Program Priorities
Program Focus System safety and security
Regulatory requirements State of Good Repair (SGR) - 85% of program
System Expansion
System Enhancements
8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management
3/28
Definition
State of Good Repair (SGR) the condition ofan asset where the asset, at a minimum, iscapable of delivering the required performancesafely and reliably for a predetermined period oftime*
* state of good repair may include short or long termreplacement/rehabilitation based on the needs of the
Authority. It does not necessarily constitute completereplacement/rehabilitation of an asset
3
8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management
4/28
4
Current Planning Methodology
Inventory assets
Assess conditions
Quantify deficiencies
Prioritize actions
Evaluate alternatives
Program acquisition,renewal, or disposal
8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management
5/28
5
Condition AssessmentThe Condition Assessment forms the basis for MARTAs CapitalImprovement Program (CIP).
The last formal system wide condition assessment was performed in2000.
Asset Breakdown StructureThere were sixteen (16) asset categories assessed:
- Buildings - Traction Power- Structures - Communications- Other Structures - Vehicle Service Equipment- Mechanical Equipment - Buses- Track - Rail Cars- Fare Collection - Other Vehicles
- Automatic Train Control - Computers- Signage - Office Furniture
Assets were broken down by system, component and type
8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management
6/28
Asset Breakdown Structure (ABS)
6
8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management
7/28
Condition Assessment - Points Focused on age, condition and replacement/rehabilitation cost
It included 10, 20 and 40 year projections of Remaining Useful Lifeand the Investment Required to maintain a State of Good Repair.
Data gathering (historical data, legacy systems, active data bases,physical inspection and work sessions/partnering with asset owners -operators and maintainers)
Used handheld inspection tools (pre-loaded) Five (5) Point Ranking System(New, Very Good, Good, Fair and Poor)
Cost Adjustment Factors (single tracking, wayside safety, demolition,non-revenue windows etc.)
Burdening (Design, Construction Management, Authority Staff,
Insurance, Contingency etc.) cost of performing work Produced useful tools
Maintainability (challenge) - change management and control
7
8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management
8/28
Condition AssessmentRemaining Useful Life (RUL) and Percent of Assets
8
8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management
9/28
Bus Projections 2000-2040
9
8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management
10/2810
Condition Assessment CIPRoad Map - Next Condition Assessment Study funded in Fiscal FY10
Conduct a MARTA-wide inventory of assets requiring capital funding, to validatethe asset base used in resource projections (38% of all assets were inspected inthe 2000 Condition Assessment)
Implement a MARTA-wide system for condition-based replacement, using aconsistent set of prioritization criteria applicable to all MARTA assets, systems andcomponents.
Develop a MARTA-wide process for prioritizing projects Develop a computer interface program to provide MARTA staff with tools to
update, sort, group, filter and create reports from the condition database Obtain preliminary cost and funding data information and integrate it into a
database that parallels the structure of the condition database Develop the methodology and program to export the condition database and
funding databases into a cost loaded scheduling software Review schedules and performance of what-if scenarios to develop sensitivity
analysis to identify how the Condition Assessment components impact on the CIP
Integrate Maintenance Management Information System (MMIS) data withCondition Assessment Program and CIP Planning. Revise data, as necessary, and refine the data files until an appropriate CIP is
developed Aligned with Contracts & Procurement, Budget and Federal/Local funding
8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management
11/2811
Capital Improvement ProgramPlanned Expenditures FY2008 FY2018
0
50
100
150
200
250
300
350
400
FY2008 FY2009 FY2010 FY2011 FY2012 FY2013 FY2014 FY2015 FY2016 FY2017 FY2018
Fiscal Year
($Millions)
State of Good Repair Service Enhancements System Expansion Regulatory Requirem
8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management
12/2812
Capital Improvement ProgramActual Expenditures FY2002 FY2008
0
50
100
150
200
250
300
350
400
450
2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
Fiscal Year
($Millions)
Planned Expenditures Actual Expenditures
8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management
13/2813
Program Review
Continued Focus on State of Good Repair Safety/Regulatory Mandates
In 2008, MARTA completed an independent comprehensivesystem wide Safety Assessment of all safety related systems to
be used for CIP prioritization.
Detailed Capital Program Review Good Project Definition Dedicated Project Manager/Team
Constructability/Phasing GEC Transition & Staffing Lags Needs Based Justification Realistic Cash flow
8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management
14/2814
Capital ImprovementLooking Forward
0.0
50.0
100.0
150.0
200.0
250.0
300.0
350.0
400.0
450.0
FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18
Fiscal Year
Dollars(millions)
CIP January CIP April
8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management
15/2815
Bus - Vehicles
Infrastructure (average bus age 5.5 years) 532 - 40 foot low floor buses, 428 CNG, 104 Diesel 22 - 30 foot low floor buses, all CNG 55 - 35 foot low floor buses, all Diesel
Proposed CIP
Continuation of Baseline (major programs) Replacement (CNG ~$350,000, Diesel ~$320,000, Accessories)
30-40 foot bus 12 years or 500,000 miles
State of Good Repair Engine/Transmission Rebuild Mid-Life Overhaul @ 6-7 years (replace engine, transmission, charger,
cooler, radiator, paint) New Initiatives Memorial Drive BRT Bus Procurement
8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management
16/2816
Bus - Facilities Infrastructure
Operating Garages Hamilton diesel only, S. Fulton, 31 years old, capacity: 223 Laredo diesel/CNG, DeKalb, 24 years old, rehab project ~2000, capacity: 250 Perry diesel/CNG, W. Atlanta, 11 years old, capacity: 225
Browns Mill heavy maintenance 31 years old, S. Atlanta Street furniture (shelters and benches)
Proposed CIP Continuation of Baseline (major programs)
State of Good Repair Facility renovation Hamilton (Title VI issue) Facility upgrades Laredo, Perry & Browns Mill Equipment upgrades/replacements all facilities & street furniture
Enhancements Stonecrest Park & Ride
New Initiatives Replacement of Rotary Lifts Relocate Non-revenue Vehicle Maintenance
8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management
17/2817
Mobility
Infrastructure Lift Vans 130 in revenue service, 45 pending
50 medium duty vans, 5 years old 12 heavy duty vans, 3 years old 33 heavy duty vans, 2 years old 5 heavy duty vans, 1 year old 30 medium duty vans, less than 1 year
45 heavy duty vans, currently being equipped for revenue service Brady Avenue 33 years old, W. Atlanta
Proposed CIP Continuation of Baseline (major programs)
Replacement (Medium 4 years or 100,000 mi. Heavy 5 years or200,000 mi.)
State of Good Repair Brady Renovation Enhancement
Mapping Device for Vans
8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management
18/2818
Rail - Vehicles Infrastructure
Fleet 338 heavy rail cars 118 CQ310, Franco Belge (1979-1981) - Rehabilitated 2007-2009* 120 CQ311, Hitachi (1984-1988) - Rehabilitated 2004-2008* 100 CQ312, Breda (2000-2006)* 15 year life extension at average cost of $1.1 M per car
SystemsTrain Control HVAC Doors Propulsion
Communications Aux. Power Supply Cab & Fault Monitoring CouplerSCADA Air System/Brakes Trucks Car Body
Proposed CIP Continuation of Baseline (major programs)
Procurement close out CQ312 Breda contract State of Good Repair
Mid-Life Overhaul (final car delivered FY09) Life Cycle Asset Reliability Enhancement Program (LCARE) Rotables/Rebuilds
New Initiatives Configuration Management standardize fleet
8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management
19/2819
Rail - Facilities Infrastructure
Maintenance/Yard Facilities Avondale 28 years old South 19 years old Armour 2 years old
Passenger Facilities 38 rail stations service dates 1979-2000
Ancillary Facilities (Traction Power Sub Station, Gap Breaker Sub Station,Train Control Rooms, Auxiliary Power) Structures
Bridges - 19 Pedestrian, 6 General Aerial Structures 58 structures totaling 12.6 miles Parking Decks 10 decks
Tunnels/Cut & Cover 41 structures, 9.4 miles
Track 48 miles double trackway in revenue service (100+ miles total) Support Facilities Headquarters, South Annex, Rail Services Control Center
8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management
20/2820
Rail Facilities (continued) Proposed CIP
Continuation of Baseline (major programs) State of Good Repair
Elevator/Escalator rehabilitation Replace Station Mechanical Equipment Structural Rehabilitations
Roofing & Paving Programs Track Renovations Train Control rehabilitation and upgrades Station Upgrades Station Lighting upgrades
Enhancements
Buckhead North Entrance New Initiatives
Five Points Renovation Rehabilitate Station Chillers
8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management
21/2821
Technology Infrastructure
Radio Communication - AFC System (Breeze) Network Ops Center - Call Centers EDP Hardware & Software - CCTV LAN/WAN Systems - Admin Systems Ops & Maint. Info Systems - Dispatch Centers
Proposed CIP Continuation of Baseline (major programs)
Replacement ERP/EAM System (Financial/Maintenance/HR)
New MMIS System on-line October 2006 Bus & System wide Radio
Automated Fare Collection (Breeze) Equipment & Software upgrades
New Initiatives DEO Management Systems
8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management
22/28
22
Safety & Security
Infrastructure CCTV System Environmental Security Related Equipment
Proposed CIP Continuation of Baseline (major programs)
CCTV replacement Facilities Security Underground storage tank management programs Pollution Prevention Program
New Initiatives CCTV on revenue rolling stock
8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management
23/28
23
System Support
Infrastructure Non-Revenue Vehicles Administrative Facilities Tools & Equipment
Proposed CIP (major programs) Replace non-revenue vehicles Facility renovations Tools & equipment (shop, printing, etc.) Furniture
New Initiatives Training Equipment & E-lab
8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management
24/28
24
Communications Infrastructure
Life Safety Fire Alarm Public Address (audio & visual) Telephone
Signage Multipurpose LED Signs (by Sign Post)
CBS Rail Network TTN Fixed route bus
Proposed CIP Continuation of Baseline (major programs)
State of Good Repair Station signage upgrades Fire alarm upgrades Upgrade PA system Voice communication
New Initiatives Seamless Bus, Rail, Station and Vehicle communication system
8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management
25/28
25
Proposed CIP (major programs) System Optimization Study
Facility Requirements Infill Stations Neighborhood Circulators Fleet Sizing and Configuration
Expansion I-20 East Line BRT I-20 West Line BRT BeltLine Clifton Corridor
Other
Peachtree Street Car Woodruff Arts Center Transit Oriented Development Greening Initiative
Planning
8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management
26/28
26
New Initiatives[$millions]
Configuration Management 30.0
CCTV Cameras in Buses 13.0
CCTV Cameras in Rail Cars 8.0
Relocation of Nonrevenue Vehicle Maintenance 2.5
Update Condition Assessment of Fixed Assets 2.5
Decatur Tunnel Vibration Remediation 0.5
Seamless Bus, Rail, Station, and Vehicle Communication System (planning) 0.5
E-Labs and Equipment 0.4Environmental "Greening" Initiative 0.3
Multimodal Facility Requirements and Plan 0.3
Peachtree Streetcar Project 0.3
GIS/REIS Needs Assessment 0.2
DEO Management Systems 0.2
Rail Station Chiller Plant Rehabilitation Evaluation (Five Points Arts Center) *
Replacement of Rotary Lifts *
Five Points Station Renovation *Accelerate Systemwide Escalators Groups 4, 5, & 6 *
Arts Center Station Modifications for Woodruff Arts Center *
* Funded within existing projects
8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management
27/28
27
FY08 FY18 Ten Year Plan
Program Type
Capital Program 282.5 373.2 350.4 312.7 290.6 244.5 221.6 164.6 158.3 154.6 158.3 2,711.3
Expansion Program 3.8 8.8 12.1 25.8 25.4 22.4 23.7 25.7 39.8 35.2 29.5 252.1
Total Program Cost 286.3 382.0 362.5 338.5 316.0 267.0 245.3 190.3 198.1 189.8 187.8 2,963.5
MARTA's Operating Budget is approx. $400M
Metropolitan Atlanta Rapid Transit Authority
FY08-FY18 Proposed Capital Program Analysis (M)
8/2/2019 8 Thursday PM - Mid Life Systems - Dave Spring Stead MARTA Asset Management
28/28
Questions