22
A LEADER IN INSTALLING TECHNOLOGICALLY ADVANCED RACKING SYSTEMS

A LEADER IN INSTALLING TECHNOLOGICALLY ......the United States, and the UAE. For more than 30 years, we have been executing projects for multinational manufacturers of automated warehouse

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: A LEADER IN INSTALLING TECHNOLOGICALLY ......the United States, and the UAE. For more than 30 years, we have been executing projects for multinational manufacturers of automated warehouse

A LEADER IN INSTALLINGTECHNOLOGICALLY ADVANCEDRACKING SYSTEMS

Page 2: A LEADER IN INSTALLING TECHNOLOGICALLY ......the United States, and the UAE. For more than 30 years, we have been executing projects for multinational manufacturers of automated warehouse

1

3,000+

400 1991

4FINISHEDPROJECTS

FULL-TIMEEMPLOYEES

COMPANYESTABLISHED

We provide fully qualified, trained workers with appropriate certifications, documenta-tion, and state-of-the-art equipment. We meet the most stringent safety stan-dards.

Our projects have been implemented across 30 countries globally. We have branches in the Czech Republic, Australia, the United States, and the UAE.

For more than 30 years, we have been executing projects for multinational manufacturers of automated warehouse systems of all types.

CONTINENTS

Our experience gained through a large number of successful projects is what ma-kes us the leaders in our field.

Page 3: A LEADER IN INSTALLING TECHNOLOGICALLY ......the United States, and the UAE. For more than 30 years, we have been executing projects for multinational manufacturers of automated warehouse

2

Page 4: A LEADER IN INSTALLING TECHNOLOGICALLY ......the United States, and the UAE. For more than 30 years, we have been executing projects for multinational manufacturers of automated warehouse

3

Leaders in the installation business for the last 30 years.

COMPLETE TURNKEY INSTALLATIONS

We have provided automated warehouse systems of all types for many multinational manufacturers. We primarily focus on the installation of racking systems for large distribution warehouses.

RESEARCH & DEVELOPMENT

We offer innovative solutions and the latest methods that can meet any requriements. We have developed unique measurement technologies that are not offered by anyone else on the market.

OUR OWN MODERN TECHNICAL CENTER

We have built a modern technical and training center in the Czech Republic to function as a base for our R&D projects and a training facility for our employees.

MACHINERY & EQUIPMENT

We assure the complete mechanization of each site. We own and manage a rental point for handling equipment, thanks to long-term global partnerships.

ABOUT US

Page 5: A LEADER IN INSTALLING TECHNOLOGICALLY ......the United States, and the UAE. For more than 30 years, we have been executing projects for multinational manufacturers of automated warehouse

4

We install technologically advanced racking systems for large logistical distribution centers. Our clients are world-renowned multinational brands and global chains.

Percentages refer to the percentage of each project type of the total completed Montáž Brož projects, 2015–2018.

SERVICES

Miniloads10%

Rack clad buildings

15%

Hanging garment systems

10% Mezzanines6%

Shelving systems

15%Shuttle racking systems

44%

Page 6: A LEADER IN INSTALLING TECHNOLOGICALLY ......the United States, and the UAE. For more than 30 years, we have been executing projects for multinational manufacturers of automated warehouse

5

OUR PROJECTS

Kronospan - Germany

Nestlé - Spain Albert Heijn - Netherlands TVH - Belgium

Zara Home - Spain

Page 7: A LEADER IN INSTALLING TECHNOLOGICALLY ......the United States, and the UAE. For more than 30 years, we have been executing projects for multinational manufacturers of automated warehouse

6

We develop products to accelerate, facilitate, and refine the construction and measurement of our racking systems.

We have also been  developing our own measuring system. In addition, we are always looking for ways to improve racking measurement methods, particularly through the  use of a digital measurement system offered by nearly all of our total stations and levelling instrumentation.

We have implemented it for the measurement of all our constructed shuttle systems in 2017, including one in Dubai.

12 TRAINED MEASUREMENT TECHNICIANS

RESEARCH & DEVELOPMENT

Training surveyors Training for a new product

Page 8: A LEADER IN INSTALLING TECHNOLOGICALLY ......the United States, and the UAE. For more than 30 years, we have been executing projects for multinational manufacturers of automated warehouse

7

MEET ARTURWe have engineered our own unique technological robot which allows accurate rack measurement and data evaluation within seconds.

Our development of this tool started in 2014, and we have been evaluating client installations and structure tolerances with it ever since.

MORE ABOUT ARTUR• Measures rail accuracy in racking systems, e.g., whether the tested parameters are within tolerance.

• The third generation of ARTUR (Evo III) is the latest version.

• Is developed in-house by our own research specialist team.

• This unique technology is not available to anyone except Montáže Brož.

BENEFITS OF USING ARTUR• Fast and precise measurements of rails tolerances.

• Provides real-time on-site off-site data analytics.

• Data is presented via the ARTUR app dashboard.

• One-person setup and operation.

• Small size, easy to carry and transport, language compatible.

Page 9: A LEADER IN INSTALLING TECHNOLOGICALLY ......the United States, and the UAE. For more than 30 years, we have been executing projects for multinational manufacturers of automated warehouse

8

COMMUNICATION

The data is automatically saved directly onto the on-site or off-site computers. Measurement differences are highlighted instantly.

REAL-TIME DATA

Connection is established via industrial long-range Bluetooth technology.

3rd GENERATION

The most advanced technology for rail accuracy measurement since its launch in 2014.

CUSTOMIZABLE DIMENSIONS

ARTUR is designed to cover aisle widths from 800 mm to 1600 mm (31.5–63 inch).

LEICA COMPATIBILITY

Connects to Total Station via laser, ensuring additional accuracy.

SPEED CONTROL

Adaptive speed control over rails connections allows us to measure the most accurate data.

Page 10: A LEADER IN INSTALLING TECHNOLOGICALLY ......the United States, and the UAE. For more than 30 years, we have been executing projects for multinational manufacturers of automated warehouse

9

Our company devotes time to our employees. We focus on adaptation, continuous improvement, education, and development, as well as sharing practical experience.

• Introduction training

• Health and safety training

• Height work training

• Mechanical training

• Training of measurement technicians

All our workers are fully qualified, trained, and hold all appropriate certifications and documentation to prove that they have passed related courses and are appropriately registered in the necessary countries.

400 EMPLOYEES

SAFETY FIRST

H&S Training

Page 11: A LEADER IN INSTALLING TECHNOLOGICALLY ......the United States, and the UAE. For more than 30 years, we have been executing projects for multinational manufacturers of automated warehouse

10

Our modern technological premises provide comfortable facilities for:

• Warehouse management

• Road transport

• Building machinery and equipment

• Locksmith’s workshops

• Research & development activities

Our facility houses several types of racking system solutions and is where our team tests any measurement tasks used later on construction sites.

At our Technical Center, we organize several company meetings per year, run teambuilding events, and conduct training courses for employees.

TECHNICAL CENTER

1 2 3 4

IntroductoryTraining

HSETraining

Height WorkTraining

MechanicalTraining

Page 12: A LEADER IN INSTALLING TECHNOLOGICALLY ......the United States, and the UAE. For more than 30 years, we have been executing projects for multinational manufacturers of automated warehouse

11

WE ARE A TEAM

Nűrnberg

Niardo

Merelbeke

Gluchow

Supervisors Bologna

Nogarole Rocca Gran Canaria

Page 13: A LEADER IN INSTALLING TECHNOLOGICALLY ......the United States, and the UAE. For more than 30 years, we have been executing projects for multinational manufacturers of automated warehouse

12

OUR CORE VALUES

WORK SAFETY

We have fully qualified, trained workers with appropriate certifications and documentation.

MEETING DEADLINES

Careful and timely completion is the standard for every order.

UNCOMPROMISING WORK QUALITY

Quality is the result of the excellent work of our skilled employees and the use of our unique measuring technology.

FLEXIBILITY

We install racking systems anywhere based on individual client needs and requirements. We overcome any potential challenges. We employ over 400 workers globally, and this number can be doubled when needed.

Page 14: A LEADER IN INSTALLING TECHNOLOGICALLY ......the United States, and the UAE. For more than 30 years, we have been executing projects for multinational manufacturers of automated warehouse

13

GLOBAL PRESENCE

4 BRANCHES

800,000

3,000+

4

ANNUALMAN-HOURS

FINISHED PROJECTS

CONTINENTS

Page 15: A LEADER IN INSTALLING TECHNOLOGICALLY ......the United States, and the UAE. For more than 30 years, we have been executing projects for multinational manufacturers of automated warehouse

14

The installation of a multishuttle system in Dubai was one of the largest projects in the world involving this type of system, and is also the largest project our company has completed to date. This project took 250,000 man-hours.

MULTISHUTTLE & MEGASHUTTLEDEMATIC

CAPACITYMultishuttle: 3,050 tons

Megashuttle: 3,800 tons

UAE

Page 16: A LEADER IN INSTALLING TECHNOLOGICALLY ......the United States, and the UAE. For more than 30 years, we have been executing projects for multinational manufacturers of automated warehouse

15

The footprint of this project was small, but what was fascinating was that it measured almost 42 meters in height when complete, making it the tallest building in Spain built by our team.

ZARA HOME

CAPACITYSilo beam-type miniload: 394 tons

Silo pallet rack: 967 tons

SPAIN

NOEGA SYSTEMS, S.L.

Page 17: A LEADER IN INSTALLING TECHNOLOGICALLY ......the United States, and the UAE. For more than 30 years, we have been executing projects for multinational manufacturers of automated warehouse

16

Four identical projects of giant shelf racking systems were installed across Germany, Poland, and Italy.Each project took 1 year, 150,000 man-hours, and 100 employees to complete.

ZALANDOSSI SCHÄFFER

CAPACITY11,000 tons per project

GERMANY POLAND ITALY

Page 18: A LEADER IN INSTALLING TECHNOLOGICALLY ......the United States, and the UAE. For more than 30 years, we have been executing projects for multinational manufacturers of automated warehouse

17

This construction put our measurement accuracy to the test. There were several thousand datapoints for the position of the racking system and its components.

ZARA

CAPACITY25,900 pallets

3,000 tons

HOLLAND

NOEGA SYSTEMS, S.L.

Page 19: A LEADER IN INSTALLING TECHNOLOGICALLY ......the United States, and the UAE. For more than 30 years, we have been executing projects for multinational manufacturers of automated warehouse

18

The first shuttle silo in the world. There are very high demands on measurements for this type of construction. Altogether it took 22 workers and 19,550 man-hours.

AMER SPORTS ÜBERHERRNTGW

CAPACITY950 tons

GERMANY

Page 20: A LEADER IN INSTALLING TECHNOLOGICALLY ......the United States, and the UAE. For more than 30 years, we have been executing projects for multinational manufacturers of automated warehouse
Page 21: A LEADER IN INSTALLING TECHNOLOGICALLY ......the United States, and the UAE. For more than 30 years, we have been executing projects for multinational manufacturers of automated warehouse
Page 22: A LEADER IN INSTALLING TECHNOLOGICALLY ......the United States, and the UAE. For more than 30 years, we have been executing projects for multinational manufacturers of automated warehouse

CONTACT USEUROPE Montáže Brož s.r.o.Headquarters:Pravy 36, Lázně Bohdaneč 533 41 Czech RepublicOffice:S.K. Neumanna 1220, Pardubice 530 02Czech Republic

USAMontaze Broz LLC375 Saddleworth PLLake Mary, FL 32746United States of America

MIDDLE EASTWorld Wide Installations Services DWC-LLBusiness Center, Dubai World CentralP.O. Box 390667Dubai, United Arab Emirates

AUSTRALIAMontaze Broz Pty LTDLevel 32 l 101 Miller StreetNorth Sydney, NSW 2060Australia

[email protected]