A 9-day old 250 ton Liebherr crane worth $3million. Did anybody look at the “Load Chart”?. “Yes! We did a pre-job safety meeting and a JSA” but a pre-lift walk through? I don’t think so….”. “How high did you want this load?”. - PowerPoint PPT Presentation

Citation preview

Page 1: A  9-day old 250 ton  Liebherr  crane worth $3million

A 9-day old 250 ton Liebherr crane worth $3million.

Page 2: A  9-day old 250 ton  Liebherr  crane worth $3million

Did anybody look at the “Load Chart”?

Page 3: A  9-day old 250 ton  Liebherr  crane worth $3million

“Yes! We did a pre-job safety meeting and a JSA” but a pre-lift walk through?

I don’t think so….”

Page 4: A  9-day old 250 ton  Liebherr  crane worth $3million

“How high did you want this load?”

Page 5: A  9-day old 250 ton  Liebherr  crane worth $3million

“I know there is a rule about having a outrigger pad in place….but this is

solid concrete.”

Page 6: A  9-day old 250 ton  Liebherr  crane worth $3million

“Boy-o-boy….the Boss aint going to be happy about this”

Page 7: A  9-day old 250 ton  Liebherr  crane worth $3million

“OOPS!!!!!!!!! Nobody told me about no basement”