23
A Case study from Denmark Danish Signalling Programme Bent Ahlgren, Banedanmark and Anders Møller, Rambøll

A Case study from Denmark - irse.org 30032012... · A Case study from Denmark Danish Signalling Programme Bent Ahlgren, Banedanmark and Anders Møller, Rambøll. ... • GSM-R data

  • Upload
    trandan

  • View
    216

  • Download
    0

Embed Size (px)

Citation preview

Page 1: A Case study from Denmark - irse.org 30032012... · A Case study from Denmark Danish Signalling Programme Bent Ahlgren, Banedanmark and Anders Møller, Rambøll. ... • GSM-R data

A Case study from Denmark

Danish Signalling Programme

Bent Ahlgren, Banedanmark and Anders Møller, Rambøll

Page 2: A Case study from Denmark - irse.org 30032012... · A Case study from Denmark Danish Signalling Programme Bent Ahlgren, Banedanmark and Anders Møller, Rambøll. ... • GSM-R data

Agenda

1. The basis for the Danish Signalling Programme

2. Procurement Phase

3. Way ahead

4. Benefits

o Punctuality

o Safety

o Improved operational procedures

o Capacity

Page 3: A Case study from Denmark - irse.org 30032012... · A Case study from Denmark Danish Signalling Programme Bent Ahlgren, Banedanmark and Anders Møller, Rambøll. ... • GSM-R data

Background of the Signalling Programme

Page 4: A Case study from Denmark - irse.org 30032012... · A Case study from Denmark Danish Signalling Programme Bent Ahlgren, Banedanmark and Anders Møller, Rambøll. ... • GSM-R data

Danish signalling needsto be renewed now

Banedanmark is the owner of DK railway infrastructure:• Replacement• Maintenance• Operation

60% of all signalling will exceed absolute final service-life within 15 years

Life of DK- ATC expires in 2020

It takes 10-12 years to renew all signalling assets.

More systems have risk of serious breakdowns even today.

50% of today's train delays are due to signalling failures.

4

Page 5: A Case study from Denmark - irse.org 30032012... · A Case study from Denmark Danish Signalling Programme Bent Ahlgren, Banedanmark and Anders Møller, Rambøll. ... • GSM-R data

A total renewal of the signalling system minimize total cost and provide better performance

A total renewal is the best solution:

• Cheapest and fastest implementation• Provides higher punctuality and capacity• Most benefits for the passengers• Benefits are achieved faster

2006: Strategic political decision of a total renewal strategy

2007-08: Detailed plans & budget for a total renewal programme

Jan 2009:Final political decision for a fully financed total renewal programme was decided by the Danish Parliament

Feb 2009-12: Signalling Programme procurement phase

5

Page 6: A Case study from Denmark - irse.org 30032012... · A Case study from Denmark Danish Signalling Programme Bent Ahlgren, Banedanmark and Anders Møller, Rambøll. ... • GSM-R data

Two different systems

Conventional network (Fjernbanen):

ERTMS 2 and modern centralized signalling infrastructure and onboard

S-banen:

Modern metro/urban system. CBTC

More interfacing projects: Fixed transmission network, STM, GSM-R etc

New operational rules

No Fall Back System

6

Page 7: A Case study from Denmark - irse.org 30032012... · A Case study from Denmark Danish Signalling Programme Bent Ahlgren, Banedanmark and Anders Møller, Rambøll. ... • GSM-R data

The logic in total renewal

7

Better prices

• Economies of scale

• International competition

• Learning curve effect

Quantum leap in technology

• EC standard component, redundancy of central components, higher availability

• Few safety approvals

• Few interfaces

Savings on operations and uniform safety

• Reduction in maintenance costs

• Simpler and safer operational rules

• Fewer Traffic Management sites and reduction in staff

Page 8: A Case study from Denmark - irse.org 30032012... · A Case study from Denmark Danish Signalling Programme Bent Ahlgren, Banedanmark and Anders Møller, Rambøll. ... • GSM-R data

Procurement Phase

Page 9: A Case study from Denmark - irse.org 30032012... · A Case study from Denmark Danish Signalling Programme Bent Ahlgren, Banedanmark and Anders Møller, Rambøll. ... • GSM-R data

Contract strategy

Design Build Maintain contracts

• 2 Contracts on main & regional lines (East and West)

• 1 Supplier 2 contracts on the S-bane including all rolling stock

• 1 Contract for on-board main & regional rolling stock

• GSM-R data included in GSM-R tender starting now

Framework type contracts that allow fitting of new lines

Possible option for ERTMS regional

9

East contract

West contract

TMS Coordination by suppliers

Rolling stock contract

All supply & implementation from track to TMS

Page 10: A Case study from Denmark - irse.org 30032012... · A Case study from Denmark Danish Signalling Programme Bent Ahlgren, Banedanmark and Anders Møller, Rambøll. ... • GSM-R data

Status

• S-bane - 5 bids received

• Contract awarded to Siemens

• Within target budget, time frame 2020 > 2018

• Main Line (Fjernbanen) – 6 bids received

• 2 Contracts awarded to Alstom (East) & Thales-Balfour Beatty Rail (West)

• Within target budget

• On-Board – 5 bids received

• Contract awarded to Alstom

• Within target budget

10

Page 11: A Case study from Denmark - irse.org 30032012... · A Case study from Denmark Danish Signalling Programme Bent Ahlgren, Banedanmark and Anders Møller, Rambøll. ... • GSM-R data

Approach

• Early dialog with suppliers

• Marked research, purchase what the market is able to supply

• Minimum development risk approach. Only calculated and limited

development risks

• Functional requirements: let the Supplier supply existing systems

• New operational rules: remove national monopoly barriers

• Dedicated organisation and international team

• Negotiated procedure

• Close involvement of our owners

• Start collaboration approach

11

What we did to achieve this

Page 12: A Case study from Denmark - irse.org 30032012... · A Case study from Denmark Danish Signalling Programme Bent Ahlgren, Banedanmark and Anders Møller, Rambøll. ... • GSM-R data

Strategy: Benefit perspective

But total replacement gives more benefits than traditional replacement

• Enhanced punctuality

• Enhanced Capacity on selected lines

• Uniform safety level in whole country

• Optimizing maintenance

• Optimizing the train control organisation

• Optimising advanced train control

• Enhanced passenger information

• Driver for a transformation of Banedanmark

12

Re-signalling naturally gives limited benefits compared to cost amount

Page 13: A Case study from Denmark - irse.org 30032012... · A Case study from Denmark Danish Signalling Programme Bent Ahlgren, Banedanmark and Anders Møller, Rambøll. ... • GSM-R data

Roll out strategies: cost perspective

Focus on cost drivers:

• TRUE COMPETITION. Buy what the industry has on the shelves. New Ops.

Rules, etc

• High numbers of units = cheaper unit price,

• Same supplier: same solution, same interfaces, very few approvals

• ”Factory production” installation (installation 25% of the cost)

• Less track mounted equipment = installation outside possession hours.

• Achieving learning curve effect

• Optimizing possessions.

• Collaboration Programme management: cost of disputes

• Discuss safety level from a ”total perspective”

• Choose cost consentive solutions: GPRS rather than ERTMS 1 on stations,

no back-up, no shunting, development of a ”suitcase solution”

13

As there is no real standard, SP opted for Economy of scale

Page 14: A Case study from Denmark - irse.org 30032012... · A Case study from Denmark Danish Signalling Programme Bent Ahlgren, Banedanmark and Anders Møller, Rambøll. ... • GSM-R data

Way ahead

Page 15: A Case study from Denmark - irse.org 30032012... · A Case study from Denmark Danish Signalling Programme Bent Ahlgren, Banedanmark and Anders Møller, Rambøll. ... • GSM-R data

Roll-out until 2021

15

Starting 2009, it will take 10-12 years to carry out the total renewal

Two contracts for the conventional network

One framework contract for on-board equipment

Contract interface at Lillebælt

Roll-out phases:

•Early deployment

•Main lines

•Regional lines

•Low density lines

Page 16: A Case study from Denmark - irse.org 30032012... · A Case study from Denmark Danish Signalling Programme Bent Ahlgren, Banedanmark and Anders Møller, Rambøll. ... • GSM-R data

The S-bane

One contract

Technology: Suppliers well proven “metro” type system e.g. CBTC

Early deployment line:Jægersborg - Hillerød

Roll-out starting from end branches towards centre of Copenhagen

Last, the central lines: Risk-minimising approach

Page 17: A Case study from Denmark - irse.org 30032012... · A Case study from Denmark Danish Signalling Programme Bent Ahlgren, Banedanmark and Anders Møller, Rambøll. ... • GSM-R data

What does it mean for Banedanmark and the employees ?

17

Reorganisation during the next 12 years with impact on:

–All traffic management staff in Banedanmark

–All signalling technicians

–Train drivers with the train operation companies

Changes include:

–New operational rules

–New workplace systems

–New places of work geographically

–and more…

Page 18: A Case study from Denmark - irse.org 30032012... · A Case study from Denmark Danish Signalling Programme Bent Ahlgren, Banedanmark and Anders Møller, Rambøll. ... • GSM-R data

The expected benefits

o Punctuality

o Safety

The Signalling Programme

o Improved operational procedures

o Capacity

Page 19: A Case study from Denmark - irse.org 30032012... · A Case study from Denmark Danish Signalling Programme Bent Ahlgren, Banedanmark and Anders Møller, Rambøll. ... • GSM-R data

Punctuality

80 % reduction in delays caused by signalling

Reduction in delays caused by signalling

Page 20: A Case study from Denmark - irse.org 30032012... · A Case study from Denmark Danish Signalling Programme Bent Ahlgren, Banedanmark and Anders Møller, Rambøll. ... • GSM-R data

Safety

Uniform level of safety country wide

Page 21: A Case study from Denmark - irse.org 30032012... · A Case study from Denmark Danish Signalling Programme Bent Ahlgren, Banedanmark and Anders Møller, Rambøll. ... • GSM-R data

Improved operational procedures

Railway Undertakings, Privat Lines, Infrastructure Managers: 4.700

Banedanmark (excl. BDK Produktion): 450

Contractors (incl. BDK Produktion): 1.000

TOTAL 6.150

Time needed to meet training requirements

Page 22: A Case study from Denmark - irse.org 30032012... · A Case study from Denmark Danish Signalling Programme Bent Ahlgren, Banedanmark and Anders Møller, Rambøll. ... • GSM-R data

Capacity

Double up in 2020

Page 23: A Case study from Denmark - irse.org 30032012... · A Case study from Denmark Danish Signalling Programme Bent Ahlgren, Banedanmark and Anders Møller, Rambøll. ... • GSM-R data

Thank you for your attention