20
A Flow Battery for A Flow Battery for Grid Grid - - Scale Energy Storage Scale Energy Storage Vincent Battaglia Principal Investigator LBNL February 22, 2012 NCCAVS Conference San Jose, CA

A Flow Battery for Grid -Scale Energy Storage€¦ · A Flow Battery for Grid -Scale Energy Storage Vincent Battaglia Principal Investigator LBNL February 22, 2012 NCCAVS Conference

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: A Flow Battery for Grid -Scale Energy Storage€¦ · A Flow Battery for Grid -Scale Energy Storage Vincent Battaglia Principal Investigator LBNL February 22, 2012 NCCAVS Conference

A Flow Battery for A Flow Battery for

GridGrid--Scale Energy StorageScale Energy Storage

Vincent Battaglia

Principal Investigator

LBNL

February 22, 2012

NCCAVS ConferenceSan Jose, CA

Page 2: A Flow Battery for Grid -Scale Energy Storage€¦ · A Flow Battery for Grid -Scale Energy Storage Vincent Battaglia Principal Investigator LBNL February 22, 2012 NCCAVS Conference

Renewable energy standards (e.g., 30% renewables by 2020 in California) will require s

form of energy back-up

New CA state bills require CPUC to examine targets for procurement of energy storage systems

GWh of storage needed in a decade

Potentially a very large market ($100B); in contrast, vehicle market expected to be $16

year by 2020.

Renewable Firming2-8 h, $28.6B

Load Following2-4 h, $28 B

Time shift Renewables1-8 h, $36 B

Frequency Regulation<1 h, $4.9 B

Source: Extracted from E

Need a source of back-up electricity in the range of 1 to 8 h;

Page 3: A Flow Battery for Grid -Scale Energy Storage€¦ · A Flow Battery for Grid -Scale Energy Storage Vincent Battaglia Principal Investigator LBNL February 22, 2012 NCCAVS Conference

• Stabilize grid power at 60Hz givenintermittent generation assets (insolar, wind)

• Requirements

� High power (MW)

� Fast ramp rate (seconds)

� High efficiency (70-90%)

� Short discharge times (< 1 hour)

California ISO – Integration of Renewable Resources Nov 2007

24h

Wind

Solar

Page 4: A Flow Battery for Grid -Scale Energy Storage€¦ · A Flow Battery for Grid -Scale Energy Storage Vincent Battaglia Principal Investigator LBNL February 22, 2012 NCCAVS Conference

Time shifting of intermittent assets to high-value periods

Similar requirements to Grid Reliability, but longer discharge times

~ 2 to 3 day

MW

Page 5: A Flow Battery for Grid -Scale Energy Storage€¦ · A Flow Battery for Grid -Scale Energy Storage Vincent Battaglia Principal Investigator LBNL February 22, 2012 NCCAVS Conference

• Capture low-cost electricity for peak us

• Replace spinning reserves

• Provide backup for “Never-Off” system

• Industrial, commercial, institutional customers

• Siting near point-of-use

� Perceived safety is critical – may hinder adoption

* Vermont State Electric Plan (2005)

$/M

W

Batteries can be designed to meet all of thesrequirements, and in some cases,

simultaneously.Simply design to the largest energy and power requirements,

then verify overall cost reduction

Page 6: A Flow Battery for Grid -Scale Energy Storage€¦ · A Flow Battery for Grid -Scale Energy Storage Vincent Battaglia Principal Investigator LBNL February 22, 2012 NCCAVS Conference

Traditional Battery

High energy density

Ex. LiCoO2; concentration of Li = 46 mol Li/l of oxide =

1230 Ah/l

Voltage = 3.6

Lower power density

Resistance ~ 30 ohm cm2 due to solid state diffusion

Cost a function of E/P

Total Cost ($/kWh) ~ 600x(P/E)1/2

~ 600x(1/td)1/21/21/21/2

The cost of constructing the battery with the

proper energy and power are coupled.

Cost related to high cost of active materials.

• Flow Battery

� Low energy density

� Ex. 1 M Br2 solutions = 54 Ah/l (factor of 23 tim

� V = 1 V

� High power density

� Resistance ~ 0.3 ohm cm2 (a factor of 100 time

� Cost

� The power and energy are literally separate en

Power unit Tanks

Total Cost ($/kWh) = ($/kW)/td + $/kWh

= $/m2*ASR/[ηηηη1/2(1-ηηηη1/2)U2)]/td

These batteries are preferred if you can co

inexpensive materials with a high-rate pow

•Low resistance

•High voltage but within electrolyte stabili

Both can be designed to meet the power and energy

Page 7: A Flow Battery for Grid -Scale Energy Storage€¦ · A Flow Battery for Grid -Scale Energy Storage Vincent Battaglia Principal Investigator LBNL February 22, 2012 NCCAVS Conference

Four important metrics: Performance (energy efficiency rather than energy density), cost, life, and safety

Historically, choice of battery is a compromise

For grid storage, main challenge is cost. Target: $100/kWh (gas turbine)

Targe

High-volume cost projections for Li-ion batteries

Source: TIAX, DOEMerit Review, 20

Page 8: A Flow Battery for Grid -Scale Energy Storage€¦ · A Flow Battery for Grid -Scale Energy Storage Vincent Battaglia Principal Investigator LBNL February 22, 2012 NCCAVS Conference

Requirements:

Need good reversibility

Need chemicals that are inexpensive

Need inexpensive cell components

Need a high power device

Higher the power, lower the number of cells

No structural changes (e.g., plating)

• Separation of energy and power

• Energy dictated by size of tanks

• Power depends on size of cell

• Cell is typically expensive

Increasing power

1200

Cell

Tanks

Page 9: A Flow Battery for Grid -Scale Energy Storage€¦ · A Flow Battery for Grid -Scale Energy Storage Vincent Battaglia Principal Investigator LBNL February 22, 2012 NCCAVS Conference

Br2/HBr

H2

HBr

Ion-exchange/micropmembrane

Ion-exchange/micropmembrane

Pt-based catalystmembrane

Pt-based catalystmembrane

Carbon felt catalyst support layer

Carbon felt catalyst support layer

Ch

arg

e

Dis

charg

e

Gas diffusion suppolayer

Gas diffusion suppolayer

H2 ↔ 2H+ + 2eBr2 + 2H+ + 2e ↔ 2HBr

Page 10: A Flow Battery for Grid -Scale Energy Storage€¦ · A Flow Battery for Grid -Scale Energy Storage Vincent Battaglia Principal Investigator LBNL February 22, 2012 NCCAVS Conference

Total cell resistance = Ohmic+charge transfer+mastransfer

Membranes and contact

Kinetically fast reactions

Better cell design

Rotating disc studies

Page 11: A Flow Battery for Grid -Scale Energy Storage€¦ · A Flow Battery for Grid -Scale Energy Storage Vincent Battaglia Principal Investigator LBNL February 22, 2012 NCCAVS Conference

0.2 0.4 0.6 0.8 1.0 1.2

0.9M Br2/1M HBr with thick carbon-felt

Current Density (A/cm2)

0.0

0.2

0.4

0.6

0.8

Po

wer

Den

sit

y (

W/c

m2)

• Carbon-felt electrode:

Max. performance: 0.6

Typical flow batteries

Temperature: RT; flowrate: 200 ml/min

Page 12: A Flow Battery for Grid -Scale Energy Storage€¦ · A Flow Battery for Grid -Scale Energy Storage Vincent Battaglia Principal Investigator LBNL February 22, 2012 NCCAVS Conference

0.2 0.4 0.6 0.8 1.0 1.2

0.9M Br2/1M HBr with thick carbon-felt

0.9M Br2/1M HBr with multilayer carbon-felt

Current Density (A/cm2)

0.0

0.2

0.4

0.6

0.8

Po

wer

Den

sit

y (

W/c

m2)

• Carbon-felt electrode:

Max. performance: 0.6

• Multi-layered C-felt el

Max. performance: 0.7

Typical flow batteries

Temperature: RT; flowrate: 200 ml/min

Page 13: A Flow Battery for Grid -Scale Energy Storage€¦ · A Flow Battery for Grid -Scale Energy Storage Vincent Battaglia Principal Investigator LBNL February 22, 2012 NCCAVS Conference

0.2 0.4 0.6 0.8 1.0 1.2 1.4

0.9M Br2/1.0M HBr

4.0M Br2/1.0M HBr

2.0M Br2/0.5M HBr

Current Density (A/cm2)

0.0

0.2

0.4

0.6

0.8

1.0

Po

wer

Den

sit

y (

W/c

m2)

•Multi-layered C-felt ele

Max. performance: 0.7

•Optimized electrolyte

Max. performance: 0.9

Temperature: RT; flowrate: 200 ml/min

Page 14: A Flow Battery for Grid -Scale Energy Storage€¦ · A Flow Battery for Grid -Scale Energy Storage Vincent Battaglia Principal Investigator LBNL February 22, 2012 NCCAVS Conference

Discharge performanceDischarge performance

Max PD

(W/cm2)%

Ma

(A/

Baseline 0.68 0.0 1

2M Br2/0.5M HBr

(No pretreat)0.89 31.7 1

0.9M Br2/1M HBr

(H2SO4 pretreated)0.92 36.2 1

1M Br2/0.5M HBr

(H2SO4 pretreated)0.97 43.5 1

Performance from pretreated PM with H2SO4 was very reliable

Max power : 0.92 (0.9M Br2/1M HBr) and 0.97 (1M Br2/0.5M HBr)

Max current density: 1.54 A/cm2

0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6

Baseline (no pretreat) 2M Br2/0.5M HBr (no pretreat) 0.9M Br2/0.5M HBr (H

2SO

4 5hrs)

1M Br2/0.5M HBr (H2SO

4 5hrs)

Pretreatment: H2SO

4 5hrs

Current Density (A/cm2)

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

Po

wer

Den

sit

y (

W/c

m2)

Page 15: A Flow Battery for Grid -Scale Energy Storage€¦ · A Flow Battery for Grid -Scale Energy Storage Vincent Battaglia Principal Investigator LBNL February 22, 2012 NCCAVS Conference

Highly reversible;no side reactions

@ Room Temperature

0.0 0.2 0.4 0.6 0.840

50

60

70

80

90

100

Discharge

Cell e

ffic

ien

cy (

%)

Power density (W/cm2)

High power at highefficiencies

Discharge

Power density (W/cm2)C

ell e

ffic

ien

cy (

%)

0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6

Discharge

Charge

Current density (A/cm2)

0.0

0.4

0.8

1.2

1.6

2.0

2.4

Po

wer

den

sit

y (

W/c

m2)

Po

wer

den

sit

y (

W/c

m2)

Charge

DischargePower

Voltage

Page 16: A Flow Battery for Grid -Scale Energy Storage€¦ · A Flow Battery for Grid -Scale Energy Storage Vincent Battaglia Principal Investigator LBNL February 22, 2012 NCCAVS Conference

800

600

400

200

0

Sta

ck +

BO

P +

Assem

bly

ca

pital co

st

($/k

Wh)

86420

Discharge time (hours)

Gen1 Gen2 Gen3 Gen4 With further optimization

Nafion limit (0.1 ohm-cm2)

Page 17: A Flow Battery for Grid -Scale Energy Storage€¦ · A Flow Battery for Grid -Scale Energy Storage Vincent Battaglia Principal Investigator LBNL February 22, 2012 NCCAVS Conference

Cost Breakdown for “Nafion Limited”

Br liq. pump: 26%

Br tank: 16%

H2 tank: 24%

Active matls.: 22%

Sensors, cables, other: 13%

BOP cost = 158 $/kWh

Membrane: 48%

H2 electrode catal.: 5%

Electrodes (no c

GDL/F

Bipo

Gasket & se

Endplates & tie rods: 4%

Stack cost = 97 $/kWh

Energy Power

Either pay for the H2 tanks and BP plates or pay for the pumps.

Focus on reducing membraand bipolar plate costs.

Page 18: A Flow Battery for Grid -Scale Energy Storage€¦ · A Flow Battery for Grid -Scale Energy Storage Vincent Battaglia Principal Investigator LBNL February 22, 2012 NCCAVS Conference

Br2 is a problem as it’s toxic with a low vapor press(boils at 58.8oC)

But perhaps we can find a complexing agent that

keeps it in solution while maintaining its performan

Page 19: A Flow Battery for Grid -Scale Energy Storage€¦ · A Flow Battery for Grid -Scale Energy Storage Vincent Battaglia Principal Investigator LBNL February 22, 2012 NCCAVS Conference

0.9M Br2/1M HBr with thick carbon-felt

0.9M Br2/1M HBr with multilayer carbon-felt

4M Br2/1M HBr with multilayer carbon-felt

0.0

0.2

0.4

0.6

0.8

Po

wer

Den

sit

y (

W/c

m2)

Increasing power

Flow batteries have the potential to be cost effective

today for large discharge times

Flow batteries have the Flow batteries have the

potential to be cost effective potential to be cost effective

today for large discharge timestoday for large discharge times

Promising power performance. Better than

competing systems

Promising power Promising power

performance. Better than performance. Better than

competing systemscompeting systems

Can we make the chemistrsafe?

Can we make the chemistrCan we make the chemistr

safe?safe?

Hydrogen-Bromine chemistry hvery fast charge transfer kinetiExpensive catalysts not neede

for the bromine electrode.

HydrogenHydrogen--Bromine chemistry hBromine chemistry h

very fast charge transfer kinetivery fast charge transfer kineti

Expensive catalysts not needeExpensive catalysts not neede

for the bromine electrode.for the bromine electrode.

Page 20: A Flow Battery for Grid -Scale Energy Storage€¦ · A Flow Battery for Grid -Scale Energy Storage Vincent Battaglia Principal Investigator LBNL February 22, 2012 NCCAVS Conference

Funding from ARPA-E

Kyu Taek Cho (Cell studies)Paul Ridgeway (Catalysis studies)Sophia Haussener (Transport modeling)

Paul Albertus (Cost Modeling)Roel Sanchez-Carrera and Boris Kozinsky (Catalyst theory)

Biswajit Choudhury (New membranes)

Mark Debe (Catalyst structures)

Proton OnSite: