Project Execution Planning for Building Information Modeling. A buildingSMART Alliance project sponsored by: The Charles Pankow Foundation Construction Industry Institute (CII) Penn State Office of Physical Plant (OPP) PACE. Conference Call Agenda. Introductions - PowerPoint PPT Presentation
Citation preview
A buildingSMART Alliance project sponsored by: The Charles Pankow Foundation Construction Industry Institute (CII) Penn State Office of Physical Plant (OPP) PACE
A buildingSMART Alliance project sponsored by: The Charles Pankow Foundation Construction Industry Institute (CII) Penn State Office of Physical Plant (OPP) PACE
Project Execution Planning for Building Information Modeling
Project Execution Planning for Building Information Modeling
Conference Call AgendaConference Call Agenda
1. Introductions2. Project Overview3. Progress Report4. Discussion of Project and Progress5. Set Up Next Meeting Time
ParticipantsParticipants
buildingSMART Project Team
Advisory BoardCIC Research Group
Penn State
John Messner, Ph.D.Director of Computer Integrated
Construction (CIC) Research ProgramProposed Grantee
Craig Dubler
Nevena Zikic
Colleen Kasprzak
Dana “Deke” Smith buildingSMART Alliance
Industry Champion
Victor Sanvido
Francois Grobler
Steve Hagan
Soad KousheshiUndergraduate Students
Additional Members T.B.D.
Chitwan Saluja
Problem StatementProblem Statement
Many owners and project teams are struggling with defining the appropriate level of modeling to perform on a project based on the current state of practice and future information needs.
Project OverviewProject Overview
Identify BIM methods and implementation strategies organized by project phase
Planning, Design, Construction, Operations Develop implementation guidelines and best practice methods Disseminate the results
BIM Execution Planning Guide Interactive execution planning computer tool Presentations at national conferences e.g. buildingSMART, AIA, AGC BIMForum, etc. Articles in industry and academic publications
Project GoalProject Goal
Develop a guide that will focus on the decisions required to implement Building Information Modeling throughout the stages of a building project:
Planning Design Construction Operations
Project DeliverablesProject Deliverables
BIM Execution Planning Guide Includes decision matrix and guidelines for BIM implementation at various project phases. Posted and distributed through the buildingSMART Alliance.
BIM Execution Planning Application Easy to use application for guiding a team through the decisions required for BIM implementation.
MethodologyMethodology
Detailed Literature Review Identify gaps in current research
Interviews Identify methods, opportunities, and challenges encountered with the adoption of BIM.
Case studies Evaluate BIM implementation on current projects
The Office of Physical PlantHershey Medical CenterJacobs FacilitiesPACE Members
Focus Groups AE class – BIM Implementation
Progress to DateProgress to Date
1. Literature review underway2. Interview questions developed, and initial
interviews started3. Currently developing interviewee list4. Wiki Setup - BIM Ex5. Presentations• buildingSMART Alliance• PACE Conference• NIST
6. Graduate Course Setup for Fall 20087. Advisory Board Formation• Currently 7 Members
Tasks this SummerTasks this Summer
1. Perform Interviews• Planning (Chitwan)• Design (Nevena)• Construction (Craig)• Operation (Colleen)
2. Develop Decision Matrix Structure3. Investigate Case Studies• Facilitate BIM Execution Plan
development• Investigate previous projects
4. Prepare for fall semester BIM course