0
Sub-total 0 0 0 0 0
C.19 SECOND UNIT CREW
Sub-total 0 0 0 0 0
C.20 OVERSEAS CREW
Local Liason/Fixer(s) 0 0 0 0
Government Minders(s) 0 0 0 0
Location Assistant(s) 0 0 0 0
Driver(s) 0 0 0 0
Camera Crew 0 0 0 0
Sound Crew 0 0 0 0
Lighting Crew 0 0 0 0
Grips Crew 0 0 0 0
Other Crew 0 0 0 0
Sub-total 0 0 0 0 0
C.24 OVERTIME & LOADINGS
Overtime 0 0 0
Loadings 0 0 0
(Night, Public Holdays, Saturday/6th Days) 0 0 0
Overtime, Loadings Overseas Crew 0 0 0
Sub-total 0 0 0 0 0
UNIT FEES & SALARIES. SUB-TOTAL 0 0 0 0 0
Preliminary Estimate for Fringes calculations (above the line):-
Pty.Ltd. Company Fees 100% 0
Taxed Individuals Salaries & ABN'ers 0% 0
Total Estimate for 'Above the Line' Crew Fringes Calculations: 0
Preliminary Estimate for Fringes calculations (below the line):-
Pty.Ltd. Company Fees 20% 0
Taxed Individuals Salaries & ABN'ers 80% 0
Allowances not included in C above ex K & M = 0
Per diems not included in C above ex N = 0
Total Estimate for 'Below the Line' Crew Fringes Calculations: 0
D FRINGES & WORKERS COMPENSATION
Australian State(s)/Territory ..........
Holiday Pay: 8.33%
Above Line (if taxed) 0 0
Crew 0 0
(Post prodn crew - in R) 0
Payroll Tax: 6.00% (State)
Above Line (if taxed) 0 0
Crew 0 0
Cast/Stunts 0 0
Extras 0 0
(Post prodn crew - in R)
Less Allowance/threshold… x shoot mths. 0
Superannuation:
Above Line (if taxed) 9% 0 0
Crew 9% 0 0
Cast/Stunts 10% 0 0
Extras est. (over $450pmth only) 10% 0 0
(Superannuation - Post prodn crew - in R)
Workers Compensation: 1.20% (State)
Above Line 0 0
Crew 0 0
(Post prodn crew - in R)
Cast/Stunts - Below Line 0 0
Extras 0 0
Fringe Benefits Tax 0
Sub-total 0 0 0 0 0
E(b) CAST & CASTING (pls State what agreements you are using…………………………………………………….)
Casting - Australia
Casting Fees 0 0 0
Audition costs 0 0 0
Cast - Principals shoot days 0 0 0
Preprodn.incl Rehearsals,W/D,M/U 0 0 0
AFC Budget-221046233.xls.ms_office-4/7/2014 Page 7/18
BUDGET as at 4/7/2014
PRE-PRODN. SHOOT POST-PRODN. Sub-total
TOTAL
PRODUCTION
EXPENDITURE
Code Description Rate Wks Amount Wks Amount Wks Amount
" ..film title ... "
Cast - Supports shoot days 0 0 0
Preprodn.incl Rehearsals,W/D,M/U 0 0 0
Overtime 0 0 0
Stunts & Loadings 0 0 0
Extras 0 0 0
Extras Overtime 0 0 0 0
Presenter(s) (Australian) 0 0 0
Narrator(s) (Australian) 0 0
Voicing & Revoicing Artist(s) 0 0
Sub-total 0 0 0 0 0
CAST & CASTING - SUB-TOTAL 0
F.1 COSTUMES (DRAMA)
Costumes - Hire 0 0 0
Costumes - Purchases 0 0 0
Cleaning & Repairs 0 0
Sub-total 0 0 0 0 0
F.2 MAKE-UP & HAIRDRESSING (DRAMA)
Make-up & Hair Supplies 0 0 0
SFX makeup 0 0 0
Sub-total 0 0 0 0 0
G.1 LOCATIONS
Permits, Rentals, Fees: Australia 0 0 0
Permits, Rentals, Fees: Overseas 0 0 0
Council Fees 0 0 0
Location Expenses: Australia 0 0 0
Location Expenses: Overseas 0 0 0
(Electricity, phone, cleaning) 0 0 0
Security: Australia 0 0 0
Gratuities 0 0 0
Sub-total 0 0 0 0 0
G.2 STUDIO/STAGE RENTALS
Studio Rental: Build/Strike 0 0
Studio Rental: Shoot 0 0
Studio Expenses 0 0
(Electricity, phone, cleaning, security) 0 0
Sub-total 0 0 0 0 0
H. SETS & PROPERTIES
H.1 CONSTRUCTION (DRAMA)
Set Construction 0 0 0
Freight & Cartage 0 0 0 0
Sub-total 0 0 0 0 0
H.2 PROPS & SET DRESSING (DRAMA)
Props & Set Dressing 0 0 0
Standby Props Truck & Equipment 0 0 0
Sub-total 0 0 0 0 0
H.3 ACTION PROPS & VEHICLES
Action Vehicles 0 0 0 0
Action Boats, safety boats etc 0 0 0 0
Towing, Freight & Transport 0 0 0 0
Sub-total 0 0 0 0 0
H.4 LIVESTOCK
Animal Hire 0 0 0 0
Saddlery, Carriages etc 0 0 0 0
Stabling, Feed, Transport, 0 0 0 0
Vet Fees 0 0 0 0
Sub-total 0 0 0 0 0
H.5 SPECIAL EFFECTS & ARMOURY
Sp. Fx. Expendables 0 0 0 0
Equipment - Hire 0 0 0 0
Weapons Hire 0 0 0 0
Weapons Expendables 0 0 0 0
Permits 0 0 0 0
Sub-total 0 0 0 0 0
H.6 VISUAL EFFECTS - Shoot Only
DETAILED QUOTE REQUIRED - PLEASE ATTACH
Equipment - Hire 0 0 0 0
Equipment - Purchase 0 0 0 0
Sundry Expenses 0 0 0 0
Sub-total 0 0 0 0 0
H.7 ANIMATION & PUPPETRY- Shoot Only
DETAILED QUOTE REQUIRED - PLEASE ATTACH
Equipment - Hire 0 0 0 0
Equipment - Purchase 0 0 0 0
Sundry Expenses 0 0 0 0
Sub-total 0 0 0 0 0
SETS & PROPS - SUB-TOTAL 0
I. STOCK, PROCESSING AND TRANSFERS
Use Section I.a for film stock & processing
Use Section I.b for tape/HD stock & processing
AFC Budget-221046233.xls.ms_office-4/7/2014 Page 8/18
BUDGET as at 4/7/2014
PRE-PRODN. SHOOT POST-PRODN. Sub-total
TOTAL
PRODUCTION
EXPENDITURE
Code Description Rate Wks Amount Wks Amount Wks Amount
" ..film title ... "
I.a STOCK, PROCESSING AND TRANSFERS - FILM & LAB - Shooting
Main Shooting Stock ( ) Programme Length ( ) Ratio ( :1)
Stock: Rate Footage/Hrs/Rolls
Neg. stock - tests p.ft 0 0
Neg. Stock p.ft 0 0
Processing:
Developing p.ft 0 0
Printing p.ft 0 0
Clock Leaders for telecine ea. 0 0
Transfers:
Telecine Transfer to Master p. 0 0
Telecine Stock p. 0 0
Telecine dubs (editing/viewing) p. 0 0
Telecine Dub Stock (Editing, Viewing) p. 0 0
Sound:
Sound Stock (DAT/Minidisk/1/4") p. 0 0
Audio Transfers (Transcription, translation) p. 0 0
Sub-total 0 0 0 0 0
I.b STOCK, PROCESSING AND TRANSFERS - TAPE & HD
Main Shooting Stock ( ) Programme Length ( ) Ratio ( :1)
Rate
Video Stock (type... ) 0 0 0 0
Video Stock (type... ) 0 0 0 0
Video Stock (type... ) 0 0 0 0
Transfers:
Transfer Video Rushes (Editing, Viewing) 0 0 0 0
Video Rushes Stock (Editing, Viewing) 0 0 0 0
Sound:
Sound Stock (DAT/Minidisk/1/4") 0 0 0 0
Audio Transfers (Transcription, translation) 0 0 0 0
Sub-total 0 0 0 0 0
J. INSERTS, STILLS AND ARCHIVAL FOOTAGE
Archival Footage - Australia:
Research: footage libraries (p.hr) 0 0 0 0
Fees for viewing copies (p.item) 0 0 0 0
Transfers & Mastering (incl. stock) (p.roll) 0 0 0 0
Archive Copyright fees (p.sec) 0 0 0 0
Access fees 0 0 0 0
Stills Duplication (p.item) 0 0 0 0
Stills Rights & Access Fees (p.item) 0 0 0 0
Freight and couriers 0 0 0 0
Archival Footage - Overseas:
Research: footage libraries (p.hr) 0 0 0 0
Fees for viewing copies (p.item) 0 0 0 0
Transfers & Mastering (incl. stock) (p.roll) 0 0 0 0
Archive Copyright fees (p.sec) 0 0 0 0
Access fees 0 0 0 0
Stills Duplication (p.item) 0 0 0 0
Stills Rights & Access Fees (p.item) 0 0 0 0
Freight and couriers 0 0 0 0
Sub-total 0 0 0 0 0
K. EQUIPMENT & STORES
K.1 CAMERA EQUIPMENT & STORES
Camera Kit & Access. Main Camera 0 0
Camera Kit & Access. 2nd Camera 0 0
Monitor kit 0 0
Additional Camera Hires 0 0
Additional Lens Hires 0 0
Additional Access. Hires 0 0
Underwater/Aerial/Specialist Camera(s) 0 0
Steadicam 0 0
Expendables 0 0 0
Sub-total 0 0 0 0 0
K.2 SOUND EQUIPMENT & STORES
Sound Equipment 0 0
Sound Equipment - Additional 0 0
Sound Expendables 0 0 0
Sub-total 0 0 0 0 0
K.3 LIGHTING EQUIPMENT & STORES
Basic Equipment 0 0
Truck & Equipment 0 0
Equipment - Additional 0 0
Generator 0 0
Burn time/Bulb replacement 0 0
Expendables 0 0 0
Sub-total 0 0 0 0 0
K.4 GRIPS EQUIPMENT & STORES
Basic Equipment 0 0
Truck & Equipment 0 0
Equipment - Additional 0 0
Boat Hire 0 0
AFC Budget-221046233.xls.ms_office-4/7/2014 Page 9/18
BUDGET as at 4/7/2014
PRE-PRODN. SHOOT POST-PRODN. Sub-total
TOTAL
PRODUCTION
EXPENDITURE
Code Description Rate Wks Amount Wks Amount Wks Amount
" ..film title ... "
Diving Requirements 0 0
Helicopter/Aerial Hire 0 0
Helicopter Mount(s) 0 0
Cranes, Rigs, Towers 0 0
Expendables 0 0 0
Sub-total 0 0 0 0 0
K.5 UNIT FACILITIES & STORES
Miscellaneous Equipment 0 0
Miscellaneous Expenses 0 0
Walkie Talkies 0 0
Mobile Phone(s) 0 0 0
Satellite phone(s) 0 0 0
Location Recce Stills 0 0
Sub-total 0 0 0 0 0
K.6 SAFETY EQUIPMENT & STORES
Protective Clothing 0 0 0
Medical Fees 0 0 0
First Aid Supplies 0 0 0
Miscellaneous 0 0 0
Sub-total 0 0 0 0 0
EQUIP. & STORES SUB-TOTAL 0
L. RENTALS & STORAGE
Office Rent 0 0 0 0
Cleaning 0 0 0 0
Storage 0 0 0 0
Miscellaneous 0 0 0 0
Sub-total 0 0 0 0 0
M. TRAVEL & TRANSPORT
Location Survey(s)
Airfares 0 0
Vehicle Hire 0 0
Other Travel 0 0
Overseas Shoot(s)
Airfares - International 0 0
Vehicle Hire 0 0
Freight - Equipment 0 0
Freight - Other 0 0
Excess Baggage 0 0
Other Travel 0 0
Australian Shoot(s)
Airfares - Australia 0 0
Vehicle Hire 0 0
Freight - Equipment 0 0
Freight - Other 0 0
Contributor/Interviewee Travel: Australia
Airfares - Australia 0 0
Vehicle Hire 0 0
Contributor/Interviewee Travel: Overseas
Airfares 0 0
Vehicle Hire 0 0
Other travel costs: Australia
Excess Baggage 0 0
Vehicle Allowances 0 0 0
Kilometrage 0 0 0
Petrol/Oil/Diesel 0 0 0
Parking & Tolls 0 0 0
Vehicle Repairs 0 0 0
Taxis 0 0 0
Couriers 0 0 0
Porters & Tips 0 0 0
Rushes Courier 0 0 0
Miscellaneous 0 0 0
Other travel costs: Overseas
Vehicle Allowances 0 0 0
Kilometrage 0 0 0
Petrol/Oil/Diesel 0 0 0
Parking & Tolls 0 0 0
Vehicle Repairs 0 0 0
Taxis 0 0 0
Couriers 0 0 0
Porters & Tips 0 0 0
Carnet Fee(s) 0 0 0
Rushes Courier 0 0 0
Customs Duties/ Charges & Agency Fees 0 0 0
Visas & Departure Taxes 0 0 0
Miscellaneous 0 0 0
Sub-total 0 0 0 0 0
N. ACCOMMODATION, LIVING, CATERING
Location Survey(s) Australia
Accommodation 0 0
Per diems 0 0
Location Catering 0 0
Other 0 0
Overseas Shoot(s)
Accommodation 0 0
Per Diems to AustralianResidents 0 0
Per Diems to Foreign Nationals 0 0
Location Catering 0 0
AFC Budget-221046233.xls.ms_office-4/7/2014 Page 10/18
BUDGET as at 4/7/2014
PRE-PRODN. SHOOT POST-PRODN. Sub-total
TOTAL
PRODUCTION
EXPENDITURE
Code Description Rate Wks Amount Wks Amount Wks Amount
" ..film title ... "
Other 0 0
Australian Shoot(s)
Accommodation 0 0
Per Diems 0 0
Location Catering 0 0
Other 0 0
Contributor Costs: Australia
Accommodation 0 0
Per Diems 0 0
Other 0 0
Contributor Costs: Overseas
Accommodation 0 0
Per Diems 0 0
Other 0 0
Other travel costs
Camping Costs 0 0 0
Office Refreshments 0 0 0
Entertaining 0 0 0
Laundry 0 0 0
Miscellaneous 0 0 0
Sub-total 0 0 0 0 0
O. INSURANCES
PROVIDE FIRM ESTIMATE
Package Premiums (on $.......) 0 0
Film Producer's Indemnity 0 0
Negative Film Risk (Faulty Stock,Cameras,Processing) 0 0
Multi Risk - Props, Sets, Costumes 0 0
Multi Risk - Camera, Lighting, Equipment 0 0
Public Liability (on $......m) 0 0
Money 0 0
Extra Expense 0 0
Personal Accident 0 0 0
Travel Packages (No of people: .......) 0 0 0
Errors & Omissions 0 0 0 0
Deductibles 0 0 0 0
Sub-total 0 0 0 0 0
P. OFFICE EXPENSES
Furniture purchase/hire 0 0 0 0
Equipment purchase/hire 0 0 0 0
Computers & Software purchase/hire 0 0 0 0
Printing & Stationery 0 0 0 0
Postage 0 0 0 0
Telephones/Fax - Office 0 0 0 0
Telephones/Fax - Location 0 0 0 0
Mobile phones 0 0 0 0
Internet 0 0 0 0
Electricity 0 0 0 0
Office Supplies 0 0 0 0
Research Material 0 0 0 0
Miscellaneous 0 0 0 0
Sub-total 0 0 0 0 0
Q. OFFSHORE SHOOT
Sets, Props, Locations 0 0 0 0
Stock, Equipment 0
Rentals & Sundry Expenses 0
Sub-total 0 0 0 0 0
TOTAL PRODUCTION COSTS 0
POST-PRODUCTION COSTS:
R. POST-PRODUCTION CREW
Post-production Manager 0 0
Post-production Assistant 0 0
Editor 0 0
Assistant Editor 0 0
Sound Editor 0 0
Sound Edit Assistant 0 0
Researcher 0 0
Specialist Researcher(s) 0 0
Transcription 0 0
Translator 0 0
Narration Script Writer 0 0
Narration Script Editor 0 0
Overtime & Fringes:
Overtime & Loadings allowance 0
Preliminary Estimate for Fringes calculations (Post Production):-
Pty.Ltd. Company Fees 0% 0
Taxed Individuals Salaries & ABN'ers 100% 0
Allowances included in T = 0
Per diems included in T = 0
Total Estimate for 'Below the Line' Crew Fringes Calculations: 0
Holiday Pay 8.33% 0 0
Payroll Tax 6.00% (State) 0 0
Superannuation 9.00% 0 0
Workers Compensation 1.20% (State) 0 0
Sub-total 0 0 0 0 0
S POST-PRODN. RENTALS & OFFICE EXPENSES
Editing:
AFC Budget-221046233.xls.ms_office-4/7/2014 Page 11/18
BUDGET as at 4/7/2014
PRE-PRODN. SHOOT POST-PRODN. Sub-total
TOTAL
PRODUCTION
EXPENDITURE
Code Description Rate Wks Amount Wks Amount Wks Amount
" ..film title ... "
Editing Room - Picture 0 0 0
Editing Room - Sound 0 0 0
Editing Supplies (incl.Media Back-up,disks) 0 0 0
Additional Drive Hires 0 0 0
Additional Equipment Hires 0 0 0
Post-Prodn Office:
Office Rent - Post-Prodn. 0 0 0
Hire - Furniture & Equipment 0 0 0
Computer Hire & Software 0 0 0
Printing, Postage & Stationery 0 0 0
Telephone, Fax, Mobiles, Internet 0 0 0
Couriers 0 0 0
Office Supplies 0 0 0
Cleaning & Rubbish Removal 0 0 0
Film Vaults
Storage - Production Elements 0 0
Sub-total 0 0 0 0 0
T POST-PRODN. TRAVEL & ACCOMMODATION
Postproduction Travel - Australia
- Airfares 0 0
- Accommodatin 0 0
- Per Diems 0 0
- Ground transport 0 0
Postproduction Travel - Overseas
- Airfares 0 0
- Accommodatin 0 0
- Per Diems 0 0
- Ground transport 0 0
- Freight 0 0
Vehicle Hire 0 0
Petrol, Oil, Diesel 0 0
Parking & Tolls 0 0
Freight - Rushes/Neg. 0 0
Freight - Delivery Items 0 0
Taxis & Couriers 0 0
Post-production Catering 0 0
Miscellaneous 0 0
Sub-total 0 0 0 0 0
U.1 PICTURE POST-PRODUCTION (FINISHING ON TAPE)
Miscellaneous Video Transfers 0 0
Miscellaneous Video Stock 0 0
Titles and Graphics:
Titles 0 0
Graphics 0 0
Subtitles 0 0
Scanning/manipulating stills/artwork 0 0
Broadcast Master
Conform offline edit p.hr 0 0
Dubs - sound editors, composer p.hr 0 0
Tape Stock for sound dubs p.roll 0 0
Grade p.hr 0 0
Digital effects p.hr 0 0
Titles -artwork and design p.hr 0 0
Credit roll preparation p.hr 0 0
Mastering p.hr 0 0
Neg Spotting p.hr 0 0
Audio re-stripe p.hr 0 0
Tech Checks/Quality Assurance p.hr 0 0
Fnal Duplication p.hr 0 0
Stock p.roll 0 0
Reversioning costs
Conform offline edit p.hr 0 0
Grade p.hr 0 0
Mastering p.hr 0 0
Tech Checks/Quality Assurance p.hr 0 0
Fnal Duplication p.hr 0 0
Stock p.roll 0 0
DVD Extras 0 0
Sub-total 0 0 0 0 0
U.2 DIGITAL VISUAL EFFECTS
PLEASE SUBMIT WRITTEN QUOTE
Animation/CGI 0 0
Sub-total 0 0 0 0 0
V SOUND - POST PRODUCTION
Broadcast Master
Total package (if negotiated as such) allow 0 0
Sound Stock allow 0 0
Tracklay p.hr 0 0
Narration Recording p.hr 0 0
Mix p.hr 0 0
M&E p.hr 0 0
Restripe p.hr 0 0
Miscellaneous allow 0 0
Audio deliverables (Or see Worksheet 2) allow 0 0
Reversioning Costs
Narration Recording p.hr 0 0
Mix p,hr 0 0
M&E p,hr 0 0
Restripe p.hr 0 0
Audio deliverables (Or see Worksheet 2) allow 0 0
AFC Budget-221046233.xls.ms_office-4/7/2014 Page 12/18
BUDGET as at 4/7/2014
PRE-PRODN. SHOOT POST-PRODN. Sub-total
TOTAL
PRODUCTION
EXPENDITURE
Code Description Rate Wks Amount Wks Amount Wks Amount
" ..film title ... "
DVD Extras allow 0 0
Sub-total 0 0 0 0 0
W MUSIC
Commissioned Music 0 0 0 0
Fees - Composer/Director 0 0 0 0
Music Research 0 0 0 0
Music Supervisor/Co-ordinator 0 0 0 0
Fixer/Co-ordinator 0 0 0 0
Arranger 0 0 0 0
Orchestration & Copying 0 0 0 0
Musicians 0 0 0 0
Performers 0 0 0 0
Recording Expenses 0 0 0 0
- Theatre Hire 0 0 0 0
- Tape 0 0 0 0
- Equipment Hire/Transport 0 0 0 0
- Lessons/coaching 0 0 0 0
- Music Rehearsal 0 0 0 0
Laboratory Costs 0 0 0 0
Pre-prodn. Playback costs 0 0 0 0
T/C. Dubs & Equipment 0 0 0 0
Pre-existing Music - Australia Label
Rights and Clearances 0 0
Licence Fees: 0 0
Synchronisation- No of Units x Rate 0 0
Publishing - No. of Units x Rate 0 0
Royalties 0 0
Pre-existing Music - Overseas Label
Rights and Clearances 0 0
Licence Fees: 0 0
Synchronisation- No of Units x Rate 0 0
Publishing - No. of Units x Rate 0 0
Royalties 0 0
Sub-total 0 0 0 0 0
X.1 PUBLICITY & STILLS - PRODUCTION & POST PRODN.
Stills Camera 0 0 0
Stills Stock 0 0 0
Stills Processing 0 0 0
Prints (Or see Worksheet 2) 0 0 0
Electronic Press Kits 0 0 0
Sub-total 0 0 0 0 0
X.2 DELIVERY REQUIREMENTS Or see Worksheet 2
All Components (total from Worksheet 2) 0 0
Delivery Masters & Dubs - Prod Co(s) 0 0
Delivery Masters & Dubs - Broadcaster(s) 0 0
Delivery Masters & Dubs - Financing Bodie(s) 0 0
Post-Production Script 0 0
Music Cue Sheets 0 0
Freight - Delivery Items 0 0
Other Delivery Items 0 0
Sub-total 0 0 0 0 0
TOTAL POST-PRODUCTION COSTS 0
TOTAL 'BELOW THE LINE' COSTS 0
INDIRECT COSTS
Y LEGAL & BUSINESS
Audits: Investors 0 0 0 0
Co-Production 0 0 0 0
Rebate Application 0 0 0 0
Overseas 0 0 0 0
Tax Accountant 0 0 0 0
Rebate Application Costs 0 0 0 0
Interest 0 0 0 0
Bank Fees 0 0 0 0
Company Fees & Expenses 0 0 0 0
Stamp Duty 0 0 0 0
Exch. Rate Fluctuation Contingency 0 0 0 0
Financing Legal Fees & Expenses
- Australia 0 0 0 0
- Overseas 0 0 0 0
Production Legal Fees & Expenses
- Australia 0 0 0 0
- Overseas 0 0 0 0
Title Searches/Clearances 0 0 0 0
Sub-total 0 0 0 0 0
Z OVERHEADS
Production Company 0 0 0 0
Other 0 0 0 0
Sub-total 0 0 0 0 0
AFC Budget-221046233.xls.ms_office-4/7/2014 Page 13/18
BUDGET as at 4/7/2014
PRE-PRODN. SHOOT POST-PRODN. Sub-total
TOTAL
PRODUCTION
EXPENDITURE
Code Description Rate Wks Amount Wks Amount Wks Amount
" ..film title ... "
TOTAL INDIRECT COSTS 0
T O T A L A L L C A T E G O R I E S 0
COMPLETION GUARANTEE 0% of 0 = 0 0
CONTINGENCY 10% of 0 = 0 0 0
FINANCE
PROSPECTUS/OFFER DOC. 0 0
STATE AGENCY FEES 0 0
FILM FINANCE CORP. Admin & LegalAGENCY ADMIN & LEGAL FEES 0 0
MARKETING 0 0
PRODUCTION LEVIES
SPAA Production Levy 0.00% of 0 = 0 0
ASDA Production Levy 0.00% of 0 = 0 0
Sub-total production levies 0 0 0
T O T A L B U D G E T : 0
AFC Budget-221046233.xls.ms_office-4/7/2014 Page 14/18
BUDGET SUMMARY " ..film title ... "
as at: (insert date)
prepared by 0 Trf.from A-Z TOTALS
"ABOVE THE LINE" COSTS
A.1 STORY & SCRIPT Fees & Expenses 0
A.2 DEVELOPMENT Fees & Expenses 0 0
B.1 PRODUCERS Fees & Expenses 0
B.2 DIRECTORS Fees & Expenses 0 0
E(a) CAST-PRINCIPALS Fees & Expenses 0
TOTAL "ABOVE THE LINE" COSTS 0
"BELOW THE LINE" COSTS
PRODUCTION COSTS
C UNIT FEES & SALARIES
1 Production Management 0
2 Production Accountancy 0
3 Asst.Directors & Script Supervision 0
4 Camera Crew 0
5 Sound Crew 0
6 Lighting Crew 0
7 Grips Crew 0
8 Costume Crew (Drama) 0
9 Make-up Crew (Drama) 0
10 Hairdressing Crew (Drama) 0
11 Art Department Crew (Drama) 0
12 Action Vehicles Crew (Drama) 0
13 Livestock Crew (Drama) 0
14 Construction Crew (Drama) 0
15 Special Effects & Armoury Crew (Drama) 0
16 Visual Effects & Animation 0
17 Occupational Health & Safety Crew 0
18 Tuition & Technical Advisers 0
19 Second Unit Crew 0
20 Overseas Crew 0
24 Overtime & Loadings 0
TOTAL UNIT FEES AND SALARIES: 0
D FRINGES & WORKERS COMP - CREW/CAST 0
E(b) CAST & CASTING (DRAMA)
1 Casting Fees & Expenses 0
2 Principals 0
3 Supports 0
4 Standins & Doubles
5 Stunts 0
6 Extras 0
7 Narrator/Presenter 0 0
F.1 COSTUMES (DRAMA) 0
F.2 MAKE-UP & HAIRDRESSING (DRAMA) 0 0
G.1 LOCATIONS 0
G.2 STAGE RENTALS 0 0
H SETS & PROPERTIES (DRAMA)
H.1 Construction 0
H.2 Props & Set Dressing 0
H.3 Action Props & Vehicles 0
H.4 Livestock 0
H.5 Special Effects & Armoury 0
H.6 Visual Effects 0
H.7 Animation & Puppetry 0 0
I.a STOCK, PROCESSING AND TRANSFERS - FILM & LAB - Shooting 0
I.b STOCK, PROCESSING AND TRANSFERS - TAPE & HD 0
J INSERTS, STILLS AND ARCHIVAL FOOTAGE 0
K.1 EQUIPMENT & STORES Camera 0
K.2 Sound 0
K.3 Lighting 0
K.4 Grips 0
K.5 Unit Facilities 0
K.6 Safety 0 0
L RENTALS & STORAGE 0
M TRAVEL & TRANSPORT 0
N ACCOMMODATION, LIVING & CATERING 0
$Australian
221046233.xls.ms_office-Budget Summary-4/7/2014 Page 15/18
as at: (insert date)
prepared by 0 Trf.from A-Z TOTALS
$Australian
O INSURANCES 0
P OFFICE EXPENSES 0
Q OFFSHORE SHOOT 0
TOTAL PRODUCTION COSTS 0
POST-PRODUCTION COSTS
R POST-PRODUCTION CREW 0
S POST-PRODN. RENTALS & OFFICE EXPENSES 0
T POST-PRODN. TRAVEL & ACCOMMODATION 0
U.1 PICTURE POST PRODUCTION 0
U.2 DIGITAL VISUAL EFFECTS 0 0
V SOUND POST-PRODUCTION 0
W MUSIC 0
X.1 PUBLICITY & STILLS - PRODUCTION 0
X.2 DELIVERY REQUIREMENTS 0 0
TOTAL POST-PRODUCTION COSTS 0
TOTAL "BELOW THE LINE" COSTS 0
INDIRECT COSTS
Y LEGAL & BUSINESS 0
Z OVERHEADS 0
TOTAL INDIRECT COSTS 0
TOTAL ALL CATEGORIES 0
COMPLETION GUARANTEE 0
CONTINGENCY 0
MARKETING 0
FINANCE 0
PRODUCTION LEVIES 0
TOTAL BUDGET 0
221046233.xls.ms_office-Budget Summary-4/7/2014 Page 16/18
POSITION/Name TRIP DETAILS VEHICLES PER DIEMS
v3 Rate No Total $ Rate No Total $ Rate pd Days Rate pwk Wks Total $ Rate pd Days Rate pwk Wks Total $
Trf. To: M M N N
Location Survey
Producer 0.00 0.00 0.00 0.00
Director 0.00 0.00 0.00 0.00
Production Manager 0.00 0.00 0.00 0.00
Local Liason/Fixer 0.00 0.00 0.00 0.00
Government Minder 0.00 0.00 0.00 0.00
D. O. P. 0.00 0.00 0.00 0.00
Other 0.00 0.00 0.00 0.00
Sub-total: 0.00 0.00 0.00 0.00
Shoot Location 1
Director 0.00 0.00 0.00 0.00
Production Assistant 0.00 0.00 0.00 0.00
Local Liason/Fixer 0.00 0.00 0.00 0.00
Government Minder 0.00 0.00 0.00 0.00
Driver 0.00 0.00 0.00 0.00
D. O. P. 0.00 0.00 0.00 0.00
Camera Assistant 0.00 0.00 0.00 0.00
Specialist Camera Operator 0.00 0.00 0.00 0.00
Recordist 0.00 0.00 0.00 0.00
Other 0.00 0.00 0.00 0.00
Sub-total: 0.00 0.00 0.00 0.00
Shoot Location 2
Director 0.00 0.00 0.00 0.00
Production Assistant 0.00 0.00 0.00 0.00
Local Liason/Fixer 0.00 0.00 0.00 0.00
Government Minder 0.00 0.00 0.00 0.00
Driver 0.00 0.00 0.00 0.00
D. O. P. 0.00 0.00 0.00 0.00
Camera Assistant 0.00 0.00 0.00 0.00
Specialist Camera Operator 0.00 0.00 0.00 0.00
Recordist 0.00 0.00 0.00 0.00
Other 0.00 0.00 0.00 0.00
Sub-total: 0.00 0.00 0.00 0.00
Shoot Location 3
Director 0.00 0.00 0.00 0.00
Production Assistant 0.00 0.00 0.00 0.00
Local Liason/Fixer 0.00 0.00 0.00 0.00
Government Minder 0.00 0.00 0.00 0.00
Driver 0.00 0.00 0.00 0.00
D. O. P. 0.00 0.00 0.00 0.00
Camera Assistant 0.00 0.00 0.00 0.00
Specialist Camera Operator 0.00 0.00 0.00 0.00
Recordist 0.00 0.00 0.00 0.00
Other 0.00 0.00 0.00 0.00
Sub-total: 0.00 0.00 0.00 0.00
Other Travel
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
Sub-total: 0.00 0.00 0.00 0.00
1. TRAVEL & ACCOMMODATION SCHEDULE - TO BUDGET CATEGORIES M & N
AIRFARES/Other fares ACCOMMODATION or Allces
221046233.xls.ms_office-Travel.Accom-4/7/2014 Page 17/19
POSITION/Name TRIP DETAILS VEHICLES PER DIEMS
v3 Rate No Total $ Rate No Total $ Rate pd Days Rate pwk Wks Total $ Rate pd Days Rate pwk Wks Total $
Trf. To: M M N N
AIRFARES/Other fares ACCOMMODATION or Allces
TOTAL TRAVEL: 0.00 0.00 0.00 0.00
221046233.xls.ms_office-Travel.Accom-4/7/2014 Page 18/19
v3 Rate
Footage/
Hrs/Rolls Sub-Total TOTAL
FILM MATERIALS (if appliable)
Interpos p.ft 0.00
Interdupe p.ft 0.00
Release Print(s) p.ft 0.00
Trailer (if not in U.1 Lab-Editing)
Sub-Total 0.00 0.00
VIDEO MATERIALS
Distribution Dubs
Video Masters: No.of copies:
HD 16:9 (USA) p.tape 0.00
HD 16:9 (Europe & Australia) p.tape 0.00
HD 4x3 (USA) p.tape 0.00
HD 4x3 (Europe & Australia) p.tape 0.00
SD 16:9 (Digital Betacam NTSC) p.tape 0.00
SD 16:9 (Digital Betacam PAL) p.tape 0.00
SD 4x3 (Digital Betacam NTSC) p.tape 0.00
SD 4x3 (Digital Betacam PAL) p.tape 0.00
Stock Costs p.tape 0.00
Aspect Ratio Converter p.hr 0.00
Transfer Time p.hr 0.00
Sub-Total 0.00 0.00
Additional Dubs
VHS - PAL p.tape 0.00
U-Matic - PAL p.tape 0.00
VHS - NTSC 16:9 p.tape 0.00
VHS - NTSC 4x3 p.tape 0.00
U-Matic - NTSC p.tape 0.00
DVD - multiregion p.hr 0.00
Sub-Total 0.00 0.00
SOUND REQUIREMENTS
Copy of Final Mix 0.00
Copy M&E 0.00
Foreign language version(s) 0.00
0.00
Sub-Total 0.00 0.00
DVD COMPONENTS
Film 0.00
Trailer 0.00
EPK 0.00
Recreation of Deleted Scenes 0.00
Behind the Scenes Documentary 0.00
Commentary Track 0.00
Commentary Track - Artist Fee 0.00
Authoring and Glass Master 0.00
Captioning 0.00
Dubs as per agreement 0.00
2. DELIVERY REQUIREMENTS (& refer Category X.2 )
221046233.xls.ms_office-Delivery Requirements-4/7/2014 Page 18/18