22
Alejandro Plasencia Tapia [email protected] +34 606602872 Topics and projects REVIEW 2009/2011 TOPICS PROJECTS Interfaces Aesthetics and Society Artificiality The User Energetic and Economic Viability Challenging the notion of PHOTO CREDITS: Phyllis Galembo [Baby Dance of Etikpe, Cross River, Nigeria, 2004], Francisco Javier Martínez [Parque Regional del Sureste 2008], Santiago Falcón [Ephesus Arthemis, 2009], Steven Meizel [Makeover Madness, 2005]. as the “reason to be” of architecture The well-being of Working actively with DETROIT TRANSFORMATION ALTA GRACIA OFF-SHORE SURGICAL CLINIC Polyurethane Moulds flux

A. Plasencia Portfolio

Embed Size (px)

DESCRIPTION

A collection of my projects as an architecture student

Citation preview

  • Alejandro Plasencia [email protected]+34 606602872

    Topics and projects REVIEW 2009/2011

    TOPI

    CSPR

    OJEC

    TS

    Interfaces Aesthetics and SocietyArtificiality The UserEnergetic and Economic Viability

    Challenging the notion of

    PHOTO CREDITS: Phyllis Galembo [Baby Dance of Etikpe, Cross River, Nigeria, 2004], Francisco Javier Martnez [Parque Regional del Sureste 2008], Santiago Falcn [Ephesus Arthemis, 2009], Steven Meizel [Makeover Madness, 2005].

    as the reason to be of architecture

    The well-being ofWorking actively with

    DETROITTRANSFORMATION

    ALTA GRACIA OFF-SHORE SURGICAL CLINIC

    Polyurethane Moulds

    flux

  • Alejandro Plasencia [email protected]+34 606602872

    Topics and projects REVIEW 2009/2011

    TOPI

    CSPR

    OJEC

    TS

    Interfaces Aesthetics and SocietyArtificiality The UserEnergetic and Economic Viability

    Challenging the notion of

    PHOTO CREDITS: Phyllis Galembo [Baby Dance of Etikpe, Cross River, Nigeria, 2004], Francisco Javier Martnez [Parque Regional del Sureste 2008], Santiago Falcn [Ephesus Arthemis, 2009], Steven Meizel [Makeover Madness, 2005].

    as the reason to be of architecture

    The well-being ofWorking actively with

    DETROITTRANSFORMATION

    ALTA GRACIA OFF-SHORE SURGICAL CLINIC

    Polyurethane Moulds

    flux

  • The expanded telephone Fully functional mechanism of a rotary dial phone. When the device receives a call the vibration of the ringer causes the mesh to vibrate.

    SEPTEMBER 2008

    flux Fluvial Instalation. Food colorant (water), natural clay (rocks), galvanized steel cable and tulle neting.

    ALDEANUEVA DE LA VERA. MAY 2009.

  • The expanded telephone Fully functional mechanism of a rotary dial phone. When the device receives a call the vibration of the ringer causes the mesh to vibrate.

    SEPTEMBER 2008

    flux Fluvial Instalation. Food colorant (water), natural clay (rocks), galvanized steel cable and tulle neting.

    ALDEANUEVA DE LA VERA. MAY 2009.

  • Construction Project

    Estructure

    Stee

    lC

    oncr

    ete

    Founda

    t ions

    Basem

    ent

    Fi rs t F

    loor

    Second

    F loor

    Th ird

    F loor

    Four th

    F loor

    The aim of the course was to design a building in full constructive detail. From the metal bars inside the reinforced concrete at the foundations up to the metal cladding in the faade.

    MAIN AXONOMETRIC An integrated system

  • Construction Project

    Estructure

    Stee

    lC

    oncr

    ete

    Founda

    t ions

    Basem

    ent

    Fi rs t F

    loor

    Second

    F loor

    Th ird

    F loor

    Four th

    F loor

    The aim of the course was to design a building in full constructive detail. From the metal bars inside the reinforced concrete at the foundations up to the metal cladding in the faade.

    MAIN AXONOMETRIC An integrated system

  • 0m

    31,3m

    55m

    7,9m

    28,7m

    Gra montacargas

    Tobogn de agua

    Desalinizadora Big Blue[MyCelx]

    Suministrode agua potable

    Red elctrica

    Plataforma de antiguo Helipuerto

    Vlvulas de entrada a los reactores

    Bateras de entropa

    Depsitos.22,00 litros

    Salas de Postoperatorio

    3 Quirfanos

    Salas de consulta

    x8 Azipods CZ [ABB Tm]

    Vidrio soplado

    Corian [DuPont TM.]

    x8 Azipods CZ [ABB Tm]

    ALTA GRACIA OFF-SHORE SURGICAL CLINIC___________________

    ___________________

    ALTA GRACIA OFF-SHORE SURGICAL CLINIC___________________

    Leisure Community

    Structure Society

    Aesthetics

    Ergonomics

    Community Management

    Deepwater Horizon

    Makeover Madness

    Tutors: Izaskun Chinchilla [Unit Master at the Bartlett Schoolof Architecture], Jose Lus Vallejo

    [Ecosistema Urbano] and Paula Montoya.

    A photoshoot by Steven MeizelMicronation o the coast of Rimini, A Television program from ABC.Isle of the Rose, 1968

    X-BandO-shore radar, 1968

    ABSOLUTE TIMEISOLATION

    Post-operatory Care

    Cindy Jackson

  • -10C

    SUR

    ESTE

    zFIBERGLASS MODEL

    1. Foam Structure2. Acrylic Paint3. Epoxy resin4. Fiberglass5. Polyester resin with fosforescent pigments

    ARDUINO PROTOT YPEHAMMOCK WITH SOLAR TRACKER

    Neoprene upholstery

    Servo S30N 9V

    LDR

    Microfan 12V

    UV SHIELD

    Silicon Joints

    LIGHT, WATERPROOF, FOSFORESCENT

    Arduino Uno

    THE BRIDGESUSPENDED STRUCTURECONNECTS THE MAIN DECKWITH THE WATER LEVEL.

    LEVEL 3: ENERGY CAPTURING DEVICES

    LEVEL 2: MEDICAL SERVICES

    LEVEL 1: ROOMS & LEISURE FOR POSTOPERATORYPACIENTS

    LEVEL 0: STRUCTURE & SERVICES CORE

    WATER LEVEL: STRUCTURE & SERVICES CORE

    STRUCTURE HIERARCHY

    Vertical communicationElectricityStructure Slabs

    WATER LEVELFIBERGLASS MOUNTAIN RANGE COVERED WITH A NEOPRENE SKIN.

    LEVEL 1 MAIN DECKROOMS AND LEISURE FACILITESPOR PATIENTS

    THE CLINICOPERATING ROOMS STRUCTURE

    ProstheticsORIGINAL DRAWING SIZE 2 x 0.5mHEJDUK AXONOMETRIC

    ALTA GRACIA OFF-SHORE SURGICAL CLINIC___________________

  • -10C

    SUR

    ESTE

    zFIBERGLASS MODEL

    1. Foam Structure2. Acrylic Paint3. Epoxy resin4. Fiberglass5. Polyester resin with fosforescent pigments

    ARDUINO PROTOT YPEHAMMOCK WITH SOLAR TRACKER

    Neoprene upholstery

    Servo S30N 9V

    LDR

    Microfan 12V

    UV SHIELD

    Silicon Joints

    LIGHT, WATERPROOF, FOSFORESCENT

    Arduino Uno

    THE BRIDGESUSPENDED STRUCTURECONNECTS THE MAIN DECKWITH THE WATER LEVEL.

    LEVEL 3: ENERGY CAPTURING DEVICES

    LEVEL 2: MEDICAL SERVICES

    LEVEL 1: ROOMS & LEISURE FOR POSTOPERATORYPACIENTS

    LEVEL 0: STRUCTURE & SERVICES CORE

    WATER LEVEL: STRUCTURE & SERVICES CORE

    STRUCTURE HIERARCHY

    Vertical communicationElectricityStructure Slabs

    WATER LEVELFIBERGLASS MOUNTAIN RANGE COVERED WITH A NEOPRENE SKIN.

    LEVEL 1 MAIN DECKROOMS AND LEISURE FACILITESPOR PATIENTS

    THE CLINICOPERATING ROOMS STRUCTURE

    ProstheticsORIGINAL DRAWING SIZE 2 x 0.5mHEJDUK AXONOMETRIC

    ALTA GRACIA OFF-SHORE SURGICAL CLINIC___________________

  • ANIMATION VIDEO [03:08]

    High density leisure platform. The outdoor areas are sepparated by a mountain range made out of fiberglass and epoxy resin with a neoprene skin. This topography defines a set of spaces with diffrent levesls of temperature, sun radiation, humidity and privacy.

    Water Level

    The Clinic

    ANIMATION VIDEO [06:40]

    Off-shore clinic designed to help patients overcome a deep body transformation. The rooms are organized depending on the intensity of the postoperatory care required for each person. The facilities are designed to promote leisure and outdoor activies in the recovery period.

  • ANIMATION VIDEO [03:08]

    High density leisure platform. The outdoor areas are sepparated by a mountain range made out of fiberglass and epoxy resin with a neoprene skin. This topography defines a set of spaces with diffrent levesls of temperature, sun radiation, humidity and privacy.

    Water Level

    The Clinic

    ANIMATION VIDEO [06:40]

    Off-shore clinic designed to help patients overcome a deep body transformation. The rooms are organized depending on the intensity of the postoperatory care required for each person. The facilities are designed to promote leisure and outdoor activies in the recovery period.

  • 613.04

    611.49

    622.68

    621.85

    618.76

    618.96

    618.66

    639.53

    629.12

    620.99

    587.99

    536.18

    537.99

    537.47525.27

    525.16

    525.11

    524.65 524.08

    524.75524.90

    523.15

    522.69

    524.03

    524.29

    524.60

    524.34

    524.29

    524.08

    524.54

    523.41

    520.30

    526.23

    526.54

    525.92521.75

    526.08

    525.82

    592.96

    573.37

    649.89

    647.83

    643.19

    640.30

    637.51

    644.12

    648.86

    635.35

    640.92

    641.12

    629.48

    649.27

    650.92

    648.65

    652.26

    624.10

    621.94

    622.66

    595.15

    639.95

    634.69

    634.07

    647.83

    615.30

    617.06

    616.03

    616.54

    607.36

    613.45

    616.55

    617.27

    613.76

    611.91

    611.49

    604.48

    591.68

    597.42

    601.34

    526.49

    525.46

    525.87

    526.28

    526.38

    526.18

    525.87

    525.35

    525.45

    525.35

    525.35

    525.76525.55

    524.17

    524.07

    524.07

    525.10

    525.97

    527.31

    526.49

    526.90

    526.80

    526.80

    527.00

    526.80

    527.11

    527.83

    526.28

    531.13

    530.92

    530.82

    529.69

    525.56 526.38

    529.73

    530.87

    526.38

    537.01

    527.00

    525.97

    549.54554.13

    546.32

    583.21596.37

    648.08

    615.85

    603.42

    583.89587.81

    614.48

    616.71

    610.48605.73

    526.49

    527.11

    527.00

    532.37

    526.69

    532.26

    614.43

    594.22

    603.30 524.44

    622.11

    ESCOMBRERAS

    Tc

    Tc

    Tc

    Tc

    Tc

    Tc

    Tc

    Rf

    Rf

    Rf

    Rf

    Rf

    Cuesta del Ascensor

    Barranco

    de

    la

    Camino

    Real

    de

    Mad

    rid

    a

    Aran

    juez

    Cam

    ino

    de

    la

    Junt

    a

    RIOMA

    NZAN

    ARES

    RIO

    JARA

    MA

    JARA

    MA

    Casa de Guardas

    Kings Dam

    0 50m 100m

    Post-natural

    The Regional Southeast Park is a vast area of 31,522 hectares around Jarama and Manzanares rivers occupied by a peculiar mix of abandoned industrial complexes, shaft lagoons, europes largest dump, gigantic quarries and residential areas.

    This site defines a new kind of landscape, in the midpoint between a post-industrial site and degraded nature. I would say it is post-natural.

    Birds fly here, but they nest around factory chimneys, they are lit up by night and it makes it easier for them to capture flying insects. Fish live on the riverbanks, but they swim in polluted water with industrial debree.

    Tutors: Cristina Daz Moreno and Efrn Garca Grinda [AMID.cero9], Unit Masters at the

    Architectural Association.

    Riverbanks are populated by a kind of animal whoch is also half natural - half artifical.

    When a tree falls into the current it starts capturing matter that flows in the current. Broken branches, leaves, bottles, papers, plastic bags, garments, ropes and all types of waste slowly form a gigantic jumble.

    Site

  • 613.04

    611.49

    622.68

    621.85

    618.76

    618.96

    618.66

    639.53

    629.12

    620.99

    587.99

    536.18

    537.99

    537.47525.27

    525.16

    525.11

    524.65 524.08

    524.75524.90

    523.15

    522.69

    524.03

    524.29

    524.60

    524.34

    524.29

    524.08

    524.54

    523.41

    520.30

    526.23

    526.54

    525.92521.75

    526.08

    525.82

    592.96

    573.37

    649.89

    647.83

    643.19

    640.30

    637.51

    644.12

    648.86

    635.35

    640.92

    641.12

    629.48

    649.27

    650.92

    648.65

    652.26

    624.10

    621.94

    622.66

    595.15

    639.95

    634.69

    634.07

    647.83

    615.30

    617.06

    616.03

    616.54

    607.36

    613.45

    616.55

    617.27

    613.76

    611.91

    611.49

    604.48

    591.68

    597.42

    601.34

    526.49

    525.46

    525.87

    526.28

    526.38

    526.18

    525.87

    525.35

    525.45

    525.35

    525.35

    525.76525.55

    524.17

    524.07

    524.07

    525.10

    525.97

    527.31

    526.49

    526.90

    526.80

    526.80

    527.00

    526.80

    527.11

    527.83

    526.28

    531.13

    530.92

    530.82

    529.69

    525.56 526.38

    529.73

    530.87

    526.38

    537.01

    527.00

    525.97

    549.54554.13

    546.32

    583.21596.37

    648.08

    615.85

    603.42

    583.89587.81

    614.48

    616.71

    610.48605.73

    526.49

    527.11

    527.00

    532.37

    526.69

    532.26

    614.43

    594.22

    603.30 524.44

    622.11

    ESCOMBRERAS

    Tc

    Tc

    Tc

    Tc

    Tc

    Tc

    Tc

    Rf

    Rf

    Rf

    Rf

    Rf

    Cuesta del Ascensor

    Barranco

    de

    la

    Camino

    Real

    de

    Mad

    rid

    a

    Aran

    juez

    Cam

    ino

    de

    la

    Junt

    a

    RIOMA

    NZAN

    ARES

    RIO

    JARA

    MA

    JARA

    MA

    Casa de Guardas

    Kings Dam

    0 50m 100m

    Post-natural

    The Regional Southeast Park is a vast area of 31,522 hectares around Jarama and Manzanares rivers occupied by a peculiar mix of abandoned industrial complexes, shaft lagoons, europes largest dump, gigantic quarries and residential areas.

    This site defines a new kind of landscape, in the midpoint between a post-industrial site and degraded nature. I would say it is post-natural.

    Birds fly here, but they nest around factory chimneys, they are lit up by night and it makes it easier for them to capture flying insects. Fish live on the riverbanks, but they swim in polluted water with industrial debree.

    Tutors: Cristina Daz Moreno and Efrn Garca Grinda [AMID.cero9], Unit Masters at the

    Architectural Association.

    Riverbanks are populated by a kind of animal whoch is also half natural - half artifical.

    When a tree falls into the current it starts capturing matter that flows in the current. Broken branches, leaves, bottles, papers, plastic bags, garments, ropes and all types of waste slowly form a gigantic jumble.

    Site

  • L e n g h t o f t h e c a b l e : 9 . 2 4 mD i a m e t e r : 2 4 m mW e i g h t : 1 8 . 3 8 k gS k e l e t o n : O a k w o o d

    L e n g h t o f t h e c a b l e : 9 . 2 4 mD i a m e t e r : 2 4 m mW e i g h t : 1 8 . 3 8 k gS k e l e t o n : O a k w o o d

    L e n g h t o f t h e c a b l e : 6 . 3 mD i a m e t e r : 2 4 m mW e i g h t : 1 2 . 5 k gS k e l e t o n : O a k w o o d

    d = 1 5 ( m )

    _ _ _ _ _ _ _

    _ _ _ _ _ _

    __

    __

    __

    __

    __

    __

    __

    __

    31,8 mm

    28,8mm

    METAL MESH (HOLES >1MM)

    HESSIAN

    ETFE MEMBRANE

    POLYETHELENE MEMBRANE

    Color Key for textile enclousures

    TranspirabilityInteraction

    Estructure PermeabilityLAMINAR

    PERMEABLE

    IMPERMEABLELINEAL

    NET

    WOVEN WOOL (HOLES > 20MM)

    Falco Naumani NestsFilters

    West Elevation

    East E

    levatio

    n

    Floor Plan

    The Unit

    From a linear material toa three-dimensional structure

    PRSE VISITOR CENTER

    Structure, Transpirability, Permeability and Interaction

    Post-natural

    PerformativeArchitecture

  • L e n g h t o f t h e c a b l e : 9 . 2 4 mD i a m e t e r : 2 4 m mW e i g h t : 1 8 . 3 8 k gS k e l e t o n : O a k w o o d

    L e n g h t o f t h e c a b l e : 9 . 2 4 mD i a m e t e r : 2 4 m mW e i g h t : 1 8 . 3 8 k gS k e l e t o n : O a k w o o d

    L e n g h t o f t h e c a b l e : 6 . 3 mD i a m e t e r : 2 4 m mW e i g h t : 1 2 . 5 k gS k e l e t o n : O a k w o o d

    d = 1 5 ( m )

    _ _ _ _ _ _ _

    _ _ _ _ _ _

    __

    __

    __

    __

    __

    __

    __

    __

    31,8 mm

    28,8mm

    METAL MESH (HOLES >1MM)

    HESSIAN

    ETFE MEMBRANE

    POLYETHELENE MEMBRANE

    Color Key for textile enclousures

    TranspirabilityInteraction

    Estructure PermeabilityLAMINAR

    PERMEABLE

    IMPERMEABLELINEAL

    NET

    WOVEN WOOL (HOLES > 20MM)

    Falco Naumani NestsFilters

    West Elevation

    East E

    levatio

    n

    Floor Plan

    The Unit

    From a linear material toa three-dimensional structure

    PRSE VISITOR CENTER

    Structure, Transpirability, Permeability and Interaction

    Post-natural

    PerformativeArchitecture

  • #2

    #1

    #4#3 #5

    New Ecosystem

    Energetic and Economical TransformationDETROIT

    Transformation Process

    Matter and Energy FluxELECTRICITYMATTERSTEAM (DTE)

    1ha

    9,67KWh/m3

    43tons/year

    x x 450m3 methane/ton

    =200KWh

    x

    [DATA FROM THE SWEDISH GAS CENTER] Source: ke Nordberg, Biogas from crops, JTI.

    Presentation at 10th year Anniversary for Biogas in Trollhttan May 31st 2006. Methane

    production from cereals is re-calculated assuming 400 l/kg VS, DW-86 %, VS-97%.

    WATERCONSUPTION

    95L/24h/pers

    x 1,95Debris Kg

    = 7800Kg Debris/day

    x 0,2Kg EX.

    = 800Kg EX./day

    x 44,6%Kg ORGANIC

    = 3479Kg ORGANIC/day

    [U.S. ENVIRONMENTAL PROTECTION AGENCY]

    380m3

    4279 Organic Matter (Kg)

    = 433ton/m3 Methane

    = 225ton/m3 Methane

    Maize Fields

    Bog Waste ProductionCASE STUDY: COMPUWARE HEADQUARTERS

    2000 workers

    People Mover

    Outdoor Piping

    The New Hub

    DATA F

    ROM

    THE GR

    AND V

    ALLEY

    STATE

    UNIVE

    RSITY

    publish

    ed in C

    hronic

    le by M

    ark Do

    nnelly.

    182,00

    0 MW =

    180 big

    nucle

    ar pow

    er stat

    ions

    PARKIN

    G TOW

    ERS AT

    MAIN

    TRANSP

    ORT HU

    BS

    DENSIF

    ICATIO

    N BIOD

    IESEL

    PLANT

    BIOCON

    STRUC

    T

    ESTURIN

    AMERICAN LOTUS

    INDIANABAT

    BALD EAGLE

    SPAWN

    ING BE

    DS

    Install

    ed by

    DTE to

    let

    sturge

    ons bre

    ed.DEB

    RIS

    BELLE

    ISLE

    MOSQUITO

    DEMOLI

    TION

    PROCES

    S

    ANAER

    OBIC B

    IODIGE

    TORS

    IINTRO

    DUCTI

    ON OF

    A NEW

    ECOSY

    STEM

    PEOPLE MOVER

    PUENTE DE MAC AURTHUR

    Book To

    wer

    PUBLI

    C AND

    RESIDE

    NTIAL

    SPACE

    HYBRI

    D.

    PIVOTI

    NG IRR

    IGATIO

    N SYST

    EM

    RKD o A

    G resou

    rce Co

    .

    HIPD

    ROMO

    BIOGAS FUELED BUSES

    TRANSP

    ORT

    BRANC

    H CON

    NECTIN

    G

    NORTH

    ERN SU

    BURBS

    ALON

    G

    WOOD

    WARD

    AVE

    Unused buildings and ruins are nally demolished.

    Debris is withdrawn and deposited in Belle Isle to form new spawning beds for sturgeons.

    New parking lots and biodigestor plants are built on the empty lots surrrounding de CBD.

    Empty unusable lots are ooded to create a new ecosystem.

    Maize elds are planted, they work as gigantic ad displays and leisure venues, the crops feed the newly built biodigestors.

    The new ecosystem integrates various endagered spacies from the region in an articial wetland.

    DTE

    COOLING

    GAS

  • #2

    #1

    #4#3 #5

    New Ecosystem

    Energetic and Economical TransformationDETROIT

    Transformation Process

    Matter and Energy FluxELECTRICITYMATTERSTEAM (DTE)

    1ha

    9,67KWh/m3

    43tons/year

    x x 450m3 methane/ton

    =200KWh

    x

    [DATA FROM THE SWEDISH GAS CENTER] Source: ke Nordberg, Biogas from crops, JTI.

    Presentation at 10th year Anniversary for Biogas in Trollhttan May 31st 2006. Methane

    production from cereals is re-calculated assuming 400 l/kg VS, DW-86 %, VS-97%.

    WATERCONSUPTION

    95L/24h/pers

    x 1,95Debris Kg

    = 7800Kg Debris/day

    x 0,2Kg EX.

    = 800Kg EX./day

    x 44,6%Kg ORGANIC

    = 3479Kg ORGANIC/day

    [U.S. ENVIRONMENTAL PROTECTION AGENCY]

    380m3

    4279 Organic Matter (Kg)

    = 433ton/m3 Methane

    = 225ton/m3 Methane

    Maize Fields

    Bog Waste ProductionCASE STUDY: COMPUWARE HEADQUARTERS

    2000 workers

    People Mover

    Outdoor Piping

    The New Hub

    DATA F

    ROM

    THE GR

    AND V

    ALLEY

    STATE

    UNIVE

    RSITY

    publish

    ed in C

    hronic

    le by M

    ark Do

    nnelly.

    182,00

    0 MW =

    180 big

    nucle

    ar pow

    er stat

    ions

    PARKIN

    G TOW

    ERS AT

    MAIN

    TRANSP

    ORT HU

    BS

    DENSIF

    ICATIO

    N BIOD

    IESEL

    PLANT

    BIOCON

    STRUC

    T

    ESTURIN

    AMERICAN LOTUS

    INDIANABAT

    BALD EAGLE

    SPAWN

    ING BE

    DS

    Install

    ed by

    DTE to

    let

    sturge

    ons bre

    ed.DEB

    RIS

    BELLE

    ISLE

    MOSQUITO

    DEMOLI

    TION

    PROCES

    S

    ANAER

    OBIC B

    IODIGE

    TORS

    IINTRO

    DUCTI

    ON OF

    A NEW

    ECOSY

    STEM

    PEOPLE MOVER

    PUENTE DE MAC AURTHUR

    Book To

    wer

    PUBLI

    C AND

    RESIDE

    NTIAL

    SPACE

    HYBRI

    D.

    PIVOTI

    NG IRR

    IGATIO

    N SYST

    EM

    RKD o A

    G resou

    rce Co

    .

    HIPD

    ROMO

    BIOGAS FUELED BUSES

    TRANSP

    ORT

    BRANC

    H CON

    NECTIN

    G

    NORTH

    ERN SU

    BURBS

    ALON

    G

    WOOD

    WARD

    AVE

    Unused buildings and ruins are nally demolished.

    Debris is withdrawn and deposited in Belle Isle to form new spawning beds for sturgeons.

    New parking lots and biodigestor plants are built on the empty lots surrrounding de CBD.

    Empty unusable lots are ooded to create a new ecosystem.

    Maize elds are planted, they work as gigantic ad displays and leisure venues, the crops feed the newly built biodigestors.

    The new ecosystem integrates various endagered spacies from the region in an articial wetland.

    DTE

    COOLING

    GAS