83 Harcourt Street, Dublin 2 Ireland D02 C977 : +353 (0)1 905 8800 : [email protected]

:

Figure 1 Area Telecommunication Analysis Source: Comreg

Note

All Dimensions to be checked on site

No Dimensions to be scaled from this Drawing

This drawing to be read with relevant

Consultant Drawings

Proposed Development

Milltown Spar

Miltown ESB

Darty Tennis Club

Marianella (ISM Site)

Orwell Park ESB

Milltown Chimney Stack

Dundrum Business Park

Islamic Centre

Beach Hill

Ericsson

General Site Boundary

FINAL

83 Harcourt Street

Dublin 2, Ireland D02 C977 +353 1 905 8800

[email protected]

Client

Winterbrook Homes (MSM)

Project

Mount St Mary’s

Option 1

Date 28/04/2021

File Name Mount St Mary’s

Drawing:

Area Site Analysis

Building

SPN

Drawing No.

C 0121

Zone Rev

1

© Independent Site Management Limited

Three

Vodafone

Eir (Meteor)

Three

Vodafone

Vodafone

Three

Eir (Meteor)

Vodafone

Three

Eir (Meteor)

Three

Vodafone

Vodafone

Eir (meteor)

Vodafone

Three

Eir (Meteor)

Eir (Meteor)

Three

Vodafone

Three

Vodafone

Three

Vodafone

Eir (Meteor)

Vodafone

Eir (Meteor)

Vodafone

Three

Vodafone

Eir (Meteor)

Three

Eir (Meteor)

Vodafone

Figure 2 Transmission Link Analysis Source: Comreg; ISM; Vodafone; Three; & Eir

Note

All Dimensions to be checked on site

No Dimensions to be scaled from this Drawing

This drawing to be read with relevant

Consultant Drawings

General Site Boundary

FINAL

83 Harcourt Street

Dublin 2, Ireland D02 C977 +353 1 905 8800

[email protected]

Client

Winterbrook Homes (MSM)

Project

Mount St Mary’s

Option 1

Date 28/04/2021

File Name Mount St Mary’s

Drawing:

Link Analysis

Building

SPN

Drawing No.

C 0121

Zone Rev

1

© Independent Site Management Limited

RTE

Ra

dio

Ma

st

St Olaf’s Mast

Figure 3 Mitigation Measures

The building(s) will be designed so that in the event that a microwave transmission link is required or obstructed by the elevation

then the roof can support what is commonly referred to as a hop site, subject to further planning permissions where applicable.

See below example.

[Drawing for illustration purposes only – Not to Scale]

Note

All Dimensions to be checked on site

No Dimensions to be scaled from this Drawing

This drawing to be read with relevant

Consultant Drawings

Typical Installation

FINAL

83 Harcourt Street

Dublin 2, Ireland D02 C977 +353 1 905 8800

[email protected]

Client

Winterbrook Homes (MSM)

Project

Mount St Mary’s

Option 1

Date 28/04/2021

File Name Mount St Mary’s

Drawing:

Mitigation Measures

Building

SPN

Drawing No.

C 0121

Zone Rev

1