Project Office C-PMSE • Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KGc-pmse.research-project.de • [email protected]
C-PMSE – Improving frequency utilization and coexistence for PMSE systems
b iti dby cognitive procedures
A System OverviewA System Overview
Dr. Radu Circa (Bosch),( ),Dr. Axel Schmidt (Sennheiser)
A research project in co-operationof industry and science
Publicly sponsored by
Contents
1 ) M ti ti d Obj ti1.) Motivation and Objectives2.) C-PMSE Architecture3.) Wireless Audio Link and Radio Link Manager
C-PMSE Project Office • c-pmse.research-project.de • [email protected] | Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG07.12.2011, Radu Circa, Axel Schmidt
2
Motivation
Digital dividend 1 reduces usable spectrum by 18%• Digital dividend 1 reduces usable spectrum by 18%
TV primary PMSE secondaryGMS/UMTS/LTE
UL DL
f [MHz]
TV primary, PMSE secondary UL DL
470 862790 880 915 925 960694502
Future Mobile Communication( i )
Digital Dividend 1
• Remaining spectrum becomes open for new services like e g white space
(primary user)
Remaining spectrum becomes open for new services like e. g. white space devices (WSD) => coexistence with new secondary services
C-PMSE Project Office • c-pmse.research-project.de • [email protected] | Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG07.12.2011, Radu Circa, Axel Schmidt
3
Motivation
C i ti S i i UHF 470MH 790MHCoexisting Services in UHF 470MHz – 790MHz• Broadcasting
• DVB-T / T2DVB T / T2• DVB-H
PMSE• PMSE
• Communications• IEEE 802.22 (CR based WRAN PHY / MAC for use by license-exempt devices in TV
white spaces, coverage range < 100km)• ECMA-392 (CR based WLAN MAC / PHY for operation in TV white spaces)• IEEE 802.11af (WiFi in TV white spaces)• 3GPP LTE Advanced (Femtocells in UHF)
C-PMSE Project Office • c-pmse.research-project.de • [email protected] | Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG07.12.2011, Radu Circa, Axel Schmidt
4
Motivation
N Sit ti f PMSENew Situation for PMSE• Less remaining useable spectrum
DVB-H470MHz 790MHz 862MHz
DVB-T
LTE-A
WSD
since 2011
LTE
remaining UHF spectrum
• New coexisting services with dynamic frequency allocationHigh potential of interfering with new TV band services due to their lower
since 2011remaining UHF spectrum
• High potential of interfering with new TV band services due to their lower sensing sensitivity
• BUT no acceptance of audible interferences (even very short ones)
C-PMSE Project Office • c-pmse.research-project.de • [email protected] | Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG07.12.2011, Radu Circa, Axel Schmidt
5
Objectives
G t f th ll ti li bilit f PMSEGuarantee of the well-proven operating reliability of PMSE
De elopment of a cogniti e s stem demonstratorDevelopment of a cognitive system demonstrator• Platform for testing cognitive algorithms • Platform for testing cognitive hardwarePlatform for testing cognitive hardware• Development of low cost sensing device• Delivering measurement results to ETSI STF 386
C-PMSE Project Office • c-pmse.research-project.de • [email protected] | Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG07.12.2011, Radu Circa, Axel Schmidt
6
C-PMSE Fundamentals
Content planeBase Station
Mobile Terminal
Link QualityIndicator
Local Portofolio Manager
Control plane
Radio LinkCognitiveScanning Radio Link Manager
CognitiveMaster
Scanning System
Service LevelAgreements
C-PMSE Project Office • c-pmse.research-project.de • [email protected] | Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG07.12.2011, Radu Circa, Axel Schmidt
7
System Architecture
Scanning System
Radio Link Manager
CognitiveMaster
C-PMSE Project Office • c-pmse.research-project.de • [email protected] | Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG07.12.2011, Radu Circa, Axel Schmidt
8
The Radio Part
T i bl kTwo main blocks• Radio link manager (RLM)• Wireless audio linksWireless audio links
C-PMSE Project Office • c-pmse.research-project.de • [email protected] | Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG07.12.2011, Radu Circa, Axel Schmidt
9
Radio Link Manager
F ti l bl k f i i l di li kFunctional block for managing wireless audio links
C-PMSE Project Office • c-pmse.research-project.de • [email protected] | Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG07.12.2011, Radu Circa, Axel Schmidt
10
Wireless Audio Links
T diti l FM li k f hi h lit l l t di t i iTraditional FM link for high quality low latency audio transmission• Additional wireless remote channel• Measurement fixture forMeasurement fixture for
monitoring transmission quality
C-PMSE Project Office • c-pmse.research-project.de • [email protected] | Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG07.12.2011, Radu Circa, Axel Schmidt
11
Radio Link Manager
St t UStart Up
C-PMSE Project Office • c-pmse.research-project.de • [email protected] | Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG07.12.2011, Radu Circa, Axel Schmidt
12
Radio Link Manager
St t U ( t )Start Up (cont.)
C-PMSE Project Office • c-pmse.research-project.de • [email protected] | Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG07.12.2011, Radu Circa, Axel Schmidt
13
Radio Link Manager
St t U ( t )Start Up (cont.)
C-PMSE Project Office • c-pmse.research-project.de • [email protected] | Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG07.12.2011, Radu Circa, Axel Schmidt
14
Radio Link Manager
O tiOperation
Panic casePanic case
C-PMSE Project Office • c-pmse.research-project.de • [email protected] | Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG07.12.2011, Radu Circa, Axel Schmidt
15
Radio Link Manager
O tiOperation
User trigger caseUser trigger case
C-PMSE Project Office • c-pmse.research-project.de • [email protected] | Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG07.12.2011, Radu Circa, Axel Schmidt
16
Radio Link Manager
O ti tiOperation proactive case
Proactive caseProactive case
C-PMSE Project Office • c-pmse.research-project.de • [email protected] | Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG07.12.2011, Radu Circa, Axel Schmidt
17
Conclusion
New situation in spectrum occupancy and usage in UHF band• New situation in spectrum occupancy and usage in UHF band• New temporary broadband services like ECMA-392, LTE-Advanced, …• New services provided with a mechanism to reduce/avoid collisions with PMSE • No protection against audible interference for state-of-the-art PMSE devices
• PMSE become cognitive to increase operating robustnessg p g• New functionalities:
• LQI measurement• Remote control channel for control of mobile terminals during operationRemote control channel for control of mobile terminals during operation
• Panic reaction triggered by LQI decrease• Proactive reaction triggered by environment changes
• Additional scanning system to support proactive case• Increase of interference detection probability• Partitioning of operation area into several scanning clusters
C-PMSE Project Office • c-pmse.research-project.de • [email protected] | Robert Bosch GmbH | Sennheiser electronic GmbH & Co. KG07.12.2011, Radu Circa, Axel Schmidt
18