A. Proposal Title: Storm Water Initiative Project (SIP): An Interdisciplinary Initiative and
Experiential Learning Opportunity to Promote the Campus as a Living Laboratory
B. Contact Information:
Hannah K. Morgan
607-436-3312
Sustainability Coordinator
202 Netzer Administration Building
C. Department: Finance and Administration
D. Amount Requested: $20,000
E. Project Summary:
In July 2013, Oneonta experienced an extreme weather event which dumped over 4.69
inches of water in a 24 hour period and generated over 2.9 million gallons of runoff from
impervious campus surfaces. SUNY Oneonta’s campus consists of approximately 30%
impervious surfaces, which creates a large runoff effect both on campus and within the Oneonta
community. There are many short-term and potentially costly solutions to storm water
management, but SUNY Oneonta has the opportunity to formulate an interdisciplinary,
systematic, educational and mindful solution using the intellectual resources of the campus to
solve this community-wide issue. This project will 1) support students and faculty with real-time
instrumentation for the collection of flow data, 2) create a rain garden and bioretention structure
with an appropriate aesthetic for our campus, and 3) assemble faculty from across the campus to
develop a strategic plan to integrate storm water management into the campus culture.
Section I: Narrative
A. Proposal significance and objectives:
The proposal is significant because it addresses a current problem the Office of Facilities
and the Maintenance Operations Center faces during extreme weather events and it provides an
educational, interdisciplinary and experiential learning opportunity for the campus community.
While an outside engineering consultant could be hired to address the storm water runoff issue, it
would cost tens of thousands of dollars and deprive the larger campus community of their input
and sense of ownership. Our approach to the storm water problem on campus will break down
the silos between the various disciplines and departments and promote interdisciplinary
collaboration and research among faculty, staff and students. This semester, a forum was
organized to gauge interest within the institution towards this broad community issue. Faculty
and staff members from 13 different areas attended the event including: History, Geography,
Philosophy, Earth and Atmospheric Sciences, Biology, Art, Economics, Environmental Science,
Communication Arts, Sociology, Finance and Administration, Facilities and Sustainability. The
enthusiasm and energy expressed during the forum solidified the momentum required to execute
phase one of this multiyear research, planning, design and construction project.
B. Contribution to the SP2010:
Sustainability is one of the six pillars in the Strategic Plan. This project has the potential
to integrate sustainable landscaping demonstration projects across campus including the
installation of rain gardens (bioretention), permeable pavers and green roof applications in
visible locations to educate the community on solutions to managing storm water runoff. Rain
gardens are depressions or shallow bowls integrated into the landscape which are designed to
hold and infiltrate water, utilizing soils with good percolation rates as well as native plants which
are adapted and suitable for wet conditions. In some cases, these plants have the ability to filter
and remove pollutants from storm water runoff (biological uptake). Permeable pavers are
constructed with strong structural materials which are laid in a grid system and are filled with
gravel or sod to promote the infiltration of storm water. Green roofs are vegetative layers on
rooftops which absorb, filter and retain storm water to reduce the total volume and flow to storm
water systems. These types of technologies have the potential to demonstrate to the student
population various sustainable design applications viable for specific landscapes.
In addition, this proposal supports the Student Engagement, Community Partnerships and
Teaching, Learning and Scholarship pillars. This proposal optimizes student experience by
engaging learning and student leadership by offering opportunities for students to participate in
the installation of the sustainable landscaping design technologies. This proposal seeks to
promote a collaborative partnership between the college and the City of Oneonta to mitigate the
storm water runoff issue. In addition, this initiative creates numerous cross-disciplinary
opportunities for coursework and research among the five schools. These pillars will be
addressed in more detail in Section C.
C. Linkage to any of the following priorities:
Experiential learning
This collaborative interdisciplinary initiative creates numerous education opportunities for
students across the disciplines including surveying the local community members on the
effects of storm water towards their neighborhoods (sociology), designing landscapes and
spaces which are both aesthetically and effectively capturing storm water runoff (art),
tracking historical data of past extreme weather events (history), assessing the public opinion
of the storm water management issue (communication arts), measuring the flow rate of storm
water inside the manholes (environmental science) and identifying native species to plant
within the rain gardens (biology).
Curricular infusion of pillars
This proposal directly infuses sustainability, student engagement and community
partnerships into the curriculum by teaching students to engage in the participatory planning
and design process and to be active citizens within the community, by promoting alliances
between the city and college. Integrating and installing demonstration projects around the
landscape engages the students by promoting a visible culture of sustainability across
campus.
Technology enhanced learning
Students hired to monitor the flow rates within the storm drain system will utilize dynamic
pressure or ultrasonic depth sensors and data loggers to measure and track the flow of storm
water over an extended period of time. This information will be used to perform a
comparative analysis of flow rates during extreme weather events.
Public/private partnerships
The City of Oneonta is affected and invested in the storm water management issues created
by the location and design of our campus. As the project progresses, the storm water working
group plans to collaborate with the city to design demonstration projects which optimize the
retention of storm water runoff.
D. Evidence that contributed to the decision to submit this request:
It has been documented that the campus has experienced an increase in significant rainfall events
which have overwhelmed the campus storm drain system. The campus is obligated to address
these issues, as they have the potential to affect the surrounding community.
E. How the activity will be assessed, using measurable, documented outcomes:
The activity will be assessed by tracking:
The number of student interns participating in the research project
The number of hours students worked towards addressing the project
The number of faculty members participating in the research project
The number of departments involved in addressing the storm water management issue
The number of courses incorporating the project as part of the curriculum
The flow rate data collected over an extended period of time
The number of demonstration projects installed on campus
The number of project updates communicated and broadcasted to the SUNY Oneonta
community
F. Implementation strategy and timeline:
The tentative schedule of phase one includes:
February 2014: Second Storm Water Management forum organized and project teams created.
March-May 2014: Monthly project team discussions and organization. Involve the City of
Oneonta. Students provide update at Student Research Expo (April).
June 2014: Strategic plan created for Storm Water Initiative Project
July 2014: Data collection begins (students) and presentation at Life of the Mind.
April 2015: Rain garden installed and public presentation of overall project timed for Earth Day.
G. Additional information: See Appendix B (Precipitation on Campus:Where Does it End Up?)
Section II: Funding Request- $20,000 (see excel sheet)
Student Labor: $2,000 (two students, $1,000 stipend)
Faculty Stipend: $3,000 (two faculty members, $1,500 stipend)
Instrumentation: $10,000 ( five flow rate sensors and five data loggers)
Demonstration Projects: $5,000 (two rain gardens)
Section III: Consultation- See Appendix A
Appendix A: Consultation
The Chief Information Officer has reviewed this proposal and verified potential costs as it relates
to technology:
[ ] Yes
[ ] No
[X] Not Applicable
Comments:
The Associate Vice President for Facilities has reviewed this proposal and verified potential
costs as it relates to facilities:
[X] Yes
[ ] No
[] Not Applicable
Comments: Tom Rathbone is aware of the Storm Water Management initiative and will be
consulted as the project progresses.
The Budget Director has reviewed this proposal and verified potential costs:
[ ] Yes
[ ] No
[X] Not Applicable
Comments:
The Senior Executive Employee Services Officer has reviewed this proposal and verified
potential costs as it relates to human resources:
[ ] Yes
[ ] No
[X] Not Applicable
Comments:
Other consultation (be specific):
Appendix B: Precipitation on Campus - Where Does it End Up?
Proposal Title: Storm Water Initiative Project (SIP)Point Person and contact information
Name: Hannah MorganCampus Phone: 607-436-3312Campus e-mail: [email protected]
Department/Unit: Finance and Administration
2014-15 2015-16 2016-17Personnel Costs:
Ongoing Salaries (PSR) $0Temporary Salaries (Temp Service) $3,000Student Employment (Student Temp Service) $2,000
Other Than Personnel Costs (OTPS) and Campus Recharges:Materials & Supplies $5,000Travel (not related to Professional Development) $0Contractual Services $0Student Scholarships $0Professional Development $0General Equipment $10,000
Contracts related to Equipment Maintenance $0Campus Storehouse $0Campus Telephone $0Campus Mail $0Campus Print Shop $0Capital Costs -- renovation $0Capital Costs -- new construction $0
Total Costs: 0.00 $0 $0 $0 $0 $20,000
Projected Amount Available:
$0
* Updated 12/2/2013
2013-2014 StAR Proposal -- Budget Template*
1-time Costs by yearRecurring (ongoing)
Costs:Use of Funds DescriptionNumber of Positions
Total 1-time Costs
Budget Detailplease enter whole dollars; enter fractions of positions in decimals (e.g. 1/2 time = 0.50)
Total Projected Other Funding Sources:
Reallocation of funds from existing resources (include account number, funding source)
New Funds (i.e. projected revenue generation)
Other Funding Sources: