PROPOSED BRIDGE PUBLIC CONSULTATION7TH MAY 2014

A development by

Page 2: 7TH MAY 2014 - Finzels Reach

INTRODUCTION

PROPOSED BRIDGE PUBLIC CONSULTATION7TH MAY 2014

A development by

Cubex is pleased to present the proposed design for a new pedestrian and cycle bridge linking Castle Park to Finzels Reach. A planning application will soon be submitted to Bristol City Council for consideration. The bridge will provide a new connection across the Floating Harbour from Cabot Circus and Bristol Shopping Quarter to Temple Meads.

Page 3: 7TH MAY 2014 - Finzels Reach

SITE CONTEXT

PROPOSED BRIDGE PUBLIC CONSULTATION7TH MAY 2014

A development by

The proposed development benefits from an existing planning permission for a mixed-use development that was granted in April 2005including: • Business (B1)• Residential apartments (C3)• Retail units (A1)• Professional services (A2)• Food and drink uses

(A3, A4 & A5)• Crèche (D1)• Health and leisure club (D2)

Along with associated public and private open space, harbourside walkway, pedestrian and cycle bridge, landscaping, parking and servicing.

CW CASTLE WHARF

FBN FERMENTATION BUILDING NORTH

FBS FERMENTATION BUILDING SOUTH

CB COMPRESSOR BUILDING

FB FINZELS BUILDING & CASK STORE

HLN HAWKINS LANE NORTH

HS HOP STORE

HLS HAWKINS LANE SOUTH

MH MALT HOUSE

GW GEORGES WHARF

BH BRIDGEWATER HOUSE

GB GENERATOR BUILDING

TP TEMPLE PLOT

MARKETING SUITEn RESIDENTIAL

n FUTURE DEVELOPMENT

n COMMERCIAL

FERRY POINT

Page 4: 7TH MAY 2014 - Finzels Reach

CONNECTIONS

PROPOSED BRIDGE PUBLIC CONSULTATION7TH MAY 2014

A development by

Page 5: 7TH MAY 2014 - Finzels Reach

BRIDGE DESIGN

PROPOSED BRIDGE PUBLIC CONSULTATION7TH MAY 2014

A development by

The principle of a bridge in this location is already approved. The purpose of this planning application is to agree the design and exact siting of the bridge. Previous proposals for the bridge (referred to as the ‘Mobius Bridge’) have been revised in terms of its form and its route. The primary rationale for these changes is to maximise accessibility for all. The proposed route for the bridge provides level access across the Floating Harbour.

Page 6: 7TH MAY 2014 - Finzels Reach

BRIDGE DESIGN

PROPOSED BRIDGE PUBLIC CONSULTATION7TH MAY 2014

A development by

MATERIALS

Timber deck and handrailing with steel balustrading and support structure.

LIGHTING

The bridge will be provided with integral lighting that not only provides safe use at night but also adds further enhancement of the bridge itself and its setting.

Page 7: 7TH MAY 2014 - Finzels Reach

BRIDGE DESIGN

PROPOSED BRIDGE PUBLIC CONSULTATION7TH MAY 2014

A development by

Through its curving plan form, the bridge achieves a gradient of no greater than 1:21 which promotes inclusive access across the Floating Harbour. The bridge has a navigable width of 20m and headroom clearance of 4.2m (to match the nearby Bristol Bridge) in accordance with theHarbourmasters requirements.

Page 8: 7TH MAY 2014 - Finzels Reach

BRIDGE DESIGN

PROPOSED BRIDGE PUBLIC CONSULTATION7TH MAY 2014

A development by

The design allows for fabrication and installation of the bridge in sections from the Floating Harbour.

Page 9: 7TH MAY 2014 - Finzels Reach

BRIDGE DESIGN

PROPOSED BRIDGE PUBLIC CONSULTATION7TH MAY 2014

A development by

The proposed landing at Castle Park creates an opportunity to improve and enhance the existing walkway and ferry landing point.

Page 10: 7TH MAY 2014 - Finzels Reach

PROGRAMME

PROPOSED BRIDGE PUBLIC CONSULTATION7TH MAY 2014

A development by

SUBMISSION OF PLANNING APPLICATION

ANTICIPATEDPLANNING DECISION

START CONSTRUCTION

ANTICIPATED OPENING

EARLY SUMMER 2014 LATE AUTUMN/EARLY WINTER 2014

LATE SPRING/ EARLY SUMMER 2015

LATE SUMMER/ EARLY AUTUMN 2015