 (Working Together for Safety)

BEST PRACTICE IN PREVENTION OFFALLING OBJECTS

Revision 2

19.11.2007

This best practice guidance is intended to address all phases from the design to the removalof equipment, i.e. the design, manufacture, packing, transport, installation, operation,maintenance and removal of equipment. Samarbeid for Sikkerhet (SfS) (Working together forSafety) recommends that each company incorporates this practice into its managementsystems.

Page 2: 8ed33f2b-2fe0-4d46-94c6-9c3fe60b28de

8/12/2019 8ed33f2b-2fe0-4d46-94c6-9c3fe60b28de

http://slidepdf.com/reader/full/8ed33f2b-2fe0-4d46-94c6-9c3fe60b28de 2/11

 

List of Contents 

1. DEFINITIONS 

2. FALLING OBJECTS (FO), MANAGEMENT SYSTEMS AND FOLLOW- UP 

3. DESIGN AND DEVELOPMENT

4. MANUFACTURE 

5. TRANSPOR AND PREPARING FOR TRANSPORT

6. EQUIPMENT AT HEIGHTS, SECURING PERMANENTLY MOUNTED, MOVABLE AND LOOSE

EQUIPMENT 

7. TIDINESS AND CLEANING 

8. WORK SITUATIONS THAT MAY LEAD TO FALLING OBJECTS 

9. PREPARATION, IMPLEMENTATION AND COMPLETION OF WORK AT HEIGHTS 

10. INSPECTIONS

11. REPORTING 

12. TRAINING 

Page 3: 8ed33f2b-2fe0-4d46-94c6-9c3fe60b28de

8/12/2019 8ed33f2b-2fe0-4d46-94c6-9c3fe60b28de

http://slidepdf.com/reader/full/8ed33f2b-2fe0-4d46-94c6-9c3fe60b28de 3/11

 

1. Definitions

Falling object (FO):

An object that moves uncontrollably from one level to a lower level. An incident involving

falling objects should be reported when the energy in the fall is equivalent to or exceeds 40

 joules.

2. Falling objects (FO), management systems and follow-

up

By means of management systems established in their companies, all actors (operators,

drilling contractors, shipowners, service contractors, manufacturers, suppliers, carriers and

base operators) shall implement measures to ensure a reduction in the number of incidents

involving falling objects and prevent such incidents occurring in the future. Management

systems shall address: compliance with own procedures; routines for following up incidents

involving falling objects; and the measurement of results. The system should be included in

the company’s supervision plan. The management system should be incorporated into thecompany’s steering documentation for preventative HSE work and should reflect the actors’

overall goals with respect to injuries and accidents. Goals for continual improvements should

be established.

• 

Follow-up work on FOs should include: goals, strategy, plans, action list, operation

and system maintenance and follow-up of suppliers and third parties.

Requirements to prevent FOs in the entire value chain (see Best Practice DroppedObject Management, page 3) should be included in contracts.

Page 4: 8ed33f2b-2fe0-4d46-94c6-9c3fe60b28de

8/12/2019 8ed33f2b-2fe0-4d46-94c6-9c3fe60b28de

http://slidepdf.com/reader/full/8ed33f2b-2fe0-4d46-94c6-9c3fe60b28de 4/11

3. Design and development

General 

Risk assessments/analyses of design in respect of FOs should be implemented on allequipment which is planned for use at heights. To the extent to which it is possible, any

findings from such analyses should result in redesigns being undertaken before the

manufacture of equipment is initiated. It must be possible to track all decisions/choices

relating to solutions back to such risk assessments. Any weaknesses in equipment which

cannot be prevented by means of design or redesign should be reported to the client so that

compensatory measures can be evaluated and implemented.

For new installations or installation of safety devices on existing equipment, user

manuals/maintenance instructions should be made available or prepared.

Permanently mounted equipment (static, moveable and temporary) 

Based on the results of risk analyses and experience with equipment, safety devices should

be designed and installed on equipment which represents a potential FO and on equipment

where slinging parts can pose a hazard.

Barriers to protect against FOs should be integrated into the equipment itself. Where this isnot possible, safety devices should be installed by the supplier.

The equipment should be designed in such a way that inspections and maintenance work

can easily be carried out without any risk from FOs. Fastening systems for equipment should

be able to withstand the maximum load to which the equipment may be exposed.

To ensure continual improvements, a system for experience transfer between owner/user

and manufacturer should be established. This system must ensure that other users are

provided with the necessary experiences and information about deficiencies in the equipment

within a reasonable period of time.

Suppliers of assembled equipment (cranes, top drives, pipe handling equipment, etc) should

provide image-based inspection and maintenance manuals (see Functional Requirements in

enclosure) which identify potential FOs, including descriptions of how barriers should be

inspected and maintained.

Tools 

All tools should be designed so that they can be properly secured.

Page 5: 8ed33f2b-2fe0-4d46-94c6-9c3fe60b28de

8/12/2019 8ed33f2b-2fe0-4d46-94c6-9c3fe60b28de

http://slidepdf.com/reader/full/8ed33f2b-2fe0-4d46-94c6-9c3fe60b28de 5/11

 

Hand tools 

Suppliers should provide documentation that fastening points for hand tools are dimensioned

in line with the maximum fall energy for tools up to 5 kg. It should be ensured that provisions

for weakling couplings are made.

Heavy tools 

Suppliers should provide documentation that fastening points for safety devices are

dimensioned in line with the maximum fall energy for tools up to 5 kg.

4. Manufacture

Manufacturing should be performed in accordance with recognised standards and

specifications.

Any design changes which are made during the manufacturing phase should be assessed

for risk in respect of FOs. It must be possible to track all decisions/choices relating tosolutions back to such risk assessments.

The risk analyses that are carried out should be documented and should be made available

on request.

Before the finished product leaves the place of manufacture, it should be inspected for

potential FOs. Such inspections should be documented.

5. Transport and preparing for transport

This means preparation work performed at the place of dispatch, transport to the quay,

reloading at the base, seagoing transport, lifting of loads onto installations, internal transport

on board, and return loads to base/land. Ref. NORSOK-R003, Section 7.11.

This also includes preparation at the place of dispatch, transport to the installation, reloading

onto the installation, internal transport on the installation and return loads, where appropriate.Ref. NORSOK-R005, Section 7.12.

Page 6: 8ed33f2b-2fe0-4d46-94c6-9c3fe60b28de

8/12/2019 8ed33f2b-2fe0-4d46-94c6-9c3fe60b28de

http://slidepdf.com/reader/full/8ed33f2b-2fe0-4d46-94c6-9c3fe60b28de 6/11

 

Suppliers 

Suppliers should pack and prepare equipment for transport and should use the correct load-

bearing equipment for the equipment involved. The load-bearing equipment should be

approved; ref. DNV 2.7.1. Furthermore, suppliers should ensure that the personnel involved

have sufficient competence in packing work.

Dispatches should be checked for loose objects before being transported and such

inspections should be documented.

Bases

Load-bearing equipment should be checked at the base/installation for loose objects before

cargo is loaded on board boats. All types of pipes and risers should be checked for loose

objects inside the pipes and for any loose thread protectors or covers.

Installations

Load-bearing equipment should be checked for loose objects before loads proceed on

internal transport for installation.

Offshore internal transport and return loads

The above-mentioned activities should also be performed on installations before load-

bearing equipment is returned.

Sea transport 

Captains should notify installations/bases if cargo has been exposed to abnormal stress or

possible damage during transport.

Page 7: 8ed33f2b-2fe0-4d46-94c6-9c3fe60b28de

8/12/2019 8ed33f2b-2fe0-4d46-94c6-9c3fe60b28de

http://slidepdf.com/reader/full/8ed33f2b-2fe0-4d46-94c6-9c3fe60b28de 7/11

 

6. Equipment at heights, securing permanently mounted,

movable and loose equipment

For equipment which represents a hazard due to FOs, securing measures above and beyond

normal fastenings should be established. Such secondary securing measures should be

prepared during the design and construction phases. Secondary securing measures should

withstand the maximum loads that may arise should normal fastenings fail. All equipment

should be secured according to movement, vibration, load in use, temperature, corrosion,

weather conditions (e.g. safe sea transport).

Securing measures should be incorporated into inspection and maintenance programmes.

For new installations or installation of securing devices on existing equipment, user

manuals/maintenance instructions should be made available or prepared by the

manufacturers.

7. Tidiness and cleaning

High levels of tidiness and cleanliness should be maintained at all times.

Responsible companies should set standards for which levels of tidiness and cleanliness are

acceptable. Standards of tidiness and cleanliness in areas should be made visible.

Guidelines should be established for how all equipment should be positioned.

8. Work situations that may lead to falling objects

When performing work at heights, personnel should at all times have full control of their own

equipment and tools as well as of any activity going on at lower levels.

For work situations that may lead to FOs, the following safeguard should be taken:

lower levels should be cordoned off. When cordoning off areas, consideration must be given

to the possibility that FOs can hit obstacles, change direction and thereby land outside the

anticipated landing area.

Page 8: 8ed33f2b-2fe0-4d46-94c6-9c3fe60b28de

8/12/2019 8ed33f2b-2fe0-4d46-94c6-9c3fe60b28de

http://slidepdf.com/reader/full/8ed33f2b-2fe0-4d46-94c6-9c3fe60b28de 8/11

Safety nets cannot replace these barriers, but can be used as additional ones.

Workplaces shall be secured when they are left unmanned, even if only temporarily.

All tools, parts and equipment should be secured. Weaklink couplings should be used in

safety devices for tools and equipment. This is so as to prevent personal injury in situations

where tools or equipment get caught up or stuck. Use of tool bags with suitable anchorage

points is recommended. Securing of tools directly to body parts should not occur.

When using manriders, tools/equipment should be fastened by safety wires to the manrider

wire. It is recommended that bags be used if several components are to be used at height.

Safety equipment should be regularly maintained to ensure that it works as intended. The

parties involved should carry out assessments of risk associated with FOs and implement

any necessary measures, both during the planning stage and throughout the entire workprocess.

The time and resources required for checking for potential falling objects and safeguarding

tidiness and cleanliness should be taken into account when planning operations.

A control system for everything that is brought up to heights should be established.

For example, a separate locker for tools to be used for work at heights could be designated,

with a list of its contents. Should such a system be introduced, someone should be

designated responsibility for the locker. Lockers and their contents should be clearly marked

with both area of application and contents.

A separate log book for equipment that is brought up to heights should also be established.

Someone should be designated responsibility for following up the log book.

The locker for equipment to be used at heights should be inspected at the end of each shift

and the log book should be updated.

Page 9: 8ed33f2b-2fe0-4d46-94c6-9c3fe60b28de

8/12/2019 8ed33f2b-2fe0-4d46-94c6-9c3fe60b28de

http://slidepdf.com/reader/full/8ed33f2b-2fe0-4d46-94c6-9c3fe60b28de 9/11

9. Preparation, implementation and completion of work

at heights

Preparation 

A supervisor should be appointed for this task.

Before work commences, a risk assessment/safe job analysis should be carried out in which

both the supervisor and the operatives participate. The risk of FOs in particular should be

discussed at such meetings.

The supervisor should:  

•  Establish plans for cordoning of the work area and safeguarding it against potentialFOs (the work area should also be checked for tools/equipment left behind fromprevious work/operations).

•  Plan requirements for access and necessary tools/equipment.•  Familiarise himself/herself with special procedures and coordinate simultaneous

operations. Delegate responsibility for tools in the work team.

Implementation 

Operatives should:  

•  Assess their own activities in relation to any other activities that may be going on atthe same time.

•  Safeguard tidiness, cleanliness and control over all loose components during thecourse of the activity.

•  Stop an operation in the event of changes and assess the need for new,compensatory measures.

•  Check that safety equipment for work at heights is correct and in good condition.

Completion 

•  The work area should be checked for tools/equipment left behind and then tidied up.This should be verified by a person who is not involved in the activity. Verificationcan be done by keeping account of what is taken up to and what is brought downfrom heights.

•  Record feedback regarding possible design improvements, requirements, bestpractices, procedures and instances of non-compliance, where appropriate.

Page 10: 8ed33f2b-2fe0-4d46-94c6-9c3fe60b28de

8/12/2019 8ed33f2b-2fe0-4d46-94c6-9c3fe60b28de

http://slidepdf.com/reader/full/8ed33f2b-2fe0-4d46-94c6-9c3fe60b28de 10/11

10. Inspections

Programmes 

Permanently and temporarily mounted equipment at heights which pose potential risks due

to FOs should be identified and made visible. Periodic inspections should be included,

recorded and followed up as part of the maintenance programme.

Such inspections should safeguard equipment which is mounted at heights and which is not

in use. Removal of such equipment should be considered. Periodic inspections should be

carried out, focusing on FOs according to the visual inspection systems.

Periodic inspections which focus on falling objects in all other zones/areas should also be

undertaken.

Completion 

Inspections should be carried out by personnel who have been trained in observation

techniques.

It is recommended that personnel from other divisions participate in such inspection teams. Itis particularly important that new/inexperienced personnel participate so that they can learn

about good observation techniques.

Use of individual checklists/inspection guides for the different areas is recommended. These

should be updated in conjunction with the installation of new equipment (preferably with

descriptive illustrations).

Plans 

An annual inspection plan should be drawn up and should include:

•  Designated responsibility for and intervals of inspections and updates of plans andrevisions.

•  Inspection of inaccessible areas with the help of access techniques.

Required standards should be documented with written and pictorial material.

Time should be allocated to inspecting equipment that is in continual use or is difficult to

access due to operation or location.

Page 11: 8ed33f2b-2fe0-4d46-94c6-9c3fe60b28de

8/12/2019 8ed33f2b-2fe0-4d46-94c6-9c3fe60b28de

http://slidepdf.com/reader/full/8ed33f2b-2fe0-4d46-94c6-9c3fe60b28de 11/11

Non-compliances/findings should be documented with the help of photographic and written

material and should include proposals for corrective measures.

In addition to the regular inspections, others should also be conducted to check for signs of

heavy stress on equipment (bad weather, jarring, etc).

The status of inspection plans should be followed up and regularly reviewed at management

meetings. In accordance with the company’s internal requirements, outstanding items should

be treated as non-compliances.

11. Reporting

Falling and potential falling objects (damage/potential/condition) should be registered and

processed in the company’s incident recording system. Such reports should state whether

there were personnel in the area, weight, fall height, joule calculation and whether the area

was cordoned off. Descriptions should also be made of other barriers (those that worked and

those that did not).

Reports should also contain other important conditions which may help to prevent future

incidents. Where relevant, reports and, where appropriate, inspection reports should be sent

to equipment suppliers for experience transfer. Important experiences must be shared withother users.

It is important to shed light on underlying causes.

12. Training

It is recommended that training in inspection and observation techniques which focus on

potential falling objects is incorporated into training programmes for all relevant personnel.