# 2051241 Water & Waste Page 1 of 48
9. DEPARTMENTAL VIEW WATER AND WASTE (COMMERCIAL BUSINESS UNIT) Mission: To deliver quality and reliable water, wastewater and waste services that meet the needs of our community
Officer Responsible: General Manager Cairns Water
Staffing Level (FTE) 313.22
Financial Summary 09/10 Budget 10/11 Budget 11/12 Budget 12/13 Budget 13/14 Budget
Revenue 181,196,936 181,620,723 179,872,260 186,259,435 190,542,326
Expenses 143,766,482 154,478,148 166,159,217 172,831,455 179,207,130
Operating Initiatives Relevant linkage(s) Completion Date
BRANCH WATER & WASTE – GENERAL MANAGEMENT AND ADMINISTRATION SUPPORT Mission: To provide general management, leadership and guidance to Cairns Water.
Officer Responsible: General Manager Water & Waste
Staffing Level (FTE) 4
Financial Summary 09/10 Budget 10/11 Budget 11/12 Budget 12/13 Budget 13/14 Budget
Revenue 75,366 77,374 79,438 82,263 85,188
Expenses 25,465,003 27,878,640 31,385,708 31,317,379 32,239,774
Operating Initiatives Relevant linkage(s) Completion Date
# 2051241 Water & Waste Page 2 of 48
ACTIVITY MANAGEMENT AND ADMINISTRATION SUPPORT
Mission: To provide excellent customer service for internal and external clients and to develop systems to ensure a smooth and effective operation
Officer Responsible: General Manager Water & Waste
Staffing Level (FTE) 5
Financial Summary 09/10 Budget 10/11 Budget 11/12 Budget 12/13 Budget 13/14 Budget
Revenue - - - - -
Expenses 25,395,581 27,805,146 31,307,945 31,236,051 32,154,723
Operating Initiatives Relevant linkage(s) Completion Date
Outputs Title Description Customer(s) Corporate
Objective/Notes Result Measures
1. Performance review of managers work
Review of work performed by each branch and the effectiveness of each branch manager; Provision of guidance and support to improve outputs; Includes the review of Departmental performance in the following areas: Budget management; Operating initiative management; Capital works management; Workplace Health and Safety
performance; Customer management.
Departmental Managers 6.7 Departmental Budget performance
6.7 Departmental Capital Budget % spent
6.7 Timeliness of Departmental operating initiative completions
6.4 Departmental Safety Performance
# 2051241 Water & Waste Page 3 of 48
6.7 Resident Response System (RRS) Departmental performance
2. Coaching and support of staff across the Department
Provision of effective support to enable all Departmental staff to meet the performance expectation of their customers.
Departmental staff 6.4 Operational Plan Outcomes
3. Business Excellence Systems Views, Self Assessment Reports and Continuous Improvement support for the Department
Business Excellence is the title of Council's adopted Organisational Effectiveness framework and program. The outputs listed to the left are the key outputs from the program. General Manager promotion and support of the program within their Department is critical to its success.
Departmental staff 6.7 BE Documentation completed
4. Agenda coordination for Council's Water & Waste Committee
Coordination of reports to be provided to Water & Waste Committee.
Committee members of Water & Waste Committee
6.3 Water & Waste Committee Agendas
Performance Measurement Result Measures (Title) Result Measure
(Description) Result Targets Source of Data Reporting Frequency
1. Departmental Budget performance
Provision of services within resourcing allowed
Expenditure for the Department in the range of 0% to 5% under budget
Oracle Financials Monthly
Revenue for the Department no more than 1% under budget
2. Departmental Capital Budget - % spent
Track progressive spending of capital budget to ensure expenditure is on track
90% of budget spent by year end
Oracle financials Monthly
3. Timeliness of Departmental operating initiative completions
All operating initiatives identified in the Operational Plan are planned for completion in the financial year.
90% of initiatives completed by year end
Monthly report status update Monthly
# 2051241 Water & Waste Page 4 of 48
4. Departmental Safety Performance
Safety performance of the Department as measured by the Lost Time Injury Frequency Rate and the Lost Time Injury Duration Rate.
Lost Time Injury Frequency Rate – improving relative to the Department's 3 year average
WH&S Statistics – Monthly WH&S report
Monthly
Lost Time Injury Duration Rate – improving relative to the Department's 3 year average
5. Resident Response System (RRS) Departmental performance
Monitoring of the number of requests (requiring a response from the Department) that are overdue (in relation to the timeframe assigned by RRS for their resolution).
Number of overdue requests at the end of each month trending downwards from 2005-06 levels
Resident Response System – Business Objects Report
Monthly
ACTIVITY MANAGEMENT AND ADMINISTRATION SUPPORT – COMMUNICATION & EDUCATION Mission: To provide excellent customer service for internal and external clients and to develop systems to ensure a smooth and
effective operation Officer Responsible: Communications & Education Officer
Staffing Level (FTE) 2
Financial Summary 09/10 Budget 10/11 Budget 11/12 Budget 12/13 Budget 13/14 Budget
Revenue 75,366 77,374 79,438 82,263 85,188
Expenses 69,421 73,495 77,763 81,328 85,051
Operating Initiatives Relevant linkage(s) Completion Date
# 2051241 Water & Waste Page 5 of 48
Outputs Title Description Customer(s) Corporate
Objective/Notes Result Measures
1. Water & Waste and Our Water & Waste Web Pages
Web pages to ensure timely and accurate information for customers
Cairns community 4.2, 6.5 Webpage Usage of Water & Waste and Our Water Websites
2. Delivery of Education Programs
Providing accurate information in relevant curriculum context of cradle-to-cradle operations and outcomes for the regions
water supply and services waste & recycling recovery and
removal
Cairns community, School Students & Teachers
4.2
Number of institutes reached
Performance Measurement Result Measures (Title) Result Measure
(Description) Result Targets Source of Data Reporting Frequency
1. Webpage Usage of Water & Waste and Our Water & Waste Websites.
Number of website visitations Increasing trend over time
Websites Monthly
2. Number of institutes reached
Effective utilisation of promotional materials at events
100% of Budget Spent Oracle Financials Monthly
# 2051241 Water & Waste Page 6 of 48
BRANCH BUSINESS SERVICES - 6010 Mission: To provide high quality services (including analysis) in an efficient and effective manner
Officer Responsible: Manager Business Services
Staffing Level (FTE) 46
Financial Summary 09/10 Budget 10/11 Budget 11/12 Budget 12/13 Budget 13/14 Budget
Revenue 4,150,335 4,237,445 4,500,277 4,796,972 4,998,684
Expenses 4,787,426 4,964,195 5,148,262 5,350,677 5,561,826
ACTIVITY BUSINESS SUPPORT – MANAGEMENT AND ADMINISTRATION SUPPORT - 6510 Mission: To provide excellent customer service for internal and external clients and to develop systems to ensure a smooth and
effective operation Officer Responsible: Manager Business Services
Staffing Level (FTE) 3
Financial Summary 09/10 Budget 10/11 Budget 11/12 Budget 12/13 Budget 13/14 Budget
Revenue - - - - -
Expenses (29,353) (26,422) (23,271) (22,764) (22,187)
Operating Initiatives Relevant linkage(s) Completion Date 1. Oversee development of Deployment Flowcharts for business processes 2. Coordinate Project Scope and business requirements for Laboratory Information
Management System and other related information management systems
6.3 June 2010
# 2051241 Water & Waste Page 7 of 48
Outputs Title Description Customer(s) Corporate
Objectives/NotesResult Measures
1. Internal Reports Comparative statistical information for target reporting associated with administration functions
Council 6.3 Completeness of monthly report information for Council meetings
2. Administration Support Administration support associated with Water & Waste
Administration Support for Spence St Level 2 Operations
6.4 Number of complaints from supported areas & customers
3. Performance management for;
- Customer Service & Billing
- Financial Management - Laboratory Services - Corporate & External
Reporting - Plumbing & Trade Waste Compliance
- Administration Support
Report monthly the measurable outputs of the unit against Corporate and legislative requirements.
General Manager – CRW&W CRW&W – Business Services
6.2 Monthly Report Completeness Branch operating performance within Operating Budget Timeliness of Branch operating initiative completion Branch Safety Performance
4. Council Reports Review of reports relating to Business Services branch for submission to General Manager for approval to provide to Water & Waste Committee
General Manager - CRW&W 6.3 Consistency of reporting format; Accurate, defensible, and clear report content
# 2051241 Water & Waste Page 8 of 48
5. Business Excellence Systems Views, Self Assessment Reports and Continuous Improvement support for the Branch
Ensure Business Excellence principles are applied to processes within Business Services branch
Branch staff 6.4 Processes mapped and PDSA
techniques applied Ongoing
maintenance of outcomes from PDSA techniques
Performance Measurement Result Measures (Title) Result Measure
(Description) Result Targets Source of Data Reporting Frequency
1. Number of complaints from supported areas & customers
Number of formal complaints received by administration officers
No more than 2 complaints per month
Document Management System
Monthly
ACTIVITY BUSINESS SERVICES – CUSTOMER SERVICE AND BILLING - 6511 Mission: To provide excellent customer service for internal and external clients and to develop systems to ensure a smooth and
effective operation Officer Responsible: Manager Business Services
Staffing Level (FTE) 6
Financial Summary 09/10 Budget 10/11 Budget 11/12 Budget 12/13 Budget 13/14 Budget
Revenue 292,615 302,552 312,828 325,181 338,023
Expenses 1,080,864 1,109,304 1,144,192 1,186,345 1,231,952
Operating Initiatives Relevant linkage(s) Completion Date
1. Develop of Deployment Flowcharts for business processes 6.3 June 2010
# 2051241 Water & Waste Page 9 of 48
Outputs Title Description Customer(s) Corporate
Objectives/NotesResult Measures
1. Water Consumption Accounts
Water usage notices and settlement data to customers, provided in a timely and effective manner
Water consumers 4.2 Water Usage Notice - time from read to bill issue date.
2. Water Usage Settlement Accounts
Final reads provided in the settlement process associated with property transfers
Solicitors and persons undertaking conveyancing works
4.2 Water Settlements - turnaround time from request to issue.
3. Water Meter Replacement Program
Meter replacement program targeting meters at the end of their useful lives
Water consumers 4.2 Capital Budget Compliance Meter Replacement Program
Performance Measurement Result Measures (Title) Result Measure
(Description) Result Targets Source of Data Reporting Frequency
1. Water Usage Notice - time from read to bill issue date
Time from read to bill issue date Within 14 days of reading date
Authority Monthly
2. Water Settlements - turnaround time from request to issue
Turnaround time from request to issue
5 days for $29 fee 24 hours for $64.50 fee
Document Management System
Monthly
# 2051241 Water & Waste Page 10 of 48
ACTIVITY BUSINESS SERVICES – FINANCIAL MANAGEMENT - 6512 Mission: To provide financial management services built on strong internal process for all customers
Officer Responsible: Principal Management Accountant
Staffing Level (FTE) 3
Financial Summary 09/10 Budget 10/11 Budget 11/12 Budget 12/13 Budget 13/14 Budget
Revenue - - - - -
Expenses 9,825 14,133 18,713 20,832 23,085
Operating Initiatives Relevant linkage(s) Completion Date 1. Implement Australian Standard principles on Fraud Prevention 6.2 June 2010
Outputs Title Description Customer(s) Corporate
Objectives/NotesResult Measures
1. Water & Waste Budget Original budget and budget review documentation from Operations, Waste and Infrastructure
Infrastructure, Business Services, Operations, Waste Services, Community Sundry debtors, CW Committee
6.2, 6.7 Adherence to Corporate Budget timeline
2. Monthly Financial Analysis Financial analysis associated with consolidated Water & Waste provision
6.2 Timeliness of financial analysis
# 2051241 Water & Waste Page 11 of 48
ACTIVITY BUSINESS SERVICES - LABORATORY SERVICES - 6513 Mission: Laboratory Services aims to provide a quality, commercial, expert, timely and cost-effective scientific service to its
internal and external customers in all aspects that determine water quality as it impacts on human lifestyle. Officer Responsible: Laboratory Services Manager
Staffing Level (FTE) 11
Financial Summary 09/10 Budget 10/11 Budget 11/12 Budget 12/13 Budget 13/14 Budget
Revenue 1,847,139 1,901,725 1,957,969 2,031,001 2,106,769
Expenses 2,121,711 2,200,209 2,276,603 2,365,512 2,456,768
Operating Initiatives Relevant linkage(s) Completion Date 1. Develop Scope and business requirements for Laboratory Information Management
System 6.3
June 2010
2. Implement interim quality management database 6.3 June 2010 3. Development of "phage" testing for re-use water compliance 6.3 October 2009
Outputs Title Description Customer(s) Corporate
Objectives/Notes Result Measures
Tests on: - Waters for Drinking
Purposes
- Tests undertaken for client purposes include water for drinking, wastewaters, pools, creeks, lakes,
Water & Waste Operations, City Works and Services, External Clients
4.1 Test turn-around time
Quality of test results
# 2051241 Water & Waste Page 12 of 48
- Waters (non-drinking) - Solid matrices - Other tests
sludge and soils and other tests. Timeliness of Laboratory operations
Performance Measurement Result Measures (Title) Result Measure
(Description) Result Targets Source of Data Reporting Frequency
1. Test turn-around time Completion rates for analyses and reporting
- 80% within 5 days Laboratory Information Management System
Monthly
2. Quality of test results Statistical function which allows the quality of the results to be determined.
Z-score ≤2' >95% of analysis batches
Laboratory Information Management System
Monthly
ACTIVITY BUSINESS SERVICES - CORPORATE AND EXTERNAL REPORTING - 6514 Mission: To ensure that Water & Waste maintains its corporate and external reporting obligations associated with all operations,
excluding environmental compliance. Officer Responsible: Business Process Officer
Staffing Level (FTE) 1
Financial Summary 09/10 Budget 10/11 Budget 11/12 Budget 12/13 Budget 13/14 Budget Revenue - - - - -
Expenses 54,133 56,868 59,726 62,315 65,014
Operating Initiatives Relevant linkage(s) Completion Date
1. Finalise documentation for Process and Reference Manual ADWQF? 2. Handover Process and Reference documentation to Operational staff 3. Establish Framework for Internal Controls and Fraud Risk
6.3, 6.7 6.3, 6.7 6.3, 6.7
June 2010 June 2010 June 2010
# 2051241 Water & Waste Page 13 of 48
Outputs Title Description Customer(s) Corporate
Objectives/NotesResult Measures
1. Total Management Plan (TMP) and Strategic Asset Management Plan (SAMP)
Coordination and maintenance of the TMP and SAMP for Water & Waste: The TMP is used to address
requirements of the Environmental Protection Policy (Water) 1997 in respect of Environmental Plans; and
The TMP or components of it, are used to satisfy the Strategic Asset Management Plan (SAMP) and Customer Service Standard requirements of the Water Act 2000.
Council, General Manager Water & Waste Department of Natural Resources & Mines
4.4 TMP and SAMP compliance with statutory requirements
2. Coordination of the Departmental Risk Register
Coordination and maintenance of the risk register for Water & Waste
Council, Executive Management Team
4.1 Currency of risk register
3. Coordination of incident scenario(s)
Coordination of the development and implementation of incident scenario(s) to allow Water & Waste to better meet catastrophic events
Operations 2.4, 4.5 Number of scenarios undertaken
Performance Measurement Result Measures (Title) Result Measure
(Description) Result Targets Source of Data Reporting Frequency
1. TMP and SAMP compliance with statutory requirements
A State Government Approved TMP and SAMP
Passing of State Government Audit
Department of Natural Resources Mines, Energy and Water
Annual
# 2051241 Water & Waste Page 14 of 48
ACTIVITY BUSINESS SERVICES – PLUMBING AND TRADE WASTE COMPLIANCE - 6517 Mission: To ensure that clients receive the highest level of service and professional advice to assist them to attain the required
standards in the developments for which they are responsible Officer Responsible: Manager Business Services
Staffing Level (FTE) 17
Financial Summary 09/10 Budget 10/11 Budget 11/12 Budget 12/13 Budget 13/14 Budget
Revenue 2,010,581 2,033,168 2,229,480 2,440,790 2,553,892
Expenses 1,550,245 1,610,102 1,672,299 1,738,437 1,807,194
Operating Initiatives Relevant linkage(s) Completion Date 1. Develop Deployment Flowcharts for business processes 6.3,6.7 June 2010
2. Manage and Administer Backflow Prevention Program 6.3,6.7 June 2010 3. Establish Revenue Collection process and system for Trade Waste 6.3 June 2010 4. Implementation of Trade Waste Management within Department 10 6.7 June 2010
Outputs Title Description Customer(s) Corporate
Objectives/NotesResult Measures
1. Plumbing and Trade Waste Compliance Assessments
Compliance assessments of plumbing and trade waste works with the mandatory requirements of the Acts, Regulations and By-Laws
Plumbers, Developers, Internal Operations
4.1 Legal challenges to compliance assessment process from external parties.
# 2051241 Water & Waste Page 15 of 48
2. Water, plumbing and drainage works - processed applications
Applications received and processed for approval to proceed with water, plumbing and drainage works
Plumbers, Developers, Internal Operations
4.1 Plumbing applications received
4.1 Plumbing application turnaround time
3. Plumbing inspections Inspections and tests of water, plumbing and drainage works during constructions for compliance with the relevant regulations
Plumbers, Developers, Internal Operations
4.1 Plumbing inspections undertaken
4. Trade waste Inspections Trade waste inspections undertaken for compliance with the relevant regulations
Plumbers, Developers, Internal Operations
1.5, 4.1 Trade waste inspections undertaken
Performance Measurement Result Measures (Title) Result Measure
(Description) Result Targets Source of Data Reporting Frequency
1. Plumbing applications revenue
Plumbing revenue received from plumbing applications
Compliance with budgeted number
Authority Oracle Financials
Monthly
2. Plumbing application turnaround time
Number of plumbing applications received and assessed within statutory compliance requirements
Assessment within twenty days
Authority Monthly
3. Number of plumbing inspections undertaken
Number of plumbing inspections undertaken for the period, as per construction requirements
Monitor number Inspection Folders (Outlook) Monthly
4. Number of monthly Trade Waste inspections
Number of trade waste inspections undertaken for the period
All inspections undertaken on anniversary date of application
Inspection Folders (Outlook) Monthly
# 2051241 Water & Waste Page 16 of 48
BRANCH OPERATIONS Mission: To operate and maintain reliable Water and Wastewater treatment facilities and Reticulation networks.
Officer Responsible: Operations Manager
Staffing Level (FTE) 185
Financial Summary 09/10 Budget 10/11 Budget 11/12 Budget 12/13 Budget 13/14 Budget
Revenue 143,340,207 141,931,690 138,030,934 143,207,385 146,042,020
Expenses 81,201,952 87,088,956 92,834,011 98,042,201 101,926,276
Operating Initiatives Relevant linkage(s) Completion Date
ACTIVITY OPERATIONS MANAGEMENT AND ADMINISTRATION SUPPORT Mission: To ensure the delivery of Water and Wastewater services are delivered in a cost effective, efficient manner to the end
user. Officer Responsible: Operations Manager
Staffing Level (FTE) 7
Financial Summary 09/10 Budget 10/11 Budget 11/12 Budget 12/13 Budget 13/14 Budget
Revenue 81,658 84,817 88,100 91,624 95,289
Expenses 468,506 488,274 508,859 529,573 551,128
# 2051241 Water & Waste Page 17 of 48
Operating Initiatives Relevant linkage(s) Completion Date
Outputs / services Title Description Customer(s) Corporate
Objective/Note Result Measures
1. Performance Management for: Water Treatment Water Reticulation Wastewater Treatment Wastewater Reticulation
Report monthly the measurable outputs of the unit against Corporate and legislative requirements.
General Manager 6.3 Monthly Report Completeness
Outputs Title Description Customer(s) Corporate
Objective/Notes Result Measures
1. Performance management for;
- Workplace Health & Safety
- Water Services - Reticulation
- Wastewater Services - Engineering &
Maintenance - Administration Support
Report monthly the measurable outputs of the unit against Corporate and legislative requirements.
General Manager – CRW&W CRW&W - Operations
6.2 Monthly Report Completeness Branch Capital Budget % spent Branch operating performance within Operating Budget Timeliness of Branch operating initiative completion Branch Safety Performance
# 2051241 Water & Waste Page 18 of 48
2. Council Reports Review of reports relating to Operations branch for submission to General Manager for approval to provide to Water & Waste Committee
General Manager - CRW&W 6.3 Consistency of reporting format; Accurate, defensible, and clear report content
3. Business Excellence Systems Views, Self Assessment Reports and Continuous Improvement support for the Branch
Ensure Business Excellence principles are applied to processes within Operations branch
Branch staff 6.4 Processes mapped and PDSA techniques applied Ongoing maintenance of outcomes from PDSA techniques
Performance Measurement Result Measures (Title) Result Measure (Description) Result Targets Source of Data Reporting Frequency 1.Monthly Report Completeness
Assess reports to check that they include cumulative data on “Activity” performance vs output
100% complete MMS Monthly
ACTIVITY OPERATIONS – WATER SERVICES - RETICULATION Mission: To supply potable water, be cost effective and meet the Customer Service Standards
Officer Responsible: Water Services Coordinator
Staffing Level (FTE) 90
Financial Summary 09/10 Budget 10/11 Budget 11/12 Budget 12/13 Budget 13/14 Budget
Revenue 49,519,538 52,235,950 54,982,008 57,549,771 59,504,320
Expenses 34,828,266 37,510,786 40,786,589 43,495,373 45,406,952
# 2051241 Water & Waste Page 19 of 48
Operating Initiatives Relevant linkage(s) Completion Date
Outputs Title Description Customer(s) Corporate
Objective/Notes Result Measure
1. Potable Water Connections to the Regional water supply system; supply of potable water to a quality equal to or better than the Australian Drinking Water Guidelines; water supply systems include: Freshwater Supply System Behana Creek Supply System Mossman & Port Douglas Supply
System Daintree Supply System Whyanbeel Supply System Minor Rural Supply Systems Distribution System
Public 4.1
Freshwater Treatment Plant efficiency Compliance with Extraction Licence requirements Water Supply Quality Continuity of Service Measures
2. Infrastructure Maintenance Maintenance of water infrastructure to service demands; principle assets are: Freshwater Treatment Plant Mossman Treatment Plant Daintree Treatment Plant Whyanbeel Treatment Plant Intakes Numerous Pump Stations Distribution Network Reservoirs and storages
Public 4.4 Continuity of Service.
# 2051241 Water & Waste Page 20 of 48
3. Asset Information Supply of Asset information on underground assets for the purpose of locating utilities
Public, CRC, Utilities 4.4 % Completion Rate based on availability and reliability of requested information.
Performance Measurement Result Measures (Title) Result Measure (Description) Result Targets Source of Data Reporting
Frequency 1. Compliance with Extraction Licence requirements
Flow data represents the total volume of water extracted from our various supplies for the purpose of potable water. Flow data will be assessed against licence limits
100% Compliance Operational data Monthly
2. Water Supply Quality – Urban & Rural Compliance of supply quality to the consumer in line with the Australian Water Drinking Guidelines and Cairns Water Customer Service Standards Public Health Act 2005) & Water Supply (Safety & Reliability) Act 2008.
100% Compliance (cumulative annual target)
NATA Certified Lab Results
Monthly
a. eColi 100% 0 per 100mL Water Quality Testing Monthly b. Turbidity 95% < 5 NTU Water Quality Testing Monthly c. pH 98% within 6.0 – 8.5 Water Quality Testing Monthly d. Colour 98% < 15 colour units Water Quality Testing Monthly e. Drinking Water Quality Complaints per 1000 Connections / Year - Number of water quality complaints received from customers
< 10 per 1000 connections (cumulative annual target)
Computerised Maintenance Management System (CMMS), CRM
Monthly
f. Drinking Water Quality Incidents / Year - Recording of incidents occurring in water supply
< 15 per year CMMS, CRM Annually
# 2051241 Water & Waste Page 21 of 48
3. Continuity of Service Measures Business requirements as set down in Water & Waste Customer Service Standards
100% compliance with Customer Charter
Operational Data Monthly
a. Mains Breaks per 100km / Year 17.9 CMMS, CRM Monthly b. Restoration of Services within 5 hours for unplanned interruptions - Time based analysis measured through MMS (E Forms)
95% CMMS, CRM Monthly
c. Number of Customers affected by unplanned interruptions per annum
TBA CMMS, CRM Monthly
d. Maximum water pressure at boundary (Class 1 buildings) - As defined in the Plumbing & Drainage Act 2002.
500 KPA Demand Management Monthly
e. Minimum water pressure expectation at boundary - Business requirements as set down in Water & Waste customer service standards
220 KPA Customer Service Standards
As Requested
ACTIVITY OPERATIONS – WASTEWATER SERVICES
Mission: To minimise the operational costs of sewerage service delivery while maintaining agreed service standards
Officer Responsible: Wastewater Services Coordinator
Staffing Level (FTE) 58
Financial Summary 09/10 Budget 10/11 Budget 11/12 Budget 12/13 Budget 13/14 Budget
Revenue 93,131,585 88,982,550 82,310,753 84,891,086 85,741,725
Expenses 44,810,150 47,911,871 50,282,158 52,696,734 54,582,495
Operating Initiatives Relevant linkage(s) Completion Date 1. Develop a ten (10) year cycle for Inflow/ Infiltration Inspections Corporate Plan 10.2.1 Jun 2016
# 2051241 Water & Waste Page 22 of 48
Outputs Title Description Customer(s) Corporate
Objective/Notes Result Measure
1. Treated Wastewater Connection to Regional Sewer System; Production of a high quality final effluent
Regulatory Agencies (EPA), Public
4.1 Regulatory compliance as defined in License #5010000159.
2. Infrastructure Maintenance
Maintenance of wastewater infrastructure to service demands; Principal assets to be maintained include: Major Treatment Plants (8) Estuarine discharge points (6) Freshwater discharge points (2) Pumping Stations (240) Sewerage mains (1,750,km)
Public 4.4 Service response measures.
3. Sewer Overflow or Blockage Responses
Response time to notified sewer blockages or overflows
Public 4.1 Service response measures.
4. Complaint Responses Response time to complaints received relating to the sewer network or treatment plants
Public 6.5 Service response measures.
Performance Measurement Result Measures (Title) Result Measure
(Description) Result Targets Source of Data Reporting Frequency
1.Regulatory Compliance a. Odour Complaints Number of Odour complaints
recorded per 1000 connections
<3 per 1000 connections
MMS Monthly
b. Number of Overflows Number of Overflows recorded per 100Km of main
<15 per 100Km MMS Monthly
2. Service Response
# 2051241 Water & Waste Page 23 of 48
a. Service Response Priority 1 events when service restored within 5 hours
>95% MMS Monthly
b. Service Response Priority 1 events when service restored within 1 hour
>95% MMS Monthly
c. Sewer Blockages
Number of blockages recorded per 100Km of main
<10 per 100Km MMS Monthly
ACTIVITY ENGINEERING AND MAINTENANCE Mission: To minimise lifecycle costs of assets while maintaining agreed service standards.
Officer Responsible: Senior Maintenance Engineer Operations
Staffing Level (FTE) 28
Financial Summary 09/10 Budget 10/11 Budget 11/12 Budget 12/13 Budget 13/14 Budget
Revenue 607,426 628,373 650,074 674,904 700,686
Expenses 526,931 585,521 638,586 677,397 716,263
Operating Initiatives Relevant linkage(s) Completion Date
Outputs Title Description Customer(s) Corporate
Objective/Notes Result Measure
1.Reliability and availability of assets
Ensure reliable operation of Assets Operations 4.1 Reliability and Availability Rates
# 2051241 Water & Waste Page 24 of 48
2. Review of assets Review of assets to current Australian Standards; Condition monitoring and assessment of water, wastewater and waste assets.
Operations 4.4 % of assets for which condition assessments are current
3 Preventative maintenance Undertake preventative maintenance to reduce unplanned interruptions to asset performance
Operations 4.4 Level of unplanned maintenance
Performance Measurement Result Measures (Title) Result Measure
(Description) Result Targets Source of Data Reporting Frequency
1. Reliability and Availability Rates
Equipment availability at a parent asset level
98% of equipment available
Maintenance Management System
Monthly
2.Review of assets Asset Information updated in Matman
100% Above ground assets
MMS Annually
3 Preventative maintenance Completion rate of planned maintenance activities
<80% of all Preventative Maintenance work generated
MMS Monthly
BRANCH INFRASTRUCTURE
Financial Summary 09/10 Budget 10/11 Budget 11/12 Budget 12/13 Budget 13/14 Budget
Revenue 5,488,555 5,640,686 5,797,561 6,002,123 6,214,000
Expenses 5,503,628 5,694,828 5,892,187 6,117,756 6,351,822
Mission: To effectively plan, manage and deliver the region’s Utility Infrastructure to meet the needs of the community to ensure a sustainable future
Officer Responsible:
Staffing Level (FTE) 37
# 2051241 Water & Waste Page 25 of 48
ACTIVITY INFRASTRUCTURE – MANAGEMENT AND ADMINISTRATION SUPPORT
Mission: To effectively plan, manage and deliver the City's Utility Infrastructure to meet the needs of the community to ensure a sustainable future
Officer Responsible: Manager, Infrastructure
Staffing Level (FTE) 9
Financial Summary 09/10 Budget 10/11 Budget 11/12 Budget 12/13 Budget 13/14 Budget
Revenue 1,214,528 1,245,198 1,276,646 1,321,439 1,367,804
Expenses 1,203,050 1,243,741 1,285,617 1,334,445 1,385,079
Operating Initiatives Relevant linkage(s) Completion Date
Outputs Title Description Customer(s) Corporate
Objective/Notes Result Measures
1. Performance management for;
- Project Delivery - Planning & Design - Asset Management - Cleaner Seas - Infrastructure - Administration Support
Report monthly the measurable outputs of the unit against Corporate and legislative requirements.
General Manager – CRW&W CRW&W - Operations
6.2 Monthly Report Completeness Branch Capital Budget % spent Branch operating performance within Operating Budget Timeliness of Branch operating initiative completion Branch Safety Performance
# 2051241 Water & Waste Page 26 of 48
2. Council Reports Review of Infrastructure branch Water & Waste Committee reports for submission to General Manager for approval
General Manager - CRW&W 6.3 Consistency of reporting format; Accurate, defensible, and clear report content
3. Business Excellence Systems Views, Self Assessment Reports and Continuous Improvement support for the Branch
Ensure Business Excellence principles are applied to processes within Infrastructure branch
Branch staff 6.4 Processes mapped and PDSA techniques applied Ongoing maintenance of outcomes from PDSA techniques
4. Capital Works Program Management
- Development of 10 Year Capital Works Program and Annual Capital Works Program - Review and performance reporting of Annual Capital Works Programs
General Manager - CRW&W
6.2 Timeliness of the development and quarterly review of the Annual and 10 Year Capital Works Program Completion of Annual Capital Works Program (Actual and Committals Expenditure)
Performance Measurement Result Measures (Title) Result Measure
(Description) Result Targets Source of Data Reporting Frequency
1. Annual development and quarterly review of annual Capital Works Program
Delivery of adopted annual Capital Works Program within forecasted time and budget
Adoption of 10 Year Annual Capital Works program by June 09
Council Report Annual
Review (cost, time) of Annual Capital Works Program
Financial Reports and Branch reports
Quarterly
# 2051241 Water & Waste Page 27 of 48
90% completion of Annual Capital Works Program by June 09
Financial Reports and Branch reports
Monthly
2. Completion of Operating activities on time and within budget
Delivery of agreed Operating tasks within forecasted time and budget
90% of Operating budget achieved within annual reporting period on Budget
Operating Budget Report Monthly
ACTIVITY INFRASTRUCTURE –PROJECT DELIVERY
Mission: Strive to provide effective and efficient capital works project delivery within time and budget
Officer Responsible: Executive Engineer, Infrastructure Project Delivery
Staffing Level (FTE) 10
Financial Summary 09/10 Budget 10/11 Budget 11/12 Budget 12/13 Budget 13/14 Budget
Revenue 1,049,256 1,082,110 1,116,050 1,157,500 1,200,495
Expenses 1,050,216 1,089,258 1,129,787 1,173,940 1,219,822
Operating Initiatives Relevant linkage(s) Completion Date
1. Construction of new reservoirs at Fishery Falls Corporate Goal 4 TMP Sub Plan 10
June 2010
2. Review of feasibility for Copperlode Falls Dam Hydro-power generation Corporate Goal 1 March 2010 3. Contract documentation review Corporate Goal 6 June 2010
# 2051241 Water & Waste Page 28 of 48
Outputs Title Description Customer(s) Corporate
Objective/Notes Result Measures
1. Water, Wastewater and Waste Asset Project Delivery
- Project delivery and contract administration for Water, Wastewater and Waste assets
- Coaching and mentoring of Project Managers
Operations (Water & Wastewater), Waste Services
4.1 Capital Projects delivered to the brief and delivered on time
2. Demand Management Implementation of Demand Management Initiatives
General Manager – CRCW&W
4.2 Compliance and effectiveness of Demand Management Strategy Program
Performance Measurement Result Measures (Title) Result Measure
(Description) Result Targets Source of Data Reporting Frequency
1. Capital Projects delivered to the brief and delivered on time
Capital Projects are delivered within budget
Capital Works expenditure within 80% of YTD forecasted budget
Capital budget report Monthly
# 2051241 Water & Waste Page 29 of 48
ACTIVITY INFRASTRUCTURE – PLANNING AND DESIGN Mission: To plan and design water, wastewater and waste infrastructure that meets the needs of the community on the basis of
environmental, social and economic sustainability. Officer Responsible: Executive Engineer Planning & Design
Staffing Level (FTE) 14
Financial Summary 09/10 Budget 10/11 Budget 11/12 Budget 12/13 Budget 13/14 Budget
Revenue 1,448,699 1,485,792 1,524,191 1,574,123 1,625,755
Expenses 1,465,717 1,520,422 1,576,709 1,638,416 1,702,428
Operating Initiatives Relevant linkage(s) Completion Date 1. Implement Fluoridation of drinking water supplies at Freshwater Water Treatment
Plant Corporate Goal 4 TMP Sub Plan 2
Dec 2009
2. Complete Concept Design for recycled water scheme incorporating Botanical Gardens and Smithfield Village development
Corporate Goal 4 TMP Sub Plans 10 and 14
June 2010
Outputs Title Description Customer(s) Corporate
Objective/Notes Result Measures
1. Water, Wastewater and Waste Strategic Infrastructure Planning
Strategic and tactical planning for future infrastructure
Ratepayers 4.4 Infrastructure capacity
2. Development Application Assessment Advice
Advise of Cairns Regional Council Water & Waste requirements in accordance with IPA
Development Assessment 6.5 Timely and accurate advice on Development Applications
# 2051241 Water & Waste Page 30 of 48
Performance Measurement Result Measures (Title) Result Measure
(Description) Result Targets Source of Data Reporting Frequency
1. Infrastructure capacity satisfies customer service standards
Water – Source, treatment and distribute to meet design standard. Eg. Safe yield, production capacity, water quality,
100% compliance Planning Reports and Demand monitoring, Operational Reports
Bi-annual
Wastewater – Collection, transport, treatment system capacity exceeds peak design loads
100% compliance Planning Reports and Pump station performance, Operational Reports
Bi-annual
Timely delivery of planning reports to set program deadlines
Cover each wastewater catchment within five year cycle – 2 per year. Develop & utilise a hydraulic model of all of Cairns Regional Council water and wastewater reticulation network.
Internal and external planning reports – captured in DM5
Annual
2. Timely and accurate advice on Development Applications
Timeliness based on date defined by Development Assessment & Statutory period defined by IPA
90% completed by date Register of Development projects
Monthly
Accurate based on no of returns from Development Assessment
Less than 10% Register of Development projects
Monthly
# 2051241 Water & Waste Page 31 of 48
ACTIVITY INFRASTRUCTURE – ASSET MANAGEMENT Mission: To have an on demand integrated assets and GIS system, supplying information and services; timely, accurately and
efficiently. Officer Responsible: Asset Co-ordinator
Staffing Level (FTE) 4
Financial Summary 09/10 Budget 10/11 Budget 11/12 Budget 12/13 Budget 13/14 Budget
Revenue 351,900 361,213 370,779 383,942 397,573
Expenses 356,773 370,865 385,516 400,874 416,844
Operating Initiatives Relevant linkage(s) Completion Date 1. Develop linkage between Corporate systems and GIS to reflect age, operational
status and maintenance history. Corporate Goal 4/6 June 2010
2. Implement detailed asset renewal strategies for inclusion in Asset Management Plans for all asset classes.
Corporate Goal 4 June 2010
Outputs Title Description Customer(s) Corporate
Objective/Notes Result Measures
1. Asset Management Plans (AMP) for Water & Waste Infrastructure
An Asset Management Strategy for Water & Waste Infrastructure, including Asset Management Plans (AMP) and the maintenance of asset data for all asset classes.
Operations, Planning & Design, Project Delivery, Business Services.
4.4 Asset Management Plans developed for all asset classes
# 2051241 Water & Waste Page 32 of 48
2. GIS Strategy for Water & Waste
On going maintenance and co-ordination of Geographic Information System (GIS) Strategy for supporting the operations of Water & Waste in delivering its service target.
Operations, Planning & Design, Project Delivery & Waste Services, Business Services
4.4 Endorsement and Implementation of Spatial Data Strategy
3. Capitalisation of Assets Asset information entered into asset registers with financial information
Asset owners 4.4 Capitalisation of assets
4. GIS Support for Water & Waste
GIS Technical Support Services to Water & Waste
Operations, Planning & Design, Project Delivery & Waste Services and Business Services.
4.4 GIS support provided to customer needs
Performance Measurement Result Measures (Title) Result Measure
(Description) Result Targets Source of Data Reporting Frequency
1. Asset Management Plans developed for all asset classes
Asset Management plans developed in accordance with CRW&W Departmental Project Plan
100% compliance with Project plan
Project Plan #1534790 �
Monthly
2. Endorsement & Implementation of Spatial Data Strategy
Timely delivery of Spatial Data Strategy
100% compliance Spatial Data Strategy Bi-annual
3. Capitalisation of Assets Value of Work In Progress due for capitalisation
95% all projects capitalised within 7 working days of asset acquisition information being supplied
Work In progress report Oracle Project status
Quarterly
4. GIS support provided to customer needs
Timely and accurate response to requests or set program deadlines for technical support
95% of jobs requested completed within timeframe agreed with customer
Advice and reports Monthly
# 2051241 Water & Waste Page 33 of 48
ACTIVITY MAJOR PROJECTS – CLEANER SEAS Mission: While utilising our values, we strive to provide effective and efficient delivery of the project within time and budget.
Officer Responsible: Wastewater/BNR Project Engineer
Staffing Level (FTE) 3
Financial Summary 09/10 Budget 10/11 Budget 11/12 Budget 12/13 Budget 13/14 Budget
Revenue 1,424,172 1,466,374 1,509,895 1,565,120 1,622,373
Expenses 1,427,873 1,470,543 1,514,558 1,570,081 1,627,648
Operating Initiatives Relevant linkage(s) Completion Date Liquid Stream Commissioning of Northern, Southern, Edmonton, Marlin Coast WWTP Corporate Goal 1 November 2009
Outputs Title Description Customer(s) Corporate
Objective/Notes Result Measures
1. Wastewater Treatment Plant Upgrade
Project delivery and contract administration using a Project Alliance (Cleaner Seas Project Alliance) delivery model
General Manager – CRCW&W
4.4 Project delivery measures
Performance Measurement Result Measures (Title) Result Measure
(Description) Result Targets Source of Data Reporting Frequency
1. Project delivery measures
Total Project Cost $188.29 million Project Cost ledger Monthly Final Turn Out Cost $148.66 million Project Cost Ledger Monthly
# 2051241 Water & Waste Page 34 of 48
Completion with PAA completion dates
100% compliance with project milestones
Project management Monthly
Level of unplanned disruption to actual operations
Nil unplanned disruptions
Plant records Monthly
Compliance with EPA License EPA License conditions Plant records Monthly
BRANCH WASTE & ENVIRONMENTAL MANAGEMENT - 6100 Mission: To provide cost effective, efficient and sustainable Waste & Environmental Management Services
Officer Responsible: Manager Waste & Environment
Staffing Level (FTE) 30
Financial Summary 09/10 Budget 10/11 Budget 11/12 Budget 12/13 Budget 13/14 Budget
Revenue 28,142,473 29,733,528 31,464,049 32,170,692 33,202,433
Expenses 26,808,473 28,851,528 30,899,050 32,003,442 33,127,433
ACTIVITY WASTE & ENVIRONMENT MANAGEMENT & ADMINISTRATION SUPPORT - 4000 Mission: To provide cost effective, efficient and sustainable Waste Management Services.
Officer Responsible: Manager Waste & Environment
Staffing Level (FTE) 1 Financial Summary 09/10 Budget 10/11 Budget 11/12 Budget 12/13 Budget 13/14 Budget
Revenue 22,492,244 23,894,805 25,412,037 25,881,467 26,686,609
Expenses 5,866,851 7,375,799 8,799,433 9,065,413 9,349,017
# 2051241 Water & Waste Page 35 of 48
Operating Initiatives Relevant linkage(s) Completion Date 1. CRC Waste Management Strategy completed and adopted by Council Corporate Plan 4.3.1 December 2009
Outputs Title Description Customer(s) Corporate
Objective/Notes Result Measures
1. Performance management for;
- Contract Management - Buy back Shop - Waste Transfer Station
Operations - Landfill Operation - Materials Recovery (MRF)
- Environmental Management Administration Support
Report monthly the measurable outputs of the unit against Corporate and legislative requirements.
General Manager – CRW&W CRW&W – Waste & Environment
6.2 Monthly Report Completeness Branch Capital Budget % spent Branch operating performance within Operating Budget Timeliness of Branch operating initiative completion Branch Safety Performance
2. Council Reports Review of reports relating to Infrastructure branch for submission to General Manager for approval to provide to Water & Waste Committee
General Manager - CRW&W 6.3 Consistency of reporting format; Accurate, defensible, and clear report content
3. Business Excellence Systems Views, Self Assessment Reports and Continuous Improvement support for the Branch
Ensure Business Excellence principles are applied to processes within Infrastructure branch
Branch staff 6.4 Processes mapped and PDSA techniques applied Ongoing maintenance of outcomes from PDSA techniques
# 2051241 Water & Waste Page 36 of 48
Performance Measurement Result Measures (Title) Result Measure
(Description) Result Targets Source of Data Reporting Frequency
1. Contracts delivered in accordance with contract requirements
Assessment of whether contractors meet contract requirements
100% compliance with contract conditions
Infringement notices issued and RRS system
Monthly
ACTIVITY WASTE SERVICES – CONTRACT MANAGEMENT - 4129 Mission: To have in place the best value for money contracts for the delivery of waste services.
Officer Responsible: Waste Contracts Supervisor
Staffing Level (FTE) 1
Financial Summary 09/10 Budget 10/11 Budget 11/12 Budget 12/13 Budget 13/14 Budget Revenue 1,803,857 1,859,488 1,916,878 1,989,610 2,065,115
Expenses 13,546,080 13,887,078 14,236,882 14,736,182 15,252,919
Operating Initiatives Relevant linkage(s) Completion Date 1. Domestic & Council facility Waste Collection contracts renewed Corporate Plan 4.3.1 June 2010
Outputs Title Description Customer(s) Corporate
Objective/Notes Result Measures
1. Domestic, Council and Commercial waste and recyclables collection and transportation
Contract No. 75086 Kerbside collection of domestic waste
Contract No. 75222 Council Facilities waste collection
Contract No. 75087 Kerbside
Residents and ratepayers Council internal branches Commercial businesses
1.4 Response time to new service requests
1.4 Number of missed services
# 2051241 Water & Waste Page 37 of 48
collection of domestic (including Douglas Shire), commercial and Council Facility recycling.
Contract No. 40-04/05 Domestic, Commercial and Council Waste Collection, Transport & Disposal Services
1.4 Response time to missed service requests
1.4 Response time to repair/replacement requests
1.4 Number of RRS complaints
2. Treatment of waste at Sita Environmental Solutions waste management facility
Contract No. 1396 Treatment of domestic waste
Residents and ratepayers Council internal branches Tablelands Regional Council
1.4 % diversion of waste from landfill
1.4 % beneficial reuse of waste
3. Contract No. 75230 Bio-solids
Removal, transport and spreading of Council bio-solids waste
CRCWW Operations 1.4 Number of RRS complaints Number of EPA infringement notices received
Performance Measurement Result Measures (Title)
Result Measure (Description)
Result Targets Source of Data Reporting Frequency
1. Response time to new service requests
Time taken to deliver new services for:
Contract No. 75086 Kerbside collection of domestic waste
100% of requests completed within 24 hours
RRS system/Contractor report Monthly
Contract No. 75222 Council Facilities waste collection
# 2051241 Water & Waste Page 38 of 48
Contract No. 75087 Kerbside collection of domestic, commercial and Council Facility recycling.
Contract No. 40-04/05 Domestic, Commercial and Council Waste Collection, Transport & Disposal Services
2. Number of missed services
Number of missed services for: Contract No. 75086 Kerbside
collection of domestic waste Less than or equal to 1 per 1000 services
CRM system/Contractor report Monthly
Contract No. 75222 Council Facilities waste collection
Contract No. 75087 Kerbside collection of domestic, commercial and Council Facility recycling.
3. Contract No. 40-04/05 Domestic, Commercial and Council Waste Collection, Transport & Disposal Services
Less than 20 justifiable missed services per month
Contract No. 75248 Processing of Green Waste
Zero missed services per month
Contract No. 75259 Pre-qualified Suppliers Arrangement for the Removal and Disposal of Hazardous Waste
Zero missed services per month
4. Response time to missed service requests
Time taken to respond to missed services for:
Contract No. 75086 Kerbside collection of domestic waste
100% of requests completed within 24 hrs
RRS system/Contractor report Monthly
# 2051241 Water & Waste Page 39 of 48
Contract No. 75222 Council Facilities waste collection
Contract No. 75087 Kerbside collection of domestic, commercial and Council Facility recycling.
Contract No. 40-04/05 Domestic, Commercial and Council Waste Collection, Transport & Disposal Services
5. Response time to repair/replacement requests
Time taken to respond to repairs and replacement requests for:
Contract No. 75086 Kerbside collection of domestic waste
100% of requests completed within 48 hours
RRS system/Contractor report Monthly
Contract No. 75222 Council Facilities waste collection
Contract No. 75087 Kerbside collection of domestic, commercial and Council Facility recycling.
Contract No. 40-04/05 Domestic, Commercial and Council Waste Collection, Transport & Disposal Services
6. Number of RRS complaints
Level of customer satisfaction for:
Contract No. 75086 Kerbside collection of domestic waste
Less than 5 justifiable complaints per month
RRS system/Contractor report Monthly
Contract No. 75222 Council Facilities waste collection
# 2051241 Water & Waste Page 40 of 48
Contract No. 75087 Kerbside collection of domestic, commercial and Council Facility recycling.
Contract No. 1396 Treatment of domestic waste Council
Contract No. 75230 Bio-solids Removal
Contract No. 40-04/05 Domestic, Commercial and Council Waste Collection, Transport & Disposal Services
Contract No. 75259 Pre-qualified Suppliers Arrangement for the Removal and Disposal of Hazardous Waste
7. % diversion of waste from landfill
Amount of waste diverted from landfill
Minimum 50% of waste diverted
RRS system/Contractor report Monthly
8. % beneficial reuse of waste
Amount of waste beneficially reused
Minimum 20% of waste beneficially reused
RRS system/Contractor report Monthly
9. Number of EPA infringement notices received
Adherence to license conditions for:
Contract No. 75230 Bio-solids Removal
Zero infringement per year
Notices/fines issued by EPA Monthly
Contract No: 38-06/07 For the Operation & Maintenance of Killaloe Transfer Station & Landfill
Contract No. 101-05/06 Supervision of Daintree Transfer Station
# 2051241 Water & Waste Page 41 of 48
Contract No. 100-05/06 Supervision of Newell Transfer Station
Contract No. 101-05/06 Supervision of Cow Bay Transfer Station
ACTIVITY WASTE SERVICES – BUY BACK SHOP - 4126
Mission: To provide items of value for sale and deliver a high level of customer service
Officer Responsible: Waste Services Supervisor Staffing Level (FTE) 2
Financial Summary 09/10 Budget 10/11 Budget 11/12 Budget 12/13 Budget 13/14 Budget
Revenue 266,922 276,264 285,933 297,370 309,265
Expenses 219,371 226,137 236,259 247,502 258,030
Operating Initiatives Relevant linkage(s) Completion Date
Outputs Title Description Customer(s) Corporate
Objective/Notes Result Measures
1. Quality saleable items Items of value recovered from the waste stream and offered for sale
Residents and Ratepayers 1.4 Revenue 1.4 Complaints
# 2051241 Water & Waste Page 42 of 48
Performance Measurement Result Measures (Title) Result Measure
(Description) Result Targets Source of Data Reporting Frequency
1. % Increase in net revenue Increase to net revenue 5% increase in net revenue from previous year
Financial operating statements
Monthly
ACTIVITY WASTE SERVICES – WASTE TRANSFER STATION OPERATIONS - 4101 Mission: To provide sustainable waste management services with a high level of customer service
Officer Responsible: Waste Services Supervisor
Staffing Level (FTE) 12 + Agency staff
Financial Summary 09/10 Budget 10/11 Budget 11/12 Budget 12/13 Budget 13/14 Budget
Revenue 1,906,786 1,971,764 2,038,972 2,119,606 2,203,434
Expenses 3,658,241 3,756,602 3,876,304 4,029,406 4,181,274
Operating Initiatives Relevant linkage(s) Completion Date 1. Develop a plan to introduce short to medium term arrangements for the
supervision of operations at Division 10 Waste & Recycling Transfer Stations and Landfills in order to enter into a combined contract to commence on 1 September 2012.
Corporate Plan 4.3.1 September 2010
# 2051241 Water & Waste Page 43 of 48
Outputs Title Description Customer(s) Corporate
Objective/Notes Result Measures
1. Transfer Station Management
* All transfer stations to be managed in accordance with all legislative requirements, particularly regarding continually increasing resource recovery. * Contract No: 38 – 06/07 Operation and management of Killaloe Transfer Station and Landfill * Contract No: 100 – 02/03 Supervision of Newell Refuse Station * Contract No: 02 – 06/07 Supervision of Cow Bay Transfer Station * Contract No:101 – 05/06 Supervision of Daintree Refuse Station * Contract No: 7 – 05/06 Collection, transportation and disposal of refuse Daintree and Cow Bay Transfer Station * Contract No: 75248 – Processing of Green Waste * Contract No: 75259 – Removal and Disposal of Hazardous Waste * Contract No. 75259 Pre-qualified Suppliers Arrangement for the Removal and Disposal of Hazardous Waste
* Buy Back Shop * MRF * Residents and ratepayers * Commercial operators * Residents and ratepayers * Residents and ratepayers * Council internal branches * Commercial operators
1.4, 6.2 % of resaleable items accepted at the Buy Back Shop % of recyclable items accepted at the MRF Number of complaints % of general waste removed
# 2051241 Water & Waste Page 44 of 48
Performance Measurement Result Measures (Title) Result Measure
(Description) Result Targets Source of Data Reporting Frequency
1. % of resaleable items accepted at the Buy Back Shop
Provide the Buy Back Shop with quality items to sell
80% of items sold within 1 month at Buy Back Shop
Buy Back Shop data Monthly
2. % of recyclable items accepted at the MRF
Provide the MRF with uncontaminated recyclable product
92% of recyclables accepted at MRF
MRF weighbridge data Monthly
3. % of general waste removed
Amount of Council general waste removed from the tipping floor each day
100% of general waste removed by close of business each day
Weighbridge data Monthly
ACTIVITY WASTE SERVICES – LANDFILL OPERATION - 4151 Mission: To manage closed landfills as required by the landfill licences and in accordance with closure plans
Officer Responsible: Waste & Environmental Manager
Staffing Level (FTE) 0
Financial Summary 09/10 Budget 10/11 Budget 11/12 Budget 12/13 Budget 13/14 Budget
Revenue 700,000 724,500 768,288 799,018 811,046
Expenses 1,553,908 1,588,479 1,654,436 1,735,507 1,808,202
# 2051241 Water & Waste Page 45 of 48
Operating Initiatives Relevant linkage(s) Completion Date 1. Closure and Post Closure Plan for Portsmith Landfill completed & peer
reviewed by DERM Corporate Plan 4.3.1 May 2010
2. Site Based Management Plans for Killaloe & Newell Beach landfills revised & Site Development Plans submitted to DERM Corporate Plan 4.3.1 July 2010
Outputs Title Description Customer(s) Corporate
Objective/Notes Result Measures
1. Landfill Management All open and closed landfills to be managed in accordance with all legislative requirements particularly regarding obtaining final profile, monitoring programs and capping
Residents and ratepayers 1.4 Compliance with DERM license and legislative requirements
Performance Measurement Result Measures (Title) Result Measure
(Description) Result Targets Source of Data Reporting Frequency
# 2051241 Water & Waste Page 46 of 48
ACTIVITY WASTE SERVICES – MATERIALS RECOVERY FACILITY (MRF) - 4127 Mission: To recover 90% of recyclable product delivered to the MRF in a safe and efficient manner at a rate of 5 tonnes per hour.
Officer Responsible: MRF Supervisor
Staffing Level (FTE) 7 plus Agency Staff
Financial Summary 09/10 Budget 10/11 Budget 11/12 Budget 12/13 Budget 13/14 Budget
Revenue 972,664 1,006,707 1,041,942 1,083,620 1,126,965
Expenses 1,966,557 2,017,204 2,092,559 2,185,124 2,272,472
Operating Initiatives Relevant linkage(s) Completion Date 1. Complete operational efficiency audit of MRF and present recommendations to
Council Corporate Plan 4.3.1 June 2010
Outputs Title Description Customer(s) Corporate
Objective/NotesResult Measures
1. Saleable recyclable product
Recyclable material sorted into saleable products Residents and ratepayers
1.4 Contaminated material Sorted product sent to market Increase in net revenue
# 2051241 Water & Waste Page 47 of 48
Performance Measurement Result Measures (Title) Result Measure
(Description) Result Targets Source of Data Reporting Frequency
1. % of contaminated material received
Amount of monthly contaminated material delivered to the MRF
Less that 8% of contamination
MRF Weighbridge data Monthly
2. % of sorted product sent to market
Amount of recyclable product sent to market
90% of total received sent to market
MRF weighbridge data Monthly
3. % increase in net revenue Increase to net revenue 5% increase in net revenue from previous year
Financial operating statements
Monthly
ACTIVITY ENVIRONMENTAL MANAGEMENT - 4301 Mission: Ensure that impacts on the environment from Water & Waste’s operations and activities are identified and minimised
Officer Responsible: Waste & Environment Manager
Staffing Level (FTE) 3
Financial Summary 09/10 Budget 10/11 Budget 11/12 Budget 12/13 Budget 13/14 Budget
Revenue - - - - -
Expenses (2,534) 230 3,177 4,307 5,518
Operating Initiatives Relevant linkage(s) Completion Date Review, revise and commence implementation of Water & Waste’s Environmental
Management System Corporate Plan (?) December 2010
# 2051241 Water & Waste Page 48 of 48
Outputs Title Description Customer(s) Corporate
Objective/Notes Result Measures
1. Water & Waste Environmental Licence Compliance Reports
Environmental Licence compliance reports to the Department of Environmental Resources Management
Operations Staff, Infrastructure Staff, Waste Services, Business Services
4.1 No enforcement action by DERM
Performance Measurement Result Measures (Title) Result Measure
(Description) Result Targets Source of Data Reporting Frequency
1. Compliance with Environmental Licence
Reporting that is timely and accurate, associated with the compliance regime at all Water & Waste sites
100% Compliance with Licence
Document Management System
Monthly
2. Coordination of incident scenario(s)
Workshops developed which allow Water & Waste to act out scenario(s) associated with operations
4 scenario sessions per year
Document Management System
Quarterly