NEW ENLARGED BUILDING FRONT ELEVATION
NEW ENLARGED LONGITUDINAL BUILDING
SECTION
OUTLINE OF ORIGINAL BUILDING FLOORS AND BLDG ENVELOPE SHOWN IN RED
NEW REAR ADDITION ELEVATION
NEW ADDITION
BUILDING MOSAIC Fire Code, Materials & Min. U-value
Poured in Place Concrete, Concrete Masonry Unit, Structural Steel, Light Gauge Metal & Timber Framing,
Rain Screen, and Solid Masonry
2. ADDITIONAL INTERIOR WYTHE OF CONCRETE MASONRY UNIT
1. NEW POURED IN PLACE CONCRETE COFFERED SLAB FOR NEW FOUNDATION FOOTING
4. NEW VERTICAL ADDITION - STEEL AND LIGHT GAUGE METAL FRAMING
3. NEW POURED IN PLACE CONCRETE CURB OVER EXISTING REINFORCED PARTY WALL
NEW TRANSVERSE BUILDING SECTION
ADDITIONAL INTERIOR WYTHE OF CONCRETE MASONRY UNIT
REBARS FOR NEW POURED IN PLACE CONCRETE COFFERED SLAB
NEW POURED IN PLACE CONCRETE CURB OVER EXISTING REINFORCED PARTY WALL
PARTY WALL EXTENSION
THERMAL BREAK TRANSITIONS
WEST NEIGHBOR’S ROOF TOP
FOAM GLASS STRUCTURAL THERMAL BREAK (TYPE 2)
HIGHER BEARING CAPACITY STRUCTURAL THERMAL BREAK (TYPE 1)
NEW STEEL TUBE
NEW STEEL TUBE
HIGHER BEARING CAPACITY THERMAL BREAK
(TYPE 1)
FOAM GLASS STRUCTURAL THERMAL BREAK
(TYPE 2)
Comparison of our Enerphit NYC townhouse with NY State average yearly energy use per household per m2