    PROJECT PROCUREMENTROJECT PROCUREMENT

  • 8/2/2019 9 Projects Procurement 60

    2/23

    PROJECT CYCLEROJECT CYCLE

  • 8/2/2019 9 Projects Procurement 60

    3/23

    THE PROJECT CYCLETHE PROJECT CYCLE

    IdentificationIdentification

    Appraisal / ViabilityAppraisal / Viability

    Funding Sources(Internal/External)Funding Sources(Internal/External)

    Project ImplementationProject Implementation

    Procurement Process(Plants,CivilProcurement Process(Plants,CivilWorks,Consultants servicesWorks,Consultants services

    Project Monitoring & SupervisionProject Monitoring & Supervision Project Completion & Commercial ProductionProject Completion & Commercial Production

  • 8/2/2019 9 Projects Procurement 60

    4/23

    Project Cost Analysisroject Cost Analysis- Elements or Components of Project Cost.lements or Components of Project Cost.o Landando Serviceserviceso Buildinguildingo Machinery / Equipmentachinery / Equipmento Preproduction Expensesreproduction Expenseso Interest during Constructionnterest during Constructiono Preoperational Expensesreoperational Expenseso Strategytrategyo Scheduleschedules

  • 8/2/2019 9 Projects Procurement 60

    5/23

    (Figures in 000)Figures in 000)Localocal Foreignoreign TotalotalLand and DevelopmentLand and Development

    Building and Civil worksBuilding and Civil worksPlant and MachineryPlant and Machinery

    Insurance, Freight andInsurance, Freight and

    ClearanceClearance

    Import DutyImport Duty

    Import SurchargeImport Surcharge

    Know-How & ConsultancyKnow-How & Consultancy

    Inland FreightInland Freight

    Proforma of Project Cost Estimates

  • 8/2/2019 9 Projects Procurement 60

    6/23

    (Figures in 000)Figures in 000)Localocal Foreignoreign Totalotal

    Erection and InstallationErection and Installation

    Preproduction ExpensesPreproduction Expenses

    Interest / FC DuringInterest / FC DuringConstructionConstruction

    Furniture & FixturesFurniture & Fixtures

    Transport & VehiclesTransport & Vehicles

    ContingenciesContingencies

    TotalotalNet Initial workinget Initial workingCapitalapitalTotal Costotal Cost

    Proforma of Project Cost EstimatesCont

  • 8/2/2019 9 Projects Procurement 60

    7/23

    Project Cost Estimates for XYZroject Cost Estimates for XYZCoconut Oils Limitedoconut Oils Limited(Rs/$.000)Rs/$.000)

    Itemstems LocalocalCurrencurrenc

    ForeignoreignCurrencurrenc

    Totalotal Totalotal

    I.I. Land, Site Development andLand, Site Development andInfrastructureInfrastructure

    1.1. LandLand

    2.2. Land ImprovementsLand Improvements

    3.3. Site Development, Access Roads,Site Development, Access Roads,

    4.4. wharf facilitieswharf facilities

    5.5. Contingency 16% (except land)Contingency 16% (except land)

    6.6. Escalation; 14% (except land)Escalation; 14% (except land)

    SUBTOTAL:SUBTOTAL:

    10201020

    205205

    12431243

    27722772

    675675

    590590

    11881188

    190190

    167167

    10201020

    205205

    12431243

    39603960

    865865

    757757

    80508050

    102202102202

    0.50.5

    124.3124.3

    369369

    86.586.5

    75.775.7

    805805

  • 8/2/2019 9 Projects Procurement 60

    8/23

    (Rs/$.000)Rs/$.000)Itemstems LocalocalCurrencyurrency ForeignoreignCurrencyurrency Totalotal Totalotal

    II.II. Building and Civil WorksBuilding and Civil Works

    1.1.Production: 2000 sq.m. at 1100Production: 2000 sq.m. at 1100

    Rs/q.mRs/q.m

    2.2.Warehouse: 1500 sq.m. at 900Warehouse: 1500 sq.m. at 900

    Rs.sq.mRs.sq.m

    3.3.Utility: 600 sq.m at 1000 Rs/sq.mUtility: 600 sq.m at 1000 Rs/sq.m4.4.Administrative: 500 sq.m. at 1500Administrative: 500 sq.m. at 1500

    Rs/sq.mRs/sq.m

    5.5.Contingency: 16%Contingency: 16%

    6.6.Escalation: 14%Escalation: 14%SUBTOTALSUBTOTAL

    15401540

    945945

    420420

    525525

    549549

    480480

    660660

    405405

    180180

    225225

    235235

    206206

    22002200

    13501350

    600600

    750750

    784784

    686686

    63706370

    220220

    135135

    6060

    7575

    78.478.4

    68.468.4

    637637

    Project Cost Estimates for XYZroject Cost Estimates for XYZCoconut Oils Limitedoconut Oils LimitedCont.ont.

  • 8/2/2019 9 Projects Procurement 60

    9/23

    (Rs/$.000)Rs/$.000)Itemstems Localocal

    CcycyForeignoreign

    CurrencyurrencyTotalotal Totalotal

    IIIIII Machinery and EquipmentMachinery and Equipment

    1.1.Oil milling (delivered)Oil milling (delivered)

    2.2.Solvent extraction (delivered)Solvent extraction (delivered)

    3.3.Cake handling and palletizing (delivered)Cake handling and palletizing (delivered)

    4.4.Oil auxilizry storeage & pumpingOil auxilizry storeage & pumping(delivered)(delivered)

    5.5.Utilities: water storage and pumpingUtilities: water storage and pumping

    (delivered)(delivered)

    6.6.Other utility equipment (delivered)Other utility equipment (delivered)7.7.Lahoratory and maintenance equipmentLahoratory and maintenance equipment

    10581058

    --

    418418

    321321

    847847

    869869

    160160

    70827082

    69526952

    16721672

    23522352

    847847

    53355335

    640640

    81408140

    69526952

    20902090

    26732673

    16941694

    62046204

    800800

    814814

    695.2695.2

    209209

    267.3267.3

    169.4169.4

    620.4620.4

    8080

    Project Cost Estimates for XYZroject Cost Estimates for XYZCoconut Oils Limitedoconut Oils LimitedCont.ont.

  • 8/2/2019 9 Projects Procurement 60

    10/23

    (Rs/$.000Rs/$.000Itemstems Localocal

    CurrencyurrencyForeignoreign

    CurrencyurrencyTotalotal Totalotal

    IIIIII Machinery and EquipmentMachinery and Equipment

    8.8. Miscellanies Equipment/MachineryMiscellanies Equipment/Machinery(delivered)(delivered)

    9.9. Erection Costs (7.5% 1-1)Erection Costs (7.5% 1-1)

    10.10. Spare partsSpare parts

    11.11. Transp. & handling equipmentTransp. & handling equipment(delivered)(delivered)12.12. Furniture, fixtures, office equipmentFurniture, fixtures, office equipment

    (delivered)(delivered)

    13.13. Contingency: 4% of 1-12Contingency: 4% of 1-12

    14.14. Escalation: 8% of 1-12Escalation: 8% of 1-12

    SUBTOTAL:SUBTOTAL:

    462462

    301301

    139139

    981981

    480480

    291291

    582582

    18461846

    20142014

    12471247

    328328

    --

    11631163

    23262326

    23102310

    23152315

    23562356

    13091309

    480480

    14541454

    29082908

    16121612

    2323

    231.231.

    138.138.

    130.130.

    44

    145.145.

    920.920.

    161.161.

    Project Cost Estimates for XYZroject Cost Estimates for XYZCoconut Oils Limitedoconut Oils LimitedCont.ont.

  • 8/2/2019 9 Projects Procurement 60

    11/23

    (Rs/$.000Rs/$.000Itemstems Localocal

    CurrencyurrencyForeignoreign

    CurrencyurrencyTotalotal Totalotal

    IVIV Engineering Fees / Consultant Fees:Engineering Fees / Consultant Fees:

    1.1.Engineering feeEngineering fee

    2.2.Management consultant feeManagement consultant fee

    SUBTOTAL:SUBTOTAL:

    --

    696696

    916916

    --

    916916

    696696

    16121612

    91.91.

    69.69.

    161.161.

    V.V. Preproduction and Launching Expenses:Preproduction and Launching Expenses:

    1.1.Project Development CostProject Development Cost 149149 447447 596596 59.59.

    Project Cost Estimates for XYZroject Cost Estimates for XYZCoconut Oils Limitedoconut Oils LimitedCont.ont.

  • 8/2/2019 9 Projects Procurement 60

    12/23

    (Rs/$.000)Rs/$.000)Itemstems Localocal

    CurrencyurrencyForeignoreign

    CurrencyurrencyTotalotal Totalotal

    TOTAL CAPITAL COSTTOTAL CAPITAL COST

    TOTAL PROJECT COSTTOTAL PROJECT COST

    TOTAL PROJECT COSTTOTAL PROJECT COST

    1962919629

    1141811418

    3104731047

    4165141651

    --

    4165141651

    6128061280

    1141811418

    7269872698

    6126128

    114.114.8

    7269.7269.8

    Project Cost Estimates for XYZCoconut Oils LimitedCont.

    Note: Rs10 = 1 US Dollar

  • 8/2/2019 9 Projects Procurement 60

    13/23

    Project Cost Estimateroject Cost Estimate 1.. Estimate vs Budgetstimate vs Budget2.. Importance of Cost Estimatemportance of Cost Estimate3.. Escalation of Project Costsscalation of Project Costs4.. Inflationnflation5.. Evolution of Project Cost Estimatevolution of Project Cost Estimate6.. Cost Consciousnessost Consciousness

  • 8/2/2019 9 Projects Procurement 60

    14/23

    Cost Estimates and theirost Estimates and theirchecking:hecking:A.. Break up the project cost into its variousreak up the project cost into its various

    components.omponents.B.. Trace each of these component costrace each of these component cost

    estimates to the physical facil ities needed,stimates to the physical facil ities needed,and check that these are on reasonablend check that these are on reasonablebases.ases.

  • 8/2/2019 9 Projects Procurement 60

    15/23

    Cont.Cont.

    C.. Visualizing as much as possible in specificisualizing as much as possible in specificterms i.e. f low charts, layouts, organizationerms i.e. f low charts, layouts, organizationcharts covering all staff and labor, sell ingharts covering all staff and labor, sell ingarrangements, storage arrangements, andrrangements, storage arrangements, andso on. (the more detailed the work done,o on. (the more detailed the work done,the better an estimate can be) ;he better an estimate can be) ;

    D..Using factors and percentages in somesing factors and percentages in somesituations, which may be rule-of-thumbituations, which may be rule-of-thumbestimates or more rigorously calculated:stimates or more rigorously calculated:andnd

  • 8/2/2019 9 Projects Procurement 60

    16/23

    Project Financingroject FinancingEquity/ Own FundsEquity/ Own FundsGovt GrantsGovt Grants

    Loans/Borrowed FundsLoans/Borrowed Funds

    Financial/ Economic JustificationFinancial/ Economic Justification

    Cost of BorrowingCost of Borrowing

    Cost of own FundsCost of own Funds

    Procedures for Utilizing fundsProcedures for Utilizing funds

  • 8/2/2019 9 Projects Procurement 60

    17/23

    PROBLEMS DURINGROBLEMS DURINGIMPLEMENTATION STAGEMPLEMENTATION STAGE

    Summary of SourcesSummary of Sources Time over runTime over run

    Cost over runCost over run

    Mixture of the two.Mixture of the two.

  • 8/2/2019 9 Projects Procurement 60

    18/23

    SUMMARY OF REASONS.SUMMARY OF REASONS.

    TIME OVER RUNSIME OVER RUNS Preparatory delays/ LocationPreparatory delays/ Location Civil works constructionCivil works construction

    Procurement of machineryProcurement of machinery

    General causesGeneral causesCOST RUNS OVER RUNS:OST RUNS OVER RUNS: InflationInflation

    Under-estimation of BOQsUnder-estimation of BOQs Abnormal price increasesAbnormal price increases Time over runTime over run

  • 8/2/2019 9 Projects Procurement 60

    19/23

    PREPARATORY DELAYS/PREPARATORY DELAYS/LOCATIONLOCATION Reappraisal and commitment of funds by variousReappraisal and commitment of funds by various

    institutions/authorities.institutions/authorities.

    Variations in terms and conditions.Variations in terms and conditions.

    Credit documentation disputes.Credit documentation disputes.

    Disagreement on legal agreements government procedures andDisagreement on legal agreements government procedures and

    regulations.regulations.

    Political rivalries.Political rivalries.

    Legal Disputes on ownershipLegal Disputes on ownership

    Defective titles of landDefective titles of land Cumbersome ProceduresCumbersome Procedures

    Price appreciation in real estatePrice appreciation in real estate

    Disputes on locationDisputes on location

  • 8/2/2019 9 Projects Procurement 60

    20/23

    CIVIL WORKS CONSTRUCTIONCIVIL WORKS CONSTRUCTION

    Tendering and re-tendering.endering and re-tendering. Disputes amongst contractors.isputes amongst contractors. Shortage of funds with the contractorshortage of funds with the contractors Shortage of funds with the projecthortage of funds with the project Non availability of materialson availability of materials Increase in prices of material cement/steelncrease in prices of material cement/steel Mobilization and demobilizationobilization and demobilization Natural calamitiesatural calamities

  • 8/2/2019 9 Projects Procurement 60

    21/23

    PROCUREMENT OF MACHINERYPROCUREMENT OF MACHINERY

    Tendering and retenderingendering and retendering Guarantees/warranteesuarantees/warrantees Currency depreciation/fluctuationurrency depreciation/fluctuation Non availability of foreign exchangeon availability of foreign exchange Rejection of machineryejection of machinery Short shipmentshort shipments Synchronization of activities of variousynchronization of activities of varioussuppliers.uppliers. Liquidation of the machinery suppliers iniquidation of the machinery suppliers inbetweenetween Natural calamities warsatural calamities wars

  • 8/2/2019 9 Projects Procurement 60

    22/23

    GENERAL CAUSESGENERAL CAUSES

    Changes in projects scopehanges in projects scope Political changes and changes in their prioritiesolitical changes and changes in their priorities Inadequacy of the appraisal:nadequacy of the appraisal: With purposeith purpose Without purposeithout purpose Changes in personnel in the fundinghanges in personnel in the fundinginstitutions/deptts. and moods of the projectnstitutions/deptts. and moods of the projectsupervisors.upervisors. Changes in PERT sequencinghanges in PERT sequencing Arrangements of additional fundsrrangements of additional funds Dispute between sponsorsispute between sponsors

  • 8/2/2019 9 Projects Procurement 60

    23/23

    CAUSES OF FAILURESCAUSES OF FAILURES

    Delay in completion, resulting in costelay in completion, resulting in costincreasencrease Capital cost overruns.apital cost overruns. Technical failureechnical failure Financial failure of the contractor.inancial failure of the contractor. Un insured casualty losses.n insured casualty losses. Raw materials:aw materials: Price increaserice increase Shortage of raw material.hortage of raw material.7.. Technical obsolescence.echnical obsolescence.8.. Loss of competitive position in the market.oss of competitive position in the market.