A Successful History of a Divided Wet Well Solution

Brian Casey, P.E. – Carollo Engineers Shawn Clark, P.E. – APSCO LLC Richard Johnson – City of Albany Chip Ullstad – Carollo Engineers

Car

ollo

Blu

eTem

plat

eWith

Logo

.ppt

x

2

Presentation Agenda

•  Project background •  Influent pump station design modifications •  Pump station physical modeling •  Construction of pump station modifications •  Pump station cleaning •  Maintenance and operation results •  Lessons learned

Car

ollo

Blu

eTem

plat

eWith

Logo

.ppt

x

3

Project goals included regulatory requirements and design preferences

•  Improve system reliability •  Reduce SSOs by 2012 •  Increase capacity from 29 to 68 mgd without

compromising dry weather flows •  Maintain free water surface below crown of

influent pipe •  Address maintenance issues

–  Low flow + wide wet well = solids accumulation

Car

ollo

Blu

eTem

plat

eWith

Logo

.ppt

x

4

The wet well layout was large and inefficient, particularly for low flows

Influent Flow

Low flow pumps High flow pumps

Car

ollo

Blu

eTem

plat

eWith

Logo

.ppt

x

5

The trash rack protected pumps but caused maintenance issues

Ground surface

Trash rack

72” influent pipe

Shallow slope does not direct solids to pumps

Car

ollo

Blu

eTem

plat

eWith

Logo

.ppt

x

6

Existing pumps had extended shafts to the motor floor only

Ground floor

Motor floor

Pump floor