31
Technology Sharing Seminar 2013 Identifying a Pipeline Alignment by Evaluating Risks and Utilizing Trenchless Technologies Utilizing Trenchless Technologies presented by: Mark Minkowski PE, Kennedy/Jenks Consultants Al Shewey PE, Kennedy/Jenks Consultants Bob Donaldson, Collaborative Strategies Justin Semion, PWS WRA Environmental 21 February 2013 Collaborative Strategies

8-NCalPUG 2013 KJ 48FM R2 · 2017-05-04 · Public & Private propertyPublic & Private property ... So th Ba side S stem A thorit (SBSA)South Bayside System Authority (SBSA) ... summer

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 8-NCalPUG 2013 KJ 48FM R2 · 2017-05-04 · Public & Private propertyPublic & Private property ... So th Ba side S stem A thorit (SBSA)South Bayside System Authority (SBSA) ... summer

Technology Sharing Seminar 2013Identifying a Pipeline Alignment by Evaluating Risks and Utilizing Trenchless TechnologiesUtilizing Trenchless Technologies

presented by:Mark Minkowski PE, Kennedy/Jenks ConsultantsAl Shewey PE, Kennedy/Jenks ConsultantsBob Donaldson, Collaborative StrategiesJustin Semion, PWS WRA Environmental

2 1 F e b r u a r y 2 0 1 3

Collaborative Strategies

Page 2: 8-NCalPUG 2013 KJ 48FM R2 · 2017-05-04 · Public & Private propertyPublic & Private property ... So th Ba side S stem A thorit (SBSA)South Bayside System Authority (SBSA) ... summer

How would you proceed? Rehab/replace ~14,000 LF Aging 48-in RCP sanitary sewer force main Built in poor soils >40 years ago; Prone to leaks Built in poor soils >40 years ago; Prone to leaks New pipe: Convey up to 65 MGD @ 35 psi

Between start and end End

National wildlife refuge Airport Public & Private propertyPublic & Private property Caltrans Poor soil conditionsA h? Approach?

Start

Kennedy/Jenks Consultants Collaborative Strategies

Start

2

Page 3: 8-NCalPUG 2013 KJ 48FM R2 · 2017-05-04 · Public & Private propertyPublic & Private property ... So th Ba side S stem A thorit (SBSA)South Bayside System Authority (SBSA) ... summer

Today’s Presentation

How to get a new pipe installed? Operational pipe installed safely @ least cost &

least time

Start

Three Keys Technical Evaluation Regulatory Outreach

End

g y Team Dynamics

Kennedy/Jenks Consultants Collaborative Strategies

3

Page 4: 8-NCalPUG 2013 KJ 48FM R2 · 2017-05-04 · Public & Private propertyPublic & Private property ... So th Ba side S stem A thorit (SBSA)South Bayside System Authority (SBSA) ... summer

OverviewSo th Ba side S stem A thorit (SBSA) South Bayside System Authority (SBSA) JPA in SF South Bay since late 1970’s Over 200,000 customers,

9 mile RCP force main conveyance system with 4 pump stations

48-inch segment > 40 yrs old 48 inch segment > 40 yrs old Poor soils (Young Bay Mud) RCP prone to leaks

Kennedy/Jenks Consultants Collaborative Strategies

4

Page 5: 8-NCalPUG 2013 KJ 48FM R2 · 2017-05-04 · Public & Private propertyPublic & Private property ... So th Ba side S stem A thorit (SBSA)South Bayside System Authority (SBSA) ... summer

Technical Evaluation Risk Evaluation Schedule & Cost

SBSA Planning – Conveyance System New pipe Pipe material – HDPEPipe material HDPE “Jointless Pipe” – Durable,

Flexible Flows Pipe Diameter Flows, Pipe Diameter

Alignment Objectives “Don’t Touch Water” Stay in Public R.O.W Seek shortest regulatory

schedule

Kennedy/Jenks Consultants Collaborative Strategies

5

Page 6: 8-NCalPUG 2013 KJ 48FM R2 · 2017-05-04 · Public & Private propertyPublic & Private property ... So th Ba side S stem A thorit (SBSA)South Bayside System Authority (SBSA) ... summer

Evaluation Criteria Cost

Environmental Mitigation Environmental Mitigation

Traffic Impacts

ConstructabilityConstructability

Utility Interference

Easement Requirementsq

Permits

Geotechnical

Operations & Maint

Schedule

Kennedy/Jenks Consultants Collaborative Strategies

6

Page 7: 8-NCalPUG 2013 KJ 48FM R2 · 2017-05-04 · Public & Private propertyPublic & Private property ... So th Ba side S stem A thorit (SBSA)South Bayside System Authority (SBSA) ... summer

Technology Reviewgy Achieve alignment objectives

with technology “Don’t touch water”… Trenchless Open trench Open trench

Risk Evaluation Balance Cost Schedule

Kennedy/Jenks Consultants Collaborative Strategies

7

Page 8: 8-NCalPUG 2013 KJ 48FM R2 · 2017-05-04 · Public & Private propertyPublic & Private property ... So th Ba side S stem A thorit (SBSA)South Bayside System Authority (SBSA) ... summer

Alternative Construction Methods

Today - numerous pipeline construction technologies Growing Public Acceptance - alternate construction

techniques Match construction alternative to community expectations Match construction alternative to community expectations Force main rehabilitation

CIPP HDPE Slip lining HDPE Slip-lining Pipe bursting

Force main replacement Microtunneling Horizontal directional drilling Pipe ramming Open cut

Kennedy/Jenks Consultants Collaborative Strategies

Open cut

8

Page 9: 8-NCalPUG 2013 KJ 48FM R2 · 2017-05-04 · Public & Private propertyPublic & Private property ... So th Ba side S stem A thorit (SBSA)South Bayside System Authority (SBSA) ... summer

Do Innovative Technologies Well OR $$$Do Innovative Technologies Well…..OR $$$

Kennedy/Jenks Consultants Collaborative Strategies

9

Page 10: 8-NCalPUG 2013 KJ 48FM R2 · 2017-05-04 · Public & Private propertyPublic & Private property ... So th Ba side S stem A thorit (SBSA)South Bayside System Authority (SBSA) ... summer

Force Main Rehabilitation HDPE Slip LiningForce Main Rehabilitation – HDPE Slip Lining

HDPE Slip Liners Tight Fit Loose Fit Loose Fit

Kennedy/Jenks Consultants Collaborative Strategies10

Page 11: 8-NCalPUG 2013 KJ 48FM R2 · 2017-05-04 · Public & Private propertyPublic & Private property ... So th Ba side S stem A thorit (SBSA)South Bayside System Authority (SBSA) ... summer

Force Main Rehab – HDPE Slip Li iLining

Folded HDPE New York Manhattan Insituform 48 inch diameter Waterline

Kennedy/Jenks Consultants Collaborative Strategies11

Page 12: 8-NCalPUG 2013 KJ 48FM R2 · 2017-05-04 · Public & Private propertyPublic & Private property ... So th Ba side S stem A thorit (SBSA)South Bayside System Authority (SBSA) ... summer

Force Main Rehabilitation - Pipe B tiBursting

Kennedy/Jenks Consultants Collaborative Strategies12

Page 13: 8-NCalPUG 2013 KJ 48FM R2 · 2017-05-04 · Public & Private propertyPublic & Private property ... So th Ba side S stem A thorit (SBSA)South Bayside System Authority (SBSA) ... summer

F M i R h bilit ti St tForce Main Rehabilitation - Streets

Fusible HDPEF ibl PVC Fusible PVC

Kennedy/Jenks Consultants Collaborative Strategies13

Page 14: 8-NCalPUG 2013 KJ 48FM R2 · 2017-05-04 · Public & Private propertyPublic & Private property ... So th Ba side S stem A thorit (SBSA)South Bayside System Authority (SBSA) ... summer

Force Main Rehabilitation - CIPPForce Main Rehabilitation - CIPP

Cured-in-Place Pipe (CIPP) Pressure Gravity

Kennedy/Jenks Consultants Collaborative Strategies14

Page 15: 8-NCalPUG 2013 KJ 48FM R2 · 2017-05-04 · Public & Private propertyPublic & Private property ... So th Ba side S stem A thorit (SBSA)South Bayside System Authority (SBSA) ... summer

F M i R l t Mi t liForce Main Replacement - Microtunneling

Kennedy/Jenks Consultants Collaborative Strategies

15

Page 16: 8-NCalPUG 2013 KJ 48FM R2 · 2017-05-04 · Public & Private propertyPublic & Private property ... So th Ba side S stem A thorit (SBSA)South Bayside System Authority (SBSA) ... summer

Force Main Replacement HDDForce Main Replacement, HDD

Horizontal Directional DrillingKennedy/Jenks Consultants Collaborative Strategies

Horizontal Directional Drilling

16

Page 17: 8-NCalPUG 2013 KJ 48FM R2 · 2017-05-04 · Public & Private propertyPublic & Private property ... So th Ba side S stem A thorit (SBSA)South Bayside System Authority (SBSA) ... summer

Force Main Replacement – Pipe Ramming Crossings

Highways Railroads

Kennedy/Jenks Consultants Collaborative Strategies17

Page 18: 8-NCalPUG 2013 KJ 48FM R2 · 2017-05-04 · Public & Private propertyPublic & Private property ... So th Ba side S stem A thorit (SBSA)South Bayside System Authority (SBSA) ... summer

Force Main Replacement – Open Cut Construction

Fusion Welded HDPE

Kennedy/Jenks Consultants Collaborative Strategies

Fusion Welded HDPE

18

Page 19: 8-NCalPUG 2013 KJ 48FM R2 · 2017-05-04 · Public & Private propertyPublic & Private property ... So th Ba side S stem A thorit (SBSA)South Bayside System Authority (SBSA) ... summer

Force Main Replacement – In-Water InstallInstall

Willamette River Force Main – Open Cut

Kennedy/Jenks Consultants Collaborative Strategies

p

19

Page 20: 8-NCalPUG 2013 KJ 48FM R2 · 2017-05-04 · Public & Private propertyPublic & Private property ... So th Ba side S stem A thorit (SBSA)South Bayside System Authority (SBSA) ... summer

Example: Alignment Selection

Technology provides solution Cross beneath Redwood Creek Microtunnel 72” casing 48” HDPE DR 21

A id tilit fli t Avoid utility conflicts Reduce property

negotiationsUSFWS

negotiations Reduce schedule

impact

Redwood Creek

PrivateProperties

MT Crossing

Kennedy/Jenks Consultants Collaborative Strategies

20

Page 21: 8-NCalPUG 2013 KJ 48FM R2 · 2017-05-04 · Public & Private propertyPublic & Private property ... So th Ba side S stem A thorit (SBSA)South Bayside System Authority (SBSA) ... summer

Kennedy/Jenks Consultants Collaborative Strategies21

Page 22: 8-NCalPUG 2013 KJ 48FM R2 · 2017-05-04 · Public & Private propertyPublic & Private property ... So th Ba side S stem A thorit (SBSA)South Bayside System Authority (SBSA) ... summer

Regulatory Coordination

US Fish & Wildlife Service (USFWS)

National Marine Fisheries (NMFS) National Marine Fisheries (NMFS)

Army Corps of Engineers (ACOE)

CDFW (was CDFG) CDFW (was CDFG)

BCDC

Cities of Redwood City & Cities of Redwood City & San Carlos

County of San Mateo

Caltrans

Kennedy/Jenks Consultants Collaborative Strategies

22

Page 23: 8-NCalPUG 2013 KJ 48FM R2 · 2017-05-04 · Public & Private propertyPublic & Private property ... So th Ba side S stem A thorit (SBSA)South Bayside System Authority (SBSA) ... summer

Kennedy/Jenks Consultants Collaborative Strategies23

Page 24: 8-NCalPUG 2013 KJ 48FM R2 · 2017-05-04 · Public & Private propertyPublic & Private property ... So th Ba side S stem A thorit (SBSA)South Bayside System Authority (SBSA) ... summer

Regulatory Outcomes

Approach “Don’t touch water”Don t touch water Clearly define jurisdictional limits Work closely with USFWS, BCDC,

Cities & CountyCities, & County Outcomes Clean Water Act Section 404 Permit Not required

Wetlands mitigation: not required Habitat and ESA monitoring surveys Habitat and ESA monitoring surveys Required

Schedule savings: years

Kennedy/Jenks Consultants Collaborative Strategies

24

Page 25: 8-NCalPUG 2013 KJ 48FM R2 · 2017-05-04 · Public & Private propertyPublic & Private property ... So th Ba side S stem A thorit (SBSA)South Bayside System Authority (SBSA) ... summer

Team Dynamics

Definition of Team Owner’s Team Engineering, Construction Installation

Communications coordination Legal, Financial, Public Outreach Environmental / Permitting

Stakeholder Team Outreach Stakeholder Team – Outreach Federal, State, County, Local Gov’ts Regulatory Agencies NGO’s Private property owners Public

Kennedy/Jenks Consultants Collaborative Strategies

25

Page 26: 8-NCalPUG 2013 KJ 48FM R2 · 2017-05-04 · Public & Private propertyPublic & Private property ... So th Ba side S stem A thorit (SBSA)South Bayside System Authority (SBSA) ... summer

Project Missionj

The 48-Inch Force Main Reliability Improvement Project will plan, design, construct and place into service a new force main pipe that protects the environment withoutforce main pipe that protects the environment, without safety incidents, at the lowest reasonable cost and in the shortest practical time.

Kennedy/Jenks Consultants Collaborative Strategies

Page 27: 8-NCalPUG 2013 KJ 48FM R2 · 2017-05-04 · Public & Private propertyPublic & Private property ... So th Ba side S stem A thorit (SBSA)South Bayside System Authority (SBSA) ... summer

Project Goals & Operating Guidelines Install new FM pipe

Identify safest, most cost-ffi i t th d f

Honor meeting appointments and promises.

S t th P j t Tefficient methods for installation

Complete construction and

Support the Project Team structure.

Bring expertise and an openCo p ete co st uct o a dconnections with no safety incidents or releases.

P id l t SBSA d

Bring expertise and an open mind.

Maintain open i i li Provide value to SBSA and

its Member Agencies

Maintain a collaborative

communication lines.

Manage Project execution.

M i t i S f P j tMaintain a collaborative team that solves problems & supports SBSA decision-making

Maintain a Safe Project. Have fun with a great

project!

Kennedy/Jenks Consultants Collaborative Strategies

making p j

Page 28: 8-NCalPUG 2013 KJ 48FM R2 · 2017-05-04 · Public & Private propertyPublic & Private property ... So th Ba side S stem A thorit (SBSA)South Bayside System Authority (SBSA) ... summer

Kennedy/Jenks Consultants Collaborative Strategies

28

Page 29: 8-NCalPUG 2013 KJ 48FM R2 · 2017-05-04 · Public & Private propertyPublic & Private property ... So th Ba side S stem A thorit (SBSA)South Bayside System Authority (SBSA) ... summer

Success comes from Team Dynamics Basis for success – clear definition of team objectives Guidelines

C ti S l ti Creative Solutions Adaptability Stakeholder Outreach “Black Swans” – what can

derail project? Frank/useful discussions

Team Organization

Obj ti Objectives Enrollment Owner’s team

Kennedy/Jenks Consultants Collaborative Strategies

Stakeholders

Page 30: 8-NCalPUG 2013 KJ 48FM R2 · 2017-05-04 · Public & Private propertyPublic & Private property ... So th Ba side S stem A thorit (SBSA)South Bayside System Authority (SBSA) ... summer

Results

Technology can lead to solutions with acceptable risks Alignment definitionAlignment definition Environmental & Permitting process simplified Stakeholder outreach simplified

Schedule savings Schedule savings

Importance of Team Coordination Clarity Clarity Mission, Objectives, Guidelines, Expectations Organizational Structure

C i i h l Communication channels

Construction starting 2013, anticipate completion by summer 2015.

Kennedy/Jenks Consultants Collaborative Strategies

summer 2015.

30

Page 31: 8-NCalPUG 2013 KJ 48FM R2 · 2017-05-04 · Public & Private propertyPublic & Private property ... So th Ba side S stem A thorit (SBSA)South Bayside System Authority (SBSA) ... summer

Follow up

Mark Minkowski PE [email protected]

Al Shewey PE [email protected]

Bob Donaldson 510-504-2825

[email protected] @g

Justin Semion PWS 415-454-8868

semion@wra ca [email protected]

Kennedy/Jenks Consultants Collaborative Strategies