A Case Study of Vibration in Positive Displacement Pump Systems Trenton Cook Sarah Simons

A Case Study of Vibration in Positive Displacement Pump

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: A Case Study of Vibration in Positive Displacement Pump

A Case Study of Vibration in Positive Displacement Pump Systems

Trenton Cook Sarah Simons

Page 2: A Case Study of Vibration in Positive Displacement Pump

Experience

Trenton Cook• FEA of machinery piping

systems• Field pulsation and vibration

assessment of piping systems• Modal and forced response

analysis of mechanical systems

Sarah Simons• Almost 10 years of

experience in flow and acoustic analysis of pump systems

• Leads research on fluid property testing, and flow and pulsations in combined machinery types

2

Page 3: A Case Study of Vibration in Positive Displacement Pump

AbstractPositive displacement pump systems can experience high piping vibrations. System vibration can have many root causes- including underdamped fluid pulsations, mechanical resonance, and poor skid design. This case study shows the mechanical and acoustic assessment of a reciprocating pumping system which had multiple vibration induced failures. Poor support stiffness, coupled with inadequate pulsation dampener performance resulted in high amplitude piping vibration- requiring both mechanical and acoustic analyses. Collected field pulsation and vibration data are presented, along with follow-up acoustic and finite element modeling results to showcase a solution to pulsation induced vibration in this particular pump system.

3

Page 4: A Case Study of Vibration in Positive Displacement Pump

Problem• Reciprocating pump

installation for salt water disposal

• Multiple reported piping failures

• Failure of pulsation dampener bladders

• Reported piping/skid vibration

4

Location of Previous Failure

Page 5: A Case Study of Vibration in Positive Displacement Pump

Solution Overview

5

• Field Data Collection• Modal Analysis• FEA Analysis• Pulsation Analysis• Design Changes:

– Mechanical– Acoustic

Page 6: A Case Study of Vibration in Positive Displacement Pump

System Overview

6

Suction (not analyzed)

Discharge• (2) Triplex pumps, skid mounted on soil pad

• 200-400 RPM• 800-1400 psi (discharge)• Pulsation dampeners

(discharge and suction)

Page 7: A Case Study of Vibration in Positive Displacement Pump

Vibration Test Locations

Field Data Collection

7

• Independent and parallel operation of Pumps #1 and #2

• Speed sweep (200-400 RPM)

• Multiple pulsation dampeners tested

• Accelerometers• Pulsation transducers

Pump 1 Pump 2

Page 8: A Case Study of Vibration in Positive Displacement Pump

Test Case - 1

8

• Parallel operation and speed sweep (200-400 RPM) of Pumps #1 and #2- in original configuration

1X 2X 1X 2X

2%Line Pres.

Pump #1 DischargePulsation

Pump #2 DischargePulsation

Page 9: A Case Study of Vibration in Positive Displacement Pump

Test Case - 1

9

• Vibration at wye (location of previous failures)• Vibration frequencies consistent with Pump#2

discharge pulsations

1X 2X Previous Failure

Page 10: A Case Study of Vibration in Positive Displacement Pump

Test Case - 1

10

• Vibration of Pump #2 pulsation dampener (top)• Mechanical resonance near 19 Hz

1X 2X

Previous Failure

Page 11: A Case Study of Vibration in Positive Displacement Pump

Test Case - 1

11

• Pump #2 pulsation dampener had failed- would not hold charge

• High amplitude pulsations (undamped) caused high amplitude piping vibration across operating range

• Multiple mechanical piping/support modes excited by high amplitude pulsations

• Next Test-- replacing Pump #2 pulsation dampener with alternative model- at site from previous use

Page 12: A Case Study of Vibration in Positive Displacement Pump

Test Case - 6

12

• Parallel operation and speed sweep (200-400 RPM) of Pumps #1 and #2- alternative dampener on Pump #2

1X 2X 1X 2X

2%Line Pres.

Pump #1Pulsation

Pump #2 Pulsation

Page 13: A Case Study of Vibration in Positive Displacement Pump

Test Case - 6

13

• Replacing the Pump #2 failed pulsation dampener with alternative dampener significantly reduced pulsation amplitudes in system

• Pump #1 still had high amplitude pulsations and vibration still persisted, despite general reduction in amplitudes

• Next Test--replacing Pump #1 pulsation dampener with alternative model- to match Pump #2

Page 14: A Case Study of Vibration in Positive Displacement Pump

Test Case - 7

14

• Parallel operation and speed sweep (200-400 RPM) of Pumps #1 and #2- with alternative dampeners

1X 2X 1X 2X

2%Line Pres.

Pump #1 DischargePulsation

Pump #2 DischargePulsation

Page 15: A Case Study of Vibration in Positive Displacement Pump

Test Case - 7

15

• Vibration at wye significantly reduced• Potential mechanical resonances still at 2X

1X 2X Previous Failure

Page 16: A Case Study of Vibration in Positive Displacement Pump

Test Case - 7

16

• Vibration of Pump #2 pulsation dampener (top)• Mechanical resonance near 34 Hz (shifted)

1X 2X

Previous Failure

Alt Dampener

Page 17: A Case Study of Vibration in Positive Displacement Pump

Test Case - 7

17

• Replacing both Pump #1 and #2 dampeners with alternative design reduced the system pulsation amplitudes within acceptable limits

• System vibration amplitudes significantly reduced with alternative dampeners

• Some high amplitude vibration still persistent- associated with mechanical resonances

• Pulsation dampeners recommended to be re-sized• Additional modal analysis and bracing recommended

Page 18: A Case Study of Vibration in Positive Displacement Pump

Modal Analysis

18

• Finite Element model built to perform modal analysis of piping system

• Results used to design additional support system to place key modes beyond range of operating speed

Page 19: A Case Study of Vibration in Positive Displacement Pump

Modal Analysis

19

• Impact test data collected in the field

• Modal analysis evaluated with FE model

Field Bump Data ~20 Hz

FEA Modal Results ~22 Hz

Modal Interference Plot

Page 20: A Case Study of Vibration in Positive Displacement Pump

Mechanical Recommendations

20

• Additional bracing of pulsation dampener flange

New Flange Support

Page 21: A Case Study of Vibration in Positive Displacement Pump

Mechanical Recommendations

21

• Additional bracing of discharge header

New Axial Gussets

Secure Piping to Restraints

Page 22: A Case Study of Vibration in Positive Displacement Pump

Pulsation Analysis

22

• Alternate dampeners in the field not rated for long-term operation at the higher end of discharge pressure

• Pulsation analysis performed to size new dampeners designed for this application

• Initial model results matched well with field data and the model with the new dampener showed sufficient attenuation of the pump excitations, similar to Field Test Case 7 results.

Blue: Original SystemGreen: New DampenerGreen Dotted Line: API 674

Pump 2: Dampener Tee Test Point

Page 23: A Case Study of Vibration in Positive Displacement Pump

Dampener Evaluation

23

• Dampeners need to be charged to 70-90% line pressure

• Avoid tall and heavy dampeners that have low MNFs

• Use bladder material suited for the application Original Tested Final

Installed

Page 24: A Case Study of Vibration in Positive Displacement Pump

Solution Results

24

• System operating without failures or excessive piping/support vibration

• Pulsation dampeners performing without failure

Blue: Original SystemGreen: New DampenerGreen Dotted Line: API 674

Page 25: A Case Study of Vibration in Positive Displacement Pump

Questions?