9th meeting of the Floods Working Group Agenda point 5 “FD implementation” WGF 9, 31.3.1.4.2011 Budapest, Hungary. Maria Brättemark, WFD Team, DG ENV.D.1, European Commission. Agenda point 5 “Implementation of the Floods Directive”. Transitional measures (art 13). - PowerPoint PPT Presentation
Citation preview
water.europa.eu
9th meeting of the Floods Working Group
-Agenda point 5 “FD implementation”
WGF 9, 31.3.1.4.2011
Budapest, Hungary.
Maria Brättemark, WFD Team, DG ENV.D.1, European Commission
water.europa.eu
Agenda point 5 “Implementation of the Floods Directive”
Directive 2007/60/EC on the assessment and management of flood risks
Transitional measures (art 13) • 13 MS have replied to the letter of 17.12.2011, asking for
information on if art 13 would be used • 8 have indicated some use of transitional measures
• PFRA (option 1.a Existing assessment) :• LV full, ES partial(3 RBD), DE unclear
• PFRA (option 1.b straight to mapping/plans) : • LU, NL full, BE, UK part of territory, DE unclear
• Maps : • LU full, AT partial, DE unclear
• Plans : • DE unclear
• For other EU Member States no use of article 13 is
assumed.
• 13 MS have replied to the letter of 17.12.2011, asking for information on if art 13 would be used
• 8 have indicated some use of transitional measures • PFRA (option 1.a Existing assessment) :
• LV full, ES partial(3 RBD), DE unclear• PFRA (option 1.b straight to mapping/plans) :
• LU, NL full, BE, UK part of territory, DE unclear• Maps :
• LU full, AT partial, DE unclear• Plans :
• DE unclear
• For other EU Member States no use of article 13 is
assumed.
Directive 2007/60/EC on the assessment and management of flood risks
Administrative arrangements
• Administrative arrangements (art 3):• 25 Member States have communicated information• Ireland and Italy have used smaller Units of management than the RBD.• Visualisation in WISE in preparation.• 221 national parts of RBD, at least 343 Competent authorities… need for
strong international coordination in the RBD !
• Most reported electronically • BG and HU informed that WFD administrative
arrangements applies.• Other Units of management
• IT & IE smaller units• RO, DE reported sub-units, may be displayed under
RBD level but these are not considered UoM as set out in the Directive.
• Administrative arrangements (art 3):• 25 Member States have communicated information• Ireland and Italy have used smaller Units of management than the RBD.• Visualisation in WISE in preparation.• 221 national parts of RBD, at least 343 Competent authorities… need for
strong international coordination in the RBD !
• Most reported electronically • BG and HU informed that WFD administrative
arrangements applies.• Other Units of management
• IT & IE smaller units• RO, DE reported sub-units, may be displayed under
RBD level but these are not considered UoM as set out in the Directive.
Directive 2007/60/EC on the assessment and management of flood risks
WISE viewer
Directive 2007/60/EC on the assessment and management of flood risks
WISE viewer
Floods Directive
interactive maps
Directive 2007/60/EC on the assessment and management of flood risks
More informationhttp://ec.europa.eu/environment/water/flood_risk/index.htm
Maria Brättemark, Desk officer Floods/WFD, European Commission, DG ENV.D.1
Thank you for your attention !