Completion Equipment
Overview of main equipment and functions
8/9/2019 8- Completion Considerations
2/26
Copyright 2007, , All rights reserved 2
Completion Equipment (1)
Tubing accessories
Landing Nipples
Locking Mandrels
Flow Couplings Blast Joints
Expansion Nipple
8/9/2019 8- Completion Considerations
3/26
Copyright 2007, , All rights reserved 3
Completion Equipment (2)
Communication equipment
Sliding Sleeve (Sliding Side Door)
Side Pocket Mandrel
8/9/2019 8- Completion Considerations
4/26
Copyright 2007, , All rights reserved 4
Completion Equipment
Landing Nipples
sometimes there is a need to install or to hang-off in the
tubing: a plug to pressure test the tubing
a plug in the tubing below packer to safe-guard the well
a standing valve or plug during workover
pressure gauges to measure bottom hole pressures
8/9/2019 8- Completion Considerations
5/26
Copyright 2007, , All rights reserved 5
Shear plug
Standing valve
ball
seatshear disk
flow
Pressure to shear disk
Plugs
8/9/2019 8- Completion Considerations
6/26
Copyright 2007, , All rights reserved 6
Completion Equipment
Landing Nipples
Is a short pipe, part of tubing string
Has a recess to lock or hang-off a Locking Mandrel
Has a polished bore to receive a seal
8/9/2019 8- Completion Considerations
7/26
Copyright 2007, , All rights reserved 7
Landing nipple
Locking mandrel
fishing neck
locking dogs
packing
recess
polished
bore
Connection for plug etc.
8/9/2019 8- Completion Considerations
8/26
Copyright 2007, , All rights reserved 8
threaded connection
seals
sliding sleeve
threaded connection
If not
installed
Equalizing Sub
to equalize pressure across a plug
8/9/2019 8- Completion Considerations
9/26
Copyright 2007, , All rights reserved 9
Completion Equipment
No-Go Landing Nipple
Nipple installed at bottom of tubing
Same recess as the normal Landing Nipple but with a
reduced bore
Stops locking mandrels leaving the tubing
8/9/2019 8- Completion Considerations
10/26
Copyright 2007, , All rights reserved 10
Sealing Cups
Locking Slips
Fishing Neck
Tubing ID (Slip-type) Lock
3 slips mounted on a tapered
body which wedges the slipsoutward to effect a lock against
the tubing wall
designed to hold pressure from
one direction
can hold only limited pressure
differential
8/9/2019 8- Completion Considerations
11/26
Copyright 2007, , All rights reserved 11
Upper Tubing
Slip Type Lock
Upper Sealing
Element
Straddle
Hole in Tubing
Lower Sealing
Element
Lower Tubing
Slip Type Lock
Application of a Slip Type Lock
8/9/2019 8- Completion Considerations
12/26
Copyright 2007, , All rights reserved 12
Flow Couplings
A tubular manufactured in 2 to 4 ft lengths with
tubing threads at the ends.
Installed at points in the tubing string where excessiveturbulence is expected.
above and below cross-overs, above and below a landing nipple, SSSV nipple,
etc
Thick wall tubular with full tubing ID Thick wall provides protection against internal erosion
Made of high-grade alloy steel
8/9/2019 8- Completion Considerations
13/26
Copyright 2007, , All rights reserved 13
Tubing
Landing Nippleor other component
Flowing Coupling
Flowing Coupling
Tubing
Flow Coupling
8/9/2019 8- Completion Considerations
14/26
Copyright 2007, , All rights reserved 14
Blast Joints
A tubular manufactured in 10 or 20 ft lengths with tubing
threads at the ends.
thick walled tubular
part of the tubing and positioned opposite the perforations in
a dual or multiple completion
Its thick wall gives added protection against erosion from the
jetting action of the producing perforations
8/9/2019 8- Completion Considerations
15/26
Copyright 2007, , All rights reserved 15
Expansion joint
In expanded position the lock
keys will engage and torque cantransmitted to the tubing joints
underneath to unscrew Anchor
Latch
To be used when extreme
expansion is expected i.e.
steam injection wells
lock key
housing
lock key
seal
inner sleeve
8/9/2019 8- Completion Considerations
16/26
Copyright 2007, , All rights reserved 16
Sliding (inner)
Sleeve
Seals
Ports
Seals
Inner Ports
OPEN CLOSED
Communication Equipment - Sliding Side Door (SSD)
8/9/2019 8- Completion Considerations
17/26
Copyright 2007, , All rights reserved 17
PORTSCLOSED
Sliding
Inner Sleeve
PORTSOPEN
SlidingInner Sleeve
Sliding Side Door
8/9/2019 8- Completion Considerations
18/26
Copyright 2007, , All rights reserved 18
Landing NippleProfile
SSD
Sleeve
Communication Equipment
SSD combined with landing nipple
8/9/2019 8- Completion Considerations
19/26
Copyright 2007, , All rights reserved 19
SSD applications
Displacing annulus and tubing fluid after completion
Selective production, testing or treating of various zones
Production of multiple zones
Circulation to kill a well or introduce corrosion inhibitors Positioning co-mingling chokes in dual zone flow
Gas lifting ( in the absence of suitable gas lift mandrels)
8/9/2019 8- Completion Considerations
20/26
Copyright 2007, , All rights reserved 20
Sliding side door
Sleeve has to be moved down
to open communication withannulus depending on type -some move up to open
To open sleeve a shifting tool is
used Some sliding side doors have a
landing nipple as part of device
2 x seal bores (same size) oneabove sleeve and one belowallow for installation of choke /separation sleeve
8/9/2019 8- Completion Considerations
21/26
Copyright 2007, , All rights reserved 21
Side Pocket Mandrel (SPM)
1. orientation guide to orientate wireline
tool, kick-over tool2. (side) pocket for gas lift valve
3. upper seal bore
4. ports (communication to annulus)5. lower seal bore
6. recess for latching gas lift valve in place
2
3
4
5
6
1
8/9/2019 8- Completion Considerations
22/26
Copyright 2007, , All rights reserved
Selective Production with ESP
SSSV
Blank
Screen
Screen
ECP
Selective prod.
SSDs
8/9/2019 8- Completion Considerations
23/26
Copyright 2007, , All rights reserved 23
Gas Lift Valve components and flow path
Fishing neck
Injection gas enters
ports and acts against
the belows to unseat
the ball seal
Gas passes through the
check valve which
prevents reverse flow to
annulus
Upper seal
Lower seal
Bottom latch
Port
bellowslock
8/9/2019 8- Completion Considerations
24/26
Copyright 2007, , All rights reserved 24
Communication Equipment
Running GLV in Side Pocket Mandrel (1)
Side Pocket Mandrel
Kick-over tool to run gas lift
valve assembly
8/9/2019 8- Completion Considerations
25/26
Copyright 2007, , All rights reserved 25
Communication Equipment
Running GLV in Side Pocket Mandrel (2)
GLV passing through (by-passing mandrel)
Kick-over tool oriented and tripped
8/9/2019 8- Completion Considerations
26/26
Copyright 2007, , All rights reserved 26
Communication Equipment
Running GLV in Side Pocket Mandrel (3)
GLV latched in valve pocket
Kick-over tool retrieved