9 th AWAKE Technical Board 11 March 2015. Actions from Last Technical Board WP laser and MPP: decide until March 2015 which compressor design will be

Embed Size (px)

Citation preview

  • Slide 1

9 th AWAKE Technical Board 11 March 2015 Slide 2 Actions from Last Technical Board WP laser and MPP: decide until March 2015 which compressor design will be chosen Patric: circulate final drawing of plasma cell support All: send numbers about costs and manpower by the end of Feb 2015 Janet: send current data to Gilles Lawrence, Jan, Friederike: proceed with studies on the vacuum window Lawrence, Bart, Silvia: exchange information about the position of the camera and the effect of the real optical line Rhodri, Edda, Matthew: finalize the addendum to the MoU. All: send requirements for signals/timing in the experiment until end of Feb (table has been circulated by Wolfgang Hoefle) Patric and Stefano: meet to talk about the camera timing Patric and Jan: define what can be done at GRANT with the clean tube after the fabrication at CERN Ans and RP: decide which shielding option for TSG41 should be realized BI, Marzia, Edda: sort out the BI equipment planning WP RF synchronization, spectrometer and BI: please comment on the planning schedule 2 Slide 3 Agenda 9 th TB 3 Slide 4 Preparation for the AWAKE Cost and Schedule Review, 28 April 2015 Slide 5 AWAKE Cost and Schedule Review, 28 April 2015 a.m. : presentations Technical description Break-down of work-packages (CERN and Collaboration institutes) Resources Manpower Cost Schedule Tools to control, Quality assurance, risks Status today p.m.: meeting of reviewers 5 Slide 6 (Simplified) AWAKE Project Lifecycle Required Documents 6 InitializeStudyDesignBuildCommission Operate & Maintain Decommision Oct 2011 LOI June 2012 AWAKE study project March 2013 - Conceptual Design Report - Work package Description (EDMS 1272163) August 2013 AWAKE approved April 2015 Engineering specifications April 2015 Cost and Schedule Review Dec 2015 Safety file Phase 1 Phase 2 Slide 7 Engineering Specifications Needed for Phase 1 7 Slide 8 Engineering Specifications 8 Slide 9 Engineering Specs Vacuum System 9 Slide 10 Work Package Descriptions Needed for Phase 2 Similar template as Engineering Specifications, but lighter. 10 Slide 11 Break-Down Structure CERN AWAKE Project Management Planning, Safety, Resources, Integration, project QA, configuration management, layout database Coordination groups: Coordination group proton/electron line: C. Bracco Coordination group integration, installation, infrastructure: A. Pardons Coordination group electron source: S. Doebert Coordination group laser: V. Fedosseev Coordination group secondary beam line: E. Gschwendtner Coordination group experiment: P. Muggli Work packages: Magnets: J. Bauche Proton line magnets Electron line magnets Power converters: G. Le Godec Beam instrumentation: L. Jensen, R. Jones Laser beam line: V. Fedosseev Electron source: S. Doebert RF synchronization: Wolfgang Hoefle Interlock: Bruno Puccio, Markus Zerlauth Shielding dumps: A. Pardons Civil engineering: J. Osborne Cooling and Ventilation: M, Battistin Electricity: T. Charvet Cabling: J-C. Guillaume, G. Gros Access: V. Rios Fire & Gas: S. Grau Radiation Protection: Helmut Vincke Transport and Handling: C. Bertone Survey: J-F. Fuchs Ethernet: Maryse Da Costa Controls: M. Gourber Pace Operational SW: BE-OP Intercepting devices: V. Vlachoudis 11 Institutes: Work packages: Plasma cell: E. Oez, P. Muggli SMI diagnostics: P. Muggli Laser: J. Moody Laser dump: P. Muggli Electron spectrometer: L. Deacon Accelerating structure: G. Burt Electron line diagnostics: V. Verzilov Who is responsible for which work package to provide documents and information for the CSR If needed, each subsystem needs its own engineering specifications! E.g. -LLRF, RF synchronization -Electron source, powering system -Machine interlock, beam interlock -BI for p-line, BI for e-line, Slide 12 We need the engineering specifications/work package descriptions by 8 APRIL 2015 latest! 12