1
H Drawing Title Program Management Consultant Client DESCRIPTION DATE Rev. APPR. THE SIGNING OF THIS TITLE BLOCK CONFIRMS THE DESIGN AND DRAFTING OF THIS PROJECT HAVE BEEN PREPARED AND CHECKED IN ACCORDANCE WITH THE COMPANY QUALITY ASSURANCE SYSTEM. Drawing Status Drawing No. Revision Engineering Design Consultant Cad Ref: STATE OF QATAR COPYRIGHT NEW PORT PROJECT STEERING COMMITTEE Sub-Consultant CONTRACT NO.: NPP / 0050 APPR. DRAWN DESIGN CHKD. DATE APPR. CAD MANAGER DRAFTER ENGINEER LEAD ENGINEER PROJ. ENGINEER ORIG. DWG SIZE: A1 Project Title QENFB INFRASTRUCTURE AND UTILITY BUILDINGS OVERALL SITE PLAN 9254-03-RD-CI-DRG-2015 1 CONSTRUCTION PSL JPU WDL WDL BME JAN 2014

9254-03-RD-CI-DRG-2015_Rev 1

Embed Size (px)

DESCRIPTION

9254-03-RD-CI-DRG-2015_Rev 1 .................................................................................................................................................................

Citation preview

Page 1: 9254-03-RD-CI-DRG-2015_Rev 1

H

Drawing Title

Program Management Consultant

Client

DESCRIPTIONDATERev. APPR.

THE SIGNING OF THIS TITLE BLOCK CONFIRMS THE DESIGN AND DRAFTINGOF THIS PROJECT HAVE BEEN PREPARED AND CHECKED IN ACCORDANCEWITH THE COMPANY QUALITY ASSURANCE SYSTEM.

Drawing Status

Drawing No. Revision

Engineering Design Consultant

Cad Ref:

STATE OF QATAR

COPYRIGHT NEW PORT PROJECT STEERING COMMITTEE

Sub-Consultant

CONTRACT NO.: NPP / 0050

APPR.DRAWNDESIGN CHKD. DATEAPPR.

CAD MANAGERDRAFTERENGINEER LEAD ENGINEER PROJ. ENGINEER

ORIG. DWG SIZE: A1

Project Title

QENFB INFRASTRUCTURE AND UTILITY BUILDINGS

OVERALL SITE PLAN

9254-03-RD-CI-DRG-2015 1

CONSTRUCTION

PSL JPU WDL WDL BMEJAN 2014