A Successful History of a Divided Wet Well Solution
Brian Casey, P.E. – Carollo Engineers Shawn Clark, P.E. – APSCO LLC Richard Johnson – City of Albany Chip Ullstad – Carollo Engineers
Car
ollo
Blu
eTem
plat
eWith
Logo
.ppt
x
2
Presentation Agenda
• Project background • Influent pump station design modifications • Pump station physical modeling • Construction of pump station modifications • Pump station cleaning • Maintenance and operation results • Lessons learned
Car
ollo
Blu
eTem
plat
eWith
Logo
.ppt
x
3
Project goals included regulatory requirements and design preferences
• Improve system reliability • Reduce SSOs by 2012 • Increase capacity from 29 to 68 mgd without
compromising dry weather flows • Maintain free water surface below crown of
influent pipe • Address maintenance issues
– Low flow + wide wet well = solids accumulation
Car
ollo
Blu
eTem
plat
eWith
Logo
.ppt
x
4
The wet well layout was large and inefficient, particularly for low flows
Influent Flow
Low flow pumps High flow pumps
Car
ollo
Blu
eTem
plat
eWith
Logo
.ppt
x
5
The trash rack protected pumps but caused maintenance issues
Ground surface
Trash rack
72” influent pipe
Shallow slope does not direct solids to pumps