Upload
others
View
5
Download
0
Embed Size (px)
Citation preview
LUFFING JIB TOWER CRANE
RTL 265A - 18 HR23/HP20 I / II / FALLS
B - 18 HR23/HP20 II / III / IV / FALLS
TECH
NIC
AL D
ATA
SHEE
T
TOWER TYPE HR 23The well known H beam mast sections with vertical bolts connection will allow greater free standing heights.Available in two versions, heavy duty (HR 23-26) and std duty type (HR 23-22).
TOWER TYPE HP 20The famous boxed beams -twin pins connections.Safety and performances trough pins.
CABINNew design CAB , wider, longer, with improved visibility.Grammer seat and gessman joy-stick for driver cofort and ABB controls for maximum safety.USB door, air con, easy cleaning of windows, 10” or 6” screen included.
WINCHESNew generation of high power winches, from 67 to 110 kw.New braking system, new reduction gear to grant highest performances ever seen on a luffer.
3
p. 4 RTL 265 A - 18 HR23/HP20
p. 10 RTL 265 B - 18 HR23/HP20
RTL 265A - 18 HR23/HP20 I / II / FALLS
4
V4 -
11/1
7 - S
ubje
ct to
cha
nge
with
out n
otic
e
TECHNICAL DATA SHEET
RTL
265
A -
18 H
R23/
HP2
0
t m 15 20 25 30 35 40 45 50 55 60
9 t t 9,00 9,00 9,00 7,99 6,33 5,08 4,12 3,34 2,70 2,20
13,5 t t 13,50 13,33 9,86 7,54 5,89 4,65 3,68 2,91 2,28 1,80 59,46 m
9 t t 9,00 9,00 9,00 8,36 6,67 5,40 4,41 3,62 3,00
16 t t 16,00 13,80 10,26 7,90 6,22 4,96 3,97 3,18 2,60 54,46 m
9 t t 9,00 9,00 9,00 9,00 7,79 6,41 5,33 4,50
18 t t 18,00 15,78 11,89 9,30 7,45 6,06 4,98 4,20 49,47 m
9 t t 9,00 9,00 9,00 9,00 8,16 6,76 5,70
18 t t 18,00 16,20 12,28 9,66 7,79 6,39 5,40 44,47 m
9 t t 9,00 9,00 9,00 9,00 8,47 7,10
18 t t 18,00 16,42 12,52 9,92 8,06 6,80 39,47 m
9 t t 9,00 9,00 9,00 9,00 8,60
18 t t 18,00 16,48 12,58 9,99 8,30 34,47 m
9 t t 9,00 9,00 9,00 9,00
18 t t 18,00 16,49 12,58 10,20 29,47 m
lb ft 49,21 65,62 82,02 98,43 114,83 131,23 147,64 164,04 180,45 196,85
19841,6 lb 19842 19842 19842 17617 13956 11210 9072 7361 5959 4850
29762,4 lb 29762 29389 21736 16633 12987 10251 8122 6418 5021 3968 195,08 ft
19841,6 lb 19842 19842 19842 18442 14709 11908 9727 7981 6614
35273,9 lb 35274 30418 22623 17426 13712 10925 8756 7019 5732 178,67 ft
19841,6 lb 19842 19842 19842 19842 17166 14123 11754 9921
39683,2 lb 39683 34778 26218 20510 16431 13370 10986 9259 162,30 ft
19841,6 lb 19842 19842 19842 19842 17987 14903 12566
39683,2 lb 39683 35714 27068 21301 17181 14087 11905 145,90 ft
19841,6 lb 19842 19842 19842 19842 18665 15653
39683,2 lb 39683 36195 27605 21876 17780 14991 129,49 ft
19841,6 lb 19842 19842 19842 19842 18960
39683,2 lb 39683 36323 27743 22018 18298 113,09 ft
19841,6 lb 19842 19842 19842 19842
39683,2 lb 39683 36360 27734 22487 96,69 ft
Rope weight:I FALL 2,383 kg/m → 1,60 lb/ftII FALL 4,766 kg/m → 3,20 lb/ft
Hoisting rope weight not included into the above chart - reduce the lifting performance with the following amount dependig on final crane height:
18,55 m
110,89 ft
60,86 ft
98,43 ft
60,93 ft
107,22 ft
60,10 ft
109,97 ft
60,70 ft
91,04 ft
64,99 ft
93,90 ft
58,33 ft
103,90 ft
27,75 m
19,81 m
28,62 m
RTL 265 A - 18
58,86 ft
32,68 m
18,32 m
33,52 m
17,78 m
31,67 m
17,94 m
30,00 m
18,57 m
RTL 265 A - 18
18,50 m
33,80 m
RTL
455
A -
25 H
R23
5RT
L 26
5 A
- 18
HR2
3/H
P20
V4 -
11/1
7 - S
ubje
ct to
cha
nge
with
out n
otic
e
6
HR23RT
L 26
5 A
- 18
HR2
3/H
P20
V4 -
11/1
7 - S
ubje
ct to
cha
nge
with
out n
otic
e
60.40 m
RT1
0.4m R1 R2
( H )6
m
2.28 m
N°1
0 H
R23
-22.
6
1
2
3
4
5
6
7
8
9
10
RT2
0.4m R1 R2
( H )
6 m
2.28 m
1
2
3
4
5
6
7
8
9
10
C25
JIBH
(m)22.6 (6-m)
22.3 (3-m)
30 57.40 9 135 54.40 9 -40 51.40 8 145 48.40 8 -50 48.40 8 -55 45.40 7 160 42.40 7 -
FEM 1.001
JIBH
(m)22.6 (6-m)
22.3 (3-m)
30 60.40 10 -35 60.40 10 -40 57.40 9 145 54.40 9 -50 54.40 9 -55 51.40 8 160 48.40 8 -
11
12
2.32 m
N°3
HR
23-2
6.6
N°9
HR
23-2
2.6
6 m
72.40 m
C25
JIBH
(m)26.6 (6-m)
22.6 (6-m)
22.3 (3-m)
30 66.40 3 8 -35 63.40 3 7 140 60.40 3 7 -45 60.40 3 7 -50 57.40 3 6 155 54.40 3 6 -60 54.40 3 6 -
FEM 1.001
JIBH
(m)26.6 (6-m)
22.6 (6-m)
22.3 (3-m)
30 72.40 3 9 -35 69.40 3 8 140 66.40 3 8 -45 66.40 3 8 -50 63.40 3 7 155 60.40 3 7 -60 57.40 3 6 1
RTB
0.4m R1 R2
( H )
2.28 m
2
3
4
5
6
7
8
9
10
11
12
2.32 m
TB H
R23
N°3
HR
23-2
6.6
6 m
81.40 m
C25
JIBH
(m)TB/12 (12-m)
26.6 (6-m)
22.6 (6-m)
22.3 (3-m)
30 75.40 1 3 7 135 72.40 1 3 7 -40 72.40 1 3 7 -45 69.40 1 3 6 150 66.40 1 3 6 -55 63.40 1 3 5 160 60.40 1 3 5 -
FEM 1.001
JIBH
(m)TB/12 (12-m)
26.6 (6-m)
22.6 (6-m)
22.3 (3-m)
30 81.40 1 3 8 135 78.40 1 3 8 -40 78.40 1 3 8 -45 75.40 1 3 7 150 72.40 1 3 7 -55 69.40 1 3 6 160 66.40 1 3 6 -
12m
6m 1
N°8
HR
23-2
2.6
3m
N°1
HR
23-2
2.3
FPR1
6 m
N°9
HR
23-2
2
1
2
3
2.28 m
4
5
6
7
8
9
8 X 8 m
8
52.00 m (C25)
58.00 m (FEM 1.001)( H ) ( JIB )
EXTERNAL CLIMBING
AB
C
*
INTERNAL CLIMBING
B
H
*
FEM 1.001
JIBH
(m)22.6 (6-m)
30 58.00 935 52.00 840 52.00 845 46.00 750 46.00 755 40.00 660 40.00 6
7
HP20
RTL
265
A -
18 H
R23/
HP2
0V4
- 11
/17
- Sub
ject
to c
hang
e w
ithou
t not
ice
56.90 m (FEM 1.001)
RTB
0.4m R1 R2
1
C25
JIBH
(m)TB/11.5(11.5-m)
PRL/3.75 (3.75-m)
30 53.15 1 1135 49.40 1 1040 49.40 1 1045 45.65 1 950 45.65 1 955 41.90 1 860 41.90 1 8
FEM 1.001
JIBH
(m)TB/11.5(11.5-m)
PRL/3.75 (3.75-m)
30 56.90 1 1235 53.15 1 1140 53.15 1 1145 49.40 1 1050 49.40 1 1055 45.65 1 960 41.90 1 8
11.5
m
2
3
4
5
6
7
8
9
10
11
12
TB H
P20
3.75
m
1,95m
N°1
2 T
HP2
0
N°1
1 T
HP2
0
53.15 m (C25)
( H )
0.4m
1
10m
2
3
4
5
6
7
8
9
10
3.75
m
1,95m
( H )47.95 m (FEM 1.001)
1
2
3
4
5
6
7
8
9
3.75
m
1,95m
( H )
42.50 m (FEM 1.001)
F - FP - T
R1 6 X 6 m
6 6 6TC
HP2
0N
°9 T
HP2
0
EXTERNAL CLIMBING
AB
C
*
INTERNAL CLIMBING
B
H
*
RTB1
R1 R2
FEM 1.001
JIBH
(m)TB/10(10-m)
PRL/3.75 (3.75-m)
30 47.95 1 1035 44.20 1 940 44.20 1 945 40.45 1 850 40.45 1 855 36.70 1 760 36.70 1 760 32.95 1 6
*
FEM 1.001
JIBH
(m)TC/10(10-m)
PRL/3.75 (3.75-m)
30 42.50 1 935 38.75 1 840 38.75 1 845 35.00 1 750 35.00 1 755 31.25 1 660 31.25 1 6
* Please ask tech. Dept.
8
Doc.N°Page.N°Data
38 16000 19 3200044 10000 22 20000
100 5240 50 10480154 3400 77 6800202 2050 102 4100
t
9 0 Æ 627 0 Æ 774 0 Æ 130
1,3 0 Æ 27518 0 Æ 3114 0 Æ 388 0 Æ 65
2,6 0 Æ 135
kW
MECHANISMS
HOISTING MECHANISM - Speed
110 HVF 180
1 - 107/03/2016
900
II
110 HVF 180
LOAD
( kg
) ILO
AD (
kg) I
I
HOISTING
m/min
I
110
0
2
4
6
8
10
12
14
16
18
20
0 50 100 150 200 250
II
0
1
2
3
4
5
6
7
8
9
10
0 50 100 150 200 250 300 350
I
Doc.N°Page.N°Data
38 16000 19 3200044 10000 22 20000
100 5240 50 10480154 3400 77 6800202 2050 102 4100
t
9 0 Æ 627 0 Æ 774 0 Æ 130
1,3 0 Æ 27518 0 Æ 3114 0 Æ 388 0 Æ 65
2,6 0 Æ 135
kW
MECHANISMS
HOISTING MECHANISM - Speed
110 HVF 180
1 - 107/03/2016
900110 HVF 180
LOAD
( kg
) ILO
AD (
kg) I
I
HOISTING
m/min
110
0
2
4
6
8
10
12
14
16
18
20
0 50 100 150 200 250
II
0
1
2
3
4
5
6
7
8
9
10
0 50 100 150 200 250 300 350
I
RTL
265
A -
18 H
R23/
HP2
0
t
9 0 → 386 0 → 563,6 0 → 881,4 0 → 14513,5 0 → 259 0 → 375,4 0 → 582,1 0 → 9618 0 → 1912 0 → 287,2 0 → 442,8 0 → 72
IV
67 HVF 90
LOAD
(t)I
I
67 HVF 90
HOISTING
II
III
kWm/min
67
0
1
2
3
4
5
6
7
8
9
10
0 50 100 150
t
9 0 → 386 0 → 563,6 0 → 881,4 0 → 14513,5 0 → 259 0 → 375,4 0 → 582,1 0 → 9618 0 → 1912 0 → 287,2 0 → 442,8 0 → 72
IV
67 HVF 90
LOAD
(t)I
I
67 HVF 90
HOISTING
II
III
kWm/min
67
0
1
2
3
4
5
6
7
8
9
10
0 50 100 150
Doc.N°Page.N°Data
38 16000 19 3200044 10000 22 20000
100 5240 50 10480154 3400 77 6800202 2050 102 4100
t
9 0 Æ 627 0 Æ 774 0 Æ 130
1,3 0 Æ 27518 0 Æ 3114 0 Æ 388 0 Æ 65
2,6 0 Æ 135
kW
MECHANISMS
HOISTING MECHANISM - Speed
110 HVF 180
1 - 107/03/2016
900
II
110 HVF 180
LOAD
( kg
) ILO
AD (
kg) I
I
HOISTING
m/min
I
110
0
2
4
6
8
10
12
14
16
18
20
0 50 100 150 200 250
II
0
1
2
3
4
5
6
7
8
9
10
0 50 100 150 200 250 300 350
I
LOA
D (t
) II
LOA
D (t
) II
LOA
D (t
) I
LOA
D (t
) I
V4 -
11/1
7 - S
ubje
ct to
cha
nge
with
out n
otic
e
Slewing 2 x 11.0 kW
Machine rating L67kW H80kW : 220 kVAL67kW H110kW : 325 kVA
0.70 rpm
RTL
455
A -
25 H
R23
9