42
A Structural Assessment Of The Non-Traditional Tarran Houses Owned By Rotherham Metropolitan Borough Council In Maltby, Rotherham For Rotherham Metropolitan Borough Council Civic Building Walker Place Rotherham S65 1UF By Curtins Consulting Engineers 5 Woodside Mews Clayton Wood Close North Leeds Ring Road Leeds LS16 6QE Tel : 0113 274 8509 Fax : 0131 274 8496 28560/NP December 2004

A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix

A Structural Assessment Of The Non-Traditional Tarran Houses

Owned By Rotherham Metropolitan Borough Council In Maltby, Rotherham

For

Rotherham Metropolitan Borough Council Civic Building Walker Place

Rotherham S65 1UF

By

Curtins Consulting Engineers 5 Woodside Mews

Clayton Wood Close North Leeds Ring Road

Leeds LS16 6QE

Tel : 0113 274 8509 Fax : 0131 274 8496

28560/NP December 2004

Page 2: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix

A Structural Assessment Of

The Non-Traditional Tarran Houses In Maltby, Rotherham

For Rotherham Metropolitan Borough Council

Issue Record Copy No: 1 No of other copies excluding this copy Prepared By: Neil Parkinson BEng (Hons) CEng MIStructE …………………………………………………… Authorised By: Ray Anderson CEng MICE FIStructE FConsE MAPM MAE …………………………………………………… Date: December 2004 Amendment Record

Date Description of Amendments Comments

23.12.04 N/a Draft Issue 1

06.01.05 Costs updated, appendices added & structural details added Draft Issue 2

28.01.05 Privately owned property numbers amended Draft Issue 3

18.02.05 Final Issue Final Issue

Page 3: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix

CONTENTS 1.0 Introduction To The Investigation 2.0 Investigation Strategy 3.0 Description Of Construction 4.0 Investigation Findings 5.0 Recommendations 6.0 Decent Homes Standard 7.0 Budget Costs For Repair Scheme 8.0 Conclusions Appendix A Maltby Estate Site Layout Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix D Laboratory Analysis Results Appendix E Linear Polarisation Corrosion Rate Monitoring Report Prepared by

Messrs BGB

Page 4: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix

Curtins Consulting Engineers Page 1 Rotherham Metropolitan Borough Council December 2004

A Structural Assessment of the Non Traditional Tarran Houses in Maltby, Rotherham

1.0 INTRODUCTION TO THE INVESTIGATION Curtins Consulting Engineers were commissioned by Rotherham Metropolitan Borough Council on 1st December 2004, to undertake investigations of the council owned Tarran properties located in Maltby. These investigations involved a combination of visual inspections and intrusive exploratory works in order to assess the current structural condition of the properties. In addition to the investigations described above, consideration has also been given to the previously undertaken condition survey together with the comments made by The Audit Commission. On this basis, costs and recommendations have been prepared in respect to the following alternative options.

a) Identify repair and upgrade works required for the properties to achieve full mortgageability status.

b) Also identify alternative repair schemes to achieve a limited form of mortgageable status. (A limited number of building societies are prepared to offer mortgages on properties with a life span of approximately 30 years.)

c) Identify repair and upgrade works required to ensure a life span of 30 years and satisfy the requirements of the Decent Homes Standard.

It is understood that there are 86 Tarran properties on the estate, 70 of which remain in the ownership of Rotherham Metropolitan Borough Council. The estate layout is shown in Appendix A.

Page 5: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix

Curtins Consulting Engineers Page 2 Rotherham Metropolitan Borough Council December 2004

A Structural Assessment of the Non Traditional Tarran Houses in Maltby, Rotherham

2.0 INVESTIGATION STRATEGY 2.1 Background A previous assessment of the condition of these properties was undertaken in February 2004, making recommendations on their future lifespan and need for repair. The report suggested that the external PRC structure should be removed and replaced with a new insulated cavity wall on extended foundations. The purpose of this supplementary investigation is to undertake a more extensive and representative sampling pattern consisting of external visual surveys of all properties combined with intrusive surveys of void properties. 2.2 Methodology The table below lists the properties where intrusive surveys were undertaken. Street Property Nos

Braithwell Road 59, 61, 63, 65, 69, 71, 73, 75, 77, 81, 83, 85, 87, 91, 93, 95, 97

Chadwick Drive 1, 3, 4, 5, 7, 8, 9

Newlands Avenue 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 14, 15, 16, 17, 19, 21, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 55, 57, 59

The properties where inspections were undertaken as part of this assessment are highlighted in bold italics. The site layout shown in Appendix A indicates the location of the council properties on the estate. In all instances, intrusive investigations were undertaken within void properties to minimise disruption to tenants. The present risk assessment is confined to consideration of the principal structural elements. The condition of non structural elements, such as doors, windows, guttering, rainwater goods, canopies, outbuildings and external fixtures and fittings, together with gas, water and electrical services, central heating, flues, bathroom and kitchen fittings and internal decorations are all excluded from consideration. Opening up work to expose hidden elements was carried out in those areas considered most likely to be suffering from degradation or deterioration. The results obtained are used as the basis of the recommendations and are given as being representative of the stock as a whole. However, as the entire structural fabric of every building cannot be inspected, there is no guarantee that the worst or most aggressive areas of degradation have been identified. Whilst sub-soil investigations were excluded from the investigations, small trial pits were dug to assess the size and form of the existing strip footings. Moreover, evidence of structural movement associated with foundation instability was recorded during the visual inspections, if present. Whilst many of the foundation solutions adopted at the time of construction would

Page 6: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix

Curtins Consulting Engineers Page 3 Rotherham Metropolitan Borough Council December 2004

A Structural Assessment of the Non Traditional Tarran Houses in Maltby, Rotherham

not comply with current standards, it is most likely that any settlement due to inadequate foundation size or depth would have already occurred. However, this does not exclude the potential risk of future movement, for example, as a result of flooding or drainage failure. The structural risk assessments exclude items of a geotechnical and environmental nature. No testing for asbestos has been carried out during the preparation of this report, nor any assessment, comment or testing for levels of toxic mould. 2.3 Background to Corrosion of Concrete in PRC Deterioration associated with reinforced concrete elements relates to corrosion of the steel reinforcement and degradation of the concrete matrix either independently or as a result of the steel corrosion. Concrete is inherently alkaline and this alkalinity protects the encased steel reinforcement from corrosion. However, the protection can be reduced by the action of acidic gases present in the air (such as carbon dioxide and sulphur dioxide). This process is called carbonation. If the depth of carbonation is greater than the concrete cover surrounding the reinforcement steel, the risk of reinforcement corrosion increases, reducing the integrity of the concrete and leading to a reduction in structural capacity. The corrosion process can be exacerbated by the presence of high levels of chloride ion in the concrete. This was sometimes used during the construction process. The following characteristics need to be assessed in order to determine the structural condition and future durability of the concrete.

• Chloride Content • Cement Content • Carbonation Depth • Cover to Reinforcement

2.3.1 Chloride Content

The chloride content of concrete is measured by potentiometric titratiun in accordance with BS1881: Pt 124; 1998. A concrete dust sample is obtained by drilling a unit and collecting the material for analysis.

In total 132 concrete samples were taken. 2.3.2 Cement Content The dust samples are tested under laboratory conditions to establish the percentage of cement by weight of concrete dust. This can then be used to express the chloride ion content as a percentage by weight of cement.

Page 7: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix

Curtins Consulting Engineers Page 4 Rotherham Metropolitan Borough Council December 2004

A Structural Assessment of the Non Traditional Tarran Houses in Maltby, Rotherham

2.3.3 Carbonation Depth The depth of carbonation in concrete is determined by spraying the surface of the drilled hole with Phenolphthalein indicator. This liquid turns uncarbonated concrete purple, such that the colourless zone can be measured to determine the carbonation depth. 2.3.4 Cover to Reinforcement Electronic cover meters can be highly inaccurate especially when determining cover in relatively thin units that may be held in position with ferrous metal nails / screws. For this reason cover was established through opening up of the units and drilled holes. 2.3.5 Linear Polarisation Corrosion Rate Monitoring (LPCRM) Curtins experience indicates that whilst high levels of chloride ion may be present in a concrete element, the rate of corrosion may not necessarily be high. Projections of remaining component life span using only the levels of chloride ion can therefore give pessimistic (i.e. short) results. A more specialist testing approach can be undertaken, which measures the actual rate at which the reinforcement is corroding. This allows a more targeted assessment of the future performance of the structure to be assessed.

Page 8: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix

Curtins Consulting Engineers Page 5 Rotherham Metropolitan Borough Council December 2004

A Structural Assessment of the Non Traditional Tarran Houses in Maltby, Rotherham

3.0 DESCRIPTION OF ORIGINAL CONSTRUCTION 3.1 General Robert Greenwood Tarran, a building contractor in Hull in the 1930’s, developed a modular building system of storey height concrete wall panels, which was adopted by the government in 1944 for use as temporary houses. Subsequently, the design was developed into a number of variants, including the Tarran Newland. Whilst the properties in Maltby are classified as Tarran houses, they should not be confused with one of the many variants developed by Tarran. The Tarran Newland system is classified as defective by Part XVI of the Housing Act of 1985. 3.2 Structural Form

The Newland system of construction comprises precast reinforced concrete storey-height tray-shaped panels, which are joined by precast reinforced concrete columns at corners and party walls. Steel channel floor units are bolted together to form a continuous steel ring beam. The panels and corner columns are clamped together and are located at ground level on precast reinforced concrete kerb units. At first floor level the steel channel ring beam is fixed to the upper and lower storey wall panels with hook bolts. Timber bearing plates are sandwiched between the ring beam and wall panels. The vertical joints between wall components are caulked internally and mortar pointed externally.

At eaves level a timber wall plate is bolted to the panels. The roof is a steel truss design constructed from steel angles. It is fixed down to the timber wall plate and is clad with profiled asbestos cement tiles. At first floor, the prefabricated steel-channel floor units span from the front and rear walls to the centre of the house where they are supported on tubular steel columns. Where the steel channels of the floor units abut other units, (ie. at the centre of the house over the support wall and at junctions between adjacent units) the back-to-back channels are bolted together

Page 9: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix

Curtins Consulting Engineers Page 6 Rotherham Metropolitan Borough Council December 2004

A Structural Assessment of the Non Traditional Tarran Houses in Maltby, Rotherham

to form an “I” section. The floor therefore comprises a complete steel grillage with the periphery channels forming the ring beam for the external walls. 3.3 Overall Stability The construction of a pair of Newland semi-detached houses is unusual insofar as two separate concrete box structures are formed by clamping together adjacent panels, which are additionally connected by the steel ring beam at first floor level and a wall plate at roof level. The stability of each house therefore relies upon the wall units remaining connected and forming a box, which will carry the vertical loading and withstand horizontal forces. The steel grillage provided at first-floor level provides an effective diaphragm which should eliminate the possibility of local lateral failure of the walls, and will distribute vertical loads onto adjacent wall panels should individual panels become weakened by reinforcement corrosion.

3.4 Corner Columns The storey-height columns are reinforced with stirrups and four ¼ in. (6mm) diameter steel rods. Holes are cast in the columns to take the fixing dowels from the panels. The columns share the vertical loading with the panels but their prime function is to tie the corner wall panels together providing continuity to the external wall. If deterioration of the post occurs such that the continuity of the concrete box is lost, the steel ring beam at first-floor level and the wall plate at eaves level should prevent immediate further damage.

3.5 Panels The reinforced panels are of a thin section and corrosion of the steel resulting in spalling and disruption of the panel will reduce its load-bearing capacity. Disruption of the concrete between the clamping members of the fixing could put the fixing under strain or if the concrete fails, the fixity could be lost. 3.6 Kerbs The precast reinforced concrete kerbs provide support and location for the wall units. Disruption due to corrosion of the reinforcing steel could result in lifting or dropping of panels putting increased load on the fixings and causing distortion of the ring beam.

Page 10: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix

Curtins Consulting Engineers Page 7 Rotherham Metropolitan Borough Council December 2004

A Structural Assessment of the Non Traditional Tarran Houses in Maltby, Rotherham

4.0 INVESTIGATION FINDINGS 4.1 Concrete Generally the concrete elements were found to be in reasonable condition on all properties. Carbonation tests and reinforcement cover depth checks were undertaken on the concrete elements at each property. This revealed that the average depth of carbonation is between 0 – 10mm and is not greater than 15mm in any of the elements tested. This is not considered to be excessive, particularly given the age of the structure and suggests that the concrete is particularly dense. However, the cover to the reinforcement in a number of the existing concrete columns is particularly low and it is therefore considered that the carbonation front is at, or approaching the embedded reinforcement in a number of locations. Consequently, a number of the existing columns, particularly corner columns, were observed to be spalling as a result of corrosion of the embedded reinforcement. This corrosion has occurred as a result of the carbonation front reaching the reinforcement and it is considered that an increasing amount of reinforcement corrosion will occur with time, if appropriate repair works are not undertaken. The analysis on the samples retrieved from the reinforced concrete elements found that the chloride ion content varied between 0.6% and 1.1% as a percentage of the total cement content, with an average content of 0.75%.

In accordance with the Building Research Establishment (BRE) Digest 444 Part 2, it is possible to assess the risk category of corrosion to reinforcement, which is dependent upon chloride content, carbonation depth, environment and concrete cover (Figure 4 in BRE Digest 444 Part 2 refers). In this instance, an average chloride content by weight of cement less than 0.6% is not considered to pose a significant risk of corrosion of the reinforcement. Chloride levels up to 1.0% can be tolerated, providing the concrete remains dry. It is therefore considered that the levels of chlorides recorded do not present a significant risk of corrosion of the reinforcement.

On the basis of the above, it is considered that deterioration of the concrete frame is attributable to a combination of the reinforcement being displaced or poorly placed during the original construction and variability of the concrete mix. As a consequence of the reduction in the alkalinity of the concrete through carbonation, corrosion of the embedded reinforcement has begun. The present state of corrosion is not considered sufficient to materially affect the overall stability of the structures providing steps are taken to stabilise the environment surrounding the PRC components.

Page 11: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix

Curtins Consulting Engineers Page 8 Rotherham Metropolitan Borough Council December 2004

A Structural Assessment of the Non Traditional Tarran Houses in Maltby, Rotherham

4.2 Trial Pit Excavations Trial pits were excavated to expose the foundations at four properties to establish their depth, dimensions and condition, together with condition of the underlying strata. The excavations at 5 Chadwick Drive indicate that the foundation is approximately 150mm deep and the formation level is approximately 400mm below ground level. The remaining excavations at 6 Newlands Avenue, 7 Newlands Avenue and 85 Braithwell Road indicate that the external walls are built off the existing rock strata. The British Geological map sheet 100 indicates that the underlying stratum is the Lower Magnesian Limestone overlain by boulder clay. 4.3 Linear Polarisation Corrosion Rate Monitoring (LPCRM) Linear Polarisation was undertaken in three locations on all void properties listed in Section 2.2, namely the corner post, lintel and wall panel. The tests indicated that the embedded reinforcement is in reasonable condition and that the rate of corrosion is in the region of 0.1mm per year, which is considered to be low. Where the concrete cover is particularly low and corrosion of the reinforcement is currently ongoing, it is not practical to measure the rate at which corrosion is occurring. The full LPCRM report provides full details of the tests undertaken on site and can be found in the appendices of this report.

Page 12: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix

Curtins Consulting Engineers Page 9 Rotherham Metropolitan Borough Council December 2004

A Structural Assessment of the Non Traditional Tarran Houses in Maltby, Rotherham

5.0 RECOMMENDATIONS

5.1 Present Condition These investigations indicate that the properties have remained in a safe structural condition to date. Evidence of concrete spalling and reinforcement corrosion is apparent to some corner posts and wall panels. This is considered to be attributable to a combination of the reinforcement being displaced or poorly placed during the original construction and variability of the concrete mix. Further investigations of the embedded reinforcement suggest that the rate of corrosion is low. Therefore, providing the concrete is kept dry, the structure should continue to perform adequately if they are to be retained. Foundations exposed during the investigations do not meet current standards with respect to depth, width and quality of concrete. In some instances, the external walls are built directly off the existing rock strata. However, they appear to have performed adequately to date without showing signs of differential settlement. Continued long term performance cannot be guaranteed as they could be affected by flooding, drainage failure or by the addition of extra load from a change in wall construction. There are localised, non structural defects that any refurbishment works should address. These include localised deterioration of timber fascias, window units, door frames and rain water goods. On the basis of the investigations undertaken, it is considered that the properties are in reasonable condition but have begun to deteriorate. Whilst the test results indicate that the concrete is in reasonable condition, it is clear that there are a number of areas where poor quality construction techniques could cause further reinforcement corrosion. Consequently, it is considered that as further moisture ingress occurs, so the number of instances of reinforcement corrosion will occur. It is therefore not possible to guarantee the future performance of these properties without undertaking repair works. 5.2 Recommended Repairs Based on the results of these investigations it is considered that providing the concrete is kept dry, these properties will continue to provide a safe structural life for a further 30 years. However, there are a number of options for increasing the useful life of these properties, depending upon the level of repair required. 5.2.1 Full Mortgageability The nature of the existing construction is such that none of the major lending institutions will provide a mortgage on these properties in their original condition. In order to obtain full mortgageability on these properties, it is necessary to undertake a PRC licenced repair scheme, such as PRC Licence Repair Scheme 081, designed specifically for the repair of Tarran houses and intended to attract the widest range of mortgage providers.

Page 13: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix

Curtins Consulting Engineers Page 10 Rotherham Metropolitan Borough Council December 2004

A Structural Assessment of the Non Traditional Tarran Houses in Maltby, Rotherham

Typically, these schemes involve the removal of the existing PRC frame, which is replaced with a traditional cavity wall construction, thereby guaranteeing a future life in excess of 50 – 60 years. Whilst these repair works will ensure a future life of the properties in excess of 50 – 60 years, they are reasonably complex and dictate that alterations are undertaken to existing drains, foundations, rainwater goods and services. It is usually necessary for tenants to be relocated temporarily during such extensive works. 5.2.2 Alternative Mortgageable Repairs Rather than undertake a full PRC licenced repair scheme, it is possible to achieve a more limited mortgageable status by adopting a reduced repair specification. Curtins Consulting, together with panel of three consulting engineering practices, prepared the Non Traditional Homes Appraisal Scheme (NTHAS), in conjunction with some of the major lending institutions. This aimed to repair non-traditional properties in an appropriate and cost effective manner, by considering the current condition of the property. Generally, NTHAS involves extensive testing of the existing concrete to verify its condition and implement appropriate repair works. A statistical analysis of the results is undertaken to ensure that a 95% confidence level can be guaranteed. These results are then compared with the five pre-determined repair categories designed to achieve a minimum 30 year life expectancy. From the results of these investigations, the properties fall into NTHAS Category 4, which dictates that the PRC elements should be removed, in a similar fashion to the repair scheme described in Section 5.2.1 above. It is therefore considered that an NTHAS repair solution offers no benefit in this instance. Whilst the PRC Licenced Repair Scheme and NTHAS are generally recognised as mortgageable repairs, some lenders are now willing to provide limited mortgages on overcladding schemes that retain the existing PRC elements. Basically, the scheme requires that a bespoke repair solution is developed and offered to CU2000 Insurance Providers, to ensure that they are satisfied with the proposed repair scheme. Providing the repair scheme is approved, a CU2000 insurance policy is granted on the scheme in a similar fashion to NHBC, and a number of lenders will normally provide mortgages at restricted rates. Whether or not mortgages are taken up, the repair scheme is intended to provide a life of at least 30 years but with the likelihood of a much longer life. In addition to the installation of an overcladding system, it will also be necessary to undertake various internal upgrade works to ensure the internal PRC elements are also kept dry and warm. These include new double glazing complete with trickle vents and appropriate ventilation to toilets and bathrooms. 5.2.3 Decent Homes Repairs The following section provides a brief overview of the application of the Decent Homes Standard to the Tarran Newland houses in Maltby, and is based on the findings of Curtins intrusive and visual inspections only. For further details of the general requirements of the

Page 14: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix

Curtins Consulting Engineers Page 11 Rotherham Metropolitan Borough Council December 2004

A Structural Assessment of the Non Traditional Tarran Houses in Maltby, Rotherham

Decent Homes Standard, refer to Section 6.0. Given that Curtins investigations were undertaken within void or decommissioned properties, the comments made should be used as guidance only. Clearly, void properties will not satisfy the requirements of the Decent Homes Standards. It is considered that in their current condition, the properties satisfy the structural requirements of the Decent Homes Standard. However, it is considered likely that within the foreseeable future deterioration of the frame will occur to such an extent, that the properties would no longer be considered structurally stable and would subsequently not satisfy the requirements of the standards. It is therefore recommended that the concrete elements should be kept dry and warm to avoid further deterioration of the frame. If mortgageable status is not required, the overcladding specification can potentially be reduced, thereby reducing costs. In order to satisfy the Decent Homes Standard, it is recommended that an insulated over render system be applied to the properties. The provision of an insulated render system will clearly also improve the thermal performance of the properties. The standards offer guidance on the nature of the heating systems adopted within properties and the associated levels of insulation required. It is recommended that the council review its records to determine the nature of the heating systems provided within these properties. It is considered however, that the provision of an insulated render system should provide sufficient insulation to satisfy the requirements of the standards. In addition to the above considerations, it will also be necessary to consider the condition of facilities such as kitchens, bathrooms, heating, electrics etc and determine if these need replacing to satisfy the Decent Homes Standard. The assessment of these facilities is considered to be beyond the scope of this report. However, for the purposes of preparing budget costs, it has been assumed that the following works will be undertaken, as used within the original condition report.

� Replacement / Upgrade of Central Heating System � Replacement Kitchens � Replacement Bathrooms � New External Doors � New Windows � Electrical Re-wire

5.2.4 Demolition In addition to costs for the repair works recommended above, consideration has also been given to the costs of demolishing the properties. The costs for buy back of properties where tenants have previously exercised their Right To Buy and now own the properties, are considered to be beyond the scope of this appointment. Preliminary demolition costs are included in Section 7.0.

Page 15: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix

Curtins Consulting Engineers Page 12 Rotherham Metropolitan Borough Council December 2004

A Structural Assessment of the Non Traditional Tarran Houses in Maltby, Rotherham

6.0 DECENT HOMES STANDARD The following section provides a brief interpretation of the requirements of the Decent Homes Standard. This section is intended as guidance only and any recommendations made to comply with the Standard, with the exception of those relating directly to the structure, are considered beyond the scope of this report. Requirements of the Decent Homes Standard The government has established a target to “ensure that all social housing meets set standards of decency by 2010, by reducing the number of households living in social housing that does not meet these standards.” The Decent Homes Standard is a minimum standard that all social housing should meet by 2010. However, landlords are not expected to make a home decent if this is against a tenant’s wish. It should be noted that landlords are not expected to undertake only that work which contributes to making homes decent, and should address elements not considered within the standard but may be considered high priority in some areas (i.e. environmental works, security etc). A decent home is described as one, which is wind and weather tight and has modern facilities and should meet the following criteria, as outlined within the standards: It meets the current statutory minimum standard for housing. The current minimum standard for housing is the Fitness Standard (Section 604, Housing Act 1985 as amended). Dwellings deemed unfit under this legislation fail this criterion. In summary, the requirements constitute the minimum deemed necessary for a dwelling house to be fit for human habitation. They are that a dwelling house should: • be free from serious disrepair • be structurally stable • be free from dampness prejudicial to the health of the occupants • have adequate provision for lighting, heating and ventilation • have an adequate piped supply of wholesome water • have an effective system for the drainage of foul, waste and surface water • have a suitably located WC for exclusive use of the occupants • have a bath or shower and wash-hand basin, with hot and cold water • have satisfactory facilities for the preparation and cooking of food including a sink with

hot and cold water

Page 16: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix

Curtins Consulting Engineers Page 13 Rotherham Metropolitan Borough Council December 2004

A Structural Assessment of the Non Traditional Tarran Houses in Maltby, Rotherham

The Fitness Standard applies to both houses and flats, but the legislation also states that flats can be considered unfit if the building, or part of the building outside the flat, fails to meet any of the following requirements: • the building or part is structurally sound • it is free from serious disrepair • it is free from dampness • it has adequate provision for ventilation • it has an effective system for the drainage of foul, waste and surface water The government intends to replace the Fitness Standard with the Housing Health and Safety Rating System (HHSRS), which will assess the health and safety risks in dwellings. The system is unlikely to come into force before 2005. Guidance on the use of HHSRS has been prepared by the Office of the Deputy Prime Minister, in order to assist landlords in the assessment of their housing.

It is in a reasonable state of repair

Dwellings deemed as failing to meet these criterion are those where either: • One or more of the key building components are old and, because of their condition,

need replacing or major repair; or • Two or more of the other building components are old and, because of their condition,

need replacing or major repair Key building components are those which, if in poor condition, could have an immediate effect on the integrity of the building and cause further deterioration in other components. They are the external components plus internal components that have potential safety implications and include external walls, roofs, windows and doors, chimneys, central heating boilers, gas fires, storage heaters and electrics. If any of these components are old and need replacing, or require immediate attention or repair, then the dwelling is not considered to be in a reasonable state of repair and remedial action is required. Other building components are those that have a less immediate impact on the integrity of the dwelling. If two or more of these components are old and need replacing, or require immediate attention or repair, then the dwelling is not considered to be in a reasonable state of repair and remedial action is required. A component is defined as ‘old’ if it is older than its expected or standard lifetime. The Decent Homes Standard offers guidance on component lifetimes to be used in the disrepair criterion. Components are deemed to be in ‘poor condition’ if they need major work, either full replacement or major repair. The Decent Homes Standard offers guidance on definitions of poor condition of various components, to be used in the disrepair criterion.

Page 17: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix

Curtins Consulting Engineers Page 14 Rotherham Metropolitan Borough Council December 2004

A Structural Assessment of the Non Traditional Tarran Houses in Maltby, Rotherham

It should be noted that one or more key components, or two or more other components, must be both old and in poor condition to render the dwelling non-decent on the grounds of disrepair. Components that are old and in good condition, or those in poor condition but not old, would not, in themselves cause the dwelling to fail.

It has reasonably modern facilities and services

Dwellings deemed as failing to meet these criterion are those which lack three or more of the following: • a reasonably modern kitchen (20 years old or less); • a kitchen with adequate space and layout; • a reasonably modern bathroom (30 years old or less); • an appropriately located bathroom and WC; • adequate insulation against external noise (where external noise is a problem); • adequate size and layout of common areas for blocks of flats. In some instances there may be limiting factors such as physical or planning restrictions that make improvements necessary to meet this criterion impossible. A dwelling would not fail this criterion where it is impossible to make the required improvements to components for planning reasons.

It provides a reasonable degree of thermal comfort

This criterion requires dwellings to have both effective insulation and efficient heating Efficient heating is defined as any gas or oil programmable central heating or electric storage heaters or programmable LPG/solid fuel central heating, or similarly efficient heating systems that may be developed in the future. Due to the differences in efficiency between gas/oil heating systems and the other heating systems listed, the level of insulation required differs. For dwellings with gas/oil programmable heating, cavity wall insulation, or at least 50mm loft insulation is deemed to offer an effective package of insulation. For dwellings heated by electric storage heaters / LPG / programmable solid fuel central heating, a higher specification of insulation is required; at least 200mm of loft insulation and cavity wall insulation. The Decent Homes Standard offers guidance on effective means of improving energy efficiency. Where new heating systems are being installed, the standards recommend that measures be taken to increase the energy efficiency of the dwelling, wherever possible.

Page 18: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix

Curtins Consulting Engineers Page 15 Rotherham Metropolitan Borough Council December 2004

A Structural Assessment of the Non Traditional Tarran Houses in Maltby, Rotherham

7.0 BUDGET COSTS FOR REPAIR SCHEME The table below indicates the costs suggested within the original Audit Commission report. The costs have been adjusted to reflect the nature of structural works involved in each of the repair schemes. Additionally, alternative costs have been provided for refurbishment works such as kitchens and bathrooms, to reflect the difference the specification of these elements can have on the final cost of the works.

Original Audit Commission Report With

Alterations To Structural Costs

Budget Costs Based On

Actual Current Contractors

Costs

Original Audit Commission Report With

Alterations To Structural Costs

Budget Costs Based On

Actual Current Contractors

Costs

Original Audit Commission Report With

Alterations To Structural Costs

Budget Costs Based On

Actual Current Contractors

Costs

Central Heating £ 3,200.00 £ 3,200.00 £ 3,200.00 £ 3,200.00 £ 3,200.00 £ 3,200.00 £ 3,200.00

Kitchen £ 2,700.00 £ 2,700.00 £ 4,225.00 £ 2,700.00 £ 4,225.00 £ 2,700.00 £ 4,225.00

Bathroom £ 1,500.00 £ 1,500.00 £ 2,500.00 £ 1,500.00 £ 2,500.00 £ 1,500.00 £ 2,500.00

External Doors £ 1,200.00 £ 1,200.00 £ 1,200.00 £ 1,200.00 £ 1,200.00 £ 1,200.00 £ 1,200.00

Windows £ 1,900.00 £ 1,900.00 £ 1,500.00 £ 1,900.00 £ 1,500.00 £ 1,900.00 £ 1,500.00

Electric Re-wire £ 1,800.00 £ 1,800.00 £ 2,750.00 £ 1,800.00 £ 2,750.00 £ 1,800.00 £ 2,750.00

Demolish & Prop £ 1,700.00 £ 1,700.00 £ 1,750.00 £ - £ - £ - £ -

Foundations £ 1,400.00 £ 2,000.00 £ 2,000.00 £ - £ - £ - £ -

Walls £ 8,750.00 £ 15,000.00 £ 15,000.00 £ - £ - £ - £ -

Party Wall £ - £ 3,000.00 £ 3,000.00 £ - £ - £ - £ -

Roof / Drains £ 2,200.00 £ 2,200.00 £ 2,000.00 £ - £ - £ - £ -

Scaffold £ 1,000.00 £ 1,000.00 £ 1,200.00 £ 1,000.00 £ 1,200.00 £ 1,000.00 £ 1,200.00

Externals £ 1,000.00 £ 1,000.00 £ 1,000.00 £ - £ - £ - £ -

Plaster and paint/decoration

£ 900.00 £ 2,000.00 £ 3,000.00 £ - £ - £ - £ -

Concrete Repairs £ - £ - £ 1,000.00 £ 1,000.00 £ - £ -

Structural Cladding £ - £ - £ 11,000.00 £ 11,000.00 £ - £ -

Concrete Repairs £ - £ - £ - £ - £ 1,000.00 £ 1,000.00

Over Render £ - £ - £ - £ - £ 7,750.00 £ 7,750.00

Re-roof £ 4,500.00 £ 4,500.00 £ 4,500.00 £ 4,500.00 £ 4,500.00 £ 4,500.00

Asbestos Removal (Roof) £ 2,000.00 £ 2,000.00 £ 2,000.00 £ 2,000.00 £ 2,000.00 £ 2,000.00

Asbestos Removal (Internal)

£ 2,000.00 £ 2,000.00 £ 2,000.00 £ 2,000.00 £ 2,000.00 £ 2,000.00

Management to 2010 £ 2,800.00 £ 2,800.00 £ 2,800.00 £ 2,800.00 £ 2,800.00 £ 2,800.00 £ 2,800.00

Annual Repairs £ 3,600.00 £ 1,000.00 £ 1,000.00 £ 3,600.00 £ 3,600.00 £ 3,600.00 £ 3,600.00

Total per property £ 47,650.00 £ 52,500.00 £ 56,625.00 £ 40,200.00 £ 43,475.00 £ 36,950.00 £ 40,225.00

Total for 70 properties £ 3,335,500.00 £ 3,675,000.00 £ 3,963,750.00 £ 2,814,000.00 £ 3,043,250.00 £ 2,586,500.00 £ 2,815,750.00

Decent Homes Repair Works

£ 12,000.00

Original Audit Commission Report Costs

PRC Licenced Repair SchemeCGU 2000 Mortgageable

Repair Scheme

The above costs exclude professional fees, disturbance allowance/decanting, VAT, contractors preliminaries etc. £2,000 cost for foundations is considered to be an average, as some dwellings may not need extra foundations if walls are built directly off the existing bedrock. £15,000 external wall cost is based on the construction of a new cavity wall with insulation.

Page 19: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix

Curtins Consulting Engineers Page 16 Rotherham Metropolitan Borough Council December 2004

A Structural Assessment of the Non Traditional Tarran Houses in Maltby, Rotherham

The Audit Commission findings have also requested that costs of demolition works be considered. Whilst the costs for re-acquisition of privately owned properties is considered beyond the scope of this assessment, the cost of all demolition works are listed below. The original condition survey report assumed demolition costs of £3,500 per property. However, it is considered that the following costs should be used when making an assessment of any demolition proposals. Preliminary Demolition Costs Demolition Works* £4,500 Asbestos removal (internal) £1,500 Asbestos removal (roof) £2,000 Disconnection of services £1,200 Total £9,200 per property Total (for 86 properties) £791,200 * Demolition works includes removal of slabs and foundations, re-grading of gardens etc, and disconnection of services. The above costs exclude professional fees, disturbance allowance / decanting, VAT, contractors preliminaries etc. The following costs for acquisition of 14 private have been transferred directly from the re-calculated costs contained in the Audit Commission report dated 11 November 2004. Costs for home loss compensation and disturbance costs have been transferred directly from the original condition report. Property Value

£22,000 Property Value

£44,000 Property Value

£55,000 Property Value

£62,000

Acquisition of 16 private properties £352,000 £704,000 £880,000 £1,056,000

Home Loss Costs £266,000 £266,000 £266,000 £266,000

Disturbance Costs £43,000 £43,000 £43,000 £43,000

Demolition £791,200 £791,200 £791,200 £791,200

Total £1,452,200 £1,804,200 £1,980,200 £2,156,200

The above costs exclude professional fees, disturbance allowance / decanting, VAT, contractors preliminaries etc. The costs shown in italics above have been taken directly from the original reports as discussed above.

Page 20: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix

Curtins Consulting Engineers Page 17 Rotherham Metropolitan Borough Council December 2004

A Structural Assessment of the Non Traditional Tarran Houses in Maltby, Rotherham

8.0 CONCLUSIONS On the basis of the investigations undertaken, it is considered that the properties are in reasonable condition but have begun to deteriorate. Whilst the test results indicate that the concrete is in reasonable condition, it is clear that there are a number of areas where poor quality construction techniques could cause further reinforcement corrosion. Consequently, it is considered that as further moisture ingress occurs, so the number of instances of reinforcement corrosion will occur. It is therefore not possible to guarantee the future performance of these properties without undertaking repair works. There are three repair schemes considered within these report, each of which will ensure a minimum future life of 30 years and meet the requirements of the Decent Homes Standards. The choice of solution is primarily a financial one and depends upon the individual circumstances of the local authority or RSL. If finance were available, it is recommended that a PRC Licensed Repair Scheme be adopted. This scheme removes the PRC elements and effectively converts the dwellings into traditional houses, with a projected lifespan of at least 60 years, but in all probability up to 80 years. However, it is possible that many more tenants will exercise their right to buy once the costly work has been undertaken. If financial constraints exist, either of the two alternative schemes will provide a life span of at least 30 years. The render finish provided under the CGU scheme tends to be more robust than that used in the basic scheme. Whilst mortgages are available from some mortgage lenders, future sales of the properties, in say 20 years, may prove problematic. Foundations exposed during the investigations do not meet current standards with respect to depth, width and quality of concrete. In some instances, the external walls are built directly off the existing rock strata. However, they appear to have performed adequately to date without showing signs of differential settlement. Whilst the continued long term performance of any foundations cannot be guaranteed, as they could be affected by flooding or drainage failure, the risk of any future movement is considered to be low It is recommended that a proportion of the annual repair budget is used to inspect the drains adjacent to the dwellings and relay any damaged pipes as necessary.

Page 21: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix

Appendix A – Maltby Estate Site Layout

Page 22: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix
Page 23: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix

Appendix B – Building Research Establishment (BRE) Digest 444 Part 2, Table 1

Page 24: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix
Page 25: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix

Appendix C Site Photographs

Page 26: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix

Photograph 1 – Typical Front Elevation of Tarran Newland House

Photograph 2 – Vertical Cracking Of Corner Post

Page 27: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix

Photograph 3 – Spalling Of Corner Post

Photograph 4 – Linear Polarisation Corrosion Rate Monitoring

Page 28: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix

Appendix D Laboratory Analysis Results

Page 29: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix

Sample Ref Address Member Type

% Cement Content

% Chloride Content

% Cl in Cement

1 26 Newland Avenue Corner Post 16.37 0.136 0.83 . MEDIUM RISK .2 26 Newland Avenue Long Panel 15.39 0.126 0.82 . MEDIUM RISK .3 26 Newland Avenue Short Panel 15.39 0.136 0.88 . MEDIUM RISK .4 26 Newland Avenue Long Panel 15.39 0.087 0.57 . MEDIUM RISK .5 26 Newland Avenue Lintel 15.39 0.143 0.93 . MEDIUM RISK .6 26 Newland Avenue Corner Post 16.37 0.143 0.87 . MEDIUM RISK .7 26 Newland Avenue Long Panel 15.39 0.126 0.82 . MEDIUM RISK .8 26 Newland Avenue Long Panel 15.39 0.126 0.82 . MEDIUM RISK .9 26 Newland Avenue Long Panel 15.39 0.101 0.66 . MEDIUM RISK .

10 26 Newland Avenue Long Panel 15.39 0.126 0.82 . MEDIUM RISK .11 26 Newland Avenue Long Panel 15.39 0.136 0.88 . MEDIUM RISK .12 26 Newland Avenue Long Panel 15.39 0.098 0.64 . MEDIUM RISK .13 26 Newland Avenue Ring Beam 15.39 0.094 0.61 . MEDIUM RISK .14 26 Newland Avenue Long Panel 15.39 0.094 0.45 . MEDIUM RISK .15 26 Newland Avenue Short Panel 15.39 0.105 0.50 . MEDIUM RISK .16 26 Newland Avenue Plinth 19.1 0.091 0.43 . MEDIUM RISK .17 30 Newland Avenue Long Panel 15.39 0.103 0.49 . MEDIUM RISK .18 30 Newland Avenue Short Panel 15.39 0.119 0.77 . MEDIUM RISK .19 30 Newland Avenue Corner Post 16.37 0.066 0.31 LOW RISK . .20 30 Newland Avenue Plinth 19.1 0.052 0.25 LOW RISK . .21 30 Newland Avenue Long Panel 15.39 0.101 0.48 . MEDIUM RISK .22 30 Newland Avenue Long Panel 15.39 0.101 0.48 . MEDIUM RISK .23 30 Newland Avenue Short Panel 15.39 0.098 0.64 . MEDIUM RISK .24 30 Newland Avenue Ring Beam 15.39 0.136 0.65 . MEDIUM RISK .25 30 Newland Avenue Lintel 15.39 0.206 0.98 . MEDIUM RISK .26 30 Newland Avenue Long Panel 15.39 0.126 0.60 . MEDIUM RISK .27 30 Newland Avenue Ring Beam 15.39 0.077 0.37 LOW RISK . .28 5 Chadwick Drive Plinth 19.1 0.087 0.46 . MEDIUM RISK .29 5 Chadwick Drive Long Panel 15.39 0.047 0.31 LOW RISK . .30 5 Chadwick Drive Corner Post 16.37 0.062 0.38 LOW RISK . .31 5 Chadwick Drive Long Panel 15.39 0.048 0.31 LOW RISK . .32 5 Chadwick Drive Short Panel 15.39 0.035 0.23 LOW RISK . .33 5 Chadwick Drive Short Panel 15.39 0.06 0.39 LOW RISK . .34 5 Chadwick Drive Lintel 15.39 0.056 0.36 LOW RISK . .35 5 Chadwick Drive Long Panel 15.39 0.043 0.28 LOW RISK . .36 5 Chadwick Drive Ring Beam 15.39 0.089 0.58 . MEDIUM RISK .37 9 Chadwick Drive Long Panel 15.39 0.043 0.28 LOW RISK . .38 9 Chadwick Drive Short Panel 15.39 0.048 0.31 LOW RISK . .39 9 Chadwick Drive Corner Post 16.37 0.047 0.29 LOW RISK . .40 9 Chadwick Drive Lintel 15.39 0.105 0.68 . MEDIUM RISK .41 9 Chadwick Drive Plinth 19.1 0.015 0.07 LOW RISK . .42 9 Chadwick Drive Ring Beam 15.39 0.062 0.30 LOW RISK . .43 9 Chadwick Drive Short Panel 15.39 0.056 0.27 LOW RISK . .44 9 Chadwick Drive Long Panel 15.39 0.085 0.40 . MEDIUM RISK .45 53 Newland Avenue Plinth 19.1 0.021 0.11 LOW RISK . .46 53 Newland Avenue Corner Post 16.37 0.052 0.25 LOW RISK . .47 53 Newland Avenue Ring Beam 15.39 0.079 0.38 LOW RISK . .48 53 Newland Avenue Long Panel 15.39 0.039 0.19 LOW RISK . .49 53 Newland Avenue Short Panel 15.39 0.041 0.20 LOW RISK . .50 53 Newland Avenue Long Panel 15.39 0.079 0.51 . MEDIUM RISK .51 53 Newland Avenue Lintel 15.39 0.12 0.57 . MEDIUM RISK .52 53 Newland Avenue Short Panel 15.39 0.058 0.28 LOW RISK . .53 51 Newland Avenue Plinth 19.1 0.012 0.06 LOW RISK . .54 51 Newland Avenue Ring Beam 15.39 0.029 0.14 LOW RISK . .55 51 Newland Avenue Short Panel 15.39 0.064 0.42 . MEDIUM RISK .56 51 Newland Avenue Long Panel 15.39 0.052 0.34 LOW RISK . .57 51 Newland Avenue Long Panel 15.39 0.052 0.34 LOW RISK . .58 51 Newland Avenue Corner Post 16.37 0.014 0.09 LOW RISK . .59 51 Newland Avenue Lintel 15.39 0.133 0.86 . MEDIUM RISK .60 51 Newland Avenue Long Panel 15.39 0.03 0.19 LOW RISK . .61 25 Newland Avenue Long Panel 15.39 0.051 0.33 LOW RISK . .62 25 Newland Avenue Short Panel 15.39 0.05 0.32 LOW RISK . .63 25 Newland Avenue Ring Beam 15.39 0.077 0.50 . MEDIUM RISK .64 25 Newland Avenue Plinth 19.1 0.055 0.29 LOW RISK . .65 25 Newland Avenue Short Panel 15.39 0.059 0.38 LOW RISK . .66 25 Newland Avenue Long Panel 15.39 0.027 0.18 LOW RISK . .67 25 Newland Avenue Corner Post 16.37 0.083 0.51 . MEDIUM RISK .68 25 Newland Avenue Lintel 15.39 0.118 0.56 . MEDIUM RISK .

BRE Categorisation, Risk Due to Chloride Content in Cement

Page 30: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix

Sample Ref Address Member Type

% Cement Content

% Chloride Content

% Cl in Cement

69 15 Newland Avenue Short Panel 15.39 0.053 0.25 LOW RISK . .70 15 Newland Avenue Ring Beam 15.39 0.046 0.22 LOW RISK . .71 15 Newland Avenue Long Panel 15.39 0.031 0.15 LOW RISK . .72 15 Newland Avenue Long Panel 15.39 0.036 0.23 LOW RISK . .73 15 Newland Avenue Short Panel 15.39 0.036 0.17 LOW RISK . .74 15 Newland Avenue Lintel 15.39 0.069 0.33 LOW RISK . .75 15 Newland Avenue Corner Post 16.37 0.015 0.07 LOW RISK . .76 15 Newland Avenue Plinth 19.1 0.013 0.06 LOW RISK . .77 7 Newland Avenue Ring Beam 15.39 0.036 0.23 LOW RISK . .78 7 Newland Avenue Long Panel 15.39 0.065 0.31 LOW RISK . .79 7 Newland Avenue Lintel 15.39 0.067 0.32 LOW RISK . .80 7 Newland Avenue Short Panel 15.39 0.065 0.31 LOW RISK . .81 7 Newland Avenue Plinth 19.1 0.032 0.15 LOW RISK . .82 7 Newland Avenue Long Panel 15.39 0.053 0.34 LOW RISK . .83 7 Newland Avenue Short Panel 15.39 0.044 0.29 LOW RISK . .84 7 Newland Avenue Corner Post 16.37 0.005 0.03 LOW RISK . .85 5 Newland Avenue Ring Beam 15.39 0.061 0.40 LOW RISK . .86 5 Newland Avenue Lintel 15.39 0.096 0.62 . MEDIUM RISK .87 5 Newland Avenue Short Panel 15.39 0.126 0.82 . MEDIUM RISK .88 5 Newland Avenue Long Panel 15.39 0.061 0.40 LOW RISK . .89 5 Newland Avenue Corner Post 16.37 0.031 0.19 LOW RISK . .90 5 Newland Avenue Lintel 15.39 0.134 0.87 . MEDIUM RISK .91 5 Newland Avenue Long Panel 15.39 0.057 0.37 LOW RISK . .92 5 Newland Avenue Plinth 19.1 0.038 0.20 LOW RISK . .93 1 Newland Avenue Long Panel 15.39 0.009 0.06 LOW RISK . .94 1 Newland Avenue Lintel 15.39 0.067 0.44 . MEDIUM RISK .95 1 Newland Avenue Short Panel 15.39 0.061 0.29 LOW RISK . .96 1 Newland Avenue Plinth 19.1 0.011 0.05 LOW RISK . .97 1 Newland Avenue Corner Post 16.37 0.017 0.08 LOW RISK . .98 1 Newland Avenue Ring Beam 15.39 0.055 0.26 LOW RISK . .99 1 Newland Avenue Short Panel 15.39 0.093 0.60 . MEDIUM RISK .100 1 Newland Avenue Long Panel 15.39 0.076 0.36 LOW RISK . .101 6 Newland Avenue Ring Beam 15.39 0.019 0.09 LOW RISK . .102 6 Newland Avenue Lintel 15.39 0.127 0.60 . MEDIUM RISK .103 6 Newland Avenue Corner Post 16.37 0.03 0.14 LOW RISK . .104 6 Newland Avenue Plinth 19.1 0.024 0.13 LOW RISK . .105 6 Newland Avenue Long Panel 15.39 0.054 0.26 LOW RISK . .106 6 Newland Avenue Short Panel 15.39 0.048 0.23 LOW RISK . .107 6 Newland Avenue Long Panel 15.39 0.048 0.23 LOW RISK . .108 6 Newland Avenue Short Panel 15.39 0.050 0.24 LOW RISK . .109 2 Newland Avenue Ring Beam 15.39 0.036 0.23 LOW RISK . .110 2 Newland Avenue Lintel 15.39 0.164 1.07 . . HIGH RISK111 2 Newland Avenue Long Panel 15.39 0.104 0.68 . MEDIUM RISK .112 2 Newland Avenue Short Panel 15.39 0.057 0.37 LOW RISK . .113 2 Newland Avenue Plinth 19.1 0.019 0.10 LOW RISK . .114 2 Newland Avenue Corner Post 16.37 0.042 0.26 LOW RISK . .115 2 Newland Avenue Long Panel 15.39 0.061 0.40 LOW RISK . .116 2 Newland Avenue Short Panel 15.39 0.081 0.53 . MEDIUM RISK .117 85 Braithwell Road Ring Beam 15.39 0.034 0.22 LOW RISK . .118 85 Braithwell Road Lintel 15.39 0.058 0.38 LOW RISK . .119 85 Braithwell Road Short Panel 15.39 0.098 0.64 . MEDIUM RISK .120 85 Braithwell Road Long Panel 15.39 0.174 1.13 . . HIGH RISK121 85 Braithwell Road Short Panel 15.39 0.108 0.70 . MEDIUM RISK .122 85 Braithwell Road Long Panel 15.39 0.050 0.24 LOW RISK . .123 85 Braithwell Road Corner Post 16.37 0.019 0.09 LOW RISK . .124 85 Braithwell Road Plinth 19.1 0.013 0.06 LOW RISK . .125 65 Braithwell Road Ring Beam 15.39 0.019 0.09 LOW RISK . .126 65 Braithwell Road Short Panel 15.39 0.123 0.80 . MEDIUM RISK .127 65 Braithwell Road Long Panel 15.39 0.098 0.47 . MEDIUM RISK .128 65 Braithwell Road Lintel 15.39 0.118 0.56 . MEDIUM RISK .129 65 Braithwell Road Corner Post 16.37 0.013 0.06 LOW RISK . .130 65 Braithwell Road Plinth 19.1 0.030 0.14 LOW RISK . .131 65 Braithwell Road Long Panel 15.39 0.040 0.26 LOW RISK . .132 65 Braithwell Road Short Panel 15.39 0.038 0.18 LOW RISK . .

BRE Categorisation, Risk Due to Chloride Content in Cement

Page 31: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix

Appendix E

Linear Polarisation Corrosion Rate Monitoring Report Prepared by Messrs BGB

Page 32: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix

29

The Loft, 30B Vine Road East Molesey Surrey KT8 9LF, UK Tel./Fax +44 (0) 20 8941 6696 Mobile +44 (0) 77 11 00 6197 Email: [email protected] www.JPBroomfield.co.uk

Corrosion Rate Survey For Curtins Consultants

Maltby

December 2004

Corrosion Rate Measurements Taken by Dr. K. Hladky Report Written By Dr. J. P. Broomfield Report No. JPB/0501/001

John P. Broomfield Broomfield Consultants

Consulting Corrosion Engineer

Page 33: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix

30

1.0 Introduction Broomfield Consultants were requested by Mr. Ray Anderson of Curtins Consultants to undertake a survey of system built houses at Maltby Near Rotherham. Arrangements for access and for labout to break out steel was made by Mr Neil Parkinson of Curtins Leeds office. Previous surveys undertaken by Curtins had revealed the presence of chlorides in the concrete and carbonation to, or approaching, reinforcement depth. Both can lead to reinforcement corrosion. In combination the likelihood of corrosion is enhanced. The survey was undertaken using the Bigfoot Polarisation Resistance Probe (small probe) which measures the instantaneous corrosion rate of reinforcing steel embedded in concrete. A brief description of the equipment, its use and interpretation of results is given in Appendix 1. There are 86 Tarran houses on Newland Avenue, Braithwell Road and Chadwick Drive. They are precast concrete single family houses. A total of thirteen were the subject of this investigation.

2.0 Investigation, The following houses were surveyed on 14 and 15 December 2004: 1, 2, 2, 15, 25, 26, 51 and 53 Newland Avenue 5 and 9 Chadwick Drive 65 and 85 Braithwell Road A reinforcing bar in an external column, beam (window lintels) and a panel was exposed at each location by Curtins appointed personnel. All measurements were external. The condition of the steel was recorded. An electrical connection was made to the steel and the reference electrode potential (half cell potential) recorded. The polarisation resistance was recorded by the equipment and then converted to a corrosion rate in micrometres per year (�m/y) steel section loss as described in Appendix 1. Measurements were made at three locations on each of the 15 houses Vertical upright - Either front or back, corner measured if possible. Measurement was not on the corner rebar, as it was often with very low cover and corroded, but on one of the other accessible bars. Two or three readings were taken in a vertical run above and below the excavation. It is possible that some of these hit horizontal ties. The bar was very thin (assumed to be 5mm) in all of them. Overall little corrosion, occasional small rust spotting. Panel - Adjacent to the vertical. There is a reinforcement round the edges of the panel, again very thin. Took 2-3 readings on a vertical above and below the rebar connection opening. Window lintel - Curtins advised that they had measured high chlorides in these units. Steel exposed by drilling to one corner in each. Usually a thicker rebar (assumed to be 8mm) found there. Measurements taken at 2-3 locations near the rebar connection.

Page 34: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix

31

All the reinforcement was very soft steel, sometimes with a 'twist' profile. On all the houses with visible corrosion this is due to very low cover (typically believed to be 1-2 mm). Those measured usually had a better cover (approximately 10 mm). On one of the houses the vertical had split in a number of places, probably due to a leaky gutter over many years. Curtins also did their own chlorides and carbonation tests (typical carbonation depth 10-15 mm). 3.0 Results and Discussion The results of the corrosion rate, reference electrode potential and visual observations are recorded in Table 1, along with the steel diameter which was used to correct the reading for the surface area over which the corrosion current is measured. Table 2 records the statistics of the results. There is a high correlation between bars showing rust and measurements of 1.0 �m/y section loss or more (highlighted in red in Table 1). Simple arithmetic shows that at the highest corrosion rate recorded it will take 1000 years for a corrosion rate of 5 �m/y to corrode through a 5mm diameter reinforcing bar. Even allowing for only 25% section loss for structural purposes there is still 250 years to reach a critical level. While the rate of section loss is not likely to lead to structural problems in the foreseeable future, there is a risk of cracking and spalling of concrete which would happen sooner and lead to potential hazards of falling concrete, unsightly appearance and ingress of the elements into the structure. However, as described in Appendix 2, we can predict the time to first cracking and the time to spalling from the corrosion rate, steel diameter, cover depth and concrete compressive strength. The results may be summarised as follows:

Cover 25 mm 25 mm 12 mm Bar Diameter 5 mm 8 mm 8 mm Compressive Strength 25MPa 25 MPa 50 MPa Time to First Crack 25 y 20 y 1.2 y Time to Spall 27 y 22 y 3.2 y

Thus it can be seen that using the worst corrosion rate measured, the time to cracking is 20 to 25 y for a 25 MPa concrete but only 1.2 y for a harder and therefore more brittle 50MPa concrete. The time to spalling is around 22 to 27 y for the 25MPa concrete reducing to 3.2 y for a 50MPa concrete with only 12mm cover. The equations used were developed in the laboratory and have had only limited field validation. They do not take into account the geometry of the reinforcement, e.g. corners, or closely spaced bars which could accelerate cracking, delamination and spalling. It can therefore be concluded from the corrosion rates measured and the information available that if the cover is generally 25mm there is a reasonable time to cracking and spalling of the concrete at the observed corrosion rates, assuming that they are

Page 35: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix

32

representative of the average corrosion rate throughout the year. However, in locations where the cover reduces to 12 mm or less, the time to cracking could be as low as one year, with spalling in 3.2 years. However, if we look at a more typical high corrosion rate of say 1 �m/y the figures increase by a factor of 5 giving a worst case time to cracking of about 6 years and a time to spalling of 16 years. Measurements were taken at locations that had not cracked or spalled and were the cover was beyond 1-5 mm. Therefore to rehabilitate the houses it will be necessary to conduct repairs of damaged concrete and control ingress of moisture by cladding and waterproofing to bring the remaining service life up to useful levels. These corrosion rates are low (see Appendix 1) and should be controllable by conventional repair and enclosure. However given that the carbonation depth has reached the steel in many locations, extensive repairs will be needed. 4.0 Conclusions

1. Corrosion rate measurements were undertaken at 126 locations lintels, columns and panels in 13 “Taran” precast concrete houses in Maltby, Rotherham.

2. Corrosion rates ranged from 0.1 to 4.7 �m/year section loss per year. 3. Even at the highest corrosion rate the time to structurally significant section loss

would be hundreds of years. 4. However, times to cracking and spalling would be only a few years if the cover is

12 mm or less at the highest corrosion rate, and 6 to 16 years to cracking and spalling if a typical high corrosion rate of 1 �m/year section loss is used. This rate was measured at 19% of the locations.

5. Extensive concrete repairs and efforts to enclose the concrete to protect it from

moisture ingress will be required to preserve the houses for any significant useful life.

Page 36: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix

Table 1 Continued 33

TABLE 1 – REFERENCE ELECTRODE POTENTIALS (ECORR) AND CORROSION RATE

Eco

rr [m

V

Ag/

AgC

l]

Est

. Dia

met

er

[mm

]

Rat

e C

orre

cted

[u

m/y

ear]

Loca

tion

Com

men

ts

1 Newland Avenue 17.3 5 2.3 Vertical Some very slight rust spots 24.8 5 1.5 Vertical 1.5 5 1.8 Vertical

76.6 5 1.8 Vertical

78 5 2.0 Panel Slight rust spots 16.8 5 1.5 Panel 39.6 5 1.8 Panel

38 5 1.5 Panel

65.7 5 0.3 Lintel Clean steel 65.3 5 0.3 Lintel

3 Newland Avenue

88.2 5 0.8 Vertical Clean steel 101.3 5 0.8 Vertical 123.1 5 0.7 Vertical

22.8 5 0.2 Panel Clean steel 71.2 5 0.2 Panel 90.5 5 0.4 Panel

124.5 8 0.4 Lintel Slight rust spots 147.8 8 0.5 Lintel

6 Newland Avenue

-29.7 5 1.5 Vertical Slight rust spots -14.6 5 1.5 Vertical -10.6 5 1.7 Vertical

39.5 5 0.8 Panel Clean steel 39.3 5 0.7 Panel

45.4 8 0.5 Lintel Clean steel 64.3 8 0.4 Lintel

Page 37: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix

Table 1 Continued 34

2 Newland Avenue

-13.3 5 0.8 Vertical Slight rust spotting -11.4 5 0.4 Vertical -49.3 5 0.6 Vertical

120.5 5 0.3 Panel Slight rust spots 123.7 5 0.3 Panel

78.8 8 0.1 Lintel Clean steel

60 8 0.2 Lintel 7 Newland Avenue

123.7 5 0.2 Vertical Clean steel 118.6 5 0.2 Vertical

110 5 0.2 Vertical

22.8 5 0.2 Panel Clean steel 40.9 5 0.1 Panel 33.2 5 0.2 Panel

-175.5 8 0.5 Lintel Clean steel -188.2 8 0.3 Lintel -190.6 8 0.6 Lintel

15 Newland Avenue

46.8 5 0.6 Vertical Slight rust spots 71.6 5 0.4 Vertical

30 5 0.1 Panel Clean steel

68.3 5 0.1 Panel

149.7 8 0.1 Lintel Clean steel 93.4 8 0.1 Lintel

25 Newland Avenue

-20.7 5 1.8 Vertical Some very slight rust spots -37.2 5 1.3 Vertical

-26 5 1.0 Vertical

126.5 5 0.8 Panel Some very slight rust spots 130 5 0.6 Panel

137.1 5 0.6 Panel

76.4 8 0.3 Lintel Clean steel 73.5 8 0.3 Lintel

Page 38: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix

Table 1 Continued 35

26 Newlands Avenue

-105.2 5 1.9 Vertical Slight rust spots -72.5 5 1.0 Vertical -32.7 5 1.1 Vertical

-55.9 5 0.3 Panel Some very slight rust spots -41.9 5 0.3 Panel -33.5 5 0.3 Panel

-74.3 8 0.3 Lintel Clean steel -49.7 8 0.3 Lintel -8.3 8 0.2 Lintel

30 Newland Avenue

128.7 5 1.1 Vertical Slight rust spots 136.3 5 1.6 Vertical

147 5 0.8 Vertical

99.9 5 0.3 Panel Clean steel 124.3 5 0.3 Panel 126.4 5 0.2 Panel

38 8 0.4 Lintel Clean steel

55.9 8 0.2 Lintel 67 8 0.2 Lintel

51 Newland Avenue

-173.1 5 1.0 Vertical Some very slight rust spots -180.6 5 0.8 Vertical -164.5 5 1.1 Vertical

4.3 5 0.1 Panel Clean steel

53.2 5 0.1 Panel 87.3 5 0.2 Panel

125.4 8 0.2 Lintel Clean steel 118.4 8 0.1 Lintel

53 Newland Avenue

192.1 5 1.5 Vertical Rust spots 256.3 5 4.7 Vertical 208.9 5 1.2 Vertical

35.8 5 0.2 Panel Clean steel 44.9 5 0.2 Panel 27.9 5 0.2 Panel

44.7 8 0.3 Lintel Clean steel 27.7 8 0.2 Lintel 48.6 8 0.3 Lintel

5 Chadwick Drive

Page 39: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix

Table 1 Continued 36

-92 5 0.4 Vertical Some very slight rust spots -74.5 5 0.3 Vertical

-87 5 0.4 Vertical

49.9 5 0.2 Panel Clean steel 79.7 5 0.2 Panel 75.6 5 0.2 Panel

-96.9 8 0.2 Lintel Clean steel -99.3 8 0.1 Lintel -38.6 8 0.1 Lintel

9 Chadwick Drive

55.6 5 0.4 Vertical Some very slight rust spots 68 5 0.4 Vertical 70 5 0.3 Vertical

70.7 5 0.2 Panel Clean steel

66 5 0.1 Panel 20.6 5 0.1 Panel

15.6 8 0.0 Lintel Clean steel

115.2 8 0.2 Lintel 106.3 8 0.2 Lintel

65 Braithwell Road

97.3 5 0.9 Vertical Some very slight rust spots 102.7 5 0.9 Vertical 105.1 5 0.7 Vertical

120.3 5 0.5 Panel Some very slight rust spots 113.4 5 0.4 Panel

160 5 0.3 Panel

45 8 0.2 Lintel Clean steel 64.1 8 0.2 Lintel

109.9 8 0.2 Lintel 85 Braithwell Road

115.7 5 0.8 Vertical Some very slight rust spots 109.2 5 0.7 Vertical 113.9 5 0.7 Vertical

127 5 0.5 Panel Some very slight rust spots

153.9 5 0.5 Panel 170.3 5 0.6 Panel

140 8 0.2 Lintel Clean steel

110.2 8 0.1 Lintel 143.8 8 0.1 Lintel

Page 40: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix

37

Table 2 – Statistics of corrosion rate measurements.

Average 0.6 �m/y Maximum 4.7 �m/y Minimum 0.1 �m/y Number of Measurements 126 Number >1.0 �m/y 24 Percentage >=1 �m/y 19%

Page 41: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix

38

APPENDIX 1

Measuring the corrosion rate of reinforced concrete using linear polarisation resistance

Concrete Society Current Practice Sheet 132

See Also Concrete Society Technical Report 60

Electrochemical tests for reinforcement corrosion

Page 42: A Structural Assessment Of For By Curtins Consulting ... of Tar… · Appendix B Building Research Establishment (BRE) Digest 444 Part 2, Table 1 Appendix C Site Photographs Appendix

39

APPENDIX 2 – CONVERSION OF SECTION LOSS RATES TO TIME TO CRACKING AND TIME TO SPALLING

Section loss to achieve first crack is given by: xo = 83.8 + 7.4c/d -22.6fc,sp See reference 1 – Gonzalez et al. 1996 where xo = radius reduction (= ½ of section loss) c = cover (mm) d = bar diameter (mm) fc,sp = tensile splitting strength = 0.3(compressive strength)2/3 (Ref. 2). However, 1st crack is not a delamination or a spall. Typically spalling occurs when cracks are over 0.1mm wide. This can be calculated from the formula w = 0.05 + B[x – xo] See reference 1 – Gonzalez et al. 1996 were w = crack width <1mm B = 0.01 for top cast steel and 0.0125 for bottom cast steel x = bar radius reduction for crack width w xo = bar radius reduction for 1st crack as above Therefore x = xo +(w – 0.05)/B Therefore Time to first cracking is 2xo/S

Time to spalling is 2x/S Where S is the corrosion rate in micrometres section loss per year REFERENCES 1. Rodriguez, J. Ortega L. M. Casal J. and Diez J. M. Corrosion of Reinforcement and

Service Life of Concrete Structures. 7th Intl. Conf on Durability of Building Materials and Components. 1996; Stockholm.

2. Neville, A. M. Properties of Concrete. 1995; 4th Edition. pp309, 310.