Procurement Plan I General 1. Project information Country India Borrower Government of India Project Name Capacity Building for Urban Development Project Credit No. 4997-IN Project Implementing Agencies i. Ministry of Urban Development (MOUD) ii. Ministry of Housing and Urban Poverty Alleviation (MoHUPA) These agencies will be assisted by the Project Management Unit 2. Bank’s approval Date of the Procurement Plan 3. Date of General Procurement Notice: 30 September 2007 and 19 August 2012 4. Period covered by this procurement plan: Covers period of first 18 months. Procurement plan will be reviewed annually or as required for necessary modifications as the project progresses. 5. Guidelines: Procurement will be carried out in accordance with the World Bank’s "Guidelines: Procurement under IBRD Loans and IDA Credits" dated May 2004, revised October, 2006 and May 1, 2010 (Procurement Guidelines); and "Guidelines: Selection and Employment of Consultants by World Bank Borrowers" dated May 2004, revised October 2006 and May 01, 2010 (Consultant Guidelines). This being a Technical Assistance project the procurement is limited to consulting services and goods. No procurement of works is envisaged under the project. 75301 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

75301 Public Disclosure Authorizeddocuments.worldbank.org/curated/en/... · scheduling. In case of any inconsistency between the provisions under procurement . manual and the provisions

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 75301 Public Disclosure Authorizeddocuments.worldbank.org/curated/en/... · scheduling. In case of any inconsistency between the provisions under procurement . manual and the provisions

Procurement Plan

I General

1. Project information

Country

India

Borrower Government of India

Project Name Capacity Building for Urban Development

Project

Credit No. 4997-IN

Project Implementing

Agencies

i. Ministry of Urban Development

(MOUD)

ii. Ministry of Housing and Urban

Poverty Alleviation (MoHUPA)

These agencies will be assisted by the

Project Management Unit

2. Bank’s approval Date of the Procurement Plan

3. Date of General Procurement Notice: 30 September 2007 and 19 August 2012

4. Period covered by this procurement plan: Covers period of first 18 months.

Procurement plan will be reviewed annually or as required for necessary modifications

as the project progresses.

5. Guidelines: Procurement will be carried out in accordance with the World Bank’s

"Guidelines: Procurement under IBRD Loans and IDA Credits" dated May 2004,

revised October, 2006 and May 1, 2010 (Procurement Guidelines); and "Guidelines:

Selection and Employment of Consultants by World Bank Borrowers" dated May 2004,

revised October 2006 and May 01, 2010 (Consultant Guidelines).

This being a Technical Assistance project the procurement is limited to consulting

services and goods. No procurement of works is envisaged under the project.

75301 P

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

ed

Page 2: 75301 Public Disclosure Authorizeddocuments.worldbank.org/curated/en/... · scheduling. In case of any inconsistency between the provisions under procurement . manual and the provisions

II. Goods and non-consulting services.

1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank

as stated in Appendix 1 to the Guidelines for Procurement:

Procurement

Method

Prior Review

Threshold

Remarks

1. Goods US $ 200,000 All ICB Contracts

subject to prior

review irrespective

of value. The first 2

contracts of any

method (NCB/

Shopping) from each

of the agencies/ULB

irrespective of value.

2. Shopping First 2 Contracts from

each of the agencies

3. Direct Contracting First 2 contracts and all

contracts above US$

100

Shopping (Goods): Applicable for items costing less than US $ 10,000 per contract after

the proposal for procurements of goods and non-consultancy services under this method

has been reviewed and agreed with the Bank.

Direct Contracting: This method will be followed by the Project after the proposal for

procurements of goods and non-consultancy services under this method supported by

adequate justification by the implementing agencies/ULB has been reviewed and agreed

with the Bank.

2. Prequalification. NOT APPLICABLE

3. Reference to (if any) Project Operational/Procurement Manual: The Procurement

Manual for CBUD.

4. Any Other Special Procurement Arrangements: [including advance procurement

and retroactive financing, if applicable]

A procurement manual based on the procurement guidelines of the Bank has been

reviewed by the Bank. Based on Bank’s ‘No Objection’, the manual has been

finalized. All procurement under the project and formats to guide procurement and

thresholds based methods for goods and services shall be guided by Manual. The

manual describes the proposed systems along with procurement management and

administrative mechanism as well as SBDs, bidding formats, protocols for planning &

scheduling. In case of any inconsistency between the provisions under procurement

Page 3: 75301 Public Disclosure Authorizeddocuments.worldbank.org/curated/en/... · scheduling. In case of any inconsistency between the provisions under procurement . manual and the provisions

manual and the provisions of the “Bank’s Guidelines, SRFP and SBDs,” the latter

shall prevail.

5. Procurement Packages with Methods and Time Schedule: No procurement of works is

envisaged under the project. For Goods as per Annexure III.

III. Selection of Consultants

1. Methods of Procurement: The following methods of selection will be adopted

depending upon size and complexity of assignment, as defined in the Consultant

Guidelines:

A. Selection of Firms (a) Quality and Cost based Selection

(b) Quality-Based Selection

(c) Selection under a Fixed Budget

(d) Least Cost Selection

(e) Selection Based on Consultant‘s Qualifications

(f) Single Source Selection

B. Selection of Individuals (g) Procedures set forth in paragraphs 5.2 and 5.3 of the Consultant Guidelines for the

Selection of Individual Consultants

(h) Selection of Individual Consultants on sole source basis as per the Procedures set

forth in Paragraph 5.4 of Guidelines

2. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated

in Appendix 1 to the Guidelines Selection and Employment of Consultants:

S.No. Selection Method

Prior Review

Threshold

1 Competitive Methods (Firms) More than US$ 200,000

equivalent per contract

2 Single Source Selection (Firms and

Individuals)

All contracts

3 Individual Consultants (Competitive

Methods)

More than US$ 50,000

equivalent per contract

3. Short list comprising entirely of national consultants: Short list of consultants for

services, estimated to cost less than US $800,000 equivalent per contract, may comprise

entirely of national consultants in accordance with the provisions of paragraph 2.7 of the

Consultant Guidelines.

Page 4: 75301 Public Disclosure Authorizeddocuments.worldbank.org/curated/en/... · scheduling. In case of any inconsistency between the provisions under procurement . manual and the provisions

4. Any Other Special Selection Arrangements: The Expression of Interest for consultancy

services estimated to cost above US$200,000 equivalent per contract for firms shall be

advertised in UNDB online and dg Market and other provisions of paragraph 2.5 of the

Consultant Guidelines.

5. Consultancy Assignments with Selection Methods and Time Schedule

As per Annexure I (MoUD) and Annexure II (MoHUPA)

IV. Implementing Agency Capacity Building Activities with Time Schedule

Submitted Separately

Page 5: 75301 Public Disclosure Authorizeddocuments.worldbank.org/curated/en/... · scheduling. In case of any inconsistency between the provisions under procurement . manual and the provisions

Plan (Cons).

Annexure I (MoUD)

PROCUREMENT PLAN FOR CONSULTANCY

Capacity Building for Urban Department WB CREDIT No 4997-IN

SL

No

.

Pac

kag

e N

o.

Description of

Services

Estim-

ated Cost

(USD Milli-ons)

Methods

of

Selection @

Prior

Review/

Post Review

Adverti-

sing for

Short listing

(Date)

TOR/

Shortlist

to be

Finalised

(Date)

RFP

Final

Draft to be

forwarded

to the Bank

(Date)**

No

Obje-

ction from

Bank for

TOR/ Shortlist/

Final

RFP (Date)**

RFP

Issued

(Date)

Proposal

to be Rec-

eived by the Project

Authorities

(Date)

Evaluation

to be

Finalised (Technical/

#Combined

/ Draft Contract/

Final

Contract)

(Date)

No

Objec-

tion by the Bank

(Technic

al/ #Combin

ed/ Draft

Contract/ Final

Contract)

(Date)**

Contract

Number,

Value and Currency

Nam

e of

Consultant

/

Nationality &

Zip Code

, if

USA

Services

to be

Completed (Date)

**

WB

R N

o. Exp.

Incu

r-red

to

Date

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

A

1

CB

UD

-CS

1

Project

Management

Unit for technical and

managerial

support

4.0 QCBS Prior 13-Oct-07

14-

March-

08

28-Sep-09

25-Jun-

10

01-Jul-

10

06-Sep-10

15-Oct-10

15-Nov-10

21-Sep-11 17-Oct-11

25-Oct-

10

X 05-Oct-

11 X

INR

165

,244

,000

M/S

Infra

structure

Profe

ssional

Enter

prise, India

15-Jul-

16

C

B

UD-

CS

1

Proje

ct

Managem

ent

Unit for

techn

ical and

mana

gerial

supp

ort

*P

P

R

A

2

CB

UD

/AL

L/0

2

Zonal/ City

Support Units

for capacity Building

activities of

Urban Local Bodies:

Package 1

3.37 QCBS Prior 10-Sep-12

12- Sep-12

10-Oct-

12

26 Nov

12

17-Oct-12 31-Oct-

12

02-Nov-

12

17-Dec-12 31-Dec-12

25-Jan-13

04-Feb-13 25-Feb-13

14-Jan-

13

X 18-Feb-

13

-

31-Mar-

16

Page 6: 75301 Public Disclosure Authorizeddocuments.worldbank.org/curated/en/... · scheduling. In case of any inconsistency between the provisions under procurement . manual and the provisions

SL

No

.

Pac

kag

e N

o.

Description of

Services

Estim-

ated Cost (USD

Milli-ons)

Methods

of Selection

@

Prior

Review/ Post

Review

Adverti-

sing for Short

listing

(Date)

TOR/

Shortlist

to be

Finalised

(Date)

RFP

Final

Draft to be

forwarded to the

Bank

(Date)**

No

Obje-ction

from

Bank for TOR/

Shortlist/

Final RFP

(Date)**

RFP

Issued (Date)

Proposal

to be Rec- eived by

the Project

Authorities (Date)

Evaluation

to be Finalised

(Technical/

#Combined/ Draft

Contract/

Final Contract)

(Date)

No

Objec-tion by

the Bank

(Technical/

#Combin

ed/ Draft Contract/

Final

Contract) (Date)**

Contract

Number, Value and

Currency

Nam

e of Cons

ultant

/ Natio

nality & Zip

Code

, if USA

Services

to be Complet

ed (Date)

**

WB

R N

o. Exp.

Incur-

red

to Date

PP

R

A

3

CB

UD

/AL

L/0

3

Zonal/ City

Support Units

for capacity Building

activities of

Urban Local Bodies:

Package 2

4.38 QCBS Prior 10-Sep-12

12- Sep-12

10-Oct-

12

26 Nov

12

17-Oct-12 31-Oct-

12

02-Nov-

12

17-Dec-12 31-Dec-12

25-Jan-13

04-Feb-13 25-Feb-13

14-Jan-

13

X 18-Feb-

13

-

31-Mar-

16

*P

P

R

A

4

CB

UD

/AL

L/0

4

Zonal/ City Support Units

for capacity

Building

activities of

Urban Local

Bodies: Package 3

4.0 QCBS Prior 10-Sep-12

12- Sep-12

10-Oct-12

26 Nov 12

17-Oct-12 31-Oct-12

02-Nov-12

17-Dec-12 31-Dec-12 25-Jan-13

04-Feb-13

25-Feb-13

14-Jan-13

X

18-Feb-

13

-

31-Mar-16

*PP

R

A

5

CB

UD

/AL

L/0

5

Rapid

Baseline Assessment of

Urban

Management Capacity in 24

Urban Local

Bodies

0.15 QCBS Post 02-Jul-12

04-Jul-12

03-Aug-

12

03-Aug-

12

X X 12-Sep-

12

21-Nov-

12

15-Oct-12 29-Oct-12

16-Nov-12 26-Nov-12

03-Dec-12

X 30-May-

13

Page 7: 75301 Public Disclosure Authorizeddocuments.worldbank.org/curated/en/... · scheduling. In case of any inconsistency between the provisions under procurement . manual and the provisions

SL

No

.

Pac

kag

e N

o.

Description of

Services

Estim-

ated Cost (USD

Milli-ons)

Methods

of Selection

@

Prior

Review/ Post

Review

Adverti-

sing for Short

listing

(Date)

TOR/

Shortlist

to be

Finalised

(Date)

RFP

Final

Draft to be

forwarded to the

Bank

(Date)**

No

Obje-ction

from

Bank for TOR/

Shortlist/

Final RFP

(Date)**

RFP

Issued (Date)

Proposal

to be Rec- eived by

the Project

Authorities (Date)

Evaluation

to be Finalised

(Technical/

#Combined/ Draft

Contract/

Final Contract)

(Date)

No

Objec-tion by

the Bank

(Technical/

#Combin

ed/ Draft Contract/

Final

Contract) (Date)**

Contract

Number, Value and

Currency

Nam

e of Cons

ultant

/ Natio

nality & Zip

Code

, if USA

Services

to be Complet

ed (Date)

**

WB

R N

o. Exp.

Incur-

red

to Date

*P

P

R

A

6

CB

UD

/AL

L/0

6

Internal

auditor under

Capacity Building for

Urban

Development Project

(CBUD)

0.10 LCS Post 10-Sep-12

26-Sep-12

10-Oct-

12

07-Dec-

12

X X 18-Oct-

12

19-Nov-12 03-Dec-12

10-Dec-12

18-Dec-12 26-Dec-12

X 30-Jun-

16

*P

P

R

A

7

CB

UD

/GO

V/0

7

Development of Model

Compendium

of Municipal

Cadre

0.13 QCBS Post 26-May-12

26-May-12

03-Jul-12

03-Jul-12

X

23-Jul-12

X

16-Aug-12

11-Sep-12

16-Nov-12

11-Oct-12 01-Nov-12 09-Nov-12

22-Nov-12

29-Nov-12

X 30-May-13

*PP

R

A

8

CB

UD

/GO

V/0

8

Design and

delivery of trainings

(including

study tours) for Urban

local Bodies

across CBUD Project Cities

1.2 QCBS Prior 18-Mar-13 26-Apr-

13

03-May-

13

17-May-

13

22-May-

13

24-Jun-13 08-Jul-13

05-Aug-13 16-Aug-13

06-Sep-13

22-Jul-13

X 30-Aug-

13

-

31-Mar-

16

Page 8: 75301 Public Disclosure Authorizeddocuments.worldbank.org/curated/en/... · scheduling. In case of any inconsistency between the provisions under procurement . manual and the provisions

SL

No

.

Pac

kag

e N

o.

Description of

Services

Estim-

ated Cost (USD

Milli-ons)

Methods

of Selection

@

Prior

Review/ Post

Review

Adverti-

sing for Short

listing

(Date)

TOR/

Shortlist

to be

Finalised

(Date)

RFP

Final

Draft to be

forwarded to the

Bank

(Date)**

No

Obje-ction

from

Bank for TOR/

Shortlist/

Final RFP

(Date)**

RFP

Issued (Date)

Proposal

to be Rec- eived by

the Project

Authorities (Date)

Evaluation

to be Finalised

(Technical/

#Combined/ Draft

Contract/

Final Contract)

(Date)

No

Objec-tion by

the Bank

(Technical/

#Combin

ed/ Draft Contract/

Final

Contract) (Date)**

Contract

Number, Value and

Currency

Nam

e of Cons

ultant

/ Natio

nality & Zip

Code

, if USA

Services

to be Complet

ed (Date)

**

WB

R N

o. Exp.

Incur-

red

to Date

*P

P

R

A

9

CB

UD

/FIN

/09

Implementatio

n of accrual

based Double Entry

Accounting

System (DEAS) for 5

urban local

bodies

1.25 QCBS Prior 01-Oct-12

22-Nov-12

01-Nov-

12

08-Nov-

12

22-Nov-

12

27-Nov-

12

03-Jan-13 18-Jan-13

11-Feb-13

20-Feb-13 04-Mar-13

01-Feb-

13

X 27-Feb-

13

31-Mar-

16

*PP

R

A

10

CB

UD

/FIN

/10

Implementatio

n of accrual based Double

Entry

Accounting

System

(DEAS) for 3

urban local bodies

0.71 QCBS Prior 01-Oct-12

22-Nov-12

01-Nov-

12

08-Nov-

12

22-Nov-

12

27-Nov-

12

03-Jan-13 18-Jan-13

11-Feb-13 20-Feb-13

04-Mar-13

01-Feb-

13 X

27-Feb-

13

31-Mar-

16

*P

P

R

A

11

CB

UD

/FIN

/11

Technical

Support in

implementation of reforms

in property tax

system, user charges and

other fees &

taxes by 7 Urban Local

Bodies:

Package 1

1.42 QCBS Prior 01-Nov-12

07-Dec-12

03-Dec-

12

07-Dec-

12

21-Dec-

12

26-Dec-

12

11-Feb-13 25-Feb-13

15-Mar-13

26-Mar-13 15-Apr-13

11-Mar-

13

X 09-Apr-

13

31-Apr-

15

Page 9: 75301 Public Disclosure Authorizeddocuments.worldbank.org/curated/en/... · scheduling. In case of any inconsistency between the provisions under procurement . manual and the provisions

SL

No

.

Pac

kag

e N

o.

Description of

Services

Estim-

ated Cost (USD

Milli-ons)

Methods

of Selection

@

Prior

Review/ Post

Review

Adverti-

sing for Short

listing

(Date)

TOR/

Shortlist

to be

Finalised

(Date)

RFP

Final

Draft to be

forwarded to the

Bank

(Date)**

No

Obje-ction

from

Bank for TOR/

Shortlist/

Final RFP

(Date)**

RFP

Issued (Date)

Proposal

to be Rec- eived by

the Project

Authorities (Date)

Evaluation

to be Finalised

(Technical/

#Combined/ Draft

Contract/

Final Contract)

(Date)

No

Objec-tion by

the Bank

(Technical/

#Combin

ed/ Draft Contract/

Final

Contract) (Date)**

Contract

Number, Value and

Currency

Nam

e of Cons

ultant

/ Natio

nality & Zip

Code

, if USA

Services

to be Complet

ed (Date)

**

WB

R N

o. Exp.

Incur-

red

to Date

*P

P

R

A

12

CB

UD

/FIN

/12

Technical

Support in

implementation of reforms

in property tax

system, user charges and

other fees &

taxes by 15 Urban Local

Bodies:

Package 2

2.8 QCBS Prior 03-Dec-12 01-Jan-

13

04-Jan-13 25-Jan-

13

29-Jan-

13

15-Mar-13 08-Apr-13

13-May-13

25-May-13 11-Jun-13

29-Apr-

13

- 08-Jun-

13

10-Jun-

15

*P

P

R

A

13

CB

UD

/SD

/13

Preparation of

City

Sanitation

Plans for

selected cities

0.74 QCBS Prior 01-Oct-12 01-Nov-

12

22-Nov-12

08-Nov-

12

22-Nov-

12

27-Nov-

12

03-Jan-13 18-Jan-13

11-Feb-13

20-Feb-13

04-Mar-13

01-Feb-

13

X

27-Feb-

13

31-Mar-

14

*P

P

R

A

14

CB

UD

/SD

/14

Preparation of Infrastructure

master plans

for selected Urban Local

Bodies

1.0 QCBS Prior 03-Dec-12 01-Jan-13

04-Jan-13 25-Jan-13

29-Jan-13

15-Mar-13 08-Apr-13 13-May-13

25-May-13

11-Jun-13

29-Apr-13

-

08-Jun-13

30-Sep-14

Page 10: 75301 Public Disclosure Authorizeddocuments.worldbank.org/curated/en/... · scheduling. In case of any inconsistency between the provisions under procurement . manual and the provisions

SL

No

.

Pac

kag

e N

o.

Description of

Services

Estim-

ated Cost (USD

Milli-ons)

Methods

of Selection

@

Prior

Review/ Post

Review

Adverti-

sing for Short

listing

(Date)

TOR/

Shortlist

to be

Finalised

(Date)

RFP

Final

Draft to be

forwarded to the

Bank

(Date)**

No

Obje-ction

from

Bank for TOR/

Shortlist/

Final RFP

(Date)**

RFP

Issued (Date)

Proposal

to be Rec- eived by

the Project

Authorities (Date)

Evaluation

to be Finalised

(Technical/

#Combined/ Draft

Contract/

Final Contract)

(Date)

No

Objec-tion by

the Bank

(Technical/

#Combin

ed/ Draft Contract/

Final

Contract) (Date)**

Contract

Number, Value and

Currency

Nam

e of Cons

ultant

/ Natio

nality & Zip

Code

, if USA

Services

to be Complet

ed (Date)

**

WB

R N

o. Exp.

Incur-

red

to Date

*P

P

R

A

15

CB

UD

/SD

/15

Developing

strategy for

reduction of Non Revenue

Water (NRW)

in 6 selected cities

0.65 QCBS Prior 14-Sep-12

25-Sep-12

15-Oct-

12

22-Oct-12 05-Nov-

12

09-Nov-

12

10-Dec-12 24-Dec-12

17-Jan-13

28-Jan-13 18-Feb-13

07-Jan-

13

X 11-Feb-

13

-

26-Dec-

15

*PP

R

A

16

CB

UD

/SD

/16

Developing

Performance Improvement

Plan (PIP) for

service delivery in

selected cities

1.2 QCBS Prior 03-Dec-12 01-Jan-

13

04-Jan-13 25-Jan-

13

29-Jan-

13

15-Mar-13 08-Apr-13

13-May-13 25-May-13

11-Jun-13

29-Apr-

13 -

08-Jun-

13

30-Jun-

15

*P

P

R

A

17

CB

UD

/SD

/17

Preparation of Detailed

Project Reports

(DPR's) for

infrastructural works in

selected

Urban Local Bodies

1.0 QCBS Prior 03-Dec-12 01-Jan-13

04-Jan-13 25-Jan-13

29-Jan-13

15-Mar-13 08-Apr-13 13-May-13

25-May-13 11-Jun-13

29-Apr-13

- 08-Jun-

13

15-Dec-15

Page 11: 75301 Public Disclosure Authorizeddocuments.worldbank.org/curated/en/... · scheduling. In case of any inconsistency between the provisions under procurement . manual and the provisions

SL

No

.

Pac

kag

e N

o.

Description of

Services

Estim-

ated Cost (USD

Milli-ons)

Methods

of Selection

@

Prior

Review/ Post

Review

Adverti-

sing for Short

listing

(Date)

TOR/

Shortlist

to be

Finalised

(Date)

RFP

Final

Draft to be

forwarded to the

Bank

(Date)**

No

Obje-ction

from

Bank for TOR/

Shortlist/

Final RFP

(Date)**

RFP

Issued (Date)

Proposal

to be Rec- eived by

the Project

Authorities (Date)

Evaluation

to be Finalised

(Technical/

#Combined/ Draft

Contract/

Final Contract)

(Date)

No

Objec-tion by

the Bank

(Technical/

#Combin

ed/ Draft Contract/

Final

Contract) (Date)**

Contract

Number, Value and

Currency

Nam

e of Cons

ultant

/ Natio

nality & Zip

Code

, if USA

Services

to be Complet

ed (Date)

**

WB

R N

o. Exp.

Incur-

red

to Date

*P

P

R

A

18

CB

UD

/UP

/18

Preparation

and Revision

of City Development

Plans for 13

Selected Cities:

Package 1

0.35 QCBS Prior 09-Jul-12

22-Jul-12

31-Aug-

12

13-Sep-

12

17-Sep-12

16-Nov-

12

01-Oct-

12

01-Dec-

12

05-Oct-

12

05-Nov-12 19-Nov-12

14-Dec-12

27-Dec-12 17-Jan-13

03-Dec-

12

X 10-Jan-

13

30-Nov-

13

*P

P

R

A

19

CB

UD

/UP

/19

Preparation and Revision

of City

Development

Plans for 17

Selected

Cities: Package 2

0.46 QCBS Prior 09-Jul-12

22-Jul-12

31-Aug-12

13-Sep-12

17-Sep-12

16-Nov-12

01-Oct-12

01-Dec-12

05-Oct-12

05-Nov-12 19-Nov-12 14-Dec-12

27-Dec-12

17-Jan-13

03-Dec-12

X

10-Jan-

13

20-Dec-13

*PP

R

A

20

CB

UD

/GO

V/2

0

Study on land

based mechanisms

for improving

municipal services

0.03 Individual

(competitive

method)

Post 05-Jun-12

05-Jun-12

03-Jul-

12

03-Jul-

12

X X X X 31-Jul-12

15-Sep-12

15-Sep-12

30-Nov-12

X CBUD/G

OV/20

INR

160,3936

Vidy

adhar Phata

k

25-Apr-

13

Page 12: 75301 Public Disclosure Authorizeddocuments.worldbank.org/curated/en/... · scheduling. In case of any inconsistency between the provisions under procurement . manual and the provisions

SL

No

.

Pac

kag

e N

o.

Description of

Services

Estim-

ated Cost (USD

Milli-ons)

Methods

of Selection

@

Prior

Review/ Post

Review

Adverti-

sing for Short

listing

(Date)

TOR/

Shortlist

to be

Finalised

(Date)

RFP

Final

Draft to be

forwarded to the

Bank

(Date)**

No

Obje-ction

from

Bank for TOR/

Shortlist/

Final RFP

(Date)**

RFP

Issued (Date)

Proposal

to be Rec- eived by

the Project

Authorities (Date)

Evaluation

to be Finalised

(Technical/

#Combined/ Draft

Contract/

Final Contract)

(Date)

No

Objec-tion by

the Bank

(Technical/

#Combin

ed/ Draft Contract/

Final

Contract) (Date)**

Contract

Number, Value and

Currency

Nam

e of Cons

ultant

/ Natio

nality & Zip

Code

, if USA

Services

to be Complet

ed (Date)

**

WB

R N

o. Exp.

Incur-

red

to Date

*P

P

R

A

21

CB

UD

/GO

V/2

1

Study on cost

recovery

practices with focus on

Water Supply

System

0.04 Individual

(competiti

ve method)

Post 09-Nov-12 30-Nov-

12

X X X X 10-Dec-12

24-Dec-12

X 31-Mar-

13

*P

P

R

A

22

CB

UD

/SD

/22

Preparation of Master Plans

and Detailed

Project

Reports for

Drainage and

Sewerage Systems for

Chhindwara

City

0.13 QCBS Post 24-Sep-12

30-Sep-12

29-Oct-12

X X 02-Nov-12

03-Dec-12 17-Dec-12 27-Dec-12

07-Jan-13

14-Jan-13

X 31-Jan-14

*PP

R

A

23

CB

UD

/SD

/23

Preparation of

Detailed Project

Reports for

Solid Waste Management

for

Chhindwara City

0.04 QCBS Post 24-Sep-12

29-Sep-12

29-Oct-

12

X X 02-Nov-

12

03-Dec-12 17-Dec-12

27-Dec-12 07-Jan-13

14-Jan-13

X 31-Dec-

12

Page 13: 75301 Public Disclosure Authorizeddocuments.worldbank.org/curated/en/... · scheduling. In case of any inconsistency between the provisions under procurement . manual and the provisions

SL

No

.

Pac

kag

e N

o.

Description of

Services

Estim-

ated Cost (USD

Milli-ons)

Methods

of Selection

@

Prior

Review/ Post

Review

Adverti-

sing for Short

listing

(Date)

TOR/

Shortlist

to be

Finalised

(Date)

RFP

Final

Draft to be

forwarded to the

Bank

(Date)**

No

Obje-ction

from

Bank for TOR/

Shortlist/

Final RFP

(Date)**

RFP

Issued (Date)

Proposal

to be Rec- eived by

the Project

Authorities (Date)

Evaluation

to be Finalised

(Technical/

#Combined/ Draft

Contract/

Final Contract)

(Date)

No

Objec-tion by

the Bank

(Technical/

#Combin

ed/ Draft Contract/

Final

Contract) (Date)**

Contract

Number, Value and

Currency

Nam

e of Cons

ultant

/ Natio

nality & Zip

Code

, if USA

Services

to be Complet

ed (Date)

**

WB

R N

o. Exp.

Incur-

red

to Date

*P

P

R

A

24

CB

UD

/AL

L/2

4

Preparation of

CBUD

website

0.10 Individual

(competiti

ve method)

Prior 09-Nov-12 30-Nov-

12

X X X X 10-Dec-12

26-Dec-12

17-Dec-

12

31-Mar-

16

*P

P

R

A

25

CB

UD

/GO

V/2

5

Preparation of Training

Needs

Assessment

(TNA) based

Training Plan

for CBUD

0.07 QCBS Post 01-Oct-12 05-Nov-12

X X 09-Nov-12

10-Dec-12 24-Dec-12 03-Jan-13

14-Jan-13

21-Jan-13

X 31-May-12

*P

P

R

A

26

CB

UD

/SD

/26

Preparation of

Detailed Project

Reports

(DPR's) for Solid Waste

Management

in selected Urban Local

Bodies

0.3 QCBS Prior 03-Dec-12 01-Jan-

13

04-Jan-13 25-Jan-

13

29-Jan-

13

15-Mar-13 08-Apr-13

13-May-13 25-May-13

11-Jun-13

29-Apr-

13 -

08-Jun-

13

15-Dec-

14

Page 14: 75301 Public Disclosure Authorizeddocuments.worldbank.org/curated/en/... · scheduling. In case of any inconsistency between the provisions under procurement . manual and the provisions

SL

No

.

Pac

kag

e N

o.

Description of

Services

Estim-

ated Cost (USD

Milli-ons)

Methods

of Selection

@

Prior

Review/ Post

Review

Adverti-

sing for Short

listing

(Date)

TOR/

Shortlist

to be

Finalised

(Date)

RFP

Final

Draft to be

forwarded to the

Bank

(Date)**

No

Obje-ction

from

Bank for TOR/

Shortlist/

Final RFP

(Date)**

RFP

Issued (Date)

Proposal

to be Rec- eived by

the Project

Authorities (Date)

Evaluation

to be Finalised

(Technical/

#Combined/ Draft

Contract/

Final Contract)

(Date)

No

Objec-tion by

the Bank

(Technical/

#Combin

ed/ Draft Contract/

Final

Contract) (Date)**

Contract

Number, Value and

Currency

Nam

e of Cons

ultant

/ Natio

nality & Zip

Code

, if USA

Services

to be Complet

ed (Date)

**

WB

R N

o. Exp.

Incur-

red

to Date

*P

P

R

A

27

CB

UD

/FIN

/27

Implementatio

n of accrual

based Double Entry

Accounting

System (DEAS) for 10

urban local

bodies: Preparation of

OBS

2.0 QCBS Prior 18-Mar-13 26-Apr-

13

03-May-

13

17-May-

13

22-May-

13

08-Jul-13 22-Jul-13

19-Aug-13

30-Aug-13 20-Sep-13

05-Aug-

13

X 13-Sep-

13

-

31-Mar-

16

*PP

R

A

28

CB

UD

/FIN

/28

Implementation of accrual

based Double

Entry

Accounting

System

(DEAS) for 12 urban local

bodies:

Updation of OBS

1.25 QCBS Prior 18-Mar-13 26-Apr-13

03-May-13

17-May-13

22-May-13

08-Jul-13 22-Jul-13 19-Aug-13

30-Aug-13

20-Sep-13

05-Aug-13

X

13-Sep-

13

-

31-Mar-16

*PP: Target dates agreed as per Procurement Plan R: revision 1,2 etc. A: actual dates RFP (Request for Proposal): Same as ‘Bid Document’ #Technical and Financial

** Applicable in case of ‘Prior Review’ by Bank WBR No.: World Bank Reference Number @ State whether (i) Single firm or individual; or (ii) Competitive. If Competitive, then state whether Quality and Cost Based Selection (QCBS) or Quality Based Selection (QBS)

NOTE: The Packages at S.No 1,2,3,4,6 are common for MOUD and MOHUPA. The Estimated Cost for MoUD Component shall be 67%

of the total estimated cost mentione above, rest 33% shall be the cost of MoHUPA Component

Page 15: 75301 Public Disclosure Authorizeddocuments.worldbank.org/curated/en/... · scheduling. In case of any inconsistency between the provisions under procurement . manual and the provisions

Annexure II (MoHUPA)

PROCUREMENT PLAN FOR CONSULTANCY

Capacity Building for Urban Department WB CREDIT No 4997-IN

SL

No

.

Pac

kag

e N

o.

Description of Services

Estim-ated Cost

(USD

Milli-ons)

Methods of

Selection

@

Prior Review/

Post

Review

Adverti-sing for

Short

listing (Date)

TOR/

Shortlist

to be

Finalised (Date)

RFP Final

Draft to

be forwarded

to the

Bank

(Date)**

No Obje-

ction

from Bank for

TOR/

Shortlist/

Final

RFP

(Date)**

RFP Issued

(Date)

Proposal to be Rec-

eived by

the Project

Authoritie

s (Date)

Evaluation to be

Finalised

(Technical/ #Combined/

Draft

Contract/

Final

Contract)

(Date)

No Objec-tion by the

Bank

(Technical/ #Combined

/ Draft

Contract/

Final

Contract)

(Date)**

Contract

Num

ber, Valu

e and

Curr

ency

Name of

Cons

ultant/

Nati

onali

ty &

Zip

Code, if

USA

Services

to be

Completed (Date)

**

WB

R N

o. Exp.

Incu

r-

red to

Date

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

*P

P

R

A

1

CB

UD

/AL

L/1

01

Staff Support Cell for

MoHUPA

0.17 QCBS Post 18-Sep-12

07-Oct-12

18-Oct-12

07-Dec-

12

X X 25-Oct-12

26-Nov-12

03-Dec-12 13-Dec-12

20-Dec-12

31-Dec12

X

31-Dec-15

*P

P

R

A

2

CB

UD

/CF

/102

Management Unit for

Challenge

Fund

0.50 QCBS Prior 01-Oct-12

22-Nov-12

01-Nov-12

08-Nov-12

22-Nov-12

27-Nov-12

03-Jan-13 18-Jan-13 11-Feb-13

20-Feb-13

04-Mar-13

01-Feb-13 X

27-Feb-13

31-Mar-16

Page 16: 75301 Public Disclosure Authorizeddocuments.worldbank.org/curated/en/... · scheduling. In case of any inconsistency between the provisions under procurement . manual and the provisions

SL

No

.

Pac

kag

e N

o.

Description of

Services

Estim-

ated Cost (USD

Milli-ons)

Methods

of Selection

@

Prior

Review/ Post

Review

Adverti-

sing for Short

listing

(Date)

TOR/

Shortlist

to be

Finalised

(Date)

RFP

Final

Draft to be

forwarded to the

Bank

(Date)**

No

Obje-ction

from

Bank for TOR/

Shortlist/

Final RFP

(Date)**

RFP

Issued (Date)

Proposal

to be Rec- eived by

the

Project Authoritie

s (Date)

Evaluation

to be Finalised

(Technical/

#Combined/ Draft

Contract/

Final Contract)

(Date)

No Objec-

tion by the Bank

(Technical/

#Combined/ Draft

Contract/

Final Contract)

(Date)**

Cont

ract Num

ber,

Value and

Curr

ency

Nam

e of Cons

ultan

t/ Nati

onali

ty & Zip

Code

, if USA

Services

to be Completed (Date)

**

WB

R N

o. Exp.

Incur-

red

to Date

*P

P

R

A

3

CB

UD

/CS

/103

Assessment

and

Institutional Strategy of

Community

Structures

0.16 QCBS Post 01-Nov-12 07-Dec-

12 X X 14-Dec-

12

14-Jan-13 28-Jan-13

08-Feb-13

18-Feb-13 25-Feb-13

X 31-Oct-13

*P

P

R

A

4

CB

UD

/SO

H/1

04

Preparation of GIS based

slum maps for

5 selected cities

0.40 QCBS Prior 18-Mar-13 26-Apr-13

03-May-13

17-May-13

22-May-13

24-Jun-13 08-Jul-13 05-Aug-13

16-Aug-13

06-Sep-13

22-Jul-13 X

30-Aug-13

-

31-Aug-15

*PP

R

A

5

CB

UD

/SO

H/1

05

Survey and

Analysis for Social and

Environmental

Assessment in

Support of

designing ISIP

0.06 QCBS Post 01-Oct-12

10-Nov-12

15-Nov-

12

X X 27-Nov-

12

28-Dec-

12

18-Jan-13

01-Feb-13 15-Feb-13

25-Feb-13

X 31-Aug-13

Page 17: 75301 Public Disclosure Authorizeddocuments.worldbank.org/curated/en/... · scheduling. In case of any inconsistency between the provisions under procurement . manual and the provisions

SL

No

.

Pac

kag

e N

o.

Description of

Services

Estim-

ated Cost (USD

Milli-ons)

Methods

of Selection

@

Prior

Review/ Post

Review

Adverti-

sing for Short

listing

(Date)

TOR/

Shortlist

to be

Finalised

(Date)

RFP

Final

Draft to be

forwarded to the

Bank

(Date)**

No

Obje-ction

from

Bank for TOR/

Shortlist/

Final RFP

(Date)**

RFP

Issued (Date)

Proposal

to be Rec- eived by

the

Project Authoritie

s (Date)

Evaluation

to be Finalised

(Technical/

#Combined/ Draft

Contract/

Final Contract)

(Date)

No Objec-

tion by the Bank

(Technical/

#Combined/ Draft

Contract/

Final Contract)

(Date)**

Cont

ract Num

ber,

Value and

Curr

ency

Nam

e of Cons

ultan

t/ Nati

onali

ty & Zip

Code

, if USA

Services

to be Completed (Date)

**

WB

R N

o. Exp.

Incur-

red

to Date

*P

P

R

A

6

CB

UD

/SO

H/1

06

Social

Assessment to

Support Preparatory

Work for

Proposed ISIP

0.05 Individual

(competiti

ve method)

Prior 01-Oct-12

10-Nov-12

22-Oct-

12

X X X X 31-Oct-12

14-Nov-12

07-Nov-12 31-Aug-13

*P

P

R

A

7

CB

UD

/SO

H/1

07

Environmental Assessment to

Support

Preparatory Work for

Proposed ISIP

0.05 Individual (competiti

ve

method)

Prior 01-Oct-12

10-Nov-12

22-Oct-12

X X X X 31-Oct-12 14-Nov-12

07-Nov-12 31-Aug-13

*PP

R

A

8

CB

UD

/PN

/10

8

Consultant for

Preparation of Business Plan

for

Practitioner

Network

0.06 Individual

(competitive

method)

Prior 03-Dec-12 03-Jan-

13

X X X X 14-Jan-13

28-Jan-13

21-Jan-13 31-Jan-14

Page 18: 75301 Public Disclosure Authorizeddocuments.worldbank.org/curated/en/... · scheduling. In case of any inconsistency between the provisions under procurement . manual and the provisions

SL

No

.

Pac

kag

e N

o.

Description of

Services

Estim-

ated Cost (USD

Milli-ons)

Methods

of Selection

@

Prior

Review/ Post

Review

Adverti-

sing for Short

listing

(Date)

TOR/

Shortlist

to be

Finalised

(Date)

RFP

Final

Draft to be

forwarded to the

Bank

(Date)**

No

Obje-ction

from

Bank for TOR/

Shortlist/

Final RFP

(Date)**

RFP

Issued (Date)

Proposal

to be Rec- eived by

the

Project Authoritie

s (Date)

Evaluation

to be Finalised

(Technical/

#Combined/ Draft

Contract/

Final Contract)

(Date)

No Objec-

tion by the Bank

(Technical/

#Combined/ Draft

Contract/

Final Contract)

(Date)**

Cont

ract Num

ber,

Value and

Curr

ency

Nam

e of Cons

ultan

t/ Nati

onali

ty & Zip

Code

, if USA

Services

to be Completed (Date)

**

WB

R N

o. Exp.

Incur-

red

to Date

*P

P

R

A

9

CB

UD

/PN

/10

9

Coordinator

for

Preparation of Business Plan

for

Practitioner Network

0.14 Individual

(competiti

ve method)

Prior 03-Dec-12 03-Jan-

13

X X X X 14-Jan-13

28-Jan-13

21-Jan-13 31-Jan-14

*P

P

R

A

10

CB

UD

/ S

OM

/110

Documentation and

Synthesis of

international experience on

preventive

strategies for slum and

poverty

alleviations

0.02 Individual (competiti

ve

method)

Post 03-Dec-12 03-Jan-13

X X X X 14-Jan-13 28-Jan-13

X 31-Jul-13

*PP

R

A

11

CB

UD

/AI/

11

1

Development

of Operational Plan for Apex

Institute

0.03 Individual

(competitive

method)

Post 14-Jan-13 11-Feb-

13

X X X X 25-Feb-13

05-Mar-12

X 31-Aug-13

Page 19: 75301 Public Disclosure Authorizeddocuments.worldbank.org/curated/en/... · scheduling. In case of any inconsistency between the provisions under procurement . manual and the provisions

SL

No

.

Pac

kag

e N

o.

Description of

Services

Estim-

ated Cost (USD

Milli-ons)

Methods

of Selection

@

Prior

Review/ Post

Review

Adverti-

sing for Short

listing

(Date)

TOR/

Shortlist

to be

Finalised

(Date)

RFP

Final

Draft to be

forwarded to the

Bank

(Date)**

No

Obje-ction

from

Bank for TOR/

Shortlist/

Final RFP

(Date)**

RFP

Issued (Date)

Proposal

to be Rec- eived by

the

Project Authoritie

s (Date)

Evaluation

to be Finalised

(Technical/

#Combined/ Draft

Contract/

Final Contract)

(Date)

No Objec-

tion by the Bank

(Technical/

#Combined/ Draft

Contract/

Final Contract)

(Date)**

Cont

ract Num

ber,

Value and

Curr

ency

Nam

e of Cons

ultan

t/ Nati

onali

ty & Zip

Code

, if USA

Services

to be Completed (Date)

**

WB

R N

o. Exp.

Incur-

red

to Date

*P

P

R

A

12

CB

UD

/SO

M/1

12

Preparation of

social

safeguard manual for

ULBs

0.01 Individual

(competiti

ve method)

Post 14-Jan-13 11-Feb-

13

X X X X 25-Feb-13

05-Mar-12

X 31-Aug-13

*P

P

R

A

13

CB

UD

/SO

M/1

13

Preparation of Environmental

safeguard

manual for ULBs

0.01 Individual (competiti

ve

method)

Post 14-Jan-13 11-Feb-13

X X X X 25-Feb-13 05-Mar-12

X 31-Aug-13

*PP

R

A

14

CB

UD

/SO

M/1

14

Support for

Preparatory and Design

work of ISIP:

Project

Resource

Management

Specialist

0.07 Individual

(competitive

method)

Prior 01-Oct-12

21-Sep-12

22-Oct-

12

X X X X 31-Oct-12

14-Nov-12

07-Nov-12 15-Nov-13

Page 20: 75301 Public Disclosure Authorizeddocuments.worldbank.org/curated/en/... · scheduling. In case of any inconsistency between the provisions under procurement . manual and the provisions

SL

No

.

Pac

kag

e N

o.

Description of

Services

Estim-

ated Cost (USD

Milli-ons)

Methods

of Selection

@

Prior

Review/ Post

Review

Adverti-

sing for Short

listing

(Date)

TOR/

Shortlist

to be

Finalised

(Date)

RFP

Final

Draft to be

forwarded to the

Bank

(Date)**

No

Obje-ction

from

Bank for TOR/

Shortlist/

Final RFP

(Date)**

RFP

Issued (Date)

Proposal

to be Rec- eived by

the

Project Authoritie

s (Date)

Evaluation

to be Finalised

(Technical/

#Combined/ Draft

Contract/

Final Contract)

(Date)

No Objec-

tion by the Bank

(Technical/

#Combined/ Draft

Contract/

Final Contract)

(Date)**

Cont

ract Num

ber,

Value and

Curr

ency

Nam

e of Cons

ultan

t/ Nati

onali

ty & Zip

Code

, if USA

Services

to be Completed (Date)

**

WB

R N

o. Exp.

Incur-

red

to Date

*P

P

R

A

15

CB

UD

/SO

M/1

15

Support for

Preparatory

and Design work of ISIP:

Poverty and

Social Safeguard

Specialist

0.06 Individual

(competiti

ve method)

Prior 01-Oct-12

21-Sep-12

22-Oct-

12

X X X X 31-Oct-12

14-Nov-12

07-Nov-12 15-Nov-13

*PP: Target dates agreed as per Procurement Plan R: revision 1,2 etc. A: actual dates RFP (Request for Proposal): Same as ‘Bid Document’ #Technical and Financial ** Applicable in case of ‘Prior Review’ by Bank WBR No.: World Bank Reference Number

@ State whether (i) Single firm or individual; or (ii) Competitive. If Competitive, then state whether Quality and Cost Based Selection (QCBS) or Quality Based Selection (QBS)

Page 21: 75301 Public Disclosure Authorizeddocuments.worldbank.org/curated/en/... · scheduling. In case of any inconsistency between the provisions under procurement . manual and the provisions

Annexure III (MoUD)

PROCUREMENT PLAN FOR GOODS

Capacity Building for Urban Department WB CREDIT No 4997-IN

SL

No

.

Pac

kag

e N

o.

Descrip-

tion of

Works/

Goods

Esti-

mated

Cost

(USD

Mill-

ions)

Method

of

Procur-

ement

ICB/

NCB

Design/

Investiga-

tion

completed

(Date)

Prior

Review/

Post

Review

Whether

Margin of

Domestic

Preference

Applicable

(YES/NO)

Estimate

Prepared &

Sanctioned

(Date and

Value)

Preparation

of Bid

Document

(Date)

Bank’s No

Objection to

Bidding

Document

(Date)**

Bids

Contract

Award

decided

(Date/

Value/

Currency)

Bank’s No

Objection

to Contract

Award

(Date)**

Contract

Signed

(Date/

Value/

Currency)

Co

ntr

act

No

.

Name

of

Contracto

r/

Nationalit

y & ZIP

Code

**

WB

R N

o.

Dat

e o

f co

mp

leti

on

of

Co

ntr

act

Ex

pen

dit

ure

incu

rred

to

Dat

e

Invitation

(Date)

Opened

On

(Date)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1

7

18 19 20 21

*

P

P

R

A

1

CB

UD

/IT

/201

Provision

of

Computer

s and

Computer

Peripheral

s for

CBUD

cities

0.18 NCB 01-Nov-12

Prior NO 08-Nov-12 15-Nov-12 29-Nov-12 05-Dec-

12

07-Jan-

13

21-Jan-13 04-Feb-13 11-Feb-13