C R A D D Y S
9788-01
CALCULATIONS
Client Project
Aldi Stores Ltd Aldi Store, Caerphilly Road, Cardiff
Calculation No Calculation Title Status
9788-01 Drainage Strategy and Calculations Information
Notes
General
• The site is a brownfield site. It is proposed to discharge stormwater to the existing public storm sewer within Waun Ddyfal. The portion of Waun Ddyfal within the site boundary is to be built over and incorporated into the car park of the new development.
• It is proposed to discharge runoff from site at a maximum discharge rate of 5.7 l/s for all storm events up to and including the 1 in 100 year return period. The capacity of onsite attenuation includes an allowance for climate change and this was made in accordance with the current best practice.
• The system incorporates trapped gullies and drainage channels, silt traps and an interceptor/separator.
• The development has low risk of flooding from all sources. This development is deemed appropriate in this location, and its redevelopment will not increase the risk of flooding to the neighbouring properties.
• It is proposed to discharge foul water offsite via an existing lateral drain to the public foul sewer at the north east corner of the site.
• All private drainage is to be maintained by Aldi Stores Ltd.
Revision Date Notes Author Checked Approved
A 24.05.17 First Issue WAH RSH RAG
C R A D D Y S
Project Aldi Store, Caerphilly Road, Cardiff Sheet 9788 01 002 Rev A
Section Drainage Strategy By WAH Checked RSH Date 24/05/17
1. INTRODUCTION/SITE DESCRIPTION
It is proposed to develop an Aldi store with parking on a brownfield site adjacent to Caerphilly Road, Cardiff, CF14 4NT. The site has an area of approximately 0.742Ha. Refer to appendix A for the site location.
There are existing private surface and foul water drains throughout the site. It is anticipated that the existing surface water system discharges offsite via a public lateral drain along Waun Ddyfal at the south boundary of the site into a public sewer within Caerphilly Road. The existing foul network similarly discharges to a public sewer in Caerphilly Road via a lateral drain at the north east corner of the site. The majority of the private surface and foul drains are to be made redundant and grubbed up provided that it is confirmed that they do not serve any third party properties. Refer to appendix B for the Welsh Water sewer map and appendix C for the existing drainage layout and areas.
The existing hard standing area is 7120m²; the proposed development will decrease this to 6855m² with the introduction of some areas of soft landscaping. Refer to appendix D for the proposed drainage areas.
2. DESIGN CRITERIA
The scheme design of the drainage system is carried out in accordance with all relevant Codes of Practice and Design Guides. These include, but are not limited to the following:
• Sewers for Adoption 7th Edition. (For adoptable drainage design calculation).
• CIRIA C753: SUDS manual (For environmental and sustainability assessment of different stormwater management options and discharge rates).
• The Approved Documents: Building Regulations 2015 Part H: Drainage and Waste Disposal (To adhere to UK building regulations).
• BS EN 1610: Construction and testing of drains and sewers (To specify drainage construction bedding materials).
• BS EN124: Gully Tops and Manhole Tops for Vehicular and Pedestrian Areas (To specify manhole covers).
• Planning Policy Wales Technical Advice Note 15 (TAN 15) (For flood risk considerations).
3. DRAINAGE PRINCIPLE
The main drainage principle, based on the SUDS management train, was to select surface water management techniques that can avoid, reduce or delay the surface water discharge rate from site. The techniques considered include soakaways, watercourses and sewers, in that order.
Soakaways: Soakaways are not considered to be a feasible option due to the ground conditions on the site. This assessment is included in a Site investigation by Brownfield Solutions Ltd. (Report: PD/C2803/1099). Refer to the below extract.
Fig 1. SUDS management train
C R A D D Y S
Project Aldi Store, Caerphilly Road, Cardiff Sheet 9788 01 003 Rev A
Section Drainage Strategy By WAH Checked RSH Date 24/05/17
.
Water courses: The nearest watercourse is an unnamed stream approximately 240m to the south west of the site. To discharge into the watercourse the drainage would have to pass through several residential properties and cross multiple residential roads. Therefore discharging the surface water to a watercourse is considered unsuitable.
Discharge to public sewer: It is proposed to connect the proposed drainage to the existing public surface water drain that is located within Waun Ddyfal at the south of the site. It is assumed that this drain discharges in to a public sewer within Caerphilly Road. It is proposed to implement a control device with attenuation and discharge the surface water at a restricted discharge rate. Refer to appendix E for the proposed drainage layout. The proposed discharge rate is to be 5.7 l/s which is equivalent to the greenfield runoff rate for the 1 in 100 year storm for the existing site. Refer to appendix F for the existing greenfield runoff rate calculations.
4. FLOOD RISK ASSESSMENT
The following considers the flood risk associated with the site in accordance with the Planning Policy Wales Technical Advice Note 15 (TAN 15).
The Development Advice Map (DAM) which is published by Natural Resources Wales and supplements TAN 15 indicates that the site is not at risk of flooding from rivers or the sea but that some areas are at low to high risk of surface water flooding. Refer to Fig. 2 below for the relevant extract from the DAM. Since the site area is less than 1.0Ha and the drainage system has been designed to imitate the greenfield runoff rate, the stormwater generated by the development is unlikely to have a significant impact upon flooding within the site locality and may be expected to improve the surface water flood risk.
Fig. 2 TAN 15 Development and Flood Risk
Site Location
C R A D D Y S
Project Aldi Store, Caerphilly Road, Cardiff Sheet 9788 01 004 Rev A
Section Drainage Strategy By WAH Checked RSH Date 24/05/17
Other issues considered in assessing the flood risks associated with developing the site were:
a) Overall loss of flood storage volume during the design event
b) Obstruction to the flow of water during a flood event
c) Increase in rate of runoff that might worsen flooding elsewhere
d) Obstruction to existing watercourses or access to them
e) Situations that may be dangerous during flooding.
f) Flooding from fluvial sources.
g) Flooding from tidal sources.
h) Flooding from overland flows
i) Flooding from ground water
j) Flooding from sewers
k) Flooding from reservoirs or canals.
l) Flooding from other sources.
Items a), b), d), e) and f) The site does not lie within a flood plain or adjacent to a watercourse.
Item c). The proposed development will slightly decrease the total roof and hardstanding areas and the stormwater drainage system incorporates an attenuation system designed to reduce the proposed discharge rate to the equivalent greenfield runoff rate for the site. It is therefore anticipated that the development of the site will not worsen flood risk elsewhere.
Item g). Flooding from tidal sources. The site is not at risk from tidal sources.
Item h). Flooding from overland flows. The site locality is a built-up area and the proposed development reduces the hard standing area. The majority of the hardstanding area of the site is typically lower than both the finished floor level of the store and the levels of the adjacent Caerphilly Road, therefore ensuring that overland flows will be directed away from both of these areas. In the event that surface water from outside the boundary does enter the site, drainage features will be arranged such that the water is intercepted before reaching the building. Refer to appendix G for the sketch indicating anticipated surface water overland flow routes on and around the site.
Item i). Flooding from ground water. There is no known history of flooding from ground water on this site.
Item j). Flooding from sewers. There is no known history of flooding from sewers in the area of the development site.
Item k). Flooding from reservoirs, canals. There are no reservoirs, canals or any artificial sources near the site.
Item l). Flooding from other sources. No other natural or artificial sources of flooding have been identified for this development.
Conclusion: This development is deemed appropriate in this location, is not at risk of flooding and its development will not increase the risk of flooding to the neighbouring properties.
5. POLLUTION
The proposed surface water drainage system incorporates silt traps, bioretention tree pits, trapped Birco drainage channel with sump units and trapped gullies which reduce the risk of silt and other pollutants entering the drainage system. There is a Class 1 bypass interceptor installed upstream of the attenuation tank to minimise any hydrocarbons entering the existing surface water system. The parking and service hard standing areas surface water runoff passes through the interceptor before discharging offsite.
C R A D D Y S
Project Aldi Store, Caerphilly Road, Cardiff Sheet 9788 01 005 Rev A
Section Drainage Strategy By WAH Checked RSH Date 24/05/17
6. DRAINAGE DESIGN CALCULATIONS
Microdrainage System 1 and Simulation software was used to design the drainage system and storm water attenuation. The storm water attenuation has been designed to have capacity for water generated for storm events up to the 1 in 30 year return period plus 40% allowance for climate change (Refer to appendix H). For more extreme events than this, up to the 1 in 100 year plus 40% allowance for climate change event, some surface ponding may occur in the car park and lorry ramp. Any flooding that occurs during the 1 in 100 year return period will be retained on site. Refer to appendix H for the full set of proposed drainage calculations.
7. FOUL DRAINAGE STRATEGY
It is proposed to discharge foul water via the existing manhole and lateral drain at the north east corner of the site. The levels of the site and the existing network dictate that a pump station will be required to achieve this. The existing manhole is to be adapted to a brake chamber, or replaced with a new brake chamber if its condition is such that an adaptation is not possible. The proposed foul drainage layout is included on the drawing in appendix E.
8. OWNERSHIP
The development does not include any public drainage to be adopted. All private drainage is to be maintained by Aldi Stores Ltd. Refer to appendix I for the private drainage Operation and Maintenance notes.
C R A D D Y S
Project Aldi Store, Caerphilly Road, Cardiff Sheet 9788 01 006 Rev A
Section Stormwater Drainage Strategy By WAH Checked RSH Date 24/05/17
Appendix A: Aerial Photo/Site Location
C R A D D Y S
Project Aldi Store, Caerphilly Road, Cardiff Sheet 9788 01 007 Rev A
Section Stormwater Drainage Strategy By WAH Checked RSH Date 24/05/17
Site Location
C R A D D Y S
Project Aldi Store, Caerphilly Road, Cardiff Sheet 9788 01 008 Rev A
Section Stormwater Drainage Strategy By WAH Checked RSH Date 24/05/17
Appendix B: Welsh Water Maps
(PU 2004)
12IN. CI 1
923
4IN. CI 1912
4IN. CI 19
14 (PU 200
4)
63mm. MDPE 2
004
1912
80mm. DIEL 2004 ()
125mm. MDPE 1991
4IN. CI 1894 (PU 2004)
90mm. PROFUSE
3IN. CI 1912
100mm. DIEL 20
04 ()
80mm. DIEL 2005 ()
100mm. DIEL 20
05 ()
80mm. DIEL 200
5 ()
12I
12IN. CI 1923
4IN. CI 1894 (PU 2004)80mm. D
IEL 2005 ()
100mm. DIEL 2004 ()
150mm. DIEL 2004 ()
4IN. CI 1914
(PU 2004)
4IN. CI 1894 (PU 2004)
00
4IN. CI 1894 (PU 2004)
12IN. CI 1
923
12IN. CI 1923
3IN. AC 19
05
3IN. AC 1905
3IN. CI 19
20
3IN. CI 19
20
3IN. CI 1948 (PU 2004)
4IN. CI 19
14 (PU 200
4)
3IN. CI 1953 (PU 2004)
180mm. MDPE 1991
12IN. CI 1923
12IN. CI 1
923
90mm. HPPE 200
3 (
63mm. MDPE 1995
63mm. MDPE 199
5
1CDER041
1CDER595
Notes:
EXACT LOCATIONS OF ALL APPARATUS
TO BE DETERMINED ON SITE.
LEGEND
VC 6 IN.
VC 6 IN.
VC 225 mm.
VC 6 IN.
VC 6 IN.
VC 225 mm.
VC 225 mm.
VC 225 mm.
VC 225 mm.
VC 225 mm.
VC 6 IN.
VC 6 IN.
VC 6 IN.
6 IN.
VC 225 mm.
VC 150 mm.
CONC 300 mm.
VC 225 m
m.
VC 225 mm.
mm.
VC 6 IN.
VC 6 IN.
VC 300 m
m.
VC 225 mm.
VC 225 mm.
VC 225 mm.
VC 150 mm.
VC 6 IN.
VC 225 mm.
VC 6 IN.
VC 225 mm.
VC 225 mm.
VC 6 IN.
VC 6 IN.
VC 225 mm.
VC 225 mm.
VC 6 IN.
VC 6 IN.
VC 6 IN.
VC 6 IN.
VC 6 IN.
VC 6 IN.
VC 6 IN.
VC 225 mm.
CONC 450 mm.
CONC 300 mm.
AC 1
VC 225 mm.
VC 225 mm.
VC 300
VC 6 IN.
VC 6 IN.
VC 6 IN.
VC 6 IN.
VC 6 IN.
VC 150 mm.
VC 150 mm.
VC 225 mm.
CONC 300 mm.
CONC 300 mm.
CONC 300 mm.
VC 225 mm.
VC 225 mm.
VC 225 m
m.
VC 225 mm.
CONC 300 mm.
VC 225 mm.
VC 225 mm.
VC 225 mm.
VC 225 mm
VC 225 mm.
VC 225 m
m.
VC 225 mm.
VC 225 mm.
VC 225 mm.
VC 225 mm.
VC 225 mm.
VC 225 mm.
VC 225 mm.
VC 225 mm.
VC 6 IN.
VC 6 IN.
VC 225 mm.
VC 6 IN.
VC 6 IN.
VC 150 mm
VC 300 mm.
VC 225 mm.
CONC 300 mm.
VC 6 IN.
VC 225 mm.
VC 6 IN.
VC 225 mm.
VC 6 IN.
VC 225 mm.
VC 6 IN.
VC 6 IN.
VC 6 IN.
VC 225 mm.
VC 6 IN.
VC 6 IN.
VC 6 IN.
VC 6 IN.
VC 225 mm.
VC 225 mm.
VC 225 mm.
VC 6 IN.
VC 6 IN.
VC 225 mm.
VC 100 mm.
VC 150 mm.
VC 150 mm.
VC 225 mm.
VC
VC 225 mm.
VC 100 mm.
VC 300 mm.
VC 225 mm.
VC 225 mm.
VC 300 mm.
VC 300 mm.
VC 300 mm.
VC 300 mm.
VC 600 mm.
VC 600 mm.
VC 100 mm.
VC 100 mm.
VC 100
mm.
VC 100 mm.
VC 100 mm.
VC 100 mm.
VC 100 mm.
VC 100 mm.
VC 100 mm.
VC 100 mm.
VC 100 mm.
VC 150 mm.
VC 150 mm.
VC 150 mm.
VC 150 mm.
uPVC 100 mm.
VC 150 mm.
VC 150 mm.
VC 150 mm.
VC 150 mm.
VC 150 mm.
VC 600 mm.
VC 300 mm.
VC 600 mm.
CONC 1500 mm.
VC 100 mm.
VC 100 mm.
VC 100 mm.
VC 100 mm.
VC 100 mm.
VC 100 mm.
VC 100 mm.
VC 100 mm.
VC 100 mm.
VC 100 mm.
VC 100 mm.
VC 100 mm.
VC 100 mm.
VC 100 mm.
VC 150 mm.
A
A
B
B
B
A
A
A
A
A
B
B
B
307
ST16804401
ST16804402
ST16804403
ST16804404
ST16804405
ST16804406
ST16804407
ST16804408
ST16804302
ST16804301
755
ST16804756
ST16804757
ST16804758
ST16804759
ST16804750
ST16804751
ST16804752
ST16804707
ST16805608
ST16804506
ST16804507
ST16804502ST16804503
ST16804504
ST16804505
ST16804501
ST16804602
ST16804510
ST16805502
ST16804604
ST16804605
ST16804606
ST16804607
ST16804608
ST16804609
ST16804610
ST16804611
ST16804612
ST16807401
ST16807403 ST16807404
ST16805401
ST16805303
ST16805402
ST16805399
ST16805301
ST16808401
ST168084
ST16808403
ST16807406
ST16807407
ST16
S
ST16808608
ST16808601
ST16807503
ST16807504
ST16807505
ST16807506
ST16808602
ST16808604
ST16808605
ST16808501
ST16808502
ST16808503
ST16808504
ST16808609
ST16808701
ST16805601
ST16805604
ST16805501
ST16805602
ST16805610
ST16805607
ST16805605
ST16805603
ST16805609
ST16806602
ST16806603 ST16807606
ST16807604
ST16806604
ST16807607
ST16807605
ST16807603
ST16807705
ST16807704
ST16807701
ST16806702
ST16807702
ST16807703
ST16807601
ST16807602
ST16807502
ST16806601
ST16805702
ST16805704
ST16807611 ST16807610
ST16807501
ST16805673
ST16806701
ST16805703
ST16806670
ST16805302
ST16805612
ST16805613
ST16805614
SST
ST16808404
ST16808303
ST16808304
ST16808305
ST16808306
ST16808307
ST16808308ST16808309
ST16808310
ST16808311
ST16808312ST16808313
ST16808405
ST16808406
ST16808407
ST16808408
ST16808505
ST16808414
ST16808415
ST16808416
ST16808417
ST16808418
ST16808419
ST16808420
ST16808421
ST16808422
ST16804309
ST16805403
ST16805404
ST16805405
ST16805406
ST1680
5407
ST16805408
ST16805409
ST16805304
ST16805305
ST16806302
ST16806303
ST16806402
ST16806403
ST16806404
ST16806405
ST16806406
ST16806407ST16805410
ST16805411
ST16805412
ST16805413
ST16805414
ST16805415
ST16805416
ST16805417
ST16805418
ST16805419
ST16805309
ST16805310
ST16805311
ST16805312
ST16805420
ST16805421
ST16806304
ST16806305
ST16806306
ST16806307
ST16806308
ST16806309
ST16806408
ST16806409
ST16806410
ST16806411
ST16806412
ST16806413
ST16806414
ST16806415
ST16806416
ST16806417
ST16806418
ST16806419
ST16806420
ST16806421
ST16806422
ST16806423
ST16806424
ST16806425
ST16806426
ST16806501
ST16805503
ST16805504
ST16805422
ST16805423
ST16805424
ST16805425
ST16805426
ST16805427
ST16805428
ST16805429
ST16805430
ST16805431
ST16805432
ST16805433
ST16805434ST16805435
ST16805436
ST16805437
ST16805438
ST16805320
ST16805321
ST16805322
ST16805323
5325
326
ST16805330
ST16805331
311
ST16806314
ST16806315
ST16806316
ST16806317
ST16806318
ST16806319
ST16806320
ST16806321
ST16806322
ST16806323 ST16806324
ST16806325
ST16807315
ST16806326
ST16806327
ST16806328
ST16806329
ST16806330
ST16806331
ST16806427
ST16806428
ST16806429
ST16806430
ST16806431ST16806432
ST16806433
ST16806434ST16806435 S
T16806436
ST16806437
ST16806438
ST16806502
ST16805439
ST16804412
ST16808431
ST16808432
ST16808433
ST16808434
ST16807402
4
2
MH2
33
18
17
25
F22
F23
F1
Int
S3
32 30
28
S8
34
F6
S26
S27
S28
F3
S4
S5
12
15
16
31
29
27
26
23
22
21
19
20
24
35
In Kitchen
1
Iron Bound Cov
Buried
3
MH8
MH9
MH10
MH20
MH19
MH21
MH18
MH17
MH22
MH23
MH24
MH16
MH12 MH11
MHF12
MHF13
MHF3
MHF4
MHF5
MHF10
MHF9
MHF11
MHF8
MHF2
MHF1
MH25
MH1
MH2MH3
MH4
MH26
MH6
MH5
MH7
c 36.433
i 35.653
c 36.356000
i 35.686000
c 37.257000
i 35.907000
c 38.203
i 28.3
c 39.411
i 37.594
c 39.13
i 36.886
c 38.987
i 36.753
c 38.207
i 35.448
c 38.972
i 37.512
c 38.987
i 37.704
c 38.03
i 36.3
c 37.69
i 36.18
c 37.66
i 35.85
c 37.9
i 35.63
c 38
.25
i 35
.48
c 38.38
i 35.17
c 38.5
i 35.41
c 38.18
i 35.79
c 38.17
i 36.16
c 38.43
i 36.79
c 38.08
i 36.45
c 38.23
i 35.37
c 38.14
i 35.3
c 37.8
i 35.18
c 37.65
i 34.88
c 38.03
i 34.8
c 38.01
i 34.71c 38.19
i 34.59
c 38.26
i 35.06
c 38.22
i 35.07
c 35.53
i 34.09
c 35.2
i 33.82
c 34.85
i 33.62
c 38.31
i 35.17
c 38.38
i 34.47
c 38.48
i 34.71
c 37.74
i 34.41
ST
Notes:
EXACT LOCATIONS OF ALL APPARATUSTO BE DETERMINED ON SITE.
LEGEND(Representative of most common features)
Private Sewer Transfer
Inspection Chamber
Lateral Drain
C R A D D Y S
Project Aldi Store, Caerphilly Road, Cardiff Sheet 9788 01 009 Rev A
Section Stormwater Drainage Strategy By WAH Checked RSH Date 24/05/17
Appendix C: Existing Drainage Areas
38.71
37.76
37.21
BP
ET
TM
TM
TM
TM
TM
SL
TM
TM
TM
SL
SL
SL
SL
SL
CS
CS
CYS
ET
ET
ET
BP
STN1
STN3
STN4
37.5
6
37.6737.79
37.88
37.97
38.00
38.03
38.09
37.6
1
GY
LP
37.55
37.55
37.52
37.44
37.49
37.58
37.4537.44
37.46
37.75
37.87
37.93
38.06
37.56 37.50
EL46.32
37.46
37.50
37.5237.55
RL42.34
EL41.00
EL41.08
RL42.46
RL50.0
4
EL46.28
38.1
738.1
4
BOL
RL49.23
EL43.3
7
EL43.3
9E
L43.5
1
EL43.4
9
RL46.4
3
RL46.4
3
RL46.3
9
RL46.2
6
Top of wall40.55
Top of wall40.53EP RL41.32
DP
EL40.87EL41.02
EL44.
39
EL44.
10
EL4
4.43
RL4
7.39
RL4
4.31
RL47.19
Roof44.52
FH
37.8
337.8
6
37.88
37.8
8
37.9
2
37.9
3
GY
37.7
4
37.7
6
37.7
9
37.7
9
37.8
1
37.8
2
37.8
3
ST
STTP
BT
CATV
37.9
137.8
6
ST
ST
ST
37.9
838.0
438.0
2
BOL
BOL
CATV
ST
ST
ST
ST
CATV
BOL
BT
38.0
137.9
738.0
5
38.1
0
38.1
2
38.1
5
38.1
7
38.2
138.1
9
38.2
8
38.2
6BOL
SP
BOL
BOLBOL
BOL
BOL
BOL
SP
ST
ST
STST
ST
IC IC
SP
BOL
BOL
BOL
BOL
GV
ST
37.9
5
38.0
1
MHCL38.04
38.0
638.0
4
38.0
938.1
0
38.1
9
GY
CATV
ST
ST
CATV
MK
CATVBT
TP
DN
LP
ST
38.0
5
38.0
1
38.0
237.9
8
37.9
6
GY
GY
38.2
5
38.22
38.2
2
38.3
438.2
7
38.2
2
38.1
3
38.1
1
38.0
5
38.0
4
38.0
137.9
837.9
837.9
737.8
937.8
337.7
8
GY
38.3
038.3
9
ICCL38.34
BOL
ST
SP
DN
SP
38.4
4
38.4
7
38.4
0
38.3
5
38.3
1
38.2
438.2
1
38.2
0
38.2
138.1
9
38.2
1
LP
ST
ICCL38.14
BT
BOL
BOL
BOL
BOL
BOL
BOL
BOL
BOL
IC
IC
CL38.19
CL38.20
SP
37.9
137.9
2
37.9
5
37.9
9
38.0
2
ST
SV
MHCL38.08
GY
38.0
9
38.1
3
38.2
0
MHCL38.25
38.3
338.3
1
38.2
7
38.2
338.2
1
38.1
4
38.0
8
38.0
638.0
338.0
237.9
53
7.9
137.8
83
7.8
33
7.8
0
38.0
337.9
7
38.3
238.1
6
38.1
9
38.2
3
38.2
0
38.1
338.1
1
37.8
937.9
2
37
.98
38.0
238.0
3
38.0
6
38.1
5
38.2
1
38.3
0
EL44.43
RL47.06
38.4
6
ST
Elec
38.3
838.3
2
38.2
938.2
5
38.1
9
RL46.7
4
EL43.8
1
GY
37.9
6
37.9
5
37.9
6
37.9
2
38.0
0
38.0
5
38.0
5
38.2
638.2
6
38.2
7
38.2
8
38.3
3
38.3
4
38.4
8
38.73
38.55
38.54
37.74
37.67
37.62
37.71
37.67
37.69
37.66
37.7
7
37.96
37.9
1
37.7
0
37.6
6
37.4
9
38.27
37.62
37.63
37.8337.77
38.01
38.07
MHCL38.14
38.14
38.0
8
38.1
4
MHCL38.18
IL36.58
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
GG
GG
GG
GG
GG
GG
GG
GG
GG
G
G
G
G
G
Fro
m R
ecord
s
Fro
m R
ecord
s
G
G
G
G
G
G
G
G
(not d
ete
cte
d)
(not d
ete
cte
d)
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
EE
EE
EE
EE
E
E
E
E
E
EE
E
E
E
EE
E
E
E
EE
E
E
E
E
E
E
E
d0.4
md0.4
m
d0.4
m
d0.6
m
d0.2
m
d0.6
m
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
d0.3
m
d0.3
m
EE
EE
EE
EE
EE
EE
E
E
E
E
Filled
Tactile
BW
(1.0
m)
Bric
k W
all(1
.0m
)
BW
(1.0
m)
BW
(0.5
m)
BW
(1.0
m)
Bric
k W
all(0
.5m
)
Bric
k W
all(0
.5m
)
Asphalt
Bric
k W
all(1
.0m
)/SR
(0.5
m)
Bus S
helte
r
Tactile
Asphalt
Asphalt
Asphalt
Asphalt
Asphalt
Asphalt
SR
Asphalt
Dro
p K
erb
Dro
p K
erb
Asphalt
Dro
p K
erb
Pic
ket F
ence
Asphalt
Asphalt
Grass
Wellfare Cabin
ContainerTactile
Brick Wall(0.5m
)
BW
(1.3
m)
BW
(0.4
m)
TactileDK
Cobbles
Asphalt
Asphalt
Brick Wall(1.2m)
Concrete
Brick Wall(0.5m)/SR(0.5m)
Dro
p K
erb
BW
(1.0
m)
Brick Wall (1.8m)
Blocked
IL36.85
IL37.04
IL35.28
IL35.69
IL35.46
Flooded
ElecBox
SWS
SWS
300mm
150m
m
Back d
rop
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
300m
m
300m
m
SWS 150m
m
SW
S
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
d0..6
m
d0..6
m
D0.7
m
d0.4
m
d0.6
md0.6
m
d0.4
m
d0.7
m
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
WW
WW
W
WW
W
WW
WW
WW
W
WW
WW
WW
W
WW
W
W
W
W
W
W
W
W
W
W
W
W
W
Fro
m R
ecord
s
Fro
m R
ecord
s
WW
WW
WW
WW
WW
WW
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
WW
WW
W
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS150mm
225mm
225m
m
225m
m
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
300mm
225m
m
FS
FS
225m
m
FS
FS
150mm
60m
m60m
m
SR(1m)
Sw.01
CL 37.500 (Approx.)
IL 36.260
Silt Trap
Sw.02
CL 37.600 (Approx.)
IL 35.935
Silt Trap
Sw.04
CL 38.050 (Approx.)
IL 35.720
Silt Trap
Sw.07
CL 38.300 (Approx.)
IL 35.430
Hydrobrake
Sw.08
CL 37.420 (Approx.)
IL 35.415
Drainage channel to be Birco
100 by Marshalls or similar
approved with in built falls.
Birco 150 drainage channel with
constant falls and sump unit by
Marshalls. 6mm Heelsure grating
- class to be a minimum D400.
Birco 150 drainage channel with
constant falls and sump unit by
Marshalls. 6mm Heelsure grating
- class to be a minimum D400.
ACO Qmax 150 drain
channel with Q-guard
ductile iron edge rail
Geocellular storage module attenuation tank,
Versa-Void by ESS or similar approved. Attenuation
size to be confirmed at tender stage.
Surface water connection to the existing surface
water drain subject to a Section 106 application.
Invert level of existing pipe to be confirmed to
Craddys prior to any drainage works.Existing pipe to be
jetted and cleaned
Class 1 by-pass interceptor,
Klargester NSBE010 or equivalent
approved. Complete with alarm
system and vent, locations to be
agreed with Architect. Invert levels
fall 100mm between inlet and outlet
points. Alarm to sound in managers
office; refer to M & E Engineer
drawings.
All existing public foul and storm
sewers within the site boundary
to be CCTV surveyed prior to the
start of works.
SRE.01
IL 36.900
RE.02
IL 36.900
Sw.03
CL 38.050 (Approx.)
IL 37.315
Silt Trap
Sw.05
CL 38.000 (Approx.)
IL 36.540
Sw.06
CL 37.900 (Approx.)
IL 36.164
Silt Trap
X X X X X X X X X X X X X X
X
X X X X X XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
X X X X X X X X X X X X X
XX
XX
XX
XX
XX
XX
XX
X
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
X XX
X X X X X X X X X
XX
XX
XX
X
XX
X
XXXXXX
XX
XX
X
X X X X X X X X X X X X X X
XX
XX
XX
XX
XX
XX
XX
XX
XX
X
XX
XX
XX
XX
XX
XX
X
X X X X
XX
XX
XX
X
XX
Non-return valve
Hydro international hydrobrake.
Hydrobrake quotation to be
confirmed.
The proposed maximum discharge
rate to be restricted to 5.7 l/s,
subject to Welsh Water approval.
X X X
SRE.02
IL 37.500
FRE.01
IL 37.465
FRE.02
IL 37.700
Fw.01
CL 38.050 (Approx.)
IL 36.950
Fw.02
CL 38.300 (Approx.)
IL 36.645
Rodding eye
mounted in wall
Birco 150 by Marshalls
with class D400 grating
and constant fall
Fw.03 - Pump Station
CL 38.500 (Approx.)
IL 36.600
Proposed twin pump with 50mm Vortex with passage, and
no grinder. Alarm panel to be installed in the managers
office. Pump specification to be confirmed at tender stage
Existing Foul Manhole
CL 38.590
IL 37.300 (TBC)
Existing Storm Manhole
CL 37.670
IL 35.870
Existing Storm Manhole
CL 38.200
IL 35.280
Condition of existing chamber to be
confirmed. New brake chamber
required is existing unsuitable to be
adapted to brake chanber
CONTRACTOR TO BE AWARE OF EXISTING GAS MAIN WITHIN WAUN DDYFAL.
THOROUGH INVESTIGATIVE WORK TO BE COMPLETED TO LOCATED THE
EXACT LOCATION OF THE GAS MAIN PRIOR TO ANY DRAINAGE WORKS.
LOCATION OF GAS MAIN TO BE CONFIRMED TO CRADDYS.
Proposed Approximate Aldi site boundary
Proposed attenuation tank
Proposed Type 2 PCC circular manhole
Proposed rodding eye
Existing inspection chamber/ manhole
Proposed drainage channel
Proposed private foul drain
Proposed private storm drain
KEY:
Existing public storm sewer
XXX Existing drainage to be made
redundant and grubbed up
Proposed private gully
Proposed foul pump station
Existing private storm sewer
Existing public foul sewer
Existing private foul sewer
Proposed private foul rising main
REVDRG SIZE
A1
DRAWING NUMBER
CHECKEDSCALE DRAWN APPROVED
STATUS
PROJECT TITLE
DRAWING TITLE
CLIENT
THIS DRAWING IS THE COPYRIGHT OF CRADDY PITCHERS LTD AND MUST
NOT BE COPIED, REPRODUCED OR SUBMITTED TO OTHER PARTIES
WITHOUT THEIR PERMISSION.
IF YOU HAVE A QUERY CALL US
AT A1
SCALING FROM THIS DRAWING OR OBTAINING DIMENSIONS ELECTRONICALLY MAY
NOT PROVIDE ACCURATE INFORMATION AND SHOULD BE AVOIDED. WORK ONLY
FROM FIGURED DIMENSIONS.
C R A D D Y S
REVISION DETAILSREV DATEBY
63 MACRAE ROAD, EDEN OFFICE PARK, HAM GREEN
BRISTOL, BS20 0DD
TEL : 01275 371 333
email : [email protected] www.craddys.co.uk
ALDI STORE
CAERPHILLY ROAD
CARDIFF
DRAINAGE LAYOUT
ALDI STORES LTD
APPROVAL
1:200 WAH RSH RAG
9788-0050 A
GENERAL NOTES
DRAWINGS AND SPECIFICATIONS: This drawing is to be read in
conjunction with all relevant Architects, Engineers and Specialists drawings
together with the specification.
PRIVATE DRAINAGE: All private drainage works shall be in accordance
with Building Regulations Document Part H.
DRAINAGE SPURS. Refer to the architect's drawings for above ground
drainage and setting out positions of svps and rwp downpipes.
LAYING DRAINAGE. It is recommended that all sewers be laid starting from
the downstream connection to the existing sewer and working upstream to
the new development.
DRAINAGE PIPE SIZES: All foul drainage pipes to be 100mm diameter
unless stated. All storm pipes to be 150mm unless stated.
DRAINAGE LAYOUT: The drainage layout is to be reviewed in conjunction
with the Aldi Caerphilly Road Cardiff Drainage Strategy Craddys document
9788-01. Details of layout in abeyance subject to alterations following
confirmation of proposed levels.
MANHOLE COVER LEVELS: All manhole cover levels to be adjusted to suit
the Architects proposed levels. If the cover levels proposed in the drainage
schedules varies by more than 100mm, Contractor to notify Craddys.
C D M : SIGNIFICANT HAZARDS
THE FOLLOWING HEALTH AND SAFETY HAZARDS ARE IDENTIFIED BY THE DESIGNER
AS ABNORMAL IN PURSUANCE OF THE CURRENT CONSTRUCTION DESIGN AND
MANAGEMENT REGULATIONS.
RISKS DURING CONSTRUCTION:
OPERATION / MAINTENANCE RISKS:
RISKS DURING DEMOLITION / DECOMMISSIONING / DISMANTLING / ALTERATIONS:
No abnormal risks have been identified relating to this design element.
IT IS ASSUMED THAT ALL WORKS WILL BE CARRIED OUT BY COMPETENT &
ADEQUATELY RESOURCED CONTRACTOR(S) WORKING TO SAFE SYSTEMS OF WORK.
A 1ST ISSUE 24.05.17WAH
DEEP EXCAVATIONS - Deep excavations should have adequate propping and shoring to
ensure stability. Personnel working in excavations should be sufficiently protected from
falling objects.
EXISTING SERVICES - Further to any existing services information available, contractor to
undertake further surveys/scans to locate any existing services prior to excavations. Refer
to Berry Geomatics topo survey, drawing number 02/17, for reference.
LIVE FOUL WATER SEWERS: The existing foul water pipes may serve other commercial
properties upstream of the existing site.
LIVE SURFACE WATER SEWERS: The existing surface water pipes serve the area
upstream of the existing site. Contractor to be made aware of the sewers being live prior to
construction.
MANHOLES/GULLIES/SILT TRAPS: Inspect manholes & silt traps for build up of silt and
general debris (once a year, preferably in the spring after leaf fall in the autumn). If
silt/debris is building up then clean with jetting lorry / gully sucker & inspect pipe.
INTERCEPTOR: Refer to manufacturers recommendations.
HYDROBRAKE: Refer to manufacturers recommendations.
PUMP STATION: Refer to manufacturer's recommendations.
C R A D D Y S
Project Aldi Store, Caerphilly Road, Cardiff Sheet 9788 01 0010 Rev A
Section Stormwater Drainage Strategy By WAH Checked RSH Date 24/05/17
Appendix D: Proposed Drainage Areas
38.71
37.76
37.21
BP
ET
TM
TM
TM
TM
TM
SL
TM
TM
TM
SL
SL
SL
SL
SL
CS
CS
CYS
ET
ET
ET
BP
STN1
STN3
STN4
37.5
6
37.67
37.79
37.88
37.97
38.00
38.03
38.09
37.6
1
GY
LP
37.55
37.55
37.6
7
37.52
37.5037.44
37.49
37.58
37.4737.45
37.44
37.46
37.75
37.87
37.93
38.06
37.54 37.56 37.50
EL46.32
37.46
37.50
37.5237.55
RL42.34
EL41.00
EL41.08
RL42.46
RL50.0
4
EL46.28
38.1
738.1
4
BOL
RL49.23
EL43.3
7
EL43.3
9E
L43.5
1
EL43.4
9
RL46.4
3
RL46.4
3
RL46.3
9
RL46.2
6
Top of wall40.55
Top of wall40.53EP RL41.32
DP
EL40.87EL41.02
EL44.
39
EL44.
10
EL44.
43
RL4
7.39
RL4
4.31
RL47.19
Roof44.52
FH
37.8
337.8
6
37.88
37.8
8
37.9
2
37.9
3
GY
37.7
4
37.7
6
37.7
9
37.7
9
37.8
1
37.8
2
37.8
3
ST
STTP
BT
CATV
37.9
137.8
6
ST
ST
ST
37.9
838.0
438.0
2
BOL
BOL
CATV
ST
ST
ST
ST
CATV
BOL
BT
38.0
137.9
738.0
5
38.1
0
38.1
2
38.1
5
38.1
7
38.2
138.1
9
38.2
8
38.2
6BOL
SP
BOL
BOLBOL
BOL
BOL
BOL
SP
ST
ST
STST
ST
IC IC
SP
BOL
BOL
BOL
BOL
GV
ST
37.9
5
38.0
1
MHCL38.04
38.0
638.0
4
38.0
938.1
0
38.1
9
GY
CATV
ST
ST
CATV
MK
CATVBT
TP
DN
LP
ST
38.0
5
38.0
1
38.0
237.9
8
37.9
6
GY
GY
38.2
5
38.22
38.2
2
38.3
438.2
7
38.2
2
38.1
3
38.1
1
38.0
5
38.0
4
38.0
137.9
837.9
837.9
737.8
937.8
337.7
8
GY
38.3
038.3
9
ICCL38.34
BOL
ST
SP
DN
SP
38.4
4
38.4
7
38.4
0
38.3
5
38.3
1
38.2
438.2
1
38.2
0
38.2
138.1
9
38.2
1
LP
ST
ICCL38.14
BT
BOL
BOL
BOL
BOL
BOL
BOL
BOL
BOL
IC
IC
CL38.19
CL38.20
SP
37.9
137.9
2
37.9
5
37.9
9
38.0
2
ST
SV
MHCL38.08
GY
38.0
9
38.1
3
38.2
0
MHCL38.25
38.3
338.3
1
38.2
7
38.2
338.2
1
38.1
4
38.0
8
38.0
638.0
338.0
237.9
53
7.9
137.8
83
7.8
33
7.8
0
38.0
337.9
7
38.3
238.1
6
38.1
9
38.2
338.1
338.1
1
37.8
937.9
2
37
.98
38.0
238.0
3
38.0
6
38.1
5
38.2
1
38.3
0
EL44.43RL47.06
38.4
6
ST
Elec
38.3
838.3
2
38.2
938.2
5
38.1
9
RL46.7
4
EL43.8
1
GY
37.9
6
37.9
5
37.9
6
37.9
2
38.0
0
38.0
5
38.0
5
38.2
638.2
6
38.2
7
38.2
8
38.3
3
38.3
4
38.4
8
38.73
38.55
38.54
37.74
37.67
37.62
37.77
37.74
37.71
37.67
37.69
37.66
37.7
7
37.96
37.9
1
37.7
0
37.6
6
37.4
9
38.1838.16
38.06
38.27
RL42.87
EL41.30
37.62
37.63
37.8337.77
38.01
38.07
MHCL38.14
38.14
38.0
8
38.1
4
38.1
8
37.57
MHCL37.70
MHCL38.18
IL36.58
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
GG
GG
GG
GG
GG
GG
GG
GG
GG
G
G
G
G
G
Fro
m R
ecord
s
Fro
m R
ecord
s
G
G
G
G
G
G
G
G
(not d
ete
cte
d)
(not d
ete
cte
d)
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
EE
EE
EE
EE
E
E
E
E
E
EE
E
E
E
EE
E
E
E
EE
E
E
E
E
E
E
E
d0.4
md0.4
m
d0.4
m
d0.6
m
d0.2
m
d0.6
m
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
d0.3
m
d0.3
m
EE
EE
EE
EE
EE
EE
E
E
E
E
Filled
Tactile
BW
(1.0
m)
Bric
k W
all(1
.0m
)
BW
(1.0
m)
BW
(0.5
m)
Bric
k W
all(0
.5m
)
Bric
k W
all(0
.5m
)
Asphalt
Bric
k W
all(1
.0m
)/SR
(0.5
m)
Bus S
helte
r
Tactile
Asphalt
Asphalt
Asphalt
Asphalt
Asphalt
Asphalt
SR
Asphalt
Dro
p K
erb
Dro
p K
erb
Asphalt
Dro
p K
erb
Pic
ket F
ence
Dro
p K
erb
Asphalt
Tank
Hoarding
Asphalt
Asphalt
Grass
Brick RW
Wellfare Cabin
Container
ContainerTactile
Scrap Material
Asphalt
Brick Wall(0.5m
)
Brick RW(1.0m)
BW
(1.3
m)
BW
(0.4
m)
TactileDK
Cobbles
Asphalt
Asphalt
Brick Wall(1.2m)
Concrete
Brick Wall(0.5m)/SR(0.5m)
Dro
p K
erb
Brick Wall (1.8m)
Blocked
IL36.85
IL37.04
IL35.28
IL35.69
IL35.46
Flooded
ElecBox
SWS
SWS
300mm
150m
m
Back d
rop
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
300m
m
300m
m
SWS 150m
m
SW
S
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
d0..6
m
d0..6
m
D0.7
m
d0.4
m
d0.6
md0.6
m
d0.4
m
d0.7
m
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
WW
WW
W
WW
W
WW
WW
WW
W
WW
WW
WW
W
WW
W
W
W
W
W
W
W
W
W
W
W
W
W
Fro
m R
ecord
s
Fro
m R
ecord
s
WW
WW
WW
WW
WW
WW
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
WW
WW
W
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS150mm
225mm
225m
m
225m
m
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
300mm
225m
m
FS
FS
225m
m
FS
FS
150mm
60m
m60m
m
SR(1m)
KEY
Site Boundary
Hard Standing Area
Soft Landscaping Area
REVDRG SIZE
A1
DRAWING NUMBER
CHECKEDSCALE DRAWN APPROVED
STATUS
PROJECT TITLE
DRAWING TITLE
CLIENT
THIS DRAWING IS THE COPYRIGHT OF CRADDY PITCHERS LTD AND MUST
NOT BE COPIED, REPRODUCED OR SUBMITTED TO OTHER PARTIES
WITHOUT THEIR PERMISSION.
IF YOU HAVE A QUERY CALL US
AT A1
SCALING FROM THIS DRAWING OR OBTAINING DIMENSIONS ELECTRONICALLY MAY
NOT PROVIDE ACCURATE INFORMATION AND SHOULD BE AVOIDED. WORK ONLY
FROM FIGURED DIMENSIONS.
C R A D D Y S
REVISION DETAILSREV DATEBY
63 MACRAE ROAD, EDEN OFFICE PARK, HAM GREEN
BRISTOL, BS20 0DD
TEL : 01275 371 333
email : [email protected] www.craddys.co.uk
ALDI STORE
CAERPHILLY ROAD
CARDIFF
PROPOSED DRAINAGE AREAS
ALDI STORES LTD
INFORMATION
1:200 WAH RSH RAG
9788sk0002 A
GENERAL NOTES
DRAWINGS AND SPECIFICATIONS: This drawing is to be read in
conjunction with all relevant Architects, Engineers and Specialists drawings
together with the specification.
C D M : SIGNIFICANT HAZARDS
THE FOLLOWING HEALTH AND SAFETY HAZARDS ARE IDENTIFIED BY THE DESIGNER
AS ABNORMAL IN PURSUANCE OF THE CURRENT CONSTRUCTION DESIGN AND
MANAGEMENT REGULATIONS.
RISKS DURING CONSTRUCTION:
No abnormal risks have been identified relating to this design element.
OPERATION / MAINTENANCE RISKS:
RISKS DURING DEMOLITION / DECOMMISSIONING / DISMANTLING / ALTERATIONS:
No abnormal risks have been identified relating to this design element.
No abnormal risks have been identified relating to this design element.
IT IS ASSUMED THAT ALL WORKS WILL BE CARRIED OUT BY COMPETENT &
ADEQUATELY RESOURCED CONTRACTOR(S) WORKING TO SAFE SYSTEMS OF WORK.
A 1ST ISSUE 23.05.17RSH
C R A D D Y S
Project Aldi Store, Caerphilly Road, Cardiff Sheet 9788 01 0011 Rev A
Section Stormwater Drainage Strategy By WAH Checked RSH Date 24/05/17
Appendix E: Proposed Drainage Layout
38.71
37.76
37.21
BP
ET
TM
TM
TM
TM
TM
SL
TM
TM
TM
SL
SL
SL
SL
SL
CS
CS
CYS
ET
ET
ET
BP
STN1
STN3
STN4
37.5
6
37.6737.79
37.88
37.97
38.00
38.03
38.09
37.6
1
GY
LP
37.55
37.55
37.52
37.44
37.49
37.58
37.4537.44
37.46
37.75
37.87
37.93
38.06
37.56 37.50
EL46.32
37.46
37.50
37.5237.55
RL42.34
EL41.00
EL41.08
RL42.46
RL50.0
4
EL46.28
38.1
738.1
4
BOL
RL49.23
EL43.3
7
EL43.3
9E
L43.5
1
EL43.4
9
RL46.4
3
RL46.4
3
RL46.3
9
RL46.2
6
Top of wall40.55
Top of wall40.53EP RL41.32
DP
EL40.87EL41.02
EL44.
39
EL44.
10
EL4
4.43
RL4
7.39
RL4
4.31
RL47.19
Roof44.52
FH
37.8
337.8
6
37.88
37.8
8
37.9
2
37.9
3
GY
37.7
4
37.7
6
37.7
9
37.7
9
37.8
1
37.8
2
37.8
3
ST
STTP
BT
CATV
37.9
137.8
6
ST
ST
ST
37.9
838.0
438.0
2
BOL
BOL
CATV
ST
ST
ST
ST
CATV
BOL
BT
38.0
137.9
738.0
5
38.1
0
38.1
2
38.1
5
38.1
7
38.2
138.1
9
38.2
8
38.2
6BOL
SP
BOL
BOLBOL
BOL
BOL
BOL
SP
ST
ST
STST
ST
IC IC
SP
BOL
BOL
BOL
BOL
GV
ST
37.9
5
38.0
1
MHCL38.04
38.0
638.0
4
38.0
938.1
0
38.1
9
GY
CATV
ST
ST
CATV
MK
CATVBT
TP
DN
LP
ST
38.0
5
38.0
1
38.0
237.9
8
37.9
6
GY
GY
38.2
5
38.22
38.2
2
38.3
438.2
7
38.2
2
38.1
3
38.1
1
38.0
5
38.0
4
38.0
137.9
837.9
837.9
737.8
937.8
337.7
8
GY
38.3
038.3
9
ICCL38.34
BOL
ST
SP
DN
SP
38.4
4
38.4
7
38.4
0
38.3
5
38.3
1
38.2
438.2
1
38.2
0
38.2
138.1
9
38.2
1
LP
ST
ICCL38.14
BT
BOL
BOL
BOL
BOL
BOL
BOL
BOL
BOL
IC
IC
CL38.19
CL38.20
SP
37.9
137.9
2
37.9
5
37.9
9
38.0
2
ST
SV
MHCL38.08
GY
38.0
9
38.1
3
38.2
0
MHCL38.25
38.3
338.3
1
38.2
7
38.2
338.2
1
38.1
4
38.0
8
38.0
638.0
338.0
237.9
53
7.9
137.8
83
7.8
33
7.8
0
38.0
337.9
7
38.3
238.1
6
38.1
9
38.2
3
38.2
0
38.1
338.1
1
37.8
937.9
2
37
.98
38.0
238.0
3
38.0
6
38.1
5
38.2
1
38.3
0
EL44.43
RL47.06
38.4
6
ST
Elec
38.3
838.3
2
38.2
938.2
5
38.1
9
RL46.7
4
EL43.8
1
GY
37.9
6
37.9
5
37.9
6
37.9
2
38.0
0
38.0
5
38.0
5
38.2
638.2
6
38.2
7
38.2
8
38.3
3
38.3
4
38.4
8
38.73
38.55
38.54
37.74
37.67
37.62
37.71
37.67
37.69
37.66
37.7
7
37.96
37.9
1
37.7
0
37.6
6
37.4
9
38.27
37.62
37.63
37.8337.77
38.01
38.07
MHCL38.14
38.14
38.0
8
38.1
4
MHCL38.18
IL36.58
Fro
m R
ecord
s
Fro
m R
ecord
s
(not d
ete
cte
d)
(not d
ete
cte
d)
d0.4
md0.4
m
d0.4
m
d0.6
m
d0.2
m
d0.6
m
d0.3
m
d0.3
m
Filled
Tactile
BW
(1.0
m)
Bric
k W
all(1
.0m
)
BW
(1.0
m)
BW
(0.5
m)
BW
(1.0
m)
Bric
k W
all(0
.5m
)
Bric
k W
all(0
.5m
)
Asphalt
Bric
k W
all(1
.0m
)/SR
(0.5
m)
Bus S
helte
r
Tactile
Asphalt
Asphalt
Asphalt
Asphalt
Asphalt
Asphalt
SR
Asphalt
Dro
p K
erb
Dro
p K
erb
Asphalt
Dro
p K
erb
Pic
ket F
ence
Asphalt
Asphalt
Grass
Wellfare Cabin
ContainerTactile
Brick Wall(0.5m
)
BW
(1.3
m)
BW
(0.4
m)
TactileDK
Cobbles
Asphalt
Asphalt
Brick Wall(1.2m)
Concrete
Brick Wall(0.5m)/SR(0.5m)
Dro
p K
erb
BW
(1.0
m)
Brick Wall (1.8m)
Blocked
IL36.85
IL37.04
IL35.28
IL35.69
IL35.46
Flooded
ElecBox
300mm
150m
m
Back d
rop
300m
m
300m
m
150mm
d0..6
m
d0..6
m
D0.7
m
d0.4
m
d0.6
md0.6
m
d0.4
m
d0.7
m
Fro
m R
ecord
s
Fro
m R
ecord
s
150mm
225mm
225m
m
225m
m
300mm
225m
m
225m
m
150mm
60m
m60m
m
SR(1m)
Sw.01
CL 37.500 (Approx.)
IL 36.260
Silt Trap
Sw.02
CL 37.600 (Approx.)
IL 35.935
Silt Trap
Sw.04
CL 38.050 (Approx.)
IL 35.720
Silt Trap
Sw.07
CL 38.300 (Approx.)
IL 35.430
Hydrobrake
Sw.08
CL 37.420 (Approx.)
IL 35.415
Drainage channel to be Birco
100 by Marshalls or similar
approved with in built falls.
Birco 150 drainage channel with
constant falls and sump unit by
Marshalls. 6mm Heelsure grating
- class to be a minimum D400.
Birco 150 drainage channel with
constant falls and sump unit by
Marshalls. 6mm Heelsure grating
- class to be a minimum D400.
Bioretention tree pits
Geocellular storage module attenuation tank,
Versa-Void by ESS or similar approved. Attenuation
size to be confirmed at tender stage.
Surface water connection to the existing surface
water drain subject to a Section 106 application.
Invert level of existing pipe to be confirmed to
Craddys prior to any drainage works.
Existing pipe to be
jetted and cleaned
Class 1 by-pass interceptor,
Klargester NSBE010 or equivalent
approved. Complete with alarm
system and vent, locations to be
agreed with Architect. Invert levels
fall 100mm between inlet and outlet
points. Alarm to sound in managers
office; refer to M & E Engineer
drawings.All existing public foul and storm
sewers within the site boundary
to be CCTV surveyed prior to the
start of works.
SRE.01
IL 36.900
RE.02
IL 36.900
Sw.03
CL 38.050 (Approx.)
IL 37.315
Silt Trap
Sw.05
CL 38.000 (Approx.)
IL 36.540
Sw.06
CL 37.900 (Approx.)
IL 36.164
Silt Trap
X X X X X X X X X X X X X X
X
X X X X X XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
X X X X X X X X X X X X X
XX
XX
XX
XX
XX
XX
XX
X
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
X XX
X X X X X X X X X
XX
XX
XX
X
XX
X
XXXXXX
XX
XX
X
X X X X X X X X X X X X X X
XX
XX
XX
XX
XX
XX
XX
XX
XX
X
XX
XX
XX
XX
XX
XX
X
X X X X
XX
XX
XX
X
XX
Non-return valve
Hydro international hydrobrake.
Hydrobrake quotation to be
confirmed.
The proposed maximum discharge
rate to be restricted to 5.7 l/s,
subject to Welsh Water approval.
X X X
SRE.02
IL 37.500
FRE.01
IL 37.465
FRE.02
IL 37.700
Fw.01
CL 38.050 (Approx.)
IL 36.950
Fw.02
CL 38.300 (Approx.)
IL 36.645
Rodding eye
mounted in wall
Birco 150 by Marshalls
with class D400 grating
and constant fall
Fw.03 - Pump Station
CL 38.500 (Approx.)
IL 36.600
Proposed twin pump with 50mm Vortex with passage, and
no grinder. Alarm panel to be installed in the managers
office. Pump specification to be confirmed at tender stage
Existing Foul Manhole
CL 38.590
IL 37.300 (TBC)
Existing Storm Manhole
CL 37.670
IL 35.870
Existing Storm Manhole
CL 38.200
IL 35.280
Condition of existing chamber to be
confirmed. New brake chamber
required is existing unsuitable to be
adapted to brake chanber
CONTRACTOR TO BE AWARE OF EXISTING ELECTRIC SUB STATION
IN THIS LOCATION WHICH IS TO BE RETAINED. THOROUGH
INVESTIGATIVE WORK TO BE COMPLETED TO DETERMINE THE
EXACT LOCATION OF ELECTRIC CABLES PRIOR TO ANY DRAINAGE
WORKS. LOCATION OF CABLES TO BE CONFIRMED TO CRADDYS.
CONTRACTOR TO BE AWARE OF EXISTING GAS MAIN WITHIN WAUN DDYFAL.
THOROUGH INVESTIGATIVE WORK TO BE COMPLETED TO DETERMINE THE
EXACT LOCATION OF THE GAS MAIN PRIOR TO ANY DRAINAGE WORKS.
LOCATION OF GAS MAIN TO BE CONFIRMED TO CRADDYS.
Proposed Approximate Aldi site boundary
Proposed attenuation tank
Proposed Type 2 PCC circular manhole
Proposed rodding eye
Existing inspection chamber / manhole
Proposed drainage channel
Proposed private foul drain
Proposed private storm drain
KEY:
Existing public storm sewer
XXX Existing drainage to be made
redundant and grubbed up
Proposed private gully
Proposed foul pump station
Existing private storm sewer
Existing public foul sewer
Existing private foul sewer
Proposed private foul rising main
REVDRG SIZE
A1
DRAWING NUMBER
CHECKEDSCALE DRAWN APPROVED
STATUS
PROJECT TITLE
DRAWING TITLE
CLIENT
THIS DRAWING IS THE COPYRIGHT OF CRADDY PITCHERS LTD AND MUST
NOT BE COPIED, REPRODUCED OR SUBMITTED TO OTHER PARTIES
WITHOUT THEIR PERMISSION.
IF YOU HAVE A QUERY CALL US
AT A1
SCALING FROM THIS DRAWING OR OBTAINING DIMENSIONS ELECTRONICALLY MAY
NOT PROVIDE ACCURATE INFORMATION AND SHOULD BE AVOIDED. WORK ONLY
FROM FIGURED DIMENSIONS.
C R A D D Y S
REVISION DETAILSREV DATEBY
63 MACRAE ROAD, EDEN OFFICE PARK, HAM GREEN
BRISTOL, BS20 0DD
TEL : 01275 371 333
email : [email protected] www.craddys.co.uk
ALDI STORE
CAERPHILLY ROAD
CARDIFF
DRAINAGE LAYOUT
ALDI STORES LTD
INFORMATION
1:200 WAH RSH RAG
9788-0050 A
GENERAL NOTES
DRAWINGS AND SPECIFICATIONS: This drawing is to be read in
conjunction with all relevant Architects, Engineers and Specialists drawings
together with the specification.
PRIVATE DRAINAGE: All private drainage works shall be in accordance
with Building Regulations Document Part H.
DRAINAGE SPURS. Refer to the architect's drawings for above ground
drainage and setting out positions of svps and rwp downpipes.
LAYING DRAINAGE. It is recommended that all sewers be laid starting from
the downstream connection to the existing sewer and working upstream to
the new development.
DRAINAGE PIPE SIZES: All foul drainage pipes to be 100mm diameter
unless stated. All storm pipes to be 150mm unless stated.
DRAINAGE LAYOUT: The drainage layout is to be reviewed in conjunction
with the Aldi Caerphilly Road Cardiff Drainage Strategy Craddys document
9788-01. Details of layout in abeyance subject to alterations following
confirmation of proposed levels.
MANHOLE COVER LEVELS: All manhole cover levels to be adjusted to suit
the Architects proposed levels. If the cover levels proposed in the drainage
schedules varies by more than 100mm, Contractor to notify Craddys.
C D M : SIGNIFICANT HAZARDS
THE FOLLOWING HEALTH AND SAFETY HAZARDS ARE IDENTIFIED BY THE DESIGNER
AS ABNORMAL IN PURSUANCE OF THE CURRENT CONSTRUCTION DESIGN AND
MANAGEMENT REGULATIONS.
RISKS DURING CONSTRUCTION:
OPERATION / MAINTENANCE RISKS:
RISKS DURING DEMOLITION / DECOMMISSIONING / DISMANTLING / ALTERATIONS:
No abnormal risks have been identified relating to this design element.
IT IS ASSUMED THAT ALL WORKS WILL BE CARRIED OUT BY COMPETENT &
ADEQUATELY RESOURCED CONTRACTOR(S) WORKING TO SAFE SYSTEMS OF WORK.
A 1ST ISSUE 24.05.17WAH
DEEP EXCAVATIONS - Deep excavations should have adequate propping and shoring to
ensure stability. Personnel working in excavations should be sufficiently protected from
falling objects.
EXISTING SERVICES - Further to any existing services information available, contractor to
undertake further surveys/scans to locate any existing services prior to excavations. Refer
to Berry Geomatics topo survey, drawing number 02/17, for reference.
LIVE FOUL WATER SEWERS: The existing foul water pipes may serve other commercial
properties upstream of the existing site.
LIVE SURFACE WATER SEWERS: The existing surface water pipes serve the area
upstream of the existing site. Contractor to be made aware of the sewers being live prior to
construction.
MANHOLES/GULLIES/SILT TRAPS: Inspect manholes & silt traps for build up of silt and
general debris (once a year, preferably in the spring after leaf fall in the autumn). If
silt/debris is building up then clean with jetting lorry / gully sucker & inspect pipe.
INTERCEPTOR: Refer to manufacturers recommendations.
HYDROBRAKE: Refer to manufacturers recommendations.
PUMP STATION: Refer to manufacturer's recommendations.
C R A D D Y S
Project Aldi Store, Caerphilly Road, Cardiff Sheet 9788 01 0012 Rev A
Section Stormwater Drainage Strategy By WAH Checked RSH Date 24/05/17
Appendix F: Existing Greenfield Run Off Rate
Craddy Pitchers Limited Page 1Eden Lodge StudiosHam GreenBristol BS20 0ETDate 29/03/2017 14:54 Designed by haywardwFile Checked byCADS Source Control 2016.1
ICP SUDS Mean Annual Flood
©1982-2016 XP Solutions
Input
Return Period (years) 100 Soil 0.300Area (ha) 0.742 Urban 0.000SAAR (mm) 1226 Region Number Region 9
Results l/sQBAR Rural 2.6QBAR Urban 2.6
Q100 years 5.7
Q1 year 2.3Q30 years 4.6Q100 years 5.7
C R A D D Y S
Project Aldi Store, Caerphilly Road, Cardiff Sheet 9788 01 0013 Rev A
Section Stormwater Drainage Strategy By WAH Checked RSH Date 24/05/17
Appendix G: Surface Water Overland Flow Routes
STN1
STN3
STN4
37.5
6
37.67
37.79
37.88
37.97
38.00
38.03
38.09
37.6
1
GY
LP
37.55
37.55
37.6
7
37.52
37.5037.44
37.49
37.58
37.4737.45
37.44
37.46
37.75
37.87
37.93
38.06
37.54 37.56 37.50
EL46.32
37.46
37.50
37.5237.55
RL42.34
EL41.00
EL41.08
RL42.46
RL50.0
4
EL46.28
38.1
738.1
4
BOL
RL49.23
EL43.3
7
EL43.3
9E
L43.5
1
EL43.4
9
RL46.4
3
RL46.4
3
RL46.3
9
RL46.2
6
Top of wall40.55
Top of wall40.53EP RL41.32
DP
EL40.87EL41.02
EL44.
39
EL44.
10
EL44.
43
RL4
7.39
RL4
4.31
RL47.19
Roof44.52
FH
37.8
337.8
6
37.88
37.8
8
37.9
2
37.9
3
GY
37.7
4
37.7
6
37.7
9
37.7
9
37.8
1
37.8
2
37.8
3
ST
STTP
BT
CATV
37.9
137.8
6
ST
ST
ST
37.9
838.0
438.0
2
BOL
BOL
CATV
ST
ST
ST
ST
CATV
BOL
BT
38.0
137.9
738.0
5
38.1
0
38.1
2
38.1
5
38.1
7
38.2
138.1
9
38.2
8
38.2
6BOL
SP
BOL
BOLBOL
BOL
BOL
BOL
SP
ST
ST
STST
ST
IC IC
SP
BOL
BOL
BOL
BOL
GV
ST
37.9
5
38.0
1
MHCL38.04
38.0
638.0
4
38.0
938.1
0
38.1
9
GY
CATV
ST
ST
CATV
MK
CATVBT
TP
DN
LP
ST
38.0
5
38.0
1
38.0
237.9
8
37.9
6
GY
GY
38.2
5
38.22
38.2
2
38.3
438.2
7
38.2
2
38.1
3
38.1
1
38.0
5
38.0
4
38.0
137.9
837.9
837.9
737.8
937.8
337.7
8
GY
38.3
038.3
9
ICCL38.34
BOL
ST
SP
DN
SP
38.4
4
38.4
7
38.4
0
38.3
5
38.3
1
38.2
438.2
1
38.2
0
38.2
138.1
9
38.2
1
LP
ST
ICCL38.14
BT
BOL
BOL
BOL
BOL
BOL
BOL
BOL
BOL
IC
IC
CL38.19
CL38.20
SP
37.9
137.9
2
37.9
5
37.9
9
38.0
2
ST
SV
MHCL38.08
GY
38.0
9
38.1
3
38.2
0
MHCL38.25
38.3
338.3
1
38.2
7
38.2
338.2
1
38.1
4
38.0
8
38.0
638.0
338.0
237.9
53
7.9
137.8
83
7.8
33
7.8
0
38.0
337.9
7
38.3
238.1
6
38.1
9
38.2
338.1
338.1
1
37.8
937.9
2
37
.98
38.0
238.0
3
38.0
6
38.1
5
38.2
1
38.3
0
EL44.43RL47.06
38.4
6
ST
Elec
38.3
838.3
2
38.2
938.2
5
38.1
9
RL46.7
4
EL43.8
1
GY
37.9
6
37.9
5
37.9
6
37.9
2
38.0
0
38.0
5
38.0
5
38.2
638.2
6
38.2
7
38.2
8
38.3
3
38.3
4
38.4
8
38.73
38.55
38.54
37.74
37.67
37.62
37.77
37.74
37.71
37.67
37.69
37.66
37.7
7
37.96
37.9
1
37.7
0
37.6
6
37.4
9
38.1838.16
38.06
38.27
RL42.87
EL41.30
37.62
37.63
37.8337.77
38.01
38.07
MHCL38.14
38.14
38.0
8
38.1
4
38.1
8
37.57
MHCL37.70
MHCL38.18
IL36.58
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
GG
GG
GG
GG
GG
GG
GG
GG
GG
G
G
G
G
G
Fro
m R
ecord
s
Fro
m R
ecord
s
G
G
G
G
G
G
G
G
(not d
ete
cte
d)
(not d
ete
cte
d)
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
EE
EE
EE
EE
E
E
E
E
E
EE
E
E
E
EE
E
E
E
EE
E
E
E
E
E
E
E
d0.4
md0.4
m
d0.4
m
d0.6
m
d0.2
m
d0.6
m
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
d0.3
m
d0.3
m
EE
EE
EE
EE
EE
EE
E
E
E
E
Filled
Tactile
BW
(1.0
m)
Bric
k W
all(1
.0m
)
BW
(1.0
m)
BW
(0.5
m)
Bric
k W
all(0
.5m
)
Bric
k W
all(0
.5m
)
Asphalt
Bric
k W
all(1
.0m
)/SR
(0.5
m)
Bus S
helte
r
Tactile
Asphalt
Asphalt
Asphalt
Asphalt
Asphalt
Asphalt
SR
Asphalt
Dro
p K
erb
Dro
p K
erb
Asphalt
Dro
p K
erb
Pic
ket F
ence
Dro
p K
erb
Asphalt
Tank
Hoarding
Asphalt
Asphalt
Grass
Brick RW
Wellfare Cabin
Container
ContainerTactile
Scrap Material
Asphalt
Brick Wall(0.5m
)
Brick RW(1.0m)
BW
(1.3
m)
BW
(0.4
m)
TactileDK
Cobbles
Asphalt
Asphalt
Brick Wall(1.2m)
Concrete
Brick Wall(0.5m)/SR(0.5m)
Dro
p K
erb
Brick Wall (1.8m)
Blocked
IL36.85
IL37.04
IL35.28
IL35.69
IL35.46
Flooded
ElecBox
SWS
SWS
300mm
150m
m
Back d
rop
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
SW
S
300m
m
300m
m
SWS 150m
m
SW
S
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
BT
d0..6
m
d0..6
m
D0.7
m
d0.4
m
d0.6
md0.6
m
d0.4
m
d0.7
m
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
WW
WW
W
WW
W
WW
WW
WW
W
WW
WW
WW
W
WW
W
W
W
W
W
W
W
W
W
W
W
W
W
Fro
m R
ecord
s
Fro
m R
ecord
s
WW
WW
WW
WW
WW
WW
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
WW
WW
W
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS150mm
225mm
225m
m
225m
m
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
300mm
225m
m
FS
FS
225m
m
FS
FS
150mm
60m
m60m
m
SR(1m)
38.71
37.76
37.21
BP
ET
TM
TM
TM
TM
TM
SL
TM
TM
TM
SL
SL
SL
SL
SL
CS
CS
CYS
ET
ET
ET
BP
KEY
Site Boundary
Potential Surface
Water Flow Route
REVDRG SIZE
A1
DRAWING NUMBER
CHECKEDSCALE DRAWN APPROVED
STATUS
PROJECT TITLE
DRAWING TITLE
CLIENT
THIS DRAWING IS THE COPYRIGHT OF CRADDY PITCHERS LTD AND MUST
NOT BE COPIED, REPRODUCED OR SUBMITTED TO OTHER PARTIES
WITHOUT THEIR PERMISSION.
IF YOU HAVE A QUERY CALL US
AT A1
SCALING FROM THIS DRAWING OR OBTAINING DIMENSIONS ELECTRONICALLY MAY
NOT PROVIDE ACCURATE INFORMATION AND SHOULD BE AVOIDED. WORK ONLY
FROM FIGURED DIMENSIONS.
C R A D D Y S
REVISION DETAILSREV DATEBY
63 MACRAE ROAD, EDEN OFFICE PARK, HAM GREEN
BRISTOL, BS20 0DD
TEL : 01275 371 333
email : [email protected] www.craddys.co.uk
ALDI STORE
CAERPHILLY ROAD
CARDIFF
SURFACE WATER OVERLAND
FLOW ROUTE
ALDI STORES LTD
INFORMATION
1:200 WAH RSH RAG
9788sk0003 A
GENERAL NOTES
DRAWINGS AND SPECIFICATIONS: This drawing is to be read in
conjunction with all relevant Architects, Engineers and Specialists drawings
together with the specification.
C D M : SIGNIFICANT HAZARDS
THE FOLLOWING HEALTH AND SAFETY HAZARDS ARE IDENTIFIED BY THE DESIGNER
AS ABNORMAL IN PURSUANCE OF THE CURRENT CONSTRUCTION DESIGN AND
MANAGEMENT REGULATIONS.
RISKS DURING CONSTRUCTION:
No abnormal risks have been identified relating to this design element.
OPERATION / MAINTENANCE RISKS:
RISKS DURING DEMOLITION / DECOMMISSIONING / DISMANTLING / ALTERATIONS:
No abnormal risks have been identified relating to this design element.
No abnormal risks have been identified relating to this design element.
IT IS ASSUMED THAT ALL WORKS WILL BE CARRIED OUT BY COMPETENT &
ADEQUATELY RESOURCED CONTRACTOR(S) WORKING TO SAFE SYSTEMS OF WORK.
A 1ST ISSUE 23.05.17WAH
C R A D D Y S
Project Aldi Store, Caerphilly Road, Cardiff Sheet 9788 01 0014 Rev A
Section Stormwater Drainage Strategy By WAH Checked RSH Date 24/05/17
Appendix H: Microdrainage Calculations for Proposed Drainage System
Appendix H1: Microdrainage Proposed Stormwater Layout
Craddy Pitchers Davidson Page 1
Kensington Court
Woodwater Park Pynes Hill
Exeter EX2 5TY
Date 24/05/2017 16:33 Designed by haywardw
File 9788 Proposed Storm.MDX Checked by
Causeway Network 2016.1
©1982-2016 XP Solutions
C R A D D Y S
Project Aldi Store, Caerphilly Road, Cardiff Sheet 9788 01 0015 Rev A
Section Stormwater Drainage Strategy By WAH Checked RSH Date 24/05/17
Appendix H2: Microdrainage Proposed Stormwater Design
Craddy Pitchers Davidson Page 0
Kensington Court
Woodwater Park Pynes Hill
Exeter EX2 5TY
Date 24/05/2017 16:31 Designed by haywardw
File 9788 Proposed Storm.MDX Checked by
Causeway Network 2016.1
STORM SEWER DESIGN by the Modified Rational Method
Design Criteria for 9788 PROPOSED STORM.SWS
©1982-2016 XP Solutions
Pipe Sizes 9788 PROPOSED STORM Manhole Sizes 9788 PROPOSED STORM
FSR Rainfall Model - England and Wales
Return Period (years) 1 Add Flow / Climate Change (%) 10
M5-60 (mm) 19.000 Minimum Backdrop Height (m) 0.200
Ratio R 0.258 Maximum Backdrop Height (m) 0.000
Maximum Rainfall (mm/hr) 50 Min Design Depth for Optimisation (m) 1.200
Maximum Time of Concentration (mins) 30 Min Vel for Auto Design only (m/s) 0.75
Foul Sewage (l/s/ha) 0.000 Min Slope for Optimisation (1:X) 500
Volumetric Runoff Coeff. 0.750
Designed with Level Soffits
Network Design Table for 9788 PROPOSED STORM.SWS
PN Length
(m)
Fall
(m)
Slope
(1:X)
I.Area
(ha)
T.E.
(mins)
Base
Flow (l/s)
k
(mm)
HYD
SECT
DIA
(mm)
Section Type Auto
Design
1.000 21.163 0.141 150.0 0.016 4.00 0.0 0.600 o 150 Pipe/Conduit
1.001 25.727 0.172 149.6 0.000 0.00 0.0 0.600 o 150 Pipe/Conduit
1.002 12.498 0.050 250.0 0.084 0.00 0.0 0.600 o 300 Pipe/Conduit
1.003 4.156 0.017 250.0 0.047 0.00 0.0 0.600 o 300 Pipe/Conduit
1.004 12.846 0.051 250.0 0.027 0.00 0.0 0.600 o 300 Pipe/Conduit
1.005 4.047 0.016 250.0 0.017 0.00 0.0 0.600 o 300 Pipe/Conduit
1.006 10.927 0.044 250.0 0.065 0.00 0.0 0.600 o 300 Pipe/Conduit
1.007 3.482 0.014 250.0 0.031 0.00 0.0 0.600 o 300 Pipe/Conduit
1.008 5.882 0.024 250.0 0.080 0.00 0.0 0.600 o 300 Pipe/Conduit
2.000 10.921 0.696 15.7 0.015 4.00 0.0 0.600 o 150 Pipe/Conduit
2.001 11.700 0.747 15.7 0.032 0.00 0.0 0.600 o 150 Pipe/Conduit
Network Results Table
PN Rain
(mm/hr)
T.C.
(mins)
US/IL
(m)
Σ I.Area
(ha)
Σ Base
Flow (l/s)
Foul
(l/s)
Add Flow
(l/s)
Vel
(m/s)
Cap
(l/s)
Flow
(l/s)
1.000 43.56 4.43 36.400 0.016 0.0 0.0 0.2 0.82 14.5 2.1
1.001 41.85 4.95 36.259 0.016 0.0 0.0 0.2 0.82 14.5 2.1
1.002 41.21 5.16 35.937 0.100 0.0 0.0 1.1 0.99 70.0 12.3
1.003 41.00 5.23 35.887 0.147 0.0 0.0 1.6 0.99 70.0 18.0
1.004 40.37 5.45 35.870 0.174 0.0 0.0 1.9 0.99 70.0 20.9
1.005 40.18 5.52 35.819 0.191 0.0 0.0 2.1 0.99 70.0 22.9
1.006 39.67 5.70 35.803 0.256 0.0 0.0 2.8 0.99 70.0 30.3
1.007 39.51 5.76 35.759 0.287 0.0 0.0 3.1 0.99 70.0 33.8
1.008 39.24 5.86 35.745 0.367 0.0 0.0 3.9 0.99 70.0 42.9
2.000 44.83 4.07 37.315 0.015 0.0 0.0 0.2 2.56 45.2 2.0
2.001 44.56 4.15 36.619 0.047 0.0 0.0 0.6 2.56 45.2 6.2
Craddy Pitchers Davidson Page 1
Kensington Court
Woodwater Park Pynes Hill
Exeter EX2 5TY
Date 24/05/2017 16:31 Designed by haywardw
File 9788 Proposed Storm.MDX Checked by
Causeway Network 2016.1
Network Design Table for 9788 PROPOSED STORM.SWS
©1982-2016 XP Solutions
PN Length
(m)
Fall
(m)
Slope
(1:X)
I.Area
(ha)
T.E.
(mins)
Base
Flow (l/s)
k
(mm)
HYD
SECT
DIA
(mm)
Section Type Auto
Design
1.009 3.335 0.033 100.0 0.000 0.00 0.0 0.600 o 300 Pipe/Conduit
1.010 14.833 0.259 57.3 0.013 0.00 0.0 0.600 o 300 Pipe/Conduit
3.000 35.924 0.359 100.1 0.000 4.00 0.0 0.600 o 225 Pipe/Conduit
3.001 37.681 0.377 100.0 0.208 0.00 0.0 0.600 o 225 Pipe/Conduit
3.002 33.281 0.708 47.0 0.000 0.00 0.0 0.600 o 225 Pipe/Conduit
3.003 16.682 0.026 642.0 0.000 0.00 0.0 0.600 o 300 Pipe/Conduit
1.011 2.422 0.024 100.9 0.000 0.00 0.0 0.600 o 300 Pipe/Conduit
Network Results Table
PN Rain
(mm/hr)
T.C.
(mins)
US/IL
(m)
Σ I.Area
(ha)
Σ Base
Flow (l/s)
Foul
(l/s)
Add Flow
(l/s)
Vel
(m/s)
Cap
(l/s)
Flow
(l/s)
1.009 39.15 5.90 35.722 0.414 0.0 0.0 4.4 1.57 111.1 48.3
1.010 38.84 6.02 35.688 0.427 0.0 0.0 4.5 2.08 147.1 49.4
3.000 43.47 4.46 36.900 0.000 0.0 0.0 0.0 1.31 52.0 0.0
3.001 41.90 4.94 36.541 0.208 0.0 0.0 2.4 1.31 52.0 26.0
3.002 41.02 5.23 36.164 0.208 0.0 0.0 2.4 1.91 76.1 26.0
3.003 39.73 5.68 35.456 0.208 0.0 0.0 2.4 0.61 43.3 26.0
1.011 38.77 6.04 35.430 0.635 0.0 0.0 6.7 1.57 110.6 73.3
Craddy Pitchers Davidson Page 2
Kensington Court
Woodwater Park Pynes Hill
Exeter EX2 5TY
Date 24/05/2017 16:31 Designed by haywardw
File 9788 Proposed Storm.MDX Checked by
Causeway Network 2016.1
Manhole Schedules for 9788 PROPOSED STORM.SWS
©1982-2016 XP Solutions
MH
Name
MH
CL (m)
MH
Depth
(m)
MH
Connection
MH
Diam.,L*W
(mm)
PN
Pipe Out
Invert
Level (m)
Diameter
(mm)
PN
Pipes In
Invert
Level (m)
Diameter
(mm)
Channel.01 36.800 0.400 Open Manhole 1200 1.000 36.400 150
w.01 37.500 1.241 Open Manhole 1200 1.001 36.259 150 1.000 36.259 150
w.02 37.600 1.663 Open Manhole 1200 1.002 35.937 300 1.001 36.087 150
xa.02 37.700 1.813 Open Manhole 1200 1.003 35.887 300 1.002 35.887 300
xb.02 37.700 1.830 Open Manhole 1200 1.004 35.870 300 1.003 35.870 300
xc.02 37.850 2.031 Open Manhole 1200 1.005 35.819 300 1.004 35.819 300
xd.02 37.850 2.047 Open Manhole 1200 1.006 35.803 300 1.005 35.803 300
xe.02 38.000 2.241 Open Manhole 1200 1.007 35.759 300 1.006 35.759 300
xf.03 38.000 2.255 Open Manhole 1200 1.008 35.745 300 1.007 35.745 300
w.03 38.050 0.735 Open Manhole 1200 2.000 37.315 150
xa.03 38.100 1.481 Open Manhole 1200 2.001 36.619 150 2.000 36.619 150
w.04 38.050 2.328 Open Manhole 1200 1.009 35.722 300 1.008 35.722 300
2.001 35.872 150
xa.04 38.050 2.362 Open Manhole 1200 1.010 35.688 300 1.009 35.688 300
Re.01 37.850 0.950 Open Manhole 1200 3.000 36.900 225
w.05 38.000 1.459 Open Manhole 1200 3.001 36.541 225 3.000 36.541 225
w.06 37.900 1.736 Open Manhole 1200 3.002 36.164 225 3.001 36.164 225
Attenuation 38.300 2.844 Open Manhole 1200 3.003 35.456 300 3.002 35.456 225
w.07 - Hydrobrake 38.300 2.870 Open Manhole 1200 1.011 35.430 300 1.010 35.430 300
3.003 35.430 300
w.08 37.400 1.994 Open Manhole 0 OUTFALL 1.011 35.406 300
Craddy Pitchers Davidson Page 3
Kensington Court
Woodwater Park Pynes Hill
Exeter EX2 5TY
Date 24/05/2017 16:31 Designed by haywardw
File 9788 Proposed Storm.MDX Checked by
Causeway Network 2016.1
PIPELINE SCHEDULES for 9788 PROPOSED STORM.SWS
Upstream Manhole
©1982-2016 XP Solutions
PN Hyd
Sect
Diam
(mm)
MH
Name
C.Level
(m)
I.Level
(m)
D.Depth
(m)
MH
Connection
MH DIAM., L*W
(mm)
1.000 o 150 Channel.01 36.800 36.400 0.250 Open Manhole 1200
1.001 o 150 w.01 37.500 36.259 1.091 Open Manhole 1200
1.002 o 300 w.02 37.600 35.937 1.363 Open Manhole 1200
1.003 o 300 xa.02 37.700 35.887 1.513 Open Manhole 1200
1.004 o 300 xb.02 37.700 35.870 1.530 Open Manhole 1200
1.005 o 300 xc.02 37.850 35.819 1.731 Open Manhole 1200
1.006 o 300 xd.02 37.850 35.803 1.747 Open Manhole 1200
1.007 o 300 xe.02 38.000 35.759 1.941 Open Manhole 1200
1.008 o 300 xf.03 38.000 35.745 1.955 Open Manhole 1200
2.000 o 150 w.03 38.050 37.315 0.585 Open Manhole 1200
2.001 o 150 xa.03 38.100 36.619 1.331 Open Manhole 1200
1.009 o 300 w.04 38.050 35.722 2.028 Open Manhole 1200
1.010 o 300 xa.04 38.050 35.688 2.062 Open Manhole 1200
3.000 o 225 Re.01 37.850 36.900 0.725 Open Manhole 1200
3.001 o 225 w.05 38.000 36.541 1.234 Open Manhole 1200
3.002 o 225 w.06 37.900 36.164 1.511 Open Manhole 1200
3.003 o 300 Attenuation 38.300 35.456 2.544 Open Manhole 1200
Downstream Manhole
PN Length
(m)
Slope
(1:X)
MH
Name
C.Level
(m)
I.Level
(m)
D.Depth
(m)
MH
Connection
MH DIAM., L*W
(mm)
1.000 21.163 150.0 w.01 37.500 36.259 1.091 Open Manhole 1200
1.001 25.727 149.6 w.02 37.600 36.087 1.363 Open Manhole 1200
1.002 12.498 250.0 xa.02 37.700 35.887 1.513 Open Manhole 1200
1.003 4.156 250.0 xb.02 37.700 35.870 1.530 Open Manhole 1200
1.004 12.846 250.0 xc.02 37.850 35.819 1.731 Open Manhole 1200
1.005 4.047 250.0 xd.02 37.850 35.803 1.747 Open Manhole 1200
1.006 10.927 250.0 xe.02 38.000 35.759 1.941 Open Manhole 1200
1.007 3.482 250.0 xf.03 38.000 35.745 1.955 Open Manhole 1200
1.008 5.882 250.0 w.04 38.050 35.722 2.028 Open Manhole 1200
2.000 10.921 15.7 xa.03 38.100 36.619 1.331 Open Manhole 1200
2.001 11.700 15.7 w.04 38.050 35.872 2.028 Open Manhole 1200
1.009 3.335 100.0 xa.04 38.050 35.688 2.062 Open Manhole 1200
1.010 14.833 57.3 w.07 - Hydrobrake 38.300 35.430 2.570 Open Manhole 1200
3.000 35.924 100.1 w.05 38.000 36.541 1.234 Open Manhole 1200
3.001 37.681 100.0 w.06 37.900 36.164 1.511 Open Manhole 1200
3.002 33.281 47.0 Attenuation 38.300 35.456 2.619 Open Manhole 1200
3.003 16.682 642.0 w.07 - Hydrobrake 38.300 35.430 2.570 Open Manhole 1200
Craddy Pitchers Davidson Page 4
Kensington Court
Woodwater Park Pynes Hill
Exeter EX2 5TY
Date 24/05/2017 16:31 Designed by haywardw
File 9788 Proposed Storm.MDX Checked by
Causeway Network 2016.1
PIPELINE SCHEDULES for 9788 PROPOSED STORM.SWS
Upstream Manhole
©1982-2016 XP Solutions
PN Hyd
Sect
Diam
(mm)
MH
Name
C.Level
(m)
I.Level
(m)
D.Depth
(m)
MH
Connection
MH DIAM., L*W
(mm)
1.011 o 300 w.07 - Hydrobrake 38.300 35.430 2.570 Open Manhole 1200
Downstream Manhole
PN Length
(m)
Slope
(1:X)
MH
Name
C.Level
(m)
I.Level
(m)
D.Depth
(m)
MH
Connection
MH DIAM., L*W
(mm)
1.011 2.422 100.9 w.08 37.400 35.406 1.694 Open Manhole 0
Free Flowing Outfall Details for 9788 PROPOSED STORM.SWS
Outfall
Pipe Number
Outfall
Name
C. Level
(m)
I. Level
(m)
Min
I. Level
(m)
D,L
(mm)
W
(mm)
1.011 w.08 37.400 35.406 0.000 0 0
C R A D D Y S
Project Aldi Store, Caerphilly Road, Cardiff Sheet 9788 01 0016 Rev A
Section Stormwater Drainage Strategy By WAH Checked RSH Date 24/05/17
Appendix H3: Microdrainage Proposed Stormwater Simulation – all storms by return period
Craddy Pitchers Davidson Page 0
Kensington Court
Woodwater Park Pynes Hill
Exeter EX2 5TY
Date 24/05/2017 16:28 Designed by haywardw
File 9788 Proposed Storm.MDX Checked by
Causeway Network 2016.1
Free Flowing Outfall Details for 9788 PROPOSED STORM.SWS
©1982-2016 XP Solutions
Outfall
Pipe Number
Outfall
Name
C. Level
(m)
I. Level
(m)
Min
I. Level
(m)
D,L
(mm)
W
(mm)
1.011 w.08 37.400 35.406 0.000 0 0
Simulation Criteria for 9788 PROPOSED STORM.SWS
Volumetric Runoff Coeff 0.750 Additional Flow - % of Total Flow 0.000
Areal Reduction Factor 1.000 MADD Factor * 10m³/ha Storage 2.000
Hot Start (mins) 0 Inlet Coeffiecient 0.800
Hot Start Level (mm) 0 Flow per Person per Day (l/per/day) 0.000
Manhole Headloss Coeff (Global) 0.500 Run Time (mins) 60
Foul Sewage per hectare (l/s) 0.000 Output Interval (mins) 1
Number of Input Hydrographs 0 Number of Storage Structures 1
Number of Online Controls 2 Number of Time/Area Diagrams 0
Number of Offline Controls 0 Number of Real Time Controls 0
Synthetic Rainfall Details
Rainfall Model FSR Profile Type Summer
Return Period (years) 1 Cv (Summer) 0.750
Region England and Wales Cv (Winter) 0.840
M5-60 (mm) 19.000 Storm Duration (mins) 30
Ratio R 0.258
Craddy Pitchers Davidson Page 1
Kensington Court
Woodwater Park Pynes Hill
Exeter EX2 5TY
Date 24/05/2017 16:28 Designed by haywardw
File 9788 Proposed Storm.MDX Checked by
Causeway Network 2016.1
Online Controls for 9788 PROPOSED STORM.SWS
©1982-2016 XP Solutions
Non Return Valve Manhole: w.01, DS/PN: 1.001, Volume (m³): 1.8
Hydro-Brake Optimum® Manhole: w.07 - Hydrobrake, DS/PN: 1.011, Volume (m³):
5.3
Unit Reference MD-SHE-0096-5700-2200-5700
Design Head (m) 2.200
Design Flow (l/s) 5.7
Flush-Flo™ Calculated
Objective Minimise upstream storage
Application Surface
Sump Available Yes
Diameter (mm) 96
Invert Level (m) 35.430
Minimum Outlet Pipe Diameter (mm) 150
Suggested Manhole Diameter (mm) 1200
Control Points Head (m) Flow (l/s)
Design Point (Calculated) 2.200 5.7
Flush-Flo™ 0.417 4.6
Kick-Flo® 0.853 3.7
Mean Flow over Head Range - 4.5
The hydrological calculations have been based on the Head/Discharge relationship for the
Hydro-Brake Optimum® as specified. Should another type of control device other than a
Hydro-Brake Optimum® be utilised then these storage routing calculations will be
invalidated
Depth (m) Flow (l/s) Depth (m) Flow (l/s) Depth (m) Flow (l/s) Depth (m) Flow (l/s)
0.100 3.1 1.200 4.3 3.000 6.6 7.000 9.8
0.200 4.2 1.400 4.6 3.500 7.1 7.500 10.2
0.300 4.5 1.600 4.9 4.000 7.5 8.000 10.5
0.400 4.6 1.800 5.2 4.500 8.0 8.500 10.8
0.500 4.6 2.000 5.4 5.000 8.4 9.000 11.1
0.600 4.5 2.200 5.7 5.500 8.8 9.500 11.4
0.800 4.0 2.400 5.9 6.000 9.1
1.000 3.9 2.600 6.2 6.500 9.5
Craddy Pitchers Davidson Page 2
Kensington Court
Woodwater Park Pynes Hill
Exeter EX2 5TY
Date 24/05/2017 16:28 Designed by haywardw
File 9788 Proposed Storm.MDX Checked by
Causeway Network 2016.1
Storage Structures for 9788 PROPOSED STORM.SWS
©1982-2016 XP Solutions
Cellular Storage Manhole: Attenuation, DS/PN: 3.003
Invert Level (m) 35.456 Safety Factor 2.0
Infiltration Coefficient Base (m/hr) 0.00000 Porosity 0.95
Infiltration Coefficient Side (m/hr) 0.00000
Depth (m) Area (m²) Inf. Area (m²) Depth (m) Area (m²) Inf. Area (m²)
0.000 248.0 250.0 1.300 248.0 332.2
0.100 248.0 256.3 1.400 248.0 338.5
0.200 248.0 262.6 1.500 248.0 344.9
0.300 248.0 269.0 1.600 248.0 351.2
0.400 248.0 275.3 1.700 248.0 357.5
0.500 248.0 281.6 1.800 0.0 360.7
0.600 248.0 287.9 1.900 0.0 360.7
0.700 248.0 294.3 2.000 0.0 360.7
0.800 248.0 300.6 2.100 0.0 360.7
0.900 248.0 306.9 2.200 0.0 360.7
1.000 248.0 313.2 2.300 0.0 360.7
1.100 248.0 319.6 2.400 0.0 360.7
1.200 248.0 325.9 2.500 0.0 360.7
Craddy Pitchers Davidson Page 3
Kensington Court
Woodwater Park Pynes Hill
Exeter EX2 5TY
Date 24/05/2017 16:28 Designed by haywardw
File 9788 Proposed Storm.MDX Checked by
Causeway Network 2016.1
1 year Return Period Summary of Critical Results by Maximum Level (Rank 1)
for 9788 PROPOSED STORM.SWS
©1982-2016 XP Solutions
Simulation Criteria
Areal Reduction Factor 1.000 Additional Flow - % of Total Flow 0.000
Hot Start (mins) 0 MADD Factor * 10m³/ha Storage 2.000
Hot Start Level (mm) 0 Inlet Coeffiecient 0.800
Manhole Headloss Coeff (Global) 0.500 Flow per Person per Day (l/per/day) 0.000
Foul Sewage per hectare (l/s) 0.000
Number of Input Hydrographs 0 Number of Storage Structures 1
Number of Online Controls 2 Number of Time/Area Diagrams 0
Number of Offline Controls 0 Number of Real Time Controls 0
Synthetic Rainfall Details
Rainfall Model FSR Ratio R 0.258
Region England and Wales Cv (Summer) 0.750
M5-60 (mm) 19.000 Cv (Winter) 0.840
Margin for Flood Risk Warning (mm) 300.0
Analysis Timestep 2.5 Second Increment (Extended)
DTS Status OFF
DVD Status ON
Inertia Status ON
Profile(s) Summer and Winter
Duration(s) (mins) 15, 30, 60, 120, 180, 240, 360, 480, 600,
720, 960, 1440, 2160, 2880, 4320, 5760
Return Period(s) (years) 1, 30, 100
Climate Change (%) 40, 40, 40
PN
US/MH
Name Storm
Return
Period
Climate
Change
First (X)
Surcharge
First (Y)
Flood
First (Z)
Overflow
1.000 Channel.01 15 Winter 1 +40% 30/15 Summer 30/15 Summer
1.001 w.01 15 Winter 1 +40% 30/15 Summer
1.002 w.02 15 Winter 1 +40% 30/15 Summer 100/15 Winter
1.003 xa.02 15 Winter 1 +40% 30/15 Summer
1.004 xb.02 15 Winter 1 +40% 30/15 Summer
1.005 xc.02 15 Winter 1 +40% 30/15 Summer
1.006 xd.02 15 Winter 1 +40% 30/15 Summer
1.007 xe.02 15 Winter 1 +40% 30/15 Summer
1.008 xf.03 15 Winter 1 +40% 30/15 Summer
2.000 w.03 15 Summer 1 +40% 100/600 Winter
2.001 xa.03 15 Winter 1 +40% 30/480 Winter
1.009 w.04 720 Winter 1 +40% 30/15 Summer
1.010 xa.04 720 Winter 1 +40% 30/15 Summer
3.000 Re.01 240 Winter 1 +40% 30/15 Summer
3.001 w.05 15 Winter 1 +40% 30/15 Summer
3.002 w.06 15 Winter 1 +40% 30/120 Winter
3.003 Attenuation 720 Winter 1 +40% 1/60 Winter
1.011 w.07 - Hydrobrake 720 Winter 1 +40% 1/15 Summer
Craddy Pitchers Davidson Page 4
Kensington Court
Woodwater Park Pynes Hill
Exeter EX2 5TY
Date 24/05/2017 16:28 Designed by haywardw
File 9788 Proposed Storm.MDX Checked by
Causeway Network 2016.1
1 year Return Period Summary of Critical Results by Maximum Level (Rank 1)
for 9788 PROPOSED STORM.SWS
©1982-2016 XP Solutions
PN
US/MH
Name
Overflow
Act.
Water
Level
(m)
Surcharged
Depth
(m)
Flooded
Volume
(m³)
Flow /
Cap.
Overflow
(l/s)
Pipe
Flow
(l/s)
1.000 Channel.01 36.445 -0.105 0.000 0.20 2.7
1.001 w.01 36.304 -0.105 0.000 0.19 2.7
1.002 w.02 36.063 -0.174 0.000 0.24 13.7
1.003 xa.02 36.046 -0.141 0.000 0.40 19.2
1.004 xb.02 36.038 -0.132 0.000 0.39 22.4
1.005 xc.02 36.020 -0.099 0.000 0.51 24.6
1.006 xd.02 36.011 -0.091 0.000 0.58 32.5
1.007 xe.02 35.987 -0.072 0.000 0.73 36.2
1.008 xf.03 35.976 -0.069 0.000 0.94 45.8
2.000 w.03 37.339 -0.126 0.000 0.06 2.6
2.001 xa.03 36.661 -0.109 0.000 0.17 6.9
1.009 w.04 35.981 -0.041 0.000 0.16 9.7
1.010 xa.04 35.988 0.000 0.000 0.08 10.0
3.000 Re.01 36.900 -0.225 0.000 0.00 0.0
3.001 w.05 36.664 -0.102 0.000 0.57 28.0
3.002 w.06 36.261 -0.128 0.000 0.39 27.9
3.003 Attenuation 35.961 0.205 0.000 0.18 4.7
1.011 w.07 - Hydrobrake 36.006 0.276 0.000 0.08 4.6
PN
US/MH
Name Status
Level
Exceeded
1.000 Channel.01 OK 40
1.001 w.01 OK
1.002 w.02 OK 3
1.003 xa.02 OK
1.004 xb.02 OK
1.005 xc.02 OK
1.006 xd.02 OK
1.007 xe.02 OK
1.008 xf.03 OK
2.000 w.03 OK
2.001 xa.03 OK
1.009 w.04 OK
1.010 xa.04 OK
3.000 Re.01 OK
3.001 w.05 OK
3.002 w.06 OK
3.003 Attenuation SURCHARGED
1.011 w.07 - Hydrobrake SURCHARGED
Craddy Pitchers Davidson Page 5
Kensington Court
Woodwater Park Pynes Hill
Exeter EX2 5TY
Date 24/05/2017 16:28 Designed by haywardw
File 9788 Proposed Storm.MDX Checked by
Causeway Network 2016.1
30 year Return Period Summary of Critical Results by Maximum Level (Rank 1)
for 9788 PROPOSED STORM.SWS
©1982-2016 XP Solutions
Simulation Criteria
Areal Reduction Factor 1.000 Additional Flow - % of Total Flow 0.000
Hot Start (mins) 0 MADD Factor * 10m³/ha Storage 2.000
Hot Start Level (mm) 0 Inlet Coeffiecient 0.800
Manhole Headloss Coeff (Global) 0.500 Flow per Person per Day (l/per/day) 0.000
Foul Sewage per hectare (l/s) 0.000
Number of Input Hydrographs 0 Number of Storage Structures 1
Number of Online Controls 2 Number of Time/Area Diagrams 0
Number of Offline Controls 0 Number of Real Time Controls 0
Synthetic Rainfall Details
Rainfall Model FSR Ratio R 0.258
Region England and Wales Cv (Summer) 0.750
M5-60 (mm) 19.000 Cv (Winter) 0.840
Margin for Flood Risk Warning (mm) 300.0
Analysis Timestep 2.5 Second Increment (Extended)
DTS Status OFF
DVD Status ON
Inertia Status ON
Profile(s) Summer and Winter
Duration(s) (mins) 15, 30, 60, 120, 180, 240, 360, 480, 600,
720, 960, 1440, 2160, 2880, 4320, 5760
Return Period(s) (years) 1, 30, 100
Climate Change (%) 40, 40, 40
PN
US/MH
Name Storm
Return
Period
Climate
Change
First (X)
Surcharge
First (Y)
Flood
First (Z)
Overflow
1.000 Channel.01 960 Winter 30 +40% 30/15 Summer 30/15 Summer
1.001 w.01 15 Winter 30 +40% 30/15 Summer
1.002 w.02 15 Winter 30 +40% 30/15 Summer 100/15 Winter
1.003 xa.02 15 Winter 30 +40% 30/15 Summer
1.004 xb.02 15 Winter 30 +40% 30/15 Summer
1.005 xc.02 15 Winter 30 +40% 30/15 Summer
1.006 xd.02 15 Winter 30 +40% 30/15 Summer
1.007 xe.02 15 Winter 30 +40% 30/15 Summer
1.008 xf.03 960 Winter 30 +40% 30/15 Summer
2.000 w.03 15 Winter 30 +40% 100/600 Winter
2.001 xa.03 960 Winter 30 +40% 30/480 Winter
1.009 w.04 960 Winter 30 +40% 30/15 Summer
1.010 xa.04 960 Winter 30 +40% 30/15 Summer
3.000 Re.01 15 Winter 30 +40% 30/15 Summer
3.001 w.05 15 Winter 30 +40% 30/15 Summer
3.002 w.06 960 Winter 30 +40% 30/120 Winter
3.003 Attenuation 960 Winter 30 +40% 1/60 Winter
1.011 w.07 - Hydrobrake 960 Winter 30 +40% 1/15 Summer
Craddy Pitchers Davidson Page 6
Kensington Court
Woodwater Park Pynes Hill
Exeter EX2 5TY
Date 24/05/2017 16:28 Designed by haywardw
File 9788 Proposed Storm.MDX Checked by
Causeway Network 2016.1
30 year Return Period Summary of Critical Results by Maximum Level (Rank 1)
for 9788 PROPOSED STORM.SWS
©1982-2016 XP Solutions
PN
US/MH
Name
Overflow
Act.
Water
Level
(m)
Surcharged
Depth
(m)
Flooded
Volume
(m³)
Flow /
Cap.
Overflow
(l/s)
Pipe
Flow
(l/s)
1.000 Channel.01 36.802 0.252 1.807 0.11 1.6
1.001 w.01 36.815 0.407 0.000 0.71 9.8
1.002 w.02 37.155 0.918 0.000 0.47 27.1
1.003 xa.02 37.095 0.908 0.000 0.86 41.3
1.004 xb.02 37.081 0.911 0.000 0.85 48.8
1.005 xc.02 37.006 0.887 0.000 1.09 52.9
1.006 xd.02 36.942 0.839 0.000 1.31 73.1
1.007 xe.02 36.853 0.794 0.000 1.67 83.3
1.008 xf.03 36.826 0.781 0.000 0.27 13.2
2.000 w.03 37.354 -0.111 0.000 0.15 6.3
2.001 xa.03 36.821 0.052 0.000 0.04 1.8
1.009 w.04 36.831 0.810 0.000 0.24 14.9
1.010 xa.04 36.834 0.846 0.000 0.12 15.3
3.000 Re.01 37.231 0.106 0.000 0.06 3.0
3.001 w.05 37.243 0.477 0.000 1.48 73.0
3.002 w.06 36.817 0.427 0.000 0.11 8.1
3.003 Attenuation 36.812 1.056 0.000 0.22 5.8
1.011 w.07 - Hydrobrake 36.834 1.104 0.000 0.08 4.6
PN
US/MH
Name Status
Level
Exceeded
1.000 Channel.01 FLOOD 40
1.001 w.01 SURCHARGED
1.002 w.02 SURCHARGED 3
1.003 xa.02 SURCHARGED
1.004 xb.02 SURCHARGED
1.005 xc.02 SURCHARGED
1.006 xd.02 SURCHARGED
1.007 xe.02 SURCHARGED
1.008 xf.03 SURCHARGED
2.000 w.03 OK
2.001 xa.03 SURCHARGED
1.009 w.04 SURCHARGED
1.010 xa.04 SURCHARGED
3.000 Re.01 SURCHARGED
3.001 w.05 SURCHARGED
3.002 w.06 SURCHARGED
3.003 Attenuation SURCHARGED
1.011 w.07 - Hydrobrake SURCHARGED
Craddy Pitchers Davidson Page 7
Kensington Court
Woodwater Park Pynes Hill
Exeter EX2 5TY
Date 24/05/2017 16:28 Designed by haywardw
File 9788 Proposed Storm.MDX Checked by
Causeway Network 2016.1
100 year Return Period Summary of Critical Results by Maximum Level (Rank
1) for 9788 PROPOSED STORM.SWS
©1982-2016 XP Solutions
Simulation Criteria
Areal Reduction Factor 1.000 Additional Flow - % of Total Flow 0.000
Hot Start (mins) 0 MADD Factor * 10m³/ha Storage 2.000
Hot Start Level (mm) 0 Inlet Coeffiecient 0.800
Manhole Headloss Coeff (Global) 0.500 Flow per Person per Day (l/per/day) 0.000
Foul Sewage per hectare (l/s) 0.000
Number of Input Hydrographs 0 Number of Storage Structures 1
Number of Online Controls 2 Number of Time/Area Diagrams 0
Number of Offline Controls 0 Number of Real Time Controls 0
Synthetic Rainfall Details
Rainfall Model FSR Ratio R 0.258
Region England and Wales Cv (Summer) 0.750
M5-60 (mm) 19.000 Cv (Winter) 0.840
Margin for Flood Risk Warning (mm) 300.0
Analysis Timestep 2.5 Second Increment (Extended)
DTS Status OFF
DVD Status ON
Inertia Status ON
Profile(s) Summer and Winter
Duration(s) (mins) 15, 30, 60, 120, 180, 240, 360, 480, 600,
720, 960, 1440, 2160, 2880, 4320, 5760
Return Period(s) (years) 1, 30, 100
Climate Change (%) 40, 40, 40
PN
US/MH
Name Storm
Return
Period
Climate
Change
First (X)
Surcharge
First (Y)
Flood
First (Z)
Overflow
1.000 Channel.01 2160 Winter 100 +40% 30/15 Summer 30/15 Summer
1.001 w.01 30 Summer 100 +40% 30/15 Summer
1.002 w.02 15 Winter 100 +40% 30/15 Summer 100/15 Winter
1.003 xa.02 720 Winter 100 +40% 30/15 Summer
1.004 xb.02 720 Winter 100 +40% 30/15 Summer
1.005 xc.02 960 Winter 100 +40% 30/15 Summer
1.006 xd.02 960 Winter 100 +40% 30/15 Summer
1.007 xe.02 960 Winter 100 +40% 30/15 Summer
1.008 xf.03 960 Winter 100 +40% 30/15 Summer
2.000 w.03 960 Winter 100 +40% 100/600 Winter
2.001 xa.03 960 Winter 100 +40% 30/480 Winter
1.009 w.04 960 Winter 100 +40% 30/15 Summer
1.010 xa.04 960 Winter 100 +40% 30/15 Summer
3.000 Re.01 15 Winter 100 +40% 30/15 Summer
3.001 w.05 15 Winter 100 +40% 30/15 Summer
3.002 w.06 960 Winter 100 +40% 30/120 Winter
3.003 Attenuation 960 Winter 100 +40% 1/60 Winter
1.011 w.07 - Hydrobrake 960 Winter 100 +40% 1/15 Summer
Craddy Pitchers Davidson Page 8
Kensington Court
Woodwater Park Pynes Hill
Exeter EX2 5TY
Date 24/05/2017 16:28 Designed by haywardw
File 9788 Proposed Storm.MDX Checked by
Causeway Network 2016.1
100 year Return Period Summary of Critical Results by Maximum Level (Rank
1) for 9788 PROPOSED STORM.SWS
©1982-2016 XP Solutions
PN
US/MH
Name
Overflow
Act.
Water
Level
(m)
Surcharged
Depth
(m)
Flooded
Volume
(m³)
Flow /
Cap.
Overflow
(l/s)
Pipe
Flow
(l/s)
1.000 Channel.01 36.808 0.258 7.706 0.18 2.5
1.001 w.01 36.831 0.422 0.000 0.74 10.2
1.002 w.02 37.601 1.364 1.377 0.69 39.5
1.003 xa.02 37.601 1.414 0.000 0.16 7.8
1.004 xb.02 37.600 1.430 0.000 0.16 9.3
1.005 xc.02 37.600 1.481 0.000 0.17 8.2
1.006 xd.02 37.599 1.497 0.000 0.20 11.2
1.007 xe.02 37.598 1.539 0.000 0.25 12.6
1.008 xf.03 37.598 1.553 0.000 0.34 16.3
2.000 w.03 37.599 0.134 0.000 0.02 0.7
2.001 xa.03 37.598 0.829 0.000 0.06 2.3
1.009 w.04 37.597 1.575 0.000 0.30 18.4
1.010 xa.04 37.596 1.607 0.000 0.15 18.9
3.000 Re.01 37.783 0.658 0.000 0.11 5.4
3.001 w.05 37.791 1.025 0.000 1.79 88.0
3.002 w.06 37.600 1.211 0.000 0.13 9.6
3.003 Attenuation 37.594 1.838 0.000 0.21 5.5
1.011 w.07 - Hydrobrake 37.592 1.863 0.000 0.10 5.6
PN
US/MH
Name Status
Level
Exceeded
1.000 Channel.01 FLOOD 40
1.001 w.01 SURCHARGED
1.002 w.02 FLOOD 3
1.003 xa.02 FLOOD RISK
1.004 xb.02 FLOOD RISK
1.005 xc.02 FLOOD RISK
1.006 xd.02 FLOOD RISK
1.007 xe.02 SURCHARGED
1.008 xf.03 SURCHARGED
2.000 w.03 SURCHARGED
2.001 xa.03 SURCHARGED
1.009 w.04 SURCHARGED
1.010 xa.04 SURCHARGED
3.000 Re.01 FLOOD RISK
3.001 w.05 FLOOD RISK
3.002 w.06 SURCHARGED
3.003 Attenuation SURCHARGED
1.011 w.07 - Hydrobrake SURCHARGED
C R A D D Y S
Project Aldi Store, Caerphilly Road, Cardiff Sheet 9788 01 0017 Rev A
Section Stormwater Drainage Strategy By WAH Checked RSH Date 24/05/17
Appendix I: Operations and Maintenance
9788w003 – Aldi Caerphilly Road, Cardiff Operation and Maintenance of Below Ground Drainage System
May 2017
C R A D D Y S
Aldi Store, Caerphilly Road, Cardiff
OPERATION AND MAINTENANCE OF BELOW GROUND DRAINAGE SYSTEM
The following is a list of the drainage items which will require periodic maintenance, and sets out how often they should be maintained to achieve their maximum design life. A brief description of how the maintenance should be carried out is provided. All maintenance should be carried out by suitably trained individuals using the correct equipment. These recommendations apply to the private drainage items within the development site (maintenance and operation of adoptable drainage is the liability of the adopting authority). Gullies Inspection and removal of debris from silt trap once a year (preferably in the spring after leaf fall in the autumn). Drainage pipes, manholes & Silt traps Inspect manholes & silt traps for build up of silt and general debris (once a year, preferably in the spring after leaf fall in the autumn) If silt/debris is building up then clean with jetting lorry / gully sucker & inspect pipe – same may be required. If the pipes to be jetted are plastic then a high flow, low pressure setting should be used so that the pipes are not damaged. (NOTE: Manhole covers can be heavy and suitable lifting equipment / procedures should be used. Personnel should not enter manholes to carry out maintenance). Hydro-Brake Inspect monthly for the first 3 months following commissioning and 6 monthly thereafter (or more frequently as required), hose down as necessary, remove any rags & silt from invert of chamber and especially around hydrobrake. If a blockage occurs this can usually be overcome by operating the by-pass door using the rope provided. This will empty the chamber of water down the level of the outlet allowing further maintenance to be carried out if required. Underground attenuation storage This system is designed to be maintenance free. Silt traps on the up-stream end of the system should be inspected and maintained as above. If excessive silt is encountered then the pipes through the system should be cleaned using a jetting lorry. Unusual / unresolved problems If the drainage system is still holding water following cleaning with a jetter, or the jetting of the system removes excessive amounts of debris this may indicate greater issues within the system. A CCTV survey is likely to be required and further advice should be sought by a drainage engineer.