A Presentation to the GSMA, GPM meeting in Doha, Qatar, April 18 2012

A Presentation to the GSMA, GPM meeting in Doha, Qatar, April 18 2012

Empowering the Wind to Energize the WorldEmpowering the Wind to Energize the World

Mats VilanderGeneral Manager, SVP Global Telecom

Page 2: A Presentation to the GSMA, GPM meeting in Doha, Qatar ...€¦ · A Presentation to the GSMA, GPM meeting in Doha, Qatar, April 18 2012 Empowering the Wind to Energize the World

2

Agenda

1. Wind turbine solutions for telecom sites

2. Drivers for adding wind

3. Case studies for a Telecom Site1. Adding wind

2. New site

Page 3: A Presentation to the GSMA, GPM meeting in Doha, Qatar ...€¦ · A Presentation to the GSMA, GPM meeting in Doha, Qatar, April 18 2012 Empowering the Wind to Energize the World

3

Telecom references

Page 4: A Presentation to the GSMA, GPM meeting in Doha, Qatar ...€¦ · A Presentation to the GSMA, GPM meeting in Doha, Qatar, April 18 2012 Empowering the Wind to Energize the World

4

• Fully utilising the existing site space and infrastructure– Site Space in tower not fully utilised

– A light weight wind turbine can be used in the existing infrastructure, fully integrated into the site (max wind-load on 105 Kg f at 65 m/s)

– Easy to install

• OPEX Saver: – Reduce up to 50% of the diesel consumption

for existing remote rural sites, sometimes up to 100% of diesel (repeater sites)

– Save O&M costs for diesel gen. sites

• CAPEX Saver: – Reduce the usage of diesel

up to 100% for new sites

Value Proposition for Mobile Operators

Page 5: A Presentation to the GSMA, GPM meeting in Doha, Qatar ...€¦ · A Presentation to the GSMA, GPM meeting in Doha, Qatar, April 18 2012 Empowering the Wind to Energize the World

5

Operator Business Case

• Comparison of costs for three types of off-grid sites:

– 100% diesel

– Hybrid (DG + controller & batteries)

– Hybrid (DG + controller & batteries + wind

• Assumptions

– Site load: 2 kW

– Wind turbines: 1

– Average wind speed: 7 m/s

– Diesel price: 0,3 USD/l

• Conclusion

– Cost reduction of more than 50%

– Annual saving of 24,000 USD for hybrid cases

– Payback in less than 2 years

Page 6: A Presentation to the GSMA, GPM meeting in Doha, Qatar ...€¦ · A Presentation to the GSMA, GPM meeting in Doha, Qatar, April 18 2012 Empowering the Wind to Energize the World

6

Business Case Hybrid Battery Diesel and Wind

Business case

Case Diesel only Hybrid Wind hybrid Year 1 2 3 4 5CAPEX 8 500 13 500 24 100 Diesel only 24340 24340 31840 24340 25340OPEX yearly 24 340 16 266 11 940 Hybrid 23 266 16 266 17 266 16 266 26 766OPEX monthly Wind hybrid 29 540 11 940 11 940 11 940 15 940

Accumulated Savings5 year expenditure Diesel only 24340 48680 80520 104860 130200CAPEX 8 750 15 500 19 600 Hybrid 23265,714 39 531 56 797 73 063 99 829 30 371 23%OPEX 121 700 81 329 59 699 Wind hybrid 29539,78 41 480 53 419 65 359 81 299 48 901 38%TOTAL 130 450 96 829 79 299Saving 33 621 51 151

25,77% 39,21%

0

50 000

100 000

150 000

Dieselonly

Hybrid Windhybrid

US

D

5 years expenditure

CAPEX

05 000

10 00015 00020 00025 00030 00035 000

1 2 3 4 5

US

D

Yearly costs

Dieselonly

020000400006000080000

100000120000140000

1 2 3 4 5

US

D

Accumulated costs

Dieselonly

* Assumes 2 Wind turbines per site

Page 7: A Presentation to the GSMA, GPM meeting in Doha, Qatar ...€¦ · A Presentation to the GSMA, GPM meeting in Doha, Qatar, April 18 2012 Empowering the Wind to Energize the World

7

Business Case Hybrid Battery Diesel and Wind

0

10000

20000

30000

40000

50000

60000

1 3 5 7 9 11 13 15 17 19 21 23

US

D

Accumulated costs per month

Diesel only Hybrid added Wind hybrid added

-20000-15000-10000-5000

05000

1000015000

1 3 5 7 9 11 13 15 17 19 21 23

US

D

Cost saving (Per Month)

Diesel only Hybrid added Wind hybrid added

* Assumes 2 Wind turbines per site

Page 8: A Presentation to the GSMA, GPM meeting in Doha, Qatar ...€¦ · A Presentation to the GSMA, GPM meeting in Doha, Qatar, April 18 2012 Empowering the Wind to Energize the World

• The site was originally powered by a diesel generator and the SAM controller. In January 2012, the Airdolpin PRO wind turbine was added.

• The wind turbine is used on a hybrid site as a mean to charge batteries, thus reducing diesel consumption.

• Technical

– Turbine: Airdolphin PRO (48 VDC)

– Site: Telecom site

– Power: Diesel, batteries and wind

– Battery 720 Ah @ 48 Volt

– Load 50 A DC

Location: Mswailili, Eastern Cape

Installation: Existing telecom tower

Vodacom South Africa

8

Page 9: A Presentation to the GSMA, GPM meeting in Doha, Qatar ...€¦ · A Presentation to the GSMA, GPM meeting in Doha, Qatar, April 18 2012 Empowering the Wind to Energize the World

Available wind energy• At Vodacom’s site (Mswailili, outside Durban) wind speeds of 1,9-8,2 m/s (daily average)

were experienced during the 53 day period. The average wind speed for the trial duration was 4,24 m/s.

• In average, a daily energy production of 2 kWh was achieved. On the best day, 7,6 kWh was produced.

9

Page 10: A Presentation to the GSMA, GPM meeting in Doha, Qatar ...€¦ · A Presentation to the GSMA, GPM meeting in Doha, Qatar, April 18 2012 Empowering the Wind to Energize the World

The new Hybrid solution is a modular cabinet system that forms a complete solution.

The system is tailor-made to clients requirements.

The site solution configuration consists of the following :

• External Steel Structures

• Cabinet A: Battery Cabinet

• Cabinet B: Equipment Cabinet

• Cabinet C: Generator Cabinet

• Sun tracking PV (size depending on load)

• Windturbine in Telecom tower ( 1-4 units)

Example of complete Hybrid Battery Diesel site with Wind and Solar

10

Page 11: A Presentation to the GSMA, GPM meeting in Doha, Qatar ...€¦ · A Presentation to the GSMA, GPM meeting in Doha, Qatar, April 18 2012 Empowering the Wind to Energize the World

Installation outside Capetown

Terzobix installation video.avi

11

Page 12: A Presentation to the GSMA, GPM meeting in Doha, Qatar ...€¦ · A Presentation to the GSMA, GPM meeting in Doha, Qatar, April 18 2012 Empowering the Wind to Energize the World

Summary• With proper wind (min 5 M/S in average wind speed, the wind turbine

will:

– Complement to PV during low insolation periods

– Valuable add on to diesel battery hybrid sites

– Markets most efficient wind turbine (Wh/kg)

• The Airdolphin PRO is tested and verified for Telecom application

• The typical pay off for adding wind is 1-2 years

• The typical off grid site can handle 1-2 turbines in the existing tower = cost efficient installation

12

Page 13: A Presentation to the GSMA, GPM meeting in Doha, Qatar ...€¦ · A Presentation to the GSMA, GPM meeting in Doha, Qatar, April 18 2012 Empowering the Wind to Energize the World

Thank you

13

Page 14: A Presentation to the GSMA, GPM meeting in Doha, Qatar ...€¦ · A Presentation to the GSMA, GPM meeting in Doha, Qatar, April 18 2012 Empowering the Wind to Energize the World

14

Page 15: A Presentation to the GSMA, GPM meeting in Doha, Qatar ...€¦ · A Presentation to the GSMA, GPM meeting in Doha, Qatar, April 18 2012 Empowering the Wind to Energize the World

Orange Madagascar