69 Soi Onnut 12 Sukhumvit 77, Suan Luang, Bangkok 10250 Thailand Tel. : (662)3329923 - 4 Fax. : (662)23329925
Bangkok
Pinthong Engineering I 3
The firm was founded in the year 1975 registered capital baht 2,000,000 and now the asset of baht 11,000,000.-, by Mr. Samarn Pinthongkam. It practices in the field of mechanical works, electrical works and in the year 1980, this firm established the civil works. In mechanical works, Pinthong Engineering engages with design, supply, installation and services of air - conditioning system, electrical system, supply and installation of acid fume gas exhaust, installation water pumps, service utilities and etc. In electrical works, Pinthong Engineering engages with design, supply, and installation from high voltage to lighting fixture including auto machine control of various projects. In civil works, Pinthong Engineering engages with construction of drainage system, waste water system, computer room, chimney and the associated foundation and buildings. Each project is carried out under the close supervision of our firm with day to day control by a senior professional. Thus clients are assured of the first class professional service and access to the entire resources of the firm. The organization is now strongly established, having already completed a number of very substantial projects.
Pinthong Engineering I 4
Pinthong Engineering I 5
Quality, Value And Integrity To Make Our World Better, Together
Pinthong Engineering I 6
Pinthong Engineering I 7
1. Engineering Services
1.1 Mechanical works, Pinthong Engineering engages with design, supply, installation and services of air conditioning system, electrical system, supply and installation of acid fume gas exhaust, installation of water pumps, service utilities and etc.
1.2 Electrical works, Pinthong Engineering engages with design, supply, and installation from high voltage to lighting fixture including auto machine control of various projects.
1.3 Civil works, Pinthong Engineering engages with construction of drainage system, waste water system, computer room, chimney, the associated foundation and buildings.
2. Engineering and Related Products Sourcing
We can source any materials, supply and equipment used in engineering projects; for example, pipeline, mechanical machine, sand/wood and safety equipment.
3. Investment in energy projects and real-estate business development
Pinthong Engineering is expanding into new investment of energy project in area of renewable energy e.g. biomass electricity plant. We also engage in buying and selling pieces of land all over Thailand, both as investor and reseller.
Pinthong Engineering I 8
Pinthong Engineering I 9
Pinthong Engineering I 10
MR. NARONGSAK SIRIMANATORN IT MANAGER
Note : Red text = contracted by project.
MR. SAMARN PINTHONGKAMPRESIDENT
MR. KASARN PIYAPIMOOKMANAGING DIRECTOR
MR. ARTID WONGMALAWANICH ASSISTANT MANAGING DIRECTOR
MRS. KWANJAI PINTHONGKAM SENIOR ADVISOR
MR. SIRA TINDUKASIRIPROJECT MANAGER
MR. ISARA KESONSILP IT & GRAPHIC DESIGNER
MR.JAKKRAPAT PORNSIRIANANPURCHASING MANAGER
MR. CHATCHAWAL KRIMITR PROJECT MANAGER
PURCHASING SECTION ACCOUNTING SECTION
HUMAN RESOUCE SECTION
ADMINITRATION SECTION
STORE SECTION
MISS. NILAWAN SIRIMANATORN FINANCE & ACCOUNTING
ENGINEER SECTION
MR. KAMPANART EAD‐R ‐REE PROJECT MANAGER
Pinthong Engineering I 11
MR. SAMARN PINTHONGKAM PRESIDENT
MR. KASARN PIYAPIMOOK MANAGING DIRECTOR MRS. KWANJAI PINTHONGKAM
SENIOR ADVISER
MISS. NILAWAN SIRIMANATORN FINANCE & ACCOUNTING
MANAGER MR. CHATCHAWAL KRIMITR PROJECT MANAGER
MR. ARTID WONGMALAWANICH ASSISTANT MANAGING DIRECTOR
MR.JAKKRAPAT PORNSIRIANAN PURCHASING MANAGER
MR. KAMPANART EAD-R -REE PROJECT MANAGER
Pinthong Engineering I 12
MR. SAMARN PINTHONGKAM Position President Qualification Bachelor of Engineering in Mechanical
Engineering, Chulalongkorn University. Professional Engineer of Thailand
Experience 1975 - Present Pinthong Engineering Company
Provides strategic direction for all projects and business units managing quality of work and client relationship.
Acts as executive advisor for all projects feasibility in area of engineering and finance.
Provides guidance in design and engineering of the company construction organizations and for the provision of engineering services, including management of an independently cost unit comprising project engineering, design and drawing office.
Liaisons with other divisions and companies within the group on the development and expansion of new areas of potential business. Most of these projects involving civil, mechanical and electrical work and many were carried out on a turnkey basis.
1966-1975 B.Grimm & Co. Project Manager - Responsible for
various project regarding air-conditioning system and electrical work. i.e,
- Pleonchit Arcade - Pranakom Milk - Bank of Thailand, Khon Ken
Branch - Bank of Thailand, Lampang
Branch Etc.
Pinthong Engineering I 13
MR. KASARN PIYAPIMOOK Position Managing Director Qualification
Bachelor of Engineering in Industrial Engineering, Chulalongkorn University
Master of Business Administration (MBA) in International Business, Long Island University, New York, USA
Master of Science in Computer Information System (MSCIS), Bentley College, Massachusetts, USA
Experience 2009 – Present Pinthong Engineering Company
Develops new business in construction, renewable energy and real estate.
Manages relationship with clients and ensures high quality of outcome from all projects.
Establishes operation plans for all units including Engineering, Human Resources and Finance & Accounting.
Sets long term growth plan and lead the execution to achieve the goals.
1995-2009 Accenture As a Senior Manager – managed a
business section of 100 personnel who are highly skilled in technical solution of ERP (Enterprise Resource Planning mostly SAP) and other system development (Java & .Net).
Established the remote/offshore Solution Center to provide the technical support for Thailand and many other countries in Asia and Europe Led the team in ERP project for technical and data solution in many regional projects e.g. Exxon Mobil, Shell and Unilever. Worked oversea with multi-national teams in Singapore, Malaysia, Japan and Oman
MR. ARTID WONGMALAWANICH Position Assistant Managing Director Qualification
Bachelor of Engineering in Mechanical Engineering, King Mongkut’s Institute of Technology Thonburi (KMITT)
Master of Business Administration (MBA) in Operations Management, National Institute of Development Administration (NIDA)
Experience 2010 – Present Pinthong Engineering Company
Develops and supports in construction, renewable energy projects.
Supervises plans, verifies and controls budget in Renewable energy projects.
Manages relationship with clients and coordinates with subcontractors and supplier.
2007 – 2010 PIYAVATE HOSPITAL Leading, Planning, Managing and
controlling the facility projects. Supervised line operations &
subcontractors and reported directly to General Supporting Director.
To ensure that all operating procedures for the property run efficiently including security, safety, emergency procedures and environmental policies.
Verify and control budget/cost. 2002 – 2007 Johnson Controls Wold Service
(Thailand) Co.,Ltd 1997 - 2000 ATT Consultants Co ., Ltd 1993 – 1997 Mitr Technical Consultants Co ., Ltd
Pinthong Engineering I 14
MR. CHATCHAWAL KRIMITR Position Project Manager Qualification
Bachelor of Engineering in Electrical Engineering, Rajamangala University of Technology
Experience 2009 – Present Pinthong Engineering Company
Plans, estimates and supports new business opportunities in construction, mechanical and electrical projects.
Plans and manages projects to high deliver quality results.
Manages all resources for projects including engineer, team leader and labor, tools and equipments.
Coordinate and resolve issues at project sites.
2001 - 2008 Electrical Engineering Consultant Designed electrical systems for many
condominium projects in Bangkok. 1992 - 2000 Pinthong Engineering Company
Estimated, designed and executed the work in structural, mechanical and electrical work. Projects included;
Suranaree University of Technology
Walailak University The Metropolitan Electricity
Authority (MEA), Pleonchit office 1991 - 1992 Berli Juker Public Company Limited
Worked in Engineering department on mutilple projects e.g. Siam Macro (Sri Nakarin), Ban Chang Plaza
1990 - 1991 Pinthong Engineering Company Estimated, designed and executed the
work in structural, mechanical and electrical work. Projects included;
Premier Corporation, Srinakarin Siam City Cement Public
Company Limited Karat Sanitary ware PCL
Pinthong Engineering I 15
Pinthong Engineering I 16
Project Manager MR. KAMPANAT EAD-A-REE Position Project Manager Qualification
Bachelor of Education in Architecture, Pranakorn Teachers College
Experience 2011 – Present Pinthong Engineering Company
Plans, estimates and supports new business opportunities in construction, mechanical and electrical projects.
Creates and executes project work plans and revises as appropriate to meet changing needs and requirements.
Manages all resources for projects including engineer, team leader and labor, tools and equipments.
Coordinate and resolve issues at project sites.
2009 - 2011 Sena Development Public Company Limited Planning, Managing and Supervision in
construction and Facility systems. Manages relationship and banking service
with clients and coordinates with subcontractors and supplier to meet target and safety.
2009 Piyachat Company Limited Coordinate and control all construction and
utility quality . Process and coordinate for obtaining necessary licenses
and permits.
2008 - 2009 Connels Engneering (Thailand) Co., Ltd. 2006 – 2008 Makerhome Co., Ltd. 2004 – 2006 White Consultant (Thailand) Co,. Ltd. 2001 – 2004 Confer Intuition Co., Ltd. 1998 – 2000 Eakbin Co., Ltd. 1996 – 1998 Sangpranee Co., Ltd. 1992 – 1996 Joe & Tinnakorn Co., Ltd.
Purchasing Manager MR. JAKKRAPAT PORNSIRIANAN Position Purchasing Manager Qualification
Bachelor of Construction Management, Sukhothai Thammathirat Open University
Experience 2011 – Present Pinthong Engineering Company
Implement procurement strategy and policies. Prepare purchase requisitions, approve and
issues purchase orders in accordance with company policy and negotiated terms and conditions.
Responsible for planning, developing and buying materials, parts, supplies and equipments in a timely and cost effective way; timely manner while maintaining appropriate quality standards and specifications.
Track Purchasing activity and measurements. 2000 - 2009 N.P.C. Neo-Life
Identifies resources needed and assigns individual responsibilities.
Manages day-to-day operational aspects of a project and scope.
Creates and executes project work plans and revises as appropriate to meet changing needs and requirements.
1993 - 2000 Thaifa Group Co., Ltd. Reviews deliverables prepared by team before
passing to client. Effectively applies our methodology and enforces
project standards. Order materials and services as per negotiated and
appropriately approved. Coordinate and control all construction and utility
quality . 1988 - 1993 Union Fur Décor Co., Ltd. 1987 - 1988 Tortrakul and Associates Consulting Engineer
Limited. 1986 – 1987 Trangrung Business 1983 – 1986 Arkar Syndicate
Pinthong Engineering I 17
Pinthong Engineering I 18
Pinthong Engineering I 19
Double A
Pinthong Engineering has been engaged by Advance Asia Engineering; one of Shaiyo AA (a subsidiary of the Double A Group); to perform the construction works of two new 9.9 MW Biomass Power Plants (approximate utility space of 13,726 sq.m.) first one at Chonburi province and second one at Khonkaen province. These Biomass Power Plants use woodchip that wasted form production paper and produce electricity to sell the Provincial Electricity Authority (PEA). Scope of Construction works - Fuel Handling Warehouse (Chonburi province) - Turbine House (Chonburi province) - Cooling Tower (Chonburi province) - Fuel Handling Warehouse (Khonkaen province) - Turbine House (Khonkaen province)
Pinthong Engineering I 20
Pinthong Engineering was engaged with Sanguan Wongse Industries Co., Ltd to perform civil design and construction of a new 8 MW Sanguan Wongse Biogas Power Plant, at Nakornratchasima province. This biogas power plant uses tapioca cake which is waste from production of starch manufacturing plant to produce electricity to sell to the Provincial Electricity Authority (PEA). Pinthong Engineering has produced related shop-floor drawing and delivered as-built drawings as final deliverables. Scope of civil works includes
- Generator House - Office - Pump Houses - Mixing Ponds - Diversion weir - Chemical Tank Foundation - Blower Houses - etc.
Sanguan Wongse Industries Co., LTD
Pinthong Engineering I 21
Pinthong Engineering Ltd. was appointed by Energica Company Limited to install Micro-Emulsion System for Kimberly-Clark Thailand Limited manufacturing plant at Pathum Thani province. Micro-Emulsion System mixes oxygen into furnace oil to feed as fuel to boilers. This system can reduce the fuel consumption upto 15% while enhance the combustion performance of boilers. Mechanical Work
Designed new water pipe, fuel pipe and related electrical systems.
Installed Micro-Emulsion System
Installed new water pipe, fuel pipe and related electrical systems.
Performed integration test of Micro-Emulsion System and boilers.
Supported commissioning of the new system.
Kimberly-Clark Thailand Limited
Pinthong Engineering I 22
Pinthong Engineering Ltd. was appointed by Energica Company Limited to install Micro-Emulsion System for Serm Suk Public Company Limited manufacturing plant at Pathum Thani province. Micro-Emulsion System mixes oxygen into furnace oil to feed as fuel to boilers. This system can reduce the fuel consumption upto 15% while enhance the combustion performance of boilers. Mechanical Work
Designed new water pipe, fuel pipe and related electrical systems.
Installed Micro-Emulsion System
Installed new water pipe, fuel pipe and related electrical systems.
Performed integration test of Micro-Emulsion System and boilers.
Supported commissioning of the new system.
Serm Suk Public Co ., Ltd
Pinthong Engineering Lp. Tender for ENCON project, work group I and common user facilities was awarded by Foster Wheeler (GB.) The work is composed of A. Civil Work
To carry out the construction of foundations of pumps, refinering towers, pipe lines, fabrication shop, road, area fence, transformer fence, isotope pit. B. Electrical Work
To carry out the construction of electrical supply front transformer to fabrication shop for welding machine. C. Mechanical Work
To carry out the construction of underground fire fighting pipe included excavation and backfill. D. Sanitary System
To construct the water supply system for toilet, area, to construct the under ground steel sewer pipe including excavation, sheet piling R.C. pipe, flood dam for facilities.
ESSO STANDARD (THAILAND)
Pinthong Engineering I 23
Pinthong Engineering has been engaged with The Royal Bangkok Sports Club for the following works. A. Drainage Pipe
To carry out the construction and installation of drainage pipes (2 dia 500 mm.Pipes) from Polo Club along Soi Sanam Polo 5 to Klong Paisingto including repairing the road that has been damaged because of the installation of the drainage pipes.
B. Sanitary System & Electrical System To carry out the construction and installation of all lighting fixtures, receptacles, switches, distribution boards, panel boards, transformers and other works for electrical system, sanitary system and fittings, water supply lines, waste and drainage lines, hydro pneumatic storage tank, septic tank and other works for sanitary system.
C. Air - Conditioning and Ventilating system To carry out the construction and installation air conditioning ventilating system to squash
badminton courts, bar, dining room office, lounge, conference room and etc. D. Sand filter and circulating pumps for Olympic size swimming pool 2 x sand filter capacity 220 cum / hr. including chemical feeder. NOTE : Including preparing for shop drawings and as-built drawings.
The Royal Bangkok Sports Club
Pinthong Engineering I 24
Pinthong Engineering I 25
Metropolitan Water Works Authority Of Thailand
Pinthong Engineering Lp. was appointed by Thai - Scan Co., Ltd. To supply and install for the following works of Metropolitan Water Works Authority of Thailand for Sam Lae Pumphouse. A. Electrical System
To carry out the construction and installation of all lighting fixtures, receptacles, switches, distribution boards, panel board. Kent instrument automatic stand by Gen - Set and etc.
B. Air - Conditioning and Ventilating System
To carry out the construction of air conditioning and Ventilating system to pump house.
C. Pump and Vacuum System
To carry out the construction and installation of sump pump, pump priming, emergency system, vacuum system and etc.
NOTE : Including preparing for shop drawings and as - built drawings.
Pinthong Engineering I 27
NO. YEAR OWNER PRIME CONTRACTOR DESCRIPTION AMOUNT
BAHT
1
1976-1976
Bangkok Marketing Co.,Ltd.
-
Supply and install of air condition
system
125,000.00
2
1976-1976
The Thai Military Bank Ltd. Nasarn Branch -
Supply and install of air condition
system
121,000.00
3
1976-1976
The Thai Military Bank Ltd. Klongjan Branch -
Supply and install of air condition
system
95,000.00
4
1976-1976
The Thai Military Bank Ltd. Nakorn Phanom Branch -
Supply and install of air condition
system
118,700.00
5
1977-1977
Srithima Construction Lp. -
Supply and install of air condition
system
120,000.00
6
1977-1977
The Thai Military Bank Ltd. Lampang Branch -
Supply and install of air condition
system
115,530.00
7
1977-1977
Sahathai Garment Co.,Ltd.
-
Supply and install of air condition
system
62,500.00
8
1978-1979
Thai-Scan Co.,Ltd.
-
Supply and install of electrical
component for 4 x 250 Hp raw water pump at
Sam Lae pumping
station for MWWA Project
1,373,898.00
Pinthong Engineering I 28
NO. YEAR OWNER PRIME CONTRACTOR DESCRIPTION AMOUNT
BAHT
9
1978-1978
Prince of Songkla University,
department of Scicence -
Supply and install of acid fume
gas exhaust
165,000.00
10
1978-1978
Thai Plastic Chemical Co.,Ltd.
-
Fabricate and install of high
pressure exhausted fans
for plastic pneumatic conveyor
54,860.00
11
1979-1979
The Siam Kraft Paper Co.,Ltd. Radburi
-
Supply of air conditioning
equipments and control accessories for high accurate temperature and
humidity (+1c & 1%) for paper
testing lab
310,000.00
12
1979-1979
Christiani & Nielsen (Thai) Ltd. -
Supply and install of air condition
system with equipment
382,664.00
13
1979-1980
Siam Technology Co.,Ltd.
-
Supply and install of electrical
testing for other equipment(water treatment system & waste water
treatment system) of Siam Agro
290,100.00
Pinthong Engineering I 29
NO. YEAR OWNER PRIME CONTRACTOR DESCRIPTION AMOUNT
BAHT
14
1980-1980
Christiani & Nielsen
(Thai) Ltd. -
Industry at Rayong
Supply and install of air conditioning
system with equipment
201,600.00
15
1979-1979
Treasury Department -
Supply and install of exhaust
system for coin making plant
785,000.00
16
1979-1979
Royal Danish Embassy
Christiani & Nielsen
(Thai) Ltd.
Supply and install of air-conditioning
for The Royal Danish Embassy
256,700.00
17
1979-1980
Phitsanuloke Danish Highway
Christiani & Nielsen
(Thai) Ltd.
Supply and install split system Air condition for
Phitsanuloke Danish Highway
157,175.00
18
1979-1980
Royal Danish Embassy
Christiani & Nielsen
(Thai) Ltd.
Supply and installation of the
air conditions system including
air duct and insulation etc. for
The Danish Embassy
267,250.00
19
1979-1980
Christiani & Nielsen (Thai) Ltd.
-
Supply and installation of
mechanical and electrical works at
Khon Kaen
860,119.00
20 1980-1980 Office of The Atomic Supply and install
of acids fume 760,000.00
Pinthong Engineering I 30
NO. YEAR OWNER PRIME CONTRACTOR DESCRIPTION AMOUNT
BAHT
21
1980-1980
Esso Standard Thailand Ltd.
-
Design the fabrication of water cooled
moisture removal for
1200 cuft / min compressed air
system
64,000.00
22
1980-1980
Communication Facilities -
Install of air-conditioning
system for all buildings and lighting at Dome
895,110.00
23
1980-1983
Royal Thai Navy Dockyard Department
-
Install of completed electrical
system including control units at
Royal Thai Navy Dock Yard
Department, Pom Prachul
5,700,000.00
24
1980-1980
The Royal Bangkok Sports Club
Department of Mineral (Thai) Ltd.
Supply and install of acid fume
and install water pipe size 1,500 gal / min 60 Hp with 2 set of equipment for
swimming pool atThe Royal
Bangkok Sports Club
430,000.00
Pinthong Engineering I 31
NO. YEAR OWNER PRIME CONTRACTOR DESCRIPTION AMOUNT
BAHT
25
1980-1980
The Royal Bangkok Sports Club
Christiani & Nielsen
(Thai) Ltd.
Renovation of water pipe system and install water pipe size 1,500 gal / min 60 Hp
with 2 set of equipment for
swimming pool atThe Royal
Bangkok Sports Club
190,781.00
26
1980-1983
The Royal Bangkok Sports Club
-
Supply and installation of
elec- trical works the
whole area
Supply and construction of
Sani- tary system
Total
15,128,000.00
10,252,916.00
25,380916.00
27
1980-1981
Christiani & Nielsen (Thai) Ltd.
-
Supply and installation of
elec- trical work for buildings of 5
storeys, 3 storeys and 1 storey
Supply and
installation of air - condition system for buildings of
5 storeys, 3 storeys and 1 storey
15,820,000.00
5,200,000.00
Pinthong Engineering I 32
NO. YEAR OWNER PRIME CONTRACTOR DESCRIPTION AMOUNT
BAHT
Supply and installation of
sani -tary work including piping for water supply
Total
12,500,000.00
33,520,000.00
28
1981-1981
Mobil Oil (Thailand) Co.,Ltd.
-
Construct the computer room size 3 m. x 5 m., gypsum board partition with
half shatter glass and aluminium
door freame Elec- trical equipments and accessories
220,000.00
29
1981-1983
Electricity Generating Authority of Thailand
-
Subcontractor of Thai Scan Co.,
Ltd.- Tileman JV for constructing
the thermal plant Chimney unit 1& 2 (122 m. high) at
Bang Pakong
12,000,000.00
30
1982-1983
CIBA-CEIGY (Thailand)
-
Construct and supply of De - mineral piping,
sewage pipe, fire fighting pipe and fire pump, air -
conditioning system,
electrical supply and transformer
6,873,170.00
Pinthong Engineering I 33
NO. YEAR OWNER PRIME CONTRACTOR DESCRIPTION AMOUNT
BAHT
31
1982-1982
Mobil Oil (Thailand) Co.,Ltd.
-
Construct the Oil piping from
wharf to the distribution system and storage tank
1,127,700.00
32
1982-1983
Thai Airways International Ltd.
Komol Sukosol Electrical Co.,Ltd.
Electrical installation system
for Orchid Project
Supply and install of
air conditioning for JET ENGINE TEST
FACILITY of Donmaung Air Port
of Thai Air way International Ltd.
Total
1,760,000.00
1,717,035.00
3,477,035.00
33
1983-1983
Siam City Cement Co.,Ltd.
-
Electrical erection work, raw mill no.4
Electrical erection work, kiln & cooler
Supply skill and semi
labour for control, power, high voltage
electrical system
Total
587,207.00
765,991.00
1,224,138.00
2,577,336.00
34
1983-1983
Sriracha Panich Co.,Ltd.
-
Construction of the chilly sauce
new factory complete with
air - conditioning system, water
supply and electrical system
4,873,000.00
Pinthong Engineering I 34
NO. YEAR OWNER PRIME CONTRACTOR DESCRIPTION AMOUNT
BAHT
35
1983-1984
International Capsule Co.,Ltd.
-
Supply and install air conditioning
system and electrical system
Supply and install air conditioning
System
Total
2,700,000.00
621,260.00
3,321,260.00
36
1983-1984
F.E. Zuelling (Bangkok)
- Supply and install
water system, gas pipe system
1,041,370.00
37
1983-1984
International Capsule Co.,Ltd.
-
38
1983-1984
Pinthong Engineering Lp.
-
Construction of Pinthong Engi -
neering Lp.Office and warehouse
complete at Patanakarn road
5,000,000.00
39
1984-1984
Esso Standard (Thailand) Ltd.
Foster Wheeler (G.B) Ltd.
Fire protection concrete encase-
ment for steel structure Sriracha
Refinery Modification /
ENCON Project Contract
no. 56/2876
Sriracha Refinery Modification /
ENCON Project Contract no. 62/2876 road
reconstruction in oil Tank Farm
1,896,942.00
270,083.00
Pinthong Engineering I 35
NO. YEAR OWNER PRIME CONTRACTOR DESCRIPTION AMOUNT
BAHT
Sriracha Refinery Modification/ENCON
Project FW (G.B.) Contract no. 1-14-2876/9 (Package 1)-
Construction of iron fence around the
extension area and around transformer.
Construction of concrete piper for the
machinery construction of under
ground drainage system, fire hydrant
system and construction of the support oil piping
Sriracha Refinery
Modification / ENCON Project
FW (G.B.) Contract no. 1 - 14 -
2876/9 Package no. II(Common
User Facility) site clearing,
cleaning existing drainage system,
construction of one unit of
general work shop (360 sqm.)
construction of reservoir,
bathroom and install water pipe
Total
3,422,977.00
2,501,697.00
8,091,699.00
Pinthong Engineering I 36
NO. YEAR OWNER PRIME CONTRACTOR DESCRIPTION AMOUNT
BAHT
40
1984-1984
The Royal Military Academy (9101) -
Supplied & Installation Electrical
system and stringing work for
guesthouse at Nakornnayok
1,590,000.00
41
1985-1986
Sukhumvit Condominium
Co.,Ltd.
-
Sanitary & Fire Protection
system contractor Golden Tower
Project The installation of sani
- tary system and fire protection
system for A 26 storey office
building, comprising of
water pumps of 1,540 gpm, Drainage pumps of 775
gpm., Engine fire pumps of 775 gpm,
Electric fire pumps of 775 gpm,
water distri- bution piping soil
and waste piping, sprinkler
piping, drainage piping and septic
system
17,741,000.00
Pinthong Engineering I 37
NO. YEAR OWNER PRIME CONTRACTOR DESCRIPTION AMOUNT BAHT
42
1985-1985
CEI Co.,Ltd. (Pathumtanee)
-
Supplied and Installation air-
condi- tion system, 199 ton Chiller Unit
6,873,170.00
43
1985-
1985
Siam City Cement Co.,Ltd.
-
Supplied and Installation for control power high voltage
electrical system
764,686.00
44
1985-
1986
The Royal Military Academy
-
Supplied and Installation elec - trical system, sanitary system and plumbing
system for hospital & head
office (Bldg # 7100 & # 1100)
19,200,000.00
45
1985-
1986
Loxley (Bangkok) Co.,Ltd. -
Installation of Project Railway
signal & telecommunica
tion system Chachoensao -
Sataheep, including 38 kg underground signal cable,
signal port RC foundation,
control houses
3,986,528.45
Pinthong Engineering I 38
NO. YEAR OWNER PRIME CONTRACTOR DESCRIPTION AMOUNT BAHT
46
1986-1987
Thai Airways
International Ltd
Ch.Karnchang Co.,Ltd.
Supply & install of electrical
system for repairing shop of Thai Airways
International Ltd. At
Donmuang Air Port
5,700,000.00
47
1986-1989
The Government Saving Ban
Ch.Karnchang Co.,Ltd.
Supply & install of electrical system for 10
stories building of
The Government Saving Bank
9,400,000.00
48
1986-1987
CEI Co.,Ltd. (Pathumtanee)
-
Supply & install of electrical system for The
Factory
480,000.00
49
1986-1987
Siam City Cement Co.,Ltd.
-
Installation of Electrical system
for The Factory
1,325,932.00
50
1986-1986
National Research
-
Air Conditioning system
- Humidity and Temperature
control by computer and
record room condition
by printer -Split-type air
conditioner for general
737,690.00
Pinthong Engineering I 39
NO. YEAR OWNER PRIME CONTRACTOR DESCRIPTION AMOUNT
BAHT
51
1986-1987
Rama IX Royal Park -
Sanitary system for building comprising of gold water
pump and piping soil and waste
piping, sewer piping
1,665,012.00
52
1987-1988
Phuket Deep Sea Port -
Design installation electrical
plumbing & pipe net work
10,752,612.25
53
1988-1988
ESSO Standard Thailand
Sembawang Thailand
Civil works for Desalter Project ESSO Standard Thailand Srira -
cha refinery
1,889,510.00
54
1988-1989
Lim Charoen Construction
-
Supply & installation of
traffic signal and steel lighting of Rama IV express
way
1,312,475.00
55
1988-1988
Rama IX Royal Park
-
Supply & installation of
fountain system for French
Garden at Rama IX Royal Park
156,043.00
Pinthong Engineering I 40
NO. YEAR OWNER PRIME CONTRACTOR DESCRIPTION AMOUNT
BAHT
56
1988-1989
R.S.R. (Gec Telecommunication
Limited)
-
Design and construction of train dispatcher
telephone system Project Contractor' s
Central Depot Bang Sue
3,100,000.00
57
1988-1990
Bangpoo Industrial Estate
Construction (Export Zone)
-
Construction, Supply
equipment & installation of waste water
treatment plant and construction of pump houses (7 pumps) and
lighting for molding
20,000,000.00
58
1988-1989
The Foundation of Jesus
Christ of Later-day Saints
-
Complete contruction of
The Mahasarakam
Chapel Meeting House Project
6,466,481.00
59
1988-1990
Thai-Ousnor
-
Installation & supply
equipment for high power
transmission line and lighting for
molding
2,542,367.00
Pinthong Engineering I 41
NO. YEAR OWNER PRIME CONTRACTOR DESCRIPTION AMOUNT
BAHT
60
1988-1990
Premier Corperate
Park Co.,Ltd.
-
Supply & installation electrical
system, sanitary system and fire
protection system for
Premier Corperate Park,
Srinakarin Rd.
23,241,458.00
61
1988-1989
T.G. Sanitary Ware Co.,Ltd.
-
Supply & installation of
electrical system
2,563,947.00
62
1989-1990
Cpac Monier Factory
-
Construction Cpac Monier
Factory Nern Mok Bangbung Cholburi
28,164,543.00
63
1989-1990
Ch.Karnchang
Co.,Ltd.
-
Supply and installation of
electrical system for P. T. E.
officePrakanong
3,053,799.00
64 1989-1990
Joint Venture Ch.Karnchang
Co.,Ltd. - Tokeaw Construction
- Ch. Karnchang Tokeaw
-
Supply & installation of
electrical system and
instrumentation for
P. W. W. A - Nakornratchasima
19,132,693.00
Pinthong Engineering I 42
NO. YEAR OWNER PRIME CONTRACTOR DESCRIPTION AMOUNT
BAHT
65 1989-1990
Siam City Cement Co.,Ltd. -
Supply & installation of
electrical system for show
room & staft housing and
sanitary ware & roof
Tiles Building Nakornratchasima
2,150,000.00
66 1990-1990
Capac Monier Factory -
Reservoir construction and
water treatment system
installation at Cpac Monier
Factory Nern Mok Bangbung Cholburi
6,452,341.00
67
1990-1990
Karat Sanitary Ware Co.,Ltd.
-
Supply & installation of
electrical system Saraburi
5,822,841.00
68
1990-1991
The Foundation of Jesus Christ
-
Complete construction of
Asoke Chapel Meeting
House Project
3,426,260.00
69
1990-1991
Karat Sanitary Ware Co.,Ltd.
-
Supply & installation of
electrical system for 4th
Project of Karat Saraburi
3,958,262.00
Pinthong Engineering I 43
NO. YEAR OWNER PRIME CONTRACTOR DESCRIPTION AMOUNT
BAHT
70 1990-1991 C.T.Square Co.,Ltd. -
Supply & installation of air
- conditioning system and
ventila tion system - Bangkok
Supply &
installation of Sanitary system
and fire protection system
– Bangkok
Total
24,132,800.00
27,939,885.35
52,072,685.35
71 1990-1991
Pattaya Plaza Condotel Project,
Cholburi
Chat Development
Co.,Ltd.
Supply & installation of
electrical system for 2 units of 12
stories condominium
"Pattaya Plaza Condotel Project"
Cholburi
21,362,604.00
72
1991-1992
Assumption Tippawan Somrong -
Supply & installation of Waste Water
Treatment system
750,000.00
73
1991-1992
Metropolitan Electricity Authority
(MEA)
Ch.Karnchang Co.,Ltd.
Supply & installation of
sanitary system, fire protection
system and waste water
treatment for head quater for MEA Pleanchit
21,704,900.00
Pinthong Engineering I 44
NO. YEAR OWNER PRIME CONTRACTOR DESCRIPTION AMOUNT
BAHT
74
1991-1992
University Technology Suranaree
Nakornratchasima
Ch.Karnchang Co.,Ltd.
Supply & installation of electrical system
and Sanitary system for University
Technology Suranaree
Nakornratchasima
Supply & installation of
electrical system for University
Tecnology Suranaree (Land-
Scape) - Na - Kornratchasima
Total
44,000,000.00
26,500,000.00
70,500,000.00
75
1994-1994
Karakarn Holding Co.,Ltd.
-
Completely installation electrical
and communication
system Karakarn Building
Silom Soi 5
4,100,000.00
76
1995-1995
Siam City Cement Co.,Ltd.
-
Installation of Electrical system for The Factory
5,811,302.00
Pinthong Engineering I 45
NO. YEAR OWNER PRIME CONTRACTOR DESCRIPTION AMOUNT
BAHT
77
1995-1998
Valiluck University
Ch.Karnchang Co.,Ltd.
Phrompratharn Construction
Ltd.,Part.
Supply & installation of
- Construction for Building F2
- Electrical system for Building
F1, F2, F3, F4, F5 -Sanitary system for Building F2
for Valiluck University
Supply &
Installation of Sanitary
system, waste water treatment
and fountain system for
Valiluck University (Land-
scape)
Total
74,493,428.05
46,080,380.56 120,573,808.61
78 2009 Woodside (Australia)
at Lamchabang Industrial Estate
PECI-Thai
Supply manpower in Electrical and Instrument work
for module/prefabrication of Pluto LNG
project
6,600,000
79 2009
Sanguan Wongse Energy Company at Nakornrachasima
/Thailand -
for 8 MW biogas power plant
including Generator House, Office, Diversion Weir, Mixing Pond,
Blower houses
25,000,000
Pinthong Engineering I 46
NO. YEAR OWNER PRIME CONTRACTOR DESCRIPTION AMOUNT
BAHT
80
2009
Siam Cement Group (MOC Cracker Project) at Maptaphut / Thailand
Thai Rotary Engineering
Public Company Limited
Electrical & Instrument work including cable,
lighting and equipment installation
404,000
81 2009 Foster Wheeler Service
(Thailand) Limited at Ban Chang / Thailand
- Welder Manpower Supply 588,000
82
2010
Serm Suk Public Co ., Ltd Energica
Piping & Electrical system of Micro –
emulsion Technology for
Bioler
193,380
83 2010 Kimberly-Clark Thailand Co ., Ltd Energica
Piping & Electrical system of Micro –
emulsion Technology for
Bioler
153,044
84
2010 Asia Satellite Tv (ASTV) -
Revonate ASTV Shop including, Air Condition, Electrical and
sanitary system
1,988,000
Pinthong Engineering I 47
NO. YEAR OWNER PRIME CONTRACTOR DESCRIPTION AMOUNT
BAHT
85
2011 (Under
Construction)
Advance Asia
Engineering (a subsidiary of the Double A
Group)
-
Construction
works of Biomass Power Plant (9.9
MW) at Chonburi and Khonkaen
Province)
96,750,000
86 2011 (Under
Construction)
SAMAPHAN INTERNATIONAL
Co.,ltd -
Renovate Samaphan
International Office (FL.3) including Electical System
1,520,328
Pinthong Engineering
Pinthong Engineering I 49
Pinthong Engineering I 50
Pinthong Engineering I 51
Pinthong Engineering I 52
Pinthong Engineering I 53
Pinthong Engineering I 54
Pinthong Engineering I 55
Pinthong Engineering I 56
Pinthong Engineering I 57
Pinthong Engineering I 58
Pinthong Engineering I 59
Pinthong Engineering I 60
Pinthong Engineering I 61
Pinthong Engineering I 62
Pinthong Engineering I 63
Pinthong Engineering I 64
Pinthong Engineering I 65
Pinthong Engineering I 66
Pinthong Engineering I 67
Pinthong Engineering I 68
Pinthong Engineering I 69
Pinthong Engineering I 70
Pinthong Engineering I 71
Pinthong Engineering I 73
Pinthong Engineering I 74
Pinthong Engineering I 75
Pinthong Engineering I 76
Pinthong Engineering I 77
Pinthong Engineering I 78
Pinthong Engineering I 79
Pinthong Engineering I 80