7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site February 19, 2013

7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site February 19 , 2013

  • Upload
    halil

  • View
    32

  • Download
    0

Embed Size (px)

DESCRIPTION

7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site February 19 , 2013. 2012 Groundwater Monitoring Results. - PowerPoint PPT Presentation

Citation preview

Page 1: 7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site  February 19 , 2013

7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund

Site

February 19, 2013

Page 2: 7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site  February 19 , 2013

• Monitor well network sampled January 2012. Ground water samples indicated a significant increase of tetrachloroethene (PCE) concentrations in the source area wells at both properties.

• Increasing water table elevations are suspected of mobilizing additional contaminants from the soils to the groundwater.

• Data received from Salt River Project indicated their well, located approximately one-half mile north of the source area, has been impacted at the Aquifer Water Quality Standard of 5 parts per billion. This well is cased from land surface to a depth of 600 feet and the interval open to the aquifer for water production is from 240 to 600 feet.

2012 Groundwater Monitoring Results

Page 3: 7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site  February 19 , 2013

7th Avenue and Bethany Home Road Site Map

Page 4: 7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site  February 19 , 2013

North-South Geologic Cross section

Page 5: 7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site  February 19 , 2013

2012 Groundwater Monitoring Results

Page 6: 7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site  February 19 , 2013

2012 Groundwater Monitoring Results

Page 7: 7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site  February 19 , 2013

2012 Groundwater Monitoring Results

Page 8: 7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site  February 19 , 2013

SRP Well 10.1N-13.5E Historical PCE Results

PCE Concentrations in parts per billion SRP Well 10.1N-13.5 E

012

3456

78

Jul-8

6

Jul-8

8

Jul-9

0

Jul-9

2

Jul-9

4

Jul-9

6

Jul-9

8

Jul-0

0

Jul-0

2

Jul-0

4

Jul-0

6

Jul-0

8

Jul-1

0

Jul-1

2

PCE Concentration

Page 9: 7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site  February 19 , 2013

• Final Remedial Investigation Report completed in April 2011 included the Remedial Objectives (ROs) for the site.

• Based upon review of public comment, the ROs are based on the following:

• Protect against possible exposure to hazardous substances in surface and subsurface soils that could occur during development of property based upon applicable zoning regulations.

• Protect against possible leaching of hazardous substances from the upper portion of the aquifer into deeper portions of the aquifer where groundwater use is occurring.

Remedial Objectives Review

Page 10: 7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site  February 19 , 2013

•Based on public comment, ROs for current and future agricultural groundwater use in the 7th Avenue and Bethany Home Road WQARF site are:

“To protect the supply of groundwater for irrigation use and for the associated recharge capacity that is

threatened by contamination emanating from the 7th Avenue and Bethany Home Road WQARF site...”

Remedial Objectives Review

Page 11: 7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site  February 19 , 2013

• Feasibility Study (FS) completed November 2012. Due to increases of PCE concentrations at the site, the FS evaluated three methods to reduce concentrations in the groundwater at the source area.

1. Enhanced reductive dechlorination (ERD)2. In situ chemical oxidation (ISCO) 3. Groundwater Extraction and Treatment (GWET)

Feasibility Study

Page 12: 7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site  February 19 , 2013

Feasibility Study Cost Comparison

Page 13: 7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site  February 19 , 2013

• Based on the cost and other factors, ERD was selected for the pilot test at the site. ERD is preferred over the similarly priced GWET because it has the ability to destroy the volatile organic compounds in place and the potential to be completed in a quicker time frame.

Feasibility Study

Page 14: 7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site  February 19 , 2013

Dechlorination Occurring at MW-12

Page 15: 7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site  February 19 , 2013

Feasibility Study/Pilot Test

Page 16: 7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site  February 19 , 2013

Feasibility Study/Pilot Test

Page 17: 7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site  February 19 , 2013

Questions?

Questions

Page 18: 7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site  February 19 , 2013

Contact Information

Scott Goodwin, Project ManagerRemedial Projects [email protected](602) 771-4452, 1-800-234-5677 ext 771-4452

Wendy Flood, Community Involvement CoordinatorRemedial Projects [email protected](602) 771-4410, 1-800-234-5677 ext 771-4410