    ecial Presentation I: Steel Projects 18/0

    R Liew

    Structural Steelwork in SingaporeStructural Steelwork in Singapore

    and Case Studiesand Case Studies

    Prof. J Y Richard LiewProf. J Y Richard Liew

    Department of Civil EngineeringDepartment of Civil Engineering

    National University of SingaporeNational University of Singapore

    over MRT Stationover MRT Station

  • 8/13/2019 7a Steel Projects(Presentation1)

    2/35

    ecial Presentation I: Steel Projects 18/0

    R Liew

  • 8/13/2019 7a Steel Projects(Presentation1)

    3/35

    ecial Presentation I: Steel Projects 18/0

    R Liew

    Cantilever Structure

  • 8/13/2019 7a Steel Projects(Presentation1)

    4/35

    ecial Presentation I: Steel Projects 18/0

    R Liew

  • 8/13/2019 7a Steel Projects(Presentation1)

    5/35

    ecial Presentation I: Steel Projects 18/0

    R Liew

  • 8/13/2019 7a Steel Projects(Presentation1)

    6/35

    ecial Presentation I: Steel Projects 18/0

    R Liew

  • 8/13/2019 7a Steel Projects(Presentation1)

    7/35

    ecial Presentation I: Steel Projects 18/0

    R Liew

    Stability During Construction

  • 8/13/2019 7a Steel Projects(Presentation1)

    8/35

    ecial Presentation I: Steel Projects 18/0

    R Liew

    Suntec City

  • 8/13/2019 7a Steel Projects(Presentation1)

    9/35

    ecial Presentation I: Steel Projects 18/0

    R Liew

  • 8/13/2019 7a Steel Projects(Presentation1)

    10/35

    ecial Presentation I: Steel Projects 18/0

    R Liew

  • 8/13/2019 7a Steel Projects(Presentation1)

    11/35

    ecial Presentation I: Steel Projects 18/0

    R Liew

  • 8/13/2019 7a Steel Projects(Presentation1)

    12/35

    ecial Presentation I: Steel Projects 18/0

    R Liew

  • 8/13/2019 7a Steel Projects(Presentation1)

    13/35

    ecial Presentation I: Steel Projects 18/0

    R Liew

  • 8/13/2019 7a Steel Projects(Presentation1)

    14/35

    ecial Presentation I: Steel Projects 18/0

    R Liew

    Brunei Hangar

  • 8/13/2019 7a Steel Projects(Presentation1)

    15/35

    ecial Presentation I: Steel Projects 18/0

    R Liew

  • 8/13/2019 7a Steel Projects(Presentation1)

    16/35

    ecial Presentation I: Steel Projects 18/0

    R Liew

    Bracing detail single sided, single bolt stability brace

  • 8/13/2019 7a Steel Projects(Presentation1)

    17/35

    ecial Presentation I: Steel Projects 18/0

    R Liew

    Effect of Lateral Buckling of BeamsEffect of Lateral Buckling of Beams

  • 8/13/2019 7a Steel Projects(Presentation1)

    18/35

    ecial Presentation I: Steel Projects 18/0

    R Liew

    CASE STUDY 1

    COMPASSVALE SCHOOL HALL

    SSTRUCTURALTRUCTURAL SSYSTEMYSTEM

  • 8/13/2019 7a Steel Projects(Presentation1)

    19/35

    ecial Presentation I: Steel Projects 18/0

    R Liew

    SSTRUCTURALTRUCTURAL SSYSTEMYSTEM

    SSITEITE OOBSERVATIONBSERVATION

    BeforeAfter

  • 8/13/2019 7a Steel Projects(Presentation1)

    20/35

    ecial Presentation I: Steel Projects 18/0

    R Liew

    SSITEITE OOBSERVATIONBSERVATION

    Did not consider interaction

    DDESIGNESIGN EERRORSRRORSColumn DesignColumn Design

    of truss with column

    Excessive flexibility andinadequate strength to resisthorizontal force

    Additional moment due tohorizontal force

  • 8/13/2019 7a Steel Projects(Presentation1)

    21/35

    ecial Presentation I: Steel Projects 18/0

    R Liew

    IncorrectIncorrect

    Truss SupportTruss Support

    detail fordetail for

    rollerroller

    supportsupport

    Actual Details

    Detail forDetail for RROLLEROLLER SupportSupport

  • 8/13/2019 7a Steel Projects(Presentation1)

    22/35

    ecial Presentation I: Steel Projects 18/0

    R Liew

    CASE STUDY 2

    ROOF TRUSS IN TUAS

    EELEVATION OFLEVATION OF RROOFOOFTTRUSSRUSS

    60m

  • 8/13/2019 7a Steel Projects(Presentation1)

    23/35

    ecial Presentation I: Steel Projects 18/0

    R Liew

    EERECTION OFRECTION OF RROOFOOFTTRUSSRUSS

    EERECTION OFRECTION OF RROOFOOFTTRUSSRUSS

  • 8/13/2019 7a Steel Projects(Presentation1)

    24/35

    ecial Presentation I: Steel Projects 18/0

    R Liew

    CCOLLAPSE OFOLLAPSE OF RROOFOOFTTRUSSRUSSPurlinsPurlins

    Concrete structure

    not completed

    Concrete structure not completedConcrete structure not completed

  • 8/13/2019 7a Steel Projects(Presentation1)

    25/35

    ecial Presentation I: Steel Projects 18/0

    R Liew

    CCOLLAPSE OFOLLAPSE OF RROOFOOFTTRUSSRUSS

    CCOLLAPSE OFOLLAPSE OF RROOFOOFTTRUSSRUSS

  • 8/13/2019 7a Steel Projects(Presentation1)

    26/35

    ecial Presentation I: Steel Projects 18/0

    R Liew

    No diagonal bracings for lateral

    CCAUSE OFAUSE OF CCOLLAPSEOLLAPSE

    stability

    Missing tie beams because concretestructure was not completed during steelerection

    Accidental lateral loads

    Stability of Steel truss during erection. Erection of first two trusses

    Column

    Tie beamGuy

  • 8/13/2019 7a Steel Projects(Presentation1)

    27/35

    ecial Presentation I: Steel Projects 18/0

    R Liew

    N

    Lateral Stability of Steel Truss

    N

    N

    Top chord

    N

    Stability of Steel truss during erection. Erection of first two trusses

    Column

    Tie beamGuy

  • 8/13/2019 7a Steel Projects(Presentation1)

    28/35

    ecial Presentation I: Steel Projects 18/0

    R Liew

    Design issues related to constructionInstallation of vertical bracing, wind bracing and purlins

    Construction Sequence3. Erection of subsequent trusses

  • 8/13/2019 7a Steel Projects(Presentation1)

    29/35

    ecial Presentation I: Steel Projects 18/0

    R Liew

    1 Lack of anchoring of lateral ties

    2 Lack of end restraintsSlide provided by NCK

  • 8/13/2019 7a Steel Projects(Presentation1)

    30/35

    ecial Presentation I: Steel Projects 18/0

    R Liew

    Lateral buckling of compression chord

    Slide provided by NCK

    Adequate Bracing duringConstruction

    6

    Sequence of erection

    1

    1

    2

    3

    4

    5

  • 8/13/2019 7a Steel Projects(Presentation1)

    31/35

    ecial Presentation I: Steel Projects 18/0

    R Liew

    Slide provided by NCK

    Slide provided by NCK

  • 8/13/2019 7a Steel Projects(Presentation1)

    32/35

    ecial Presentation I: Steel Projects 18/0

    R Liew

    Case study 6 Collapse of BusCase study 6 Collapse of Bus

    ShelterShelter

  • 8/13/2019 7a Steel Projects(Presentation1)

    33/35

    ecial Presentation I: Steel Projects 18/0

    R Liew

  • 8/13/2019 7a Steel Projects(Presentation1)

    34/35

    ecial Presentation I: Steel Projects 18/0

    R Liew

    Direct butt welding Inner tube stiffening External stiffening

  • 8/13/2019 7a Steel Projects(Presentation1)

    35/35

    ecial Presentation I: Steel Projects 18/0

    Think outside the Box!Other technologies

    SustainabilityEngineering history