33
NICA Volga river Yuri Murin, VBLHEP JINR for the MPD ITS team [email protected] Yangtze Volga NICA A MAPS based Inner Tracking System of the Multi-Purpose Detector at the NICA collider

A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in

NICA

Volga

river

Yuri Murin, VBLHEP JINR for the MPD ITS team

[email protected]

Yangtze

Volga

NICA

A MAPS based Inner Tracking System of the Multi-Purpose Detector at the NICA collider

Page 2: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in

The physics case – an attempt to deconfine quarks through

density fluctuations of the fireball under critical

conditions

A role of the rare probes (heavy hyperons and charmed

mesons) in search of hints of critical point

Transition from strips to pixels and the MAPS “invasion”

The new ALICE ITS2 saves NICA a generation period

the MPD ITS project and plans for its implimentation

The outline

2

Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019

Page 3: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in

3

Look for a needle in a “hay” of tracks for rare events

The Inner Tracking System or Vertex tracker is a multilayer telescope which measures the position of particle hits positions to

restore the track trajectory. It’s special task to be located as close as possible to the interaction point and to be as precise as possible to identify specific decays of particles carrying strangeness, charm or

beauty i.e. S, C, or B - quarksYu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019

Page 4: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in

STAR F.T.

HADES

CBM

Inte

racti

on

ra

te [

Hz]

Collision energy √S [GeV]NN

NICA/BM@N II

To deconfine quarks: to heat or to enhance density fluctuations

NA-61/SHINE

2022 – 2025: SIS-100 FAIR

energy region of max.

baryonic density

NICA/MPD

STAR BES II

4Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019

Page 5: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in

5

The basic task for the Inner Tracking System

Identification of particles through inspection of Inverse Massdistributions M2=sum(Ei)

2-sum(Pi)2 (c=1)

Λ → p + π –

Ξ¯ → Λ + π –

└→ p + π –

Ω¯ → Λ + K¯

└→ p + π –

Λc→ p + K‒ + π +

D0 → K¯ + π +

D+→ K‒ + π + + π +

Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019

Page 6: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in

6

Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019

The MAPS “Invasion”

Page 7: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in

7

Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019

New ALICE ITS#2: sharing of technology

Page 8: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in

8

Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019

The ALPIDE sensor

Page 9: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in

9

Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019

The ALPIDE Readout

Page 10: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in

10

Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019

New ALICE ITS#2 beats records on material budget

Page 11: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in

11

Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019

New ALICE ITS#2: …….and number of pixels

Page 12: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in

12

Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019

Plans for ALICE ITS#3: exchange of the IB

Page 13: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in

Stage I: TPC, TOF, ECAL, ZDC, FFD + ITS(OB)

MPD-ITS (OB) is now recognized at Stage I

Stage I: overall commissioning

starts in 2022 (t.b.c.)13

Stage II : ITS(IB) + EndCap (CPC, Straw, TOF, ECAL)

FHCal

FFD

Transfer of High Tech Instrumentation Know-How from CERN to NICA-MPD

Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019

Page 14: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in

CERN will procure, test and deliver to NICA

19’000 ALPIDE Monolithic Active Pixel Sensors for the MPD ITS

4’500 SAMPA electronic circuits for the TPC readout

5’000 FEAST DC/DC converters for the ECAL MPD

Jigs and fixtures for module and supermodule assembly for the MPD ITS

Training of personal for assembly and QA certification modules and supermodules of the MPD ITS

Provision of complete technical and commercial information on parts of the

new ALICE Inner Tracking System, including drawings, internal technical reports, quotes, etc.

Items to be shipped from CERN formulated in Addendums to the Protocol

Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019

Page 15: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in

15

MPD ITS based on the ALPIDE MAPS CERN technology

Beam pipe Ø = 40 mm

Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019

Page 16: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in

ITS pointing resolution within STAR-ALICE toy model

16

ALICE MPD

New ITS

Old ITS

Ø = 40 mm

Ø = 50 mm

Ø = 60 mm

Pions Pions

Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019

Page 17: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in

Selection criteria

17

D0 selection parameters:

• distances of closest approach to the

collision vertex DCAπ,K ,

• two-track separation DCAD ,

• decay path λD,

• pointing angle θD.

Selection criteria:

DCAπ > С1 && DCAK > С2 && DCAD < С3 && λD > С4 && θD < С5

The parameters of the corresponding selections are optimized by maximizing

the signal significance :

where S and B are the estimated numbers of the

signal and background events.

Do → K- + π+

daBS

S)а(Sg

a

0

Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019

Page 18: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in

18

Example : cuts selections for D0

dcaK>0.01 сm &

dcaPi>0.01 сm & distPiK

< 0.02 cm & path(D0) >

0.025 сm & angle(D0) <

0.2 rad

Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019

Page 19: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in

19

D+ and D0 reconstruction

DCA(π, K,D0), path(D0), angle(D0) cuts

t1=t2=t3=50μ (IB ITS3) t4=t5=700μ (ОВ ITS2)

Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019

Page 20: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in

20

Strange particle reconstruction results

Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019

Page 21: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in

21

Particle D0 D+

Decay channel D0→ K- + π + D+→ K- + π + + π +

Multiplicity (HSD 10-2 10-2

BR,% 3.9 9.1

IB option ITS3(50μ) ITS2(200μ) ITS3(50μ) ITS2(200μ)

S/B(2σ) 0.43 0.10 0.65 0.27

Significance 15.1 2.2 28.5 7.6

Efficiency,% 1.9 0.13 2.3 0.3

D-meson parameters in 100М central Au+Au collisions at = 9 ГэВNNS

Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019

Impact of Beam pipe diameter on efficiency

Page 22: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in

22

Current limitations of eхperimental data on D meson

Abdel Nasser TAWFIK† and Ehab ABBAS

Thermal Description of Particle Production in Au-Au Collisions at STAR Energies

Physics of Particles and Nuclei Letters. November 2013

Identificaion achieved

Thermal generator: D meson’s pt - spectrum

Yu. Murin for the MPD ITS Team

Page 23: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in

23

MC and reconstructed pt-spectra of D0-mesons and their decay products

D0 mesons

Pions

Kaons

Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019

Page 24: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in

Stage I: Installation of OB (2022-

23)

~ 9 500

ALPIDE MAPS

in 5 cylinders of 2 barrels

D+ K-

π+

π+

tentative assembly

layout

ITS realization in two Steps (OB first) due to BP sequence

4,9۰109 pixels, active area 3,9 m2.

24

MPD beam pipe

Stage I: 64 mm in diameterStage II:

38 mm in diameter

Stage II: OB+IB (2022+25) ?

October, 2019, Warsaw, NICA Days-2019

Page 25: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in

Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019

Current Activities1.Mechanics for integration of ITS with Beam Pipe and TPC - JINR

Page 26: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in

Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019

Current Activities2. Start production of ultralight CF mechanics in SPbSU and VBLHEP

Page 27: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in

Truss length is 1540 mm. Modules (HICs)

are are located on two cooling plates .

OB stave carriers 196 sensors.

The MPD ITS need is 42 OB staves.

Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019

Current Activities3. Start Assembly of HICs in Dubna and China (2020 Q1) and Staves(2021 Q1)

Page 28: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in

Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019

Planned Activities4. Development of ITS3 together with ALICE ITS3 team

Page 29: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in

Yu. Murin for the MPD ITS TeamOctober, 2019, Warsaw, NICA Days-2019

Planned Activities5. Preparing the Technical Design Report and Organization of the MPD ITS Consortium

Page 30: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in

Conclusions

and summary

30

Yu. Murin for the MPD ITS Team

Page 31: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in

major milestones of the

MPD ITS project

(tentavily!)

• 2018 –2019 – simulations and start of delivery of parts from CERN

• 2019 – organization of the Russian-Chinese Consortium

• 2019 – Writing TDR ( Draft)

• 2019-2020 – Production of first HICs at VBLHEP and CCNU

• 2020 –2021 – Mechanics including parts for integration

• 2020 –2021 – updating the readout chain (with China and ?)

• 2020 –2023 – R@D effort on IB together with ALICE

• 2021 –2023 – Production HICs, assembly of OB staves (with

China )

• 2023 (?) – ITS-OB assembly, bench testing, commissioning

• 2025( ?) – ITS-OB+IB commissioning (Stage II)

31October, 2019, Warsaw, NICA Days-2019 Yu. Murin for the MPD ITS Team

Page 32: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in

summary The MPD-ITS project is both scientific- and time-wise well justified

The project has a solid reason to be accomplished in two stages

The MPD-ITS(OB) (stage 1) one is now recognized and approved

for financing at JINR

The MPD-ITS(IB) (stage 2) contains R@D proposed to be

performed under the supervision of ALICE Collaboration (ITS-3)

The project effort due to its technical complexity cannot be

undertaken by JINR alone and calls for organization of a

Consortium of Institutes from Russia and China (and elsewhere!)

functioning at least till 2025

32October, 2019, Warsaw, NICA Days-2019 Yu. Murin for the MPD ITS Team

Page 33: A MAPS based Inner Tracking System of the Multi-Purpose Detector at the … · 2019. 11. 4. · MPD-ITS (OB) is now recognized at Stage I Stage I: overall commissioning starts in

33Thank you for attention and RFBR for GRANT # 18-02-401119!