Upload
hitesh-sharma
View
120
Download
7
Tags:
Embed Size (px)
DESCRIPTION
BTS
Citation preview
Alcatel-Lucent GSM
9100 Compact BTS
Indoor/Outdoor Evolution
Installation Manual
BTS Document
Installation & Dismantling Manual
3BK 17430 3135 RJZZA Ed.03
Status RELEASED
Short title
All rights reserved. Passing on and copying of this document, useand communication of its contents not permitted without writtenauthorization from Alcatel-Lucent.
BLANK PAGE BREAK
2 / 84 3BK 17430 3135 RJZZA Ed.03
Contents
Contents
Preface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
1 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71.1 Presentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
1.1.1 Hardware Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81.1.2 Cases . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 101.1.3 Options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 101.1.4 Initial State . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 101.1.5 Final State . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 101.1.6 Restrictions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 101.1.7 Grouped Task Sequence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
1.2 Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 121.2.1 Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 121.2.2 Site-Specific Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
1.3 Scheduling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 131.4 Resources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
1.4.1 Tools . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 141.4.2 Forms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 171.4.3 Supplies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 171.4.4 Applicable Documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
2 Install 9100 Compact BTS Indoor/Outdoor Evolution . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 192.1 Before Going On Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 202.2 Before You Start . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
2.2.1 Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 202.2.2 Required Knowledge . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
2.3 Delivery and Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 212.4 Rack Transportation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
2.4.1 Crane Transportation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 232.4.2 Manual Transportation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
2.5 Rack Positioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 282.5.1 C1: Case of Steel Construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 282.5.2 C2: Case of Concrete Foundation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 312.5.3 C3: Case of Wall Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 352.5.4 C4: Case of Pole Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
2.6 Power Supply and Earth Cables Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 502.6.1 Installation of Cables in the Site Cable Way . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 512.6.2 Protective Earth Cable Connection (GND) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 522.6.3 Power Cables Connection for AC Variant . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 542.6.4 Power Cables Connection for DC Variant . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 562.6.5 Fit the Mains In Cover . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
2.7 PCM Cables Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 602.7.1 Install the PCM Cables in the Cables Way . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 602.7.2 Cables Passing at Rack Side . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 612.7.3 Cables Connection at Rack Side . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 632.7.4 Other Connection Possibilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67
2.8 Antenna Jumpers Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 702.8.1 Jumper Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 702.8.2 Connection to the Rack . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 712.8.3 Connection to the Feeders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72
2.9 Options Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 742.9.1 Alarm Cables Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 742.9.2 Synchronization Cables Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78
2.10 Finish Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 812.10.1 Label the Rack . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81
3BK 17430 3135 RJZZA Ed.03 3 / 84
Contents
2.10.2 Close the Cable Entry . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 812.10.3 Leave the Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82
2.11 OUTC Layout . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83
4 / 84 3BK 17430 3135 RJZZA Ed.03
Preface
Preface
Purpose This document describes how to install on site an 9100 Compact BTSIndoor/Outdoor Evolution (CBIE/CBOE) of Alcatel-Lucent BSS.
What’s New In Edition 03The following section were updated:
Site-Specific Information (Section 1.2.2)
Installation Kits (Section 1.4.1.2).
Connection of Optical Fiber PCM cable (Section 2.7.4.3) was added.
In Edition 02Update for indoor applicability.
In Edition 01First official release of the document.
Audience This document is intended for:
Installers
Site administrators
Supervisors
Project managers
Field service technicians
Occasional users.
Assumed Knowledge You must have a basic understanding of the following:
Basic knowledge of Alcatel-Lucent BSS equipment
Experience of electrical mounting and cabling.
3BK 17430 3135 RJZZA Ed.03 5 / 84
Preface
6 / 84 3BK 17430 3135 RJZZA Ed.03
1 Overview
1 Overview
This section provides general information about the principle of the operationand requirements for the procedure.
3BK 17430 3135 RJZZA Ed.03 7 / 84
1 Overview
1.1 Presentation
1.1.1 Hardware Description
1.1.1.1 Rack ConfigurationThe following figure shows the rack configuration for the 9100 Compact BTSIndoor/Outdoor Evolution installation with an AC variant.
AC Power Supply
FANU
SU
MA
AG
X
AG
X
TRM
TRM
System Cooling Fan
SR1 SR2 DACHEATER
+
+RECTIFIER
Cooling SystemAir Inlet
Heater
Figure 1: Example of 9100 Compact BTS Indoor/Outdoor Evolution(CBIE/CBOE) AC Variant 2 Sectors with 1 or 2 TRX
8 / 84 3BK 17430 3135 RJZZA Ed.03
1 Overview
The following figure shows the rack configuration for the 9100 Compact BTSIndoor/Out door Evolution installation with a DC variant.
DC DistributionUnit
SR1SR2DAC
HEATER
FANU
SU
MA
AG
X
AG
X
TRM
TRM
System Cooling Fan
Heater
Cooling SystemAir Inlet
Figure 2: Example of 9100 Compact BTS Indoor/Outdoor Evolution(CBIE/CBOE) DC Variant 2 Sectors with 1 or 2 TRX
3BK 17430 3135 RJZZA Ed.03 9 / 84
1 Overview
1.1.1.2 Weight and DimensionsThe following table gives the overall dimensions with roof overlapping.
Dimensions (mm) Average weight (kg)
CBIE/CBOE H= 900
W= 370
D= 500
35 empty cabinet
70 equipped cabinet
1.1.2 Cases
The following cases apply:
C1: Case of steel construction installation
C2: Case of concrete foundation hollow base
C3: Case of wall installation
C4: Case of pole installation.
1.1.3 Options
The following additional equipment can be installed:
Alarm cables
Synchronization cables.
1.1.4 Initial State
To begin installation the following materials are delivered and packed on site:
Rack
Installation Kits
Additional Equipment.
1.1.5 Final State
After installation:
Rack is fixed to the floor
Subracks are switched OFF
Equipment is ready for commissioning.
1.1.6 Restrictions
None.
10 / 84 3BK 17430 3135 RJZZA Ed.03
1 Overview
1.1.7 Grouped Task Sequence
Before going on site
Rack transportation
Power supply and Earth cables installation
PCM cables installation
Antenna jumpers installation
Options installation
Finish installation
Before you start
Delivery and checks
Rack positioning
3BK 17430 3135 RJZZA Ed.03 11 / 84
1 Overview
1.2 Preparation
1.2.1 Prerequisites
Before to begin installation check that:
The site is conform to safety rules of General Wiring Handbook
The site is ready to receive the rack, according to the SPP 67
The equipment is delivered on site with associated installation kits.
Note: The site feeders are not mandatory installed before starting of operation.
1.2.2 Site-Specific Information
These information are necessary to start installation:
Address and access to the site (key holder)
Grounding plate location
Customer power supply cabinet location
Fuse breakers location in customer power supply cabinet
Antenna feeders connection and information (if needed)
Rack precise location
Final configuration to be installed
Number of alarms to be connected (if the case)
Alarm terminal blocks location
Type of rack to be installed
Type of power supply, AC or DC
Type of rack fixation (steel construction or concrete construction)
PCM connection type (terminal blocks)
Abis transmission type (electrical or optical)
In case of electrical, PCM cable impedance (120-ohm or 75-ohm)
Synchronization configuration (if the case)
Optional equipment to be installed.
12 / 84 3BK 17430 3135 RJZZA Ed.03
1 Overview
1.3 Scheduling
In order to avoid safety problem on site, the equipment must be installedby a team of 2 installers minimum.
The following table gives the duration for the basic tasks.
Task Duration1st personin mn
Duration2nd personin mn
Before Going On Site 20 20
Before You Start 30 30
Delivery and Checks 20 20
Rack Transportation (1) - -
Rack Positioning (Section 2.5) 20 20
Power Supply and Earth Cables Installation 20 20
PCM Cables Installation 20 -
Antenna Jumpers Installation 20 20
Finish Installation 10 10
Total without optional tasks 160 140
(1) : Transportation time to final location depending of the site. Mandatory 2 peoplefor manual transport of disassembled equipment.
The following table gives the duration for the optional tasks and additionalequipment installation.
Optional Tasks Duration1st personin mn
Duration2nd personin mn
Alarm Cables Installation 15 -
Synchronization Cables Installation - 30
3BK 17430 3135 RJZZA Ed.03 13 / 84
1 Overview
1.4 Resources
1.4.1 Tools
1.4.1.1 Hardware ToolsThe following table is used to check, at base, the availability of the requiredtools.
Refer to Tools Catalogue for content checking.
Name Reference Calibration
Basic set of tools OUT 001 No
Tightening tool for antenna jumpers 3BK 25050 AA OUT 003 No
BTS Outdoor specific tools OUT 007 No
Dynamometric tools OUT 011 Yes
1.4.1.2 Installation KitsThe following table is used to check, on site, the mandatory or optional deliveryitem kits.
The used symbols are:
◊ = mandatory kit
# = technical choice kit
∇ = customer option kit.
Kits Mnemo Reference Qty
◊ Basic kit CBIE/CBOE 3BK 26431 ABAA 1
# Wall mounting kit for CBIE/CBOE 3BK 28943 AAAA 1/if neede
# Floor mounting kit for CBIE/CBOE 3BK 28944 AAAA 1/if neede
# Pole mounting kit for CBIE/CBOE 3BK 28945 AAAA 1/if neede
# Transportation bolts 1AD 09973 0001 4/installationteam
# Antenna jumper cable (1m) BLF1 3BK 05360 BAAA 2/AN
# Antenna jumper cable (2m) BLF2 3BK 05360 CAAA 2/AN
# Antenna jumper cable (3m) BLF3 3BK 05360 DAAA 2/AN
# 120-ohm PCM cable (8 pairs L907/4) CA120S8 3BK 08965 AAAA
3BK 08965 ABAA
100 m roll
250 m roll
14 / 84 3BK 17430 3135 RJZZA Ed.03
1 Overview
Kits Mnemo Reference Qty
# 75-ohm PCM Cable (8 coax FLEX3/8) CACOAX8 3BK 25241 AAAA
3BK 25241 ABAA
100 m roll
250 m roll
◊ GND Yellow/Green cable 1 x 16 mm2 PC25YG1D 3BK 08957 BAAA
3BK 08957 BBAA
100 m roll
250 m roll
◊ AC 230 Volts power cable 3 x 1.5 mm2 PC05B5 3BK 08938 AAAA reel
# DC -48V power cable 1x 10 mm2 blue PC16BL1D 3BK 26923 AAAA
3BK 26923 ABAA
100 m roll
250 m roll
# DC 0V power cable 1x 10 mm2 black PC16B1D 3BK 08937 BAAA
3BK 08937 BBAA
100 m roll
250 m roll
∇ Clock Synchronization cable (10 m) OCC33 3BK 08304 AA 1
∇ Clock Synchronization cable (10 m) OCC23 3BK 08303 AA 2
∇ Alarm cable 8 pairs (L907/4) CA120S8 3BK 08965 AAAA
3BK 08965 ABAA
100 m roll
250 m roll
∇ Mechanical part for 24 terminal blocks MP24 1AD 02843 0001 1
∇ Labels for 24 terminal blocks LAB 1AD 02853 0001 1
∇ CAD Terminal block JS10 1AB 06634 0011 4
∇ DDF wall fixation kit FKW 1AD 02844 0002 1
∇ DDF rack fixation kit FKR 1AD 02845 0001 1
# 120-ohm jumper for DDF (1 pair L904/1) CA120S 3BK 08941 AAAA
3BK 08941 ABAA
100 m roll
250 m roll
# 75-ohm jumper for DDF (1 coax FLEX3) CACOAX1 3BK 08939 AAAA
3BK 08939 ABAA
100 m roll
250 m roll
∇ Terminal block 75 Ohm 8 BNC connectors 1AD 03371 0009 For BNC links
∇ Terminal block 75 Ohm for 1.6-5.6 connectors 1AD 03371 0010 For 1.6-5.6 links
∇ BNCm connector for Flex 3 1AB 00642 0011 2/jumper cableFlex 3
∇ 1.6-5.6 connector for Flex 3 1AB 02546 0013 2/jumper cableFlex 3
∇ Specific heat shrinking sheat for Flex 3 ST75 1AC 00330 0002 8/CBIE/CBOE
◊ Shims for levelling (1 Set for 10 racks) 3BK 26159 AAAA 1/10CBIE/CBOE
3BK 17430 3135 RJZZA Ed.03 15 / 84
1 Overview
Kits Mnemo Reference Qty
∇ Cable Optical fiber LC-LC 2SM 15m 849122239
∇ Cable Optical fiber LC-LC 2SM 30m 849125380
∇ Cable Optical fiber LC-LC 2SM 50m 849122247
∇ Cable Optical fiber LC-LC 2SM 70m 849123591
∇ Cable Optical fiber LC-LC 2SM 85m 849125398
∇ Cable Optical fiber LC-LC 2SM 100m 849123609
∇ Cable Optical fiber LC-LC 2SM 150m 849125406
∇ Cable Optical fiber LC-LC 2SM 200m 849125414
∇ Cable Optical fiber LC-LC 2SM 250m 849125422
∇ Cable Optical fiber LC-LC 2SM 300m 849125430
∇ Cable Optical fiber LC-LC 2MM 5m 849125513
∇ Cable Optical fiber LC-LC 2MM 15m 849122270
∇ Cable Optical fiber LC-LC 2MM 30m 849125521
∇ Cable Optical fiber LC-LC 2MM 50m 849122288
∇ Cable Optical fiber LC-LC 2MM 70m 849123633
∇ Cable Optical fiber LC-LC 2MM 85m 849125539
∇ Cable Optical fiber LC-LC 2MM 100m 849123641
∇ Cable Optical fiber LC-LC 2MM 150m 849125547
∇ Cable Optical fiber LC-LC 2MM 200m 849125554
∇ Cable Optical fiber LC-LC 2MM 250m 849125562
∇ Cable Optical fiber LC-LC 2MM 300m 849125570
∇ SFP MOD 1000BASE-LX10 1AB 18728 0029
∇ SFP MOD S-16.1 1AB 19467 0019
∇ SFP MOD S-16.1 1AB 19467 0018
∇ SFP MOD 1000BASE-SX 1AB 18728 0063
∇ SFP MOD I-16.1 1AB 18728 0064
∇ SFP MOD S-16.1 1AB 18728 0065
∇ SFP MOD L-16.1 1AB 18728 0066
16 / 84 3BK 17430 3135 RJZZA Ed.03
1 Overview
1.4.2 Forms
You must have the following forms:
BSS Site Premises Inspection Form (post handover)8BL 00704 0016 DRBRA
Site Premises Inspection Form (CEL)8BL 00704 0015 DRBRA
1.4.3 Supplies
Installer or subcontractor must supply:
One set of sleeves to fit at each end of cables (PCM, Alarm, Power, ...)
One set of screws, nuts and washers to connect power cables to Site
Power Box and to Earth Plate
One set of terminal lugs for power cables.
1.4.4 Applicable Documents
You need the following GSM documents to complete this scenario:
Applicable Notification List (3DF 00462 0004 AAAGA)
Catalogue of Instruction Operation for GSM (3DF 00300 0004 UAZZA)
IO 78 - 9100 BTS Radio Configurations for Antenna Supervision (3DF00300 0078 UAZZA)
Tools Catalogue for field activity for GSM (3BK 20458 0001 RJZZA)
BSS Methods Handbook (3BK 17430 0002 RJZZA)
Installation Manual Generic Completion Check List for GSM (3BK 172000002 QZZZA)
General Wiring handbook for GSM (3BK 17160 0001 RJZZA)
Installation Method of DDF for BSS Equipment (3DF 00435 0033 RJZZA)
9100 BTS Hardware Description (3BK 21242 AAAA TQZZA)
Site Premise Inspection Form (8BL 00704 0015 DRBRA)
Site Preparation Specifications 9100 Compact BTS Outdoor Evolution
(CBOE)8BL 00704 0084 DRZZA
Site Preparation Specifications 9100 Compact BTS Indoor Evolution (CBIE)8BL 00704 0086 DRZZA
3BK 17430 3135 RJZZA Ed.03 17 / 84
1 Overview
18 / 84 3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
Install 9100 Compact BTS Indoor/Outdoor Evolution section presents all thechecks needed before starting the installation, and all detailed tasks to beperformed on site.
3BK 17430 3135 RJZZA Ed.03 19 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.1 Before Going On SiteBefore going on site, you must check that the following information and suppliesare available:
The customer has been informed of the:
Date and time
Site name and address
Purpose of the operation.
All Prerequisites (Section 1.2.1) are fulfilled
Personnel is available and ready for operation (see Scheduling (Section 1.3))
Site-Specific Information (Section 1.2.2) is available and ready for operation
All Hardware Tools (Section 1.4.1.1) and Supplies (Section 1.4.3) are
available and ready for operation
Applicable Documents (Section 1.4.4) are available.
2.2 Before You Start
2.2.1 Checks
On arrival at site, before you start, perform the following operations:
Check that all Prerequisites (Section 1.2.1) are fulfilled
Check applicable notifications and operating instructions (refer to Catalogueof Technical and Logistic Information (ITL-PRO) and Catalogue of Instruction
Operation (IO))
Check that all Hardware Tools (Section 1.4.1.1) and Supplies (Section 1.4.3)are available and ready for operation
Check that safety precautions have been taken in accordance with the
safety instructions described in the General Wiring Handbook
Check if any Cases (Section 1.1.2) and Options (Section 1.1.3) apply
Complete the header field of the CCL
Complete the Site Premises Inspection Form (CEL)
Check that the resistance of the antistatic wrist strap is greater than 1M .Connect the anti-static wrist strap to the rack earth.
20 / 84 3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.2.2 Required Knowledge
You must be familiar with the following:
The safety rules and precautions given in the General Wiring Handbook
How to document faults and anomalies, as described in the BSS MethodsHandbook
How to complete the Site Premises Inspection Form (CEL).
2.3 Delivery and Checks
For personal and equipment safety, it is important that:
During any kind of transportation the door must be closed
At door open the door restrainer must be latched.
HL
1,20 0,601,20
P
AR
AV
430
H
Baie N°3Az 320°
G2_SBTS
_O_120 P
L
3 4
1 2
1. Unpack the equipment
2. Check the delivery and report any damage to the carrier delivery note
3BK 17430 3135 RJZZA Ed.03 21 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
3. Report on CCL:
Factory serial number
Cabinet serial number
4. Identify the final location of the rack.
22 / 84 3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.4 Rack Transportation
2.4.1 Crane Transportation
Do not try to lift the cabinet by the roof with crane hooks!The roof must be dismantled in order to lift the cabinet with eyebolts.
2.4.1.1 Dismantle the RoofTo prepare the rack:
1. Remove the screws fixing the roof
2. Push the roof to the back
3. Lift the roof and remove it.
3BK 17430 3135 RJZZA Ed.03 23 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.4.1.2 Crane Transportation
Nr Materials Reference Kit
1 Crane transportation bolts 1AD 09973 0001 -
Crane transportation:
1. At the top of the BTS remove the screws (1) (See Figure 3 )
Do not remove the rail (2), it is used during crane transportation.
1
2
Figure 3: Eyebolt Screwing Position
2. Attach the four eyebolts ( inner diameter: 26 mm, thickness :16 mm) tothe rack.
Figure 4: Eyebolts
24 / 84 3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
12345678901234567890
Figure 5: Crane Transportation
For craning the rack:
3. Check that direction of pull [alpha] = minimum 60�. The choice of straps(slings), hooks and crane are under responsibility of subcontractor (SeeFigure 5 ).
4. After reaching the final position disconnect the straps and replace theeyebolts with the screws (1). Do not remove the rail (2) (See Figure 3 ).
2.4.1.3 Close the RoofTo close the roof:
1. Put the roof on the top of the BTS.
3BK 17430 3135 RJZZA Ed.03 25 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2. Make sure the guiding pins are in the foreseen holes.
3. Pull the roof to the front.
4. Fix the roof with the screws
H 13
26 / 84 3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.4.2 Manual Transportation
Cabinet can be lifted and carried manually at top hood along its reinforcedside edges.
Cabinet must not be lifted at top hood front and back edge!
Figure 6: Manual Transportation With Straps
Figure 7: Manual Transportation Using the Handles
Figure 8: With Pallet Handling
3BK 17430 3135 RJZZA Ed.03 27 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.5 Rack Positioning
2.5.1 C1: Case of Steel Construction
Nr Materials Reference Kit
1 Screw HM10 x 30 1AD 00050 0048
2 Spring washer M10 1AD 00507 0014
3 Plain washer M10 1AD 0087 0120
4 Nut HM10 1AD 0019 70046
Floor mounting kit
3BK 28944 AAAA
5 Shims for leveling 1-2 mm thick 3BK 26159 AAAA SHIMS
To fix the rack on steel construction:
1. Drill the steel construction. Holes must be positioned as described inthe following figure.
481
mm
260 mm
337 mm
Front
Back
Figure 9: Drilling Scheme
28 / 84 3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2. Position the rack on the steel construction.
3BK 17430 3135 RJZZA Ed.03 29 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
3. Fix the rack to the steel construction (1, 2, 3, 4 of Figure 10 ). Do nottighten the screws.
123123
1
2
3
4
Figure 10: Fix the Rack
In case of uneven steel construction, check and correct if necessary theantiparallelism between front and back of BTS. It is important that there is nodifference in the slope angles that can twist the rack.
4. If necessary insert shims under the CBIE/CBOE support the rack weight.
5. Tighten the screws to fix the rack.
30 / 84 3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.5.2 C2: Case of Concrete Foundation
Nr Materials Reference Kit
1 Screw HM10 x 30 1AD 00050 0048
2 Nut HM10 1AD 00197 0046
3 Plain washer M10 1AD 00087 0120
4 Spring washer M10 1AD 00507 0014
5 Screw HM10 x 70 1AD 00050 0050
6 CBIE/CBOE profile steel -
Floor mounting kit
3BK 28944 AAAA
7 Shims for leveling 1-2 mm thick 3BK 26159 AAAA SHIMS
To fix the rack on concrete floor:
1. Mark on the floor the position of the fixing points as shown in the followingfigure.
3BK 17430 3135 RJZZA Ed.03 31 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2. Drill the fixing holes (4 holes) (See Figure 11 )
75 mm
13 mm
Figure 11: Holes Specifications
3. Place the profile steel on the concrete floor.
4. Using the M10 screws fix the steel profile to the ground.
32 / 84 3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
5. Place the rack on the steel profiles and align the fixing holes.
6. Fix the rack to the steel profiles. Do not tighten the screws.
123123
1
2
3
4
Figure 12: Fix the Rack
In case of uneven steel construction, check and correct if necessary theantiparallelism between front and back of BTS. It is important that there is nodifference in the slope angles that can twist the cabinet.
7. If necessary insert shims under the CBIE/CBOE to support the rack weight.
3BK 17430 3135 RJZZA Ed.03 33 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
8. Tighten the fixing screws.
34 / 84 3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.5.3 C3: Case of Wall Installation
Nr Materials Reference Kit
1 Screw HM10 x 70 1AD 00050 0050
Expansion plug M10 x 60 1AD 02655 0001
2 Screw HM8 x 20 1AD 00050 0044
3 Plain washer M8 1AD 00087 0126
4 Spring washer M8 1AD 00507 0025
5 Screw M10 x 30 1AD 00050 0048
6 Spring washer M10 1AD 00507 0014
7 Plain washer M10 1AD 00087 0120
8 Nut HM10 1AD 00197 0046
9 90 � support 2
10 Straight support 2
11 Wall support 1
12 Cabinet support 1
13 CBIE/CBOE wall drilling template 1
Wall mounting kit
3BK 28943 AAAA
To keep mounting reliability of the rack, the wall to be fixed must be concretewall.
3BK 17430 3135 RJZZA Ed.03 35 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
1. Use the following drawing to mark the position of the fixation holes onthe wall.
36 / 84 3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2. Check that the holes are distributed as described in the following figure.
3. Drill the holes.
3BK 17430 3135 RJZZA Ed.03 37 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
4. Identify the component parts of the support. Two pieces of each part areneeded to build the support.
5. Build up the support by connecting the parts using the screws, nuts andwashers.
38 / 84 3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
6. Install the bracket on the rack left side wall, upper part.
7. Install the other bracket on the wall and fix it using three upper holes.
3BK 17430 3135 RJZZA Ed.03 39 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
8. Install the support components on the wall and fix it with the provided screws.
9. Lift the rack and place it on the supports.
10. Remove the roof.
40 / 84 3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
11. Fix the rack to the support, upper part.
12. Fix the rack to the support, lower part.
3BK 17430 3135 RJZZA Ed.03 41 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
13. Install the roof.
42 / 84 3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.5.4 C4: Case of Pole Installation
Nr Materials Reference Kit
1 Screw HM10 x 280 1AD 11792 0001
2 Screw HM8 x 20 1AD 00050 0044
3 Plain washer M8 1AD 00087 0126
4 Spring washer M8 1AD 00507 0025
5 Screw M10 x 30 1AD 00050 0048
6 Spring washer M10 1AD 00507 0014
7 Plain washer M10 1AD 00087 0120
8 Nut HM10 1AD 00197 0046
9 90 � support -
10 Straight support -
11 Pole support -
12 Cabinet support -
13 Fixation bracket -
Pole mounting kit
3BK 28945 AAAA
3BK 17430 3135 RJZZA Ed.03 43 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
To install the CBIE/CBOE rack on a pole:
1. Identify the items used for pole fixation. Six brackets are delivered.
Figure 13: Pole Fixation Bracket
2. Attach the upper mounting plate to one bracket.
3. On the pole mark the position for the fixation brackets.
4. Install the upper mounting plate on the pole.
Use a torque of 47 Nm when tightening the support to the pole.
44 / 84 3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
5. Identify the component parts of the support. Two 90� supports and fourstraight supports are needed to build the support.
6. Build up the support by connecting the parts using the screws, nuts andwashers.
Help: Use items 5, 6, 7 and 8 from materials table to connect the supportcomponents.
3BK 17430 3135 RJZZA Ed.03 45 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
7. Attach two brackets on the support.
46 / 84 3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
8. Install the lower support on the pole.
Use a torque of 47 Nm when tightening the support to the pole.
3BK 17430 3135 RJZZA Ed.03 47 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
9. Install the bracket on the rack left side wall, upper part.
Help: Use items 2, 3 and 4 from materials table to fix the bracket.
48 / 84 3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
10. Lift the rack on the lower support and attach it to the support with theprovided screws, nuts and washers.
11. Fix the rack to the upper mounting plate using the provided screws, nutsand washers.
3BK 17430 3135 RJZZA Ed.03 49 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.6 Power Supply and Earth Cables InstallationThis section describes the procedure to :
Install cables in the cable tray
Connect protective Earth cable
Connect 230 volts mains power supply cables for AC variant
Connect 48 volts mains power supply cables for DC variant
Test the power supply installation.
Before making any electrical connections to the rack, ensure that thesafety instructions are applied:
The electrical power supply is disconnected. Ensure all switches or fuses
devoted to the new RACK into the site connection box are powered OFF.
Due to high leakage current, the protective EARTH must be connected tothe equipment before AC power cable connection.
The terminals of the wires, for all the conductive cables (AC, DC andground) are well tightened, this is very important to avoid damageof the equipment.
50 / 84 3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.6.1 Installation of Cables in the Site Cable Way
Nr Material Reference Kit
1 Tie wraps 1AD 00414 0006 Basic kit
2 GND cable Y/G in 100m roll
GND cable Y/G in 250m roll
3BK 08957 BAAA
3BK 08957 BBAA
-
3 AC 230V power cable 3BK 08938 AAAA -
1 2
1m
34
5 6
To install the cables in the cable way:
1. Install Yellow / green cable in power compartment of cable tray (lug atBTS side)
2. Install power cables in power compartment of cable tray
3. Attach cables with plastic tie wraps
4. Cut the cables at good length
5. Fit a lug on earth cable at site side
6. Connect the earth cable at the site earth plate.
3BK 17430 3135 RJZZA Ed.03 51 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.6.2 Protective Earth Cable Connection (GND)
Nr Material Reference Kit
1 Lug ring crimp 1AB 03205 0060 Basic kit
2 Tie wraps 1AD 00414 0006 Basic kit
To install the protective earth cable:
1. Crimp a [empty ] 8 terminal lug at RACK side and crimp an adapted lug atsite extremity of GND cable
2. Make a label and connect the GND cable to the site earth plate (ExampleBTS 3 of site)
BTS 3
52 / 84 3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
3. Remove the screws fixing the cable entry cover plate (A) then removethe cover plate.
Cover Plate for Cable Entry
4. Connect earth cable to the grounding stud (8mm).
3BK 17430 3135 RJZZA Ed.03 53 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.6.3 Power Cables Connection for AC Variant
2.6.3.1 AC 230V Mains Power Supply Connection
Nr Material Reference Kit
1 Wire terminal 1AB 05067 0005
2 Tie wraps 1AD 00414 0006
Basic kit
To connect the wires:
1. Cut the cable at the good length.
2. Put a shrink sleeve at each end of cable.
3. Fit a wire terminal on each wire of the cable.
Figure 14: Fit the Wire Terminals
4. Pass the cable through the grommet in the AC Mains In protection cover.
5. Connect the wires to the connectors on the LPFC ( begin with thegreen/yellow wire).
Do not fit back yet the cover, because you have to check the voltage first !
Figure 15: Connect the AC Cable to the Equipment
6. Connect the AC mains cable to the site power supply box.
54 / 84 3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.6.3.2 AC Power Supply Testing
N P
AC230V
N P
N P
V
N P
V
7
65
43
21
To test the power supply:
1. At site power cabinet: check if 230 V fuse breakers are switched OFF.
2. At rack side: using an ohmmeter, check that there is no short circuit betweenphase and neutral.
3. At rack side: do the same test between protective earth (green / yellowwire) and each 230 V wire.
4. At site power cabinet: switch ON the 230 V fuse breakers.
5. At rack side: check that the 230 V voltage between phase and neutral ispresent.
6. At rack side: using phase tester, check that the phase wire is connectedat good connection point.
7. At site power cabinet: switch OFF the fuse breakers.
3BK 17430 3135 RJZZA Ed.03 55 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.6.4 Power Cables Connection for DC Variant
2.6.4.1 DC Power Supply Connection
Nr Material Reference Kit
1 Lug, hole 6 mm for 10 mm2 GND cable 1AB 032050022 Basic kit
To connect the DC power supply:
1. Prepare the head of the DC cable.
16mm
2. Put a shrink sleeve at the end of each cable.
3. Fit wire terminal at the end of each wire.
6
4. Run the -48 V DC power cable through the hole in the rubber protective cap,connect it to the DC In filter and attach it to the rack using cable ties.
56 / 84 3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
5. Connect the 0V DC cable to the M6 grounding bolt and attach it to therack using cable ties.
6. Connect and label the DC mains cable to the primary DC power supply.
BTS
(x)
3BK 17430 3135 RJZZA Ed.03 57 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.6.4.2 DC Power Supply Testing
DC− 48V
0V − 48V
0V − 48V
V
1 2
3 4
5 6
To test the DC power supply:
1. At side power cabinet, check if fuse breakers are switched OFF.
2. At rack side, using a multimeter, check if there is no short-circuit between-48V filter and 0V stud.
3. At side power cabinet, switch ON the fuse breakers.
4. At rack side, verify if the voltage between -48V filter and 0V stud is about -48Volts DC nominal. Check carefully the polarity.
5. At site power cabinet, switch OFF the fuse breakers.
6. At rack side, using a multimeter, verify if the -48V is switched OFF. Fit therubber cap to the -48V terminal.
58 / 84 3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.6.5 Fit the Mains In Cover
To fit the cover:
1. Place the cover at the good position.
2. Fix the cover with the screws (See Figure 16 ).
3. Attach the cables to the cable way using cable ties and allow sufficient lengthof wires to avoid traction at terminals.
Figure 16: Fit the Mains In Cover
3BK 17430 3135 RJZZA Ed.03 59 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.7 PCM Cables InstallationThis chapter describes the procedure to:
Install PCM cables in site cable tray
Connect PCM cables to the rack.
2.7.1 Install the PCM Cables in the Cables Way
Nr Material Reference Kit
1 Label 3BK 08062 ADAA
2 Tie wraps 1AD 00414 0006
Basic kit
3 PCM cable L907/4 (120 ohm) 100 m roll
PCM cable L907/4 (120 ohm) 250 m roll or
FLEX 3/8 (75 ohm) 100 m roll
FLEX 3/8 (75 ohm) 250 m roll
3BK 08965 AAAA
3BK 08965 ABAA
3BK 25241 AAAA
3BK 25241 ABAA
Installation kit
1m
Abis 1
Abis 2
1 2
3 4
5
To install the cables in the cable way:
1. Install cables in PCM compartment of cable tray.
2. Attach cables with plastic tie wraps.
3. Mark cables with a marker.
4. Cut cables at good length.
5. Label cable with supplied labels.
60 / 84 3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.7.2 Cables Passing at Rack Side
To pass the cables at rack side:
1. Strip the cable at cable gland level.
2. Pass the cables through the cable gland and attach them to the rack.
3. Tighten the gland on the cable.
15 mm
15 mm
1 2
3BK 17430 3135 RJZZA Ed.03 61 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
4. Identify the Abis connectors on OUTC board.
Abis KRONE(inserting)
Abis (screwing)
4
5
5. Pass the cables toward the OUTC board.
62 / 84 3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.7.3 Cables Connection at Rack Side
During installation it is mandatory to use the right tool for each terminal block.
The references for the insertion tools are:
1AD 03221 0001 for Krone
1AD 01604 0001 for Nexans.
2.7.3.1 Case of L907/ 4 - 120 Ohm CableThe following figure shows the L907/4 cable structure.
Quad 1grey/white purple/blue
Quad 4 Quad 2
Quad 3grey/blackpurple/red
grey/green
purple/white grey/yellow
purple/brown
Figure 17: L907/4 Cable
The following table gives the wires color, connecting position and signal.
Color KRONE connector Signal
white
grey
8
8
Abis1/TX
Abis1/TX
Quad 1
(output high level signal goingtoward BSC)
blue
violet
6
6
Abis2/TX
Abis2/TX
3BK 17430 3135 RJZZA Ed.03 63 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
Color KRONE connector Signal
yellow
grey
7
7
Abis1/RX
Abis1/RX
Quad 2
(input low level signal comingfrom BSC)
brown
violet
5
5
Abis2/RX
Abis2/RX
Quad 3 & 4 not used
Table 1: Wires Color, Position and Signals
150 mm
Sleeve
1 2
3 4
5 6
87
65
4
RX
TX
RX
TX 8
1
32
18
RX
TX
RX
TX 8
1
1
OUTC
To connect the L907/4 cable:
1. Remove the PCM lightening protection from KRONE connector of OUTCboard
2. Prepare head of L907/4 cable
3. Fit a sleeve to end of cable
4. Insert the L 907/4 wires using mandatory KRONE original tool
5. Fit the lightening protection to the KRONE connector
6. Squeeze the cable braid in the metallic clamp.
64 / 84 3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.7.3.2 Case of FLEX3/8 - 75 Ohm Coaxial CableThe following table gives the wires connecting position and signal.
Coaxial KRONE connector
1 Abis 1 (TX) 8 -braid
8 -inner conductor
2 Abis 1 (RX) 7 - braid
7 - inner conductor
3 Abis 2 (TX) 6 - braid
6 - inner conductor
4 Abis 2 (RX) 5 - braid
5 - inner conductor
50 mm
1234
1
1
10 mm
AB
IS3
AB
IS4
11
TX
R
XT
X
RX
88
1 2
3 4
5 6
1. Remove the PCM lightening protection from KRONE connector of OUTCboard
3BK 17430 3135 RJZZA Ed.03 65 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2. Using Hot Air Blower, fit the Heat Shrink Sleeve 1AC 00330 0002 on eachcoaxial. Fit a rubber sleeve on head of cable
3. Insert the 75-ohm coaxial using original KRONE tool
4. Connect wire bridge for used ports on OUTC ABIS green connectors asfollows:
Wire bridge from pin 1 to pin 2
Wire bridge from pin 4 to pin 5
Wire bridge from pin 6 to pin 7
Ports assignment is 1 and 2 for GSM (3 and 4 are not used).
5. Fit the lightening protection to the KRONE connector.
6. Fit two SP2M 75-ohm adapter at PCM sub-D port ABIS1 and ABIS2 onOUTC board.
The following figure shows an example of 75-ohm cabling.
12
34
56
78
8 coaxial cable
RX
RX
RX
RX
TX
TX
TX
TX
RX
TX 87
TX coax.
Core
TX
Figure 18: FLEX 3/8 Connection
66 / 84 3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.7.4 Other Connection Possibilities
2.7.4.1 Connection of Other 120 Ohm Cables
AB
IS1
AB
IS2
11
TX
R
XT
X
RX
88
Figure 19: Example of OUTC Screwing Connectors
If cables are not supplied by Alcatel-Lucent, then the wires must have rightspecifications for inserting in the KRONE connector. If not, the wires have to beconnected to the green screwing connectors of OUTC board ( Figure 19 ).
The 3 jumpers must be removed from the connectors (they are used only for75-Ohm connection).
1 GND braid earthing clamp
2 TX
3 TX
BTS output signal going
toward BSC
4 GND drain wires
5 RX
6 RX
BTS input signal coming
from BSC
7 R200 (not used)
8 GND braid earthing clamp
3BK 17430 3135 RJZZA Ed.03 67 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.7.4.2 Connection of Other 75 Ohm Coaxial Cables
50 mm
10 mm123123123123
12
34
56
7
123123
1234561234561234561123456112345671212345671234567812341234
12345123451234 123123 12123 112312345123451 1234512123456123456712345
123451231231234 12123 1123123
1 2
To connect the cables:
1. Prepare the head of cables
2. Connect the wires to the terminals and mount the earthing clamp.
Coaxial Connector Pin Remarks
1 Abis 1 (TX) 2 - braid
3 - inner conductor
2 Abis 1 (RX) 5 - braid
6 - inner conductor
3 Abis 2 (TX) 2 - braid
3 - inner conductor
4 Abis 2 (RX) 5 - braid
6 - inner conductor
For each connector :
- wire bridge from pin 1 to pin 2
- wire bridge from pin 4 to pin 5
- wire bridge from pin 6 to pin 7
68 / 84 3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.7.4.3 Connection of Optical Fiber PCM cableThe section applies only for the optical transmission on Abis.
The following table lists the items required to complete the task.
Description Reference Kit
Cable Optical fiber LC-LC 2SM 15m * 849122239 -
Cable Optical fiber LC-LC 2MM 5m * 849125513 -
SFP transceiver * 1AB 18728 0029 -
* : Refer to Installation Kits (Section 1.4.1.2) for more optical fiber cables and SFP variants
To connect the PCM optical fiber cables:
1. Run the optical fiber cables through the cable gland/cable entry inside thecabinet.
2. Insert a SFP transceiver module in the OPT1 slot (on the GNC daughterboard of the SUMX) and lock it.
3. Remove the protection cover from the SFP transceiver module.
4. Remove the protection caps from the optical fiber connectors.
5. Connect the cables to the OPT1 connector on SUMX.
6. Label the optical fiber cable on the SUMX side.
7. Tighten the cable gland, if applicable.
The PCM optical fiber cables are installed.
3BK 17430 3135 RJZZA Ed.03 69 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.8 Antenna Jumpers Installation
2.8.1 Jumper Installation
Nr Material Reference Kit
1 Labels 3BK 08062 ADAA
2 Tie wraps 1AD 00414 0006
Basic kit
3 Antenna jumper cable 3BK 05360 xAAA Installation kit
For the jumpers type 1AB 18821 0001 (3m) or 1AB 18821 0002 (4m), use thebending tool and follow the instructions from IO 95 (3DF 00300 0095 UAZZA).
Label:
Label:
Ant A
Ant AAnt B
Ant B
230
45
A B A
NORTH
ANT BAZIMUTH
125
SECT: NANT A
CBO
AB BA
A A BB
N PANB ANB
B
Figure 20: Example of Antenna Cabling and Labeling
Figure 21: Label the Antenna Jumpers (Do Not forget the Frequency Labels)
70 / 84 3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.8.2 Connection to the Rack
The antenna connections mapping is done according to the following scheme:
Sector P Ant B
Sector P Ant A
Sector N Ant A
Sector N Ant B
Figure 22: Antenna Mapping
To connect the cables:
1. Ensure that the radius of each cable is at least 3 cm.
2. Refer to Site-Specific Information (Section 1.2.2) for cables connections
3. Connect the cables to the rack (See Figure 23 ).
4. Tighten the screw manually then shake cables a little.
5. Using the tightening tool, tighten with firmness.
6. Use tie wraps to bundle the jumpers together.
Figure 23: Antenna Jumpers Connection
3BK 17430 3135 RJZZA Ed.03 71 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.8.3 Connection to the Feeders
Check that feeders are properly connected to site ground !If the feeders are not labeled, don’t connect the jumpers, but inform thecustomer and fulfill the CCL
Nr Material Reference Kit
1 Vinyl electrical tape 1AC 01556 0001
2 Tie wraps 1AD 00414 0006
3 Rubber splicing tape 1AC 01595 0001
Basic kit
To connect the feeders:
1. Connect the antenna jumpers to the feeders
2. Verify the connectors
3. Screw connector male with connector female
4. Tighten the screw manually then shake cables a little
Figure 24: First Tighten Manually, then Use the Specific Tightening Tool
5. Using specific tightening tool tighten with firmness (“Tools catalogue”)
6. Fit the vinyl electrical tape (1) over the connectors.
Start taping from 30 mm from the connector (jumper side) and go downstretching and overlapping (50%) 30 mm over the connector (1 layer).
You should not see any metal after taping.
7. Fit the rubber splicing tape (3) of Figure 25 over the vinyl electrical tape.
Start taping from 20 mm top of the connector (coaxial cable side) and godown stretching and overlapping (50%) 20 mm over the connector (1 layer).
72 / 84 3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
8. Fit the vinyl electrical tape (1) over the rubber splicing tape.
Start taping from 30 mm from the connector (jumper side) and go downstretching and overlapping (50%) 30 mm over the connector (1 layer).
At the end of taping do not stretch the tape in the last few turns.
9. Secure with tie wraps to avoid tape removing (2) of Figure 25 .
12121231231231231231234512345612345123121234121212 1212 1231212
12312312 1212 1231 1212 12312 12312 123412 12312 123
12 1231234 12311234 1231234 12341234 1231234 123412 12341 123123123
1231234123 121234512345
12312311234 1212345 1212 12312 12312 1212 12312
1212312312 12312 123412 12312 121212 1212312 1212312123412312345123123456712345612345
1234512312312 121
Tie wrap(2)
Rubbersplicing tape (3)
Feeder Jumper
Vinylelectrical tape (1)
Tie wrap(2)
Ground link for feeders
1212312312123456123123412123412 112312 1212 1212 12123 12312 12312 12312 1231 12312 1231234 12311234 1211234 121234 121234 123123 123123 12312
1212121231231234 12312123 121234 1212 1212 12312 123412
121234123412 1231 121 1231212123121212312312341234512345123411212
Figure 25: Water Proof the Connections
3BK 17430 3135 RJZZA Ed.03 73 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.9 Options Installation
2.9.1 Alarm Cables Installation
2.9.1.1 Alarm Cables Passing
Nr Material Reference Kit
1 Tie wraps 1AD 00414 0006 Basic kit
2 Labels 3BK 08062 ADAA Basic kit
3 L907/4 in 100 m roll
L907/4 in 250 m roll
3BK 08965 AAAA
3BK 08965 ABAA
Installation kit
Alarm
Figure 26: Alarm Cable Passing Through the OUTC Board
74 / 84 3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
1m
Alarm
1
15 mm
15 mm
12
3
4
56
To pass the cables:
1. Mark the cables with a marker
2. Install the cables in the special compartment of the cable tray
3. Attach the cables with plastic tie wraps
4. Label the cables with supplied labels
5. Strip the cables at cable gland level
6. Pass the cables trough the cable glands
Use adhesive tie wraps to fix the cable to the side wall.
3BK 17430 3135 RJZZA Ed.03 75 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.9.1.2 Alarm Cables ConnectingTo install the alarm cables:
1. Prepare the end of cable (cut the no-used wires)
5 6
70 mm
2. Label the cable with supplied labels: [Alarm 1]
3. Unscrew and remove the jumpers from X900 external alarm connectoron OUTC
76 / 84 3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
4. Connect the cable to the X900 connector
5. Fix the cable in the earthing clamp.
3BK 17430 3135 RJZZA Ed.03 77 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.9.2 Synchronization Cables Installation
2.9.2.1 Synchronization Cables Passing
Nr Materials Reference Kit
1 Labels 3BK 08062 ADAA Basic kit
2 Tie wrap 1AD 00414 0006 Basic kit
3 Cable for clock synchronization - Installation kit
Alcatel-Lucent 9100 BTS/G2-BTS (10 m) 3BK 08303 AA
Alcatel-Lucent 9100 BTS/Alcatel-Lucent 9100 BTS (10 m) 3BK 08304 AA
XCLK
Figure 27: Synchronization Cable Passing Through the OUTC Board
78 / 84 3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.9.2.2 Compact BTS Indoor/Outdoor Evolution / Alcatel-Lucent G2 BTS Connection
CBOE OUTCXCLC 1 out
Master Slave
CLK inSTSE viaCOB2
G2
CBOEOUTCXCLC 1 in
Master Slave
CLK out MBSR via COB2
G2
59
4
8
3
7
2
6
P1
59
4
8
3
7
2
6
P2
screen
screen
white
brown
green
yellow
grey
pink
blue
red
OUTC COB2
OCC23 3BK 08303 AA
1 2 3 4 5
6 7 8 9
10 m
P1 P2
Figure 28: Compact BTS Indoor/Outdoor / Alcatel-Lucent G2 BTS Synchronization Cable
3BK 17430 3135 RJZZA Ed.03 79 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.9.2.3 Compact BTS Indoor/Outdoor Evolution / MBS GSM Outdoor or 9100 BTSEvolution or 9100 BTS Connection
CBOE OUTC
XCLC 1 out
Master Slave
G3/G4/MBO/CBOE
COAR/OUTC
XCLK 1 in
59
4
8
3
7
2
6
P1
59
4
8
3
7
2
6
P2
screen
screen
white
brown
green
yellow
grey
pink
blue
red
OUTC 1 COAR/OUTC 2
OCC33 3BK 08304 AA
1 2 3 4 5
6 7 8 9
10 m
P1 P2
Figure 29: Compact BTS Indoor/Outdoor Evolution/ 9100 BTS Synchronization Cable
To install the synchronization cables:
1. Choose the good configuration
2. Pass the synchronization cables in the site cable way
3. Label the cables with supplied labels
4. Dismantle SubD 9 connectors (write down the wire colors)
5. Pass the cables through the BTS bottom plate
6. Put back the SubD 9 connectors
7. Connect the cables to the corresponding sockets of connection area
8. Fasten the connectors with knurled screws.
80 / 84 3BK 17430 3135 RJZZA Ed.03
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.10 Finish Installation
2.10.1 Label the Rack
BTS STATION 4
BTS STATION 4
Figure 30: Fit the "BTS STATION" and "N" Labels at the Top of the BTS
2.10.2 Close the Cable Entry
Cover Plate for Cable Entry
Figure 31: Close the Cable Entry
To close the cable entry:
1. Fit the cover plate
2. Fix the plate to the rack with the provided screws (A).
3BK 17430 3135 RJZZA Ed.03 81 / 84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
2.10.3 Leave the Site
12
1. Clean the site.
Do not put packages into the customer bin.
2. Give the key to the site responsible.
82 / 84 3BK 17430 3135 RJZZA Ed.03
2Install9100
Com
pactB
TS
Indoor/Outdoor
Evolution
2.11O
UT
CL
ayou
t
18
1 81 81 81 8
1 16
1 16
Figure
32:O
UT
CC
onnectors
3BK
174303135
RJZ
ZA
Ed.03
83/
84
2 Install 9100 Compact BTS Indoor/Outdoor Evolution
BLANK PAGE BREAK
84 / 84 3BK 17430 3135 RJZZA Ed.03