A Project on Ekc Innovations

Embed Size (px)

Citation preview

Page 1: A Project on Ekc Innovations

7/29/2019 A Project on Ekc Innovations

http://slidepdf.com/reader/full/a-project-on-ekc-innovations 1/21

A project on

INNOVATIONSEKC Ltd.

By,

Nishad Khamkar

Sonia Mirajkar

Shashank Palande

Shailaja Patil

Ashwini Pokharkar

Aseem Halani

Page 2: A Project on Ekc Innovations

7/29/2019 A Project on Ekc Innovations

http://slidepdf.com/reader/full/a-project-on-ekc-innovations 2/21

About EKC

• Established in 1978

• 8 Manufacturing units around the globe.

• Restructured to public limited in 2001.

• Capacity to produce 500000 cylinders around the

globe.

• All major markets covered.

Page 3: A Project on Ekc Innovations

7/29/2019 A Project on Ekc Innovations

http://slidepdf.com/reader/full/a-project-on-ekc-innovations 3/21

Major competitors

• Rama cylinders

Bharat forge

• CPI industries USA

• Hi Tech industries Japan

Page 4: A Project on Ekc Innovations

7/29/2019 A Project on Ekc Innovations

http://slidepdf.com/reader/full/a-project-on-ekc-innovations 4/21

Photos of some plants

Page 5: A Project on Ekc Innovations

7/29/2019 A Project on Ekc Innovations

http://slidepdf.com/reader/full/a-project-on-ekc-innovations 5/21

Products

Page 6: A Project on Ekc Innovations

7/29/2019 A Project on Ekc Innovations

http://slidepdf.com/reader/full/a-project-on-ekc-innovations 6/21

Products

Page 7: A Project on Ekc Innovations

7/29/2019 A Project on Ekc Innovations

http://slidepdf.com/reader/full/a-project-on-ekc-innovations 7/21

Products

Page 8: A Project on Ekc Innovations

7/29/2019 A Project on Ekc Innovations

http://slidepdf.com/reader/full/a-project-on-ekc-innovations 8/21

Products

Page 9: A Project on Ekc Innovations

7/29/2019 A Project on Ekc Innovations

http://slidepdf.com/reader/full/a-project-on-ekc-innovations 9/21

Kaizen – idea generation.

Page 10: A Project on Ekc Innovations

7/29/2019 A Project on Ekc Innovations

http://slidepdf.com/reader/full/a-project-on-ekc-innovations 10/21

Kaizen Idea Sheet 

Shop: Spinning Section M/C: Pipe Cutting I / II /III m/cs Reg. No:  004 / 2010

Kaizen Theme :- Elimination of 

Unwanted Running of Hyd. Power pack. 

Kaizen Idea : Providing Automatic Timer to cut off powerwhile M/c. is running for Idle .

Problem/Present Status: Countermeasure: 

Kaizen Finish

15/6/10Kaizen Start

10% SavingTarget

To be calculateBench Mark

Team Members :-

Mr. Amol Pawar , Mr. Jadhav ,

Mr. V Sharma, Mr. Umesh Meher

Team Leader : M H Thakur Benefits:-

1) Mistake proofing foravoiding loss due toOperators oversight.2) Energy saving in safe

practices

Analysis: Unnecessary Running of elect.

Motor of Hyd. Power packResult:-

1 )Reduction in Energy consumptions2 )Safe running of machine .3) Optimum use of machine elements .4 ) Oil temp. will be in controlled zone ,

less oil leakages

* E xact calculations are to be done forsaving

Activity KK JH QM PM SH OTPM DM ET

Result Area P Q C D S M

Defect Type

C

No

M/C T/date Res. Status

1 PC1 15/7/10

Mr.Amol

2 PC2 15/7/10

Mr.Amol

3 PC3 15/7/10

Mr.Amol

This is applicable for All

Conventional Machines

Providing Automatic timer /

Relay to cut / switch off 

electrical motor ( 2 HP),

while Machine is not in Use

And Hyd. Power pack is on

Machine is running and

there is not having

mistake proofing for 

switching off the power 

when running in idlecondition . Unnecessary

Running of elect. Motor of 

Hyd. Power pack.

Why –Why Analysis

Continuous Running Elect. Motor .

M/cs. Running continuouslywithout stopping Hyd. Motor.

Forget / Fail to switchOff in idle /no load condition.

Page 11: A Project on Ekc Innovations

7/29/2019 A Project on Ekc Innovations

http://slidepdf.com/reader/full/a-project-on-ekc-innovations 11/21

Why – why analysis.

My car will not start. 

1. Why? - The battery is dead

2. Why? - The alternator is not functioning.

3. Why? - The alternator belt has broken.

4. Why? - The alternator belt was well beyond its useful service life

and has never been replaced.

5. Why? - I have not been maintaining my car according to the

recommended service schedule.

Page 12: A Project on Ekc Innovations

7/29/2019 A Project on Ekc Innovations

http://slidepdf.com/reader/full/a-project-on-ekc-innovations 12/21

OLD LAYOUT

Page 13: A Project on Ekc Innovations

7/29/2019 A Project on Ekc Innovations

http://slidepdf.com/reader/full/a-project-on-ekc-innovations 13/21

Benefits of proper layout

• Plays a major role in cost reduction

• Time reduction

• Continuous flow

• Maximum utilization of available space

• Flexibility as per predicted future demand

Page 14: A Project on Ekc Innovations

7/29/2019 A Project on Ekc Innovations

http://slidepdf.com/reader/full/a-project-on-ekc-innovations 14/21

New Layout

Page 15: A Project on Ekc Innovations

7/29/2019 A Project on Ekc Innovations

http://slidepdf.com/reader/full/a-project-on-ekc-innovations 15/21

Achievements through layout changes

• Smooth uninterrupted flow of cylinders

• Increase in productivity

• Maximum utilization of machinery

• Cost reduction from 360 to 210 per cylinder

• Flexibility in producing any size of cylinders

Page 16: A Project on Ekc Innovations

7/29/2019 A Project on Ekc Innovations

http://slidepdf.com/reader/full/a-project-on-ekc-innovations 16/21

 Spinning and furnace 

Page 17: A Project on Ekc Innovations

7/29/2019 A Project on Ekc Innovations

http://slidepdf.com/reader/full/a-project-on-ekc-innovations 17/21

Before change

PRODUCTION Capacity Achieved Variance

Causes of negative variances Previous Month

Major loss of hours Total

Set-

up

B/d Any

other N/L

 No plan,

 N/M

Lost

Hours

Productio

n

Qty

Lost

Hours

Spinning

m/c 1 11000 4280 6720 72.2 224.5 81.25 378 9690 181.25

m/c 2 12000 6700 5300 81 80.5 129.25 290.75 8549 239.75

m/c 3 8000 5404 2596 85.2 44.5 201 330.75 5156 259.5

m/c 4 12000 7083 4917 91 85.2 89.2 265.5 7051 281.75

23467 19533 30446

Page 18: A Project on Ekc Innovations

7/29/2019 A Project on Ekc Innovations

http://slidepdf.com/reader/full/a-project-on-ekc-innovations 18/21

After change

PRODUCTION Capacity Achieved Variance

Causes of negative variances Previous Month

Major loss of hours Total

Set-

up

B/d Any

other N/L

 No plan,

 N/M

Lost

Hours

Prodn

Qty

Lost

Hours

Spinning

m/c 1 15000 9015 5985 62.2 174.5 11.25 248 8546 235.75

m/c 2 15000 9874 5126 62.7 125.2 20.25 208.2 8916 222.25

m/c 3 8000 328 7672 55.5 69.25 320.5 445.2 240 473.75

m/c 4 15000 6237 8763 124 139.2 61 324.2 6507 249.5

m/c 5 15000 8394 6606 95.2 54.25 73.25 222.7 9809 181.75

33848 34018

Page 19: A Project on Ekc Innovations

7/29/2019 A Project on Ekc Innovations

http://slidepdf.com/reader/full/a-project-on-ekc-innovations 19/21

Process Flow

• Tube cutting

• Bottom forming

• Neck forming operation

• Heat treatment

• Neck machining

• Internal cleaning

• Hydraulic test

• Tightness test

Page 20: A Project on Ekc Innovations

7/29/2019 A Project on Ekc Innovations

http://slidepdf.com/reader/full/a-project-on-ekc-innovations 20/21

Page 21: A Project on Ekc Innovations

7/29/2019 A Project on Ekc Innovations

http://slidepdf.com/reader/full/a-project-on-ekc-innovations 21/21

Innovations in processes

• Capable to develop pull type of production

• Line balancing

• Transportation

 – Lead time reduction

 – Automation

• Elimination of unwanted processes

• Continues flow (no WIP)

• Ergonomics achieved