PETROLEUM DEVELOPMENT OMAN L.L.C. (PDO) Contractor Job No. : 20036 Unit No Vendor Doc. No. : 732/QAP/90 Rev. 06 Project Title: SAIH NIHAYDA CONDENSATE STABILIZATION PLANT (SNCP) Doc. Category : Q3 Sheet No 1 of 8 PDO Contract No. C311194 Document Title: INSPECTION & TEST PLAN (QAP) FOR V 6901 (Kauther Slug Catcher) PDO Doc. No.: Rev. 06 SNG-69-42000P-MS-5733-551-0000 Project No. 20036 Unit Description: INSPECTION & TEST PLAN (QAP) FOR V 6901 (Kauther Slug Catcher) MR NO. :- 20036-0100-M31-MR-42000 REV. 02 PURCHASE ORDER NO. :- 4580041305 TAG No. : V 6901 POS. : 00010 ITEM NO. :- 00011. VESSEL CATEGORY:- ENGINEERED PRESSURE VESSEL NACE MR-01-75 & SOUR SERVICE 06 26/05/2014 REVISED TO INCORPORATE PDO COMMENTS S. Naik P.V.Ghanekar 05 10/04/2014 REVISED TO INCORPORATE PDO COMMENTS S. Naik P.V.Ghanekar 04 08/10/2013 REVISED TO INCORPORATE PDO COMMENTS S. Naik P.V.Ghanekar 03 17/07/2013 ISSUE FOR APPROVAL S. Naik P.V.Ghanekar 02 10/06/2013 ISSUE FOR APPROVAL S. Naik P.V.Ghanekar 01 14/01/2013 ISSUE FOR APPROVAL S. Naik P.V.Ghanekar Rev Date Description Prepared Checked Approved Contractor Details (Headquarters and Offices): ABB SpA - Process Automation Division via Luciano Lama 33 20099 Sesto S.Giovanni (MI) - Italy Document property of ABB SpA: its reproduction, circulation and use without prior consent is forbidden 17/06/2014 Company comments on rev.05 response sheet shall be considerd

(732-ITP-90 (V-6901) 42000-SNG-69-42000P-MS-5733-551-0000-06

Embed Size (px)

Citation preview

  • PETROLEUM DEVELOPMENT

    OMAN L.L.C. (PDO) Contractor Job No. : 20036 Unit No

    Vendor Doc. No. : 732/QAP/90 Rev. 06

    Project Title: SAIH NIHAYDA CONDENSATE STABILIZATION PLANT (SNCP) Doc. Category : Q3

    Sheet No 1 of 8

    PDO Contract No. C311194

    Document Title: INSPECTION & TEST PLAN (QAP) FOR V 6901

    (Kauther Slug Catcher)

    PDO Doc. No.: Rev. 06

    SNG-69-42000P-MS-5733-551-0000

    Project No. 20036 Unit Description:

    INSPECTION & TEST PLAN (QAP) FOR V 6901 (Kauther Slug Catcher)

    MR NO. :- 20036-0100-M31-MR-42000 REV. 02 PURCHASE ORDER NO. :- 4580041305 TAG No. : V 6901 POS. : 00010 ITEM NO. :- 00011. VESSEL CATEGORY:- ENGINEERED PRESSURE VESSEL NACE MR-01-75 & SOUR SERVICE

    06 26/05/2014 REVISED TO INCORPORATE PDO COMMENTS S. Naik P.V.Ghanekar 05 10/04/2014 REVISED TO INCORPORATE PDO COMMENTS S. Naik P.V.Ghanekar 04 08/10/2013 REVISED TO INCORPORATE PDO COMMENTS S. Naik P.V.Ghanekar 03 17/07/2013 ISSUE FOR APPROVAL S. Naik P.V.Ghanekar 02 10/06/2013 ISSUE FOR APPROVAL S. Naik P.V.Ghanekar 01 14/01/2013 ISSUE FOR APPROVAL S. Naik P.V.Ghanekar

    Rev Date Description Prepared Checked Approved

    Contractor Details (Headquarters and Offices): ABB SpA - Process Automation Division via Luciano Lama 33 20099 Sesto S.Giovanni (MI) - Italy

    Document property of ABB SpA: its reproduction, circulation and use without prior consent is forbidden

    17/06/2014

    Company comments on rev.05 response sheet shall be considerd

  • 732/QAP/90 Page 2 of 8...

    CLIENT : ABB S.p.A - Italy. QAP No. : 732/QAP/90 Rev. 6P.O. No. : 4580041305/01 DTD 14-03-2013. DATE : 19/05/2014EQUPT. No. : V 6901. CODE OF CONSTRUCTION : ASME SEC. VIII DIV 2 ED 2010 ADDENDA 2011PROJECT NAME : SAIH NIHAYDA CONDENSATE STABILIZATION PLANT (SNCP) DRG. No. : 732-E-90CONTRACTOR JOB No. : 20036 INSPECTION : AI (LR Insurance, Inc.)

    SPECIFICATIONS FOR PRESSURE VESSELS

    :SP 2069 Rev. 0, SP 2051 Rev. 2, DEP 31.10.00.10 Sep. 2011,

    SP 2041 Rev. 2, DEP 30.10.60.18 May 2004,& NACE MR 0175.

    SP 1176 Rev. 2, DEP 30.10.02.17 Feb. 2011,

    GR A.I. ABB PDO

    1.0

    1.1 Drawing , Design Calculations Review of Documents ASME Sec. VIII Div. 2/ 20036-0100-M31-MR-42000ASME Sec. VIII Div. 2

    / 20036-0100-M31-MR-42000

    Approved Drawing, Design

    CalculationsH R RA RA

    1.2 Quality Assurance Plan, IRR Approval Review of documentsASME Sec. VIII Div. 2/ Approved Drawing

    / 20036-0100-M31-MR-42000

    ASME Sec. VIII Div. 2/ Approved Drawing

    / 20036-0100-M31-MR-42000QAP H H RA RA

    1.3

    Procedures - NDE, Heat Treatment, Hydrotest, Hardness, PMI, Painting, Packing transport

    & preservation procedures

    Documented ProcedureASME Sec. VIII Div. 2 /

    / Approved Drawing/ 20036-0100-M31-MR-42000

    ASME Sec. VIII Div. 2 / / Approved Drawing

    / 20036-0100-M31-MR-42000

    Procedure Documents H R RA RA

    1.4 Pre inspection meetingReviewing & understanding of

    technical requirements and Approval of MTC.

    Purchase order / 20036-0100-M31-MR-42000

    Purchase order / 20036-0100-M31-MR-42000

    Minutes ofmeeting H ---- H H

    2.0

    Material after receipt (For Pressure Parts)

    Plates, Pipes

    H H RA RA

    Forging, fittings, Fastners, gaskets etc. H R RA RA

    Scope of InspectionREMARKS

    DOCUMENTS

    SL.NO STAGE / ACTIVITY TYPE OF CHECK REFERENCE DOCUMENT

    ASME Sec.-II A/B / Data sheet / Approved

    Drawing

    SP 1246 Part 1,2,3,4 Rev. 2 & Part 5 Rev. 3, DEP 31.22.20.31- Gen. Feb. 2011,

    ASME Sec.-II A/B / Data sheet / Approved

    Drawing / TDC / SP 2069, SP 2041, DEP 31.22.20.31 & NACE-MR-01-75.

    Material Test Certificates, Identification

    reports

    1) ALL CS materials shall be killed or semi killed & Carbon content shall be 0.23% max.2) Mateial for shell & head shall be supplied in normalised condition. Chemical composition : Carbon (c) = 0.20 % (Max) Sulfur (s) = 0.003 % (Max) for plate, 0.01% for seamless product, 0.025% for forging, Vanadium (V) + Niobium (NB) = 0.03 (Max) Carbon Equivalent (CE) = 0.43% (t 50mm) & 0.45 % (50mm < t 200mm) 3) Clad plate material shall be ultrasonically tested at the mill in accordance with ASME SA-578.4) Forged products above 50 mm thick shall be 100 % ultrasonically examined

    ACCEPTANCE NORMS FORMAT OF RECORD

    G.R.ENGINEERING PRIVATE LTD. -TARAPUR

    INSPECTION & TEST PLAN (QAP) FOR V 6901

    MATERIAL INSPECTION

    2.1

    Review of manufacturer's test certificates, Identification co-realting heat number, Visual

    damages & Dimesional inspection, Transfer of identity &

    physical verification.

    Form No. GR 11 Rev. 02 FOR DETAILED NON DESTRUCTIVE EXAMINATION REQUIREMENTS REFER ANNEXURE "A"

  • 732/QAP/90 Page 3 of 8...

    CLIENT : ABB S.p.A - Italy. QAP No. : 732/QAP/90 Rev. 6P.O. No. : 4580041305/01 DTD 14-03-2013. DATE : 19/05/2014EQUPT. No. : V 6901. CODE OF CONSTRUCTION : ASME SEC. VIII DIV 2 ED 2010 ADDENDA 2011PROJECT NAME : SAIH NIHAYDA CONDENSATE STABILIZATION PLANT (SNCP) DRG. No. : 732-E-90CONTRACTOR JOB No. : 20036 INSPECTION : AI (LR Insurance, Inc.)

    SPECIFICATIONS FOR PRESSURE VESSELS

    :SP 2069 Rev. 0, SP 2051 Rev. 2, DEP 31.10.00.10 Sep. 2011,

    SP 2041 Rev. 2, DEP 30.10.60.18 May 2004,& NACE MR 0175.

    SP 1176 Rev. 2, DEP 30.10.02.17 Feb. 2011,

    GR A.I. ABB PDO

    Scope of InspectionREMARKSSL.NO STAGE / ACTIVITY TYPE OF CHECK REFERENCE DOCUMENT

    SP 1246 Part 1,2,3,4 Rev. 2 & Part 5 Rev. 3, DEP 31.22.20.31- Gen. Feb. 2011,

    ACCEPTANCE NORMS FORMAT OF RECORD

    G.R.ENGINEERING PRIVATE LTD. -TARAPUR

    INSPECTION & TEST PLAN (QAP) FOR V 6901

    2.2Non Pressure Parts (including internals,

    supports etc.)

    Review of Material Test Certificates

    ASME Sec.-II A, Approved Drawing,

    SP 2069, DEP 31.22.20.31

    ASME Sec.-II A, Approved Drawing

    Material Test Certificates H --- R R

    3.0

    3.1 Shop Weld & Test Plan WPS,PQR,WPQ & Consumable , NDT Plan

    ASME Sec. IX / Approved Drawing / DEP 30.10.60.18 &

    31.22.20.31

    ASME Sec. IX Weld Plan H R RA RA

    3.2 PQR Welding parameters ASME Sec. IX

    / Approved Drawing / DEP 30.10.60.18

    ASME Sec. IX / Approved Drawing WPS/ PQR H R RA RA

    3.3 WPQ Qualification requirementsASME Sec. IX

    / Approved Drawing / DEP 30.10.60.18

    ASME Sec. IX / Approved Drawing WPQ H R RA RA

    3.4 Welding Consumable Chemical & mechanical properties ASME Sec. II Part C

    / DEP 30.10.60.18 ASME Sec. II Part CBatch Test Certificate R R R R

    4.0

    Visual & Dimensional inspection including profile check &

    minimum thickness mesurementH W W

    Dye Penetrant Test (to detect cracks inside &

    outside knuckle surface area) H R W

    Normalising of dished ends. Heat Treatment Chart H R R

    Simulation Test Coupon of normalised dished end.

    Inspection Report H W H W Test Coupon for physical test

    UT to check lack of bond after forming 100 % surface area UT report H ---- W

    UT shall be carried out in accordance with specification ASME SA-578 level 1

    RT - Full for weld seams in dished ends. RT Report H R R

    RT films review.

    WELDING INSPECTION WPS & PQR

    Inspection report

    Inspection of Formed Components

    Inspection of Formed Components

    (Dished ends)

    ASME Sec. VIII Div. 2/ Approved Drawing

    / SP 2069 Appendix 8, SP 1176, DEP 31.22.20.31

    SNG-69-42000P-MS-6038-517-0000,

    SNG-69-42000P-MS-6038-539-0000,

    SNG-69-42000P-MS-6026-525-0000,

    SNG-69-42000P-MS-6038-536-0000

    ASME Sec. VIII Div. 2/ Approved Drawing4.1

    Form No. GR 11 Rev. 02 FOR DETAILED NON DESTRUCTIVE EXAMINATION REQUIREMENTS REFER ANNEXURE "A"

  • 732/QAP/90 Page 4 of 8...

    CLIENT : ABB S.p.A - Italy. QAP No. : 732/QAP/90 Rev. 6P.O. No. : 4580041305/01 DTD 14-03-2013. DATE : 19/05/2014EQUPT. No. : V 6901. CODE OF CONSTRUCTION : ASME SEC. VIII DIV 2 ED 2010 ADDENDA 2011PROJECT NAME : SAIH NIHAYDA CONDENSATE STABILIZATION PLANT (SNCP) DRG. No. : 732-E-90CONTRACTOR JOB No. : 20036 INSPECTION : AI (LR Insurance, Inc.)

    SPECIFICATIONS FOR PRESSURE VESSELS

    :SP 2069 Rev. 0, SP 2051 Rev. 2, DEP 31.10.00.10 Sep. 2011,

    SP 2041 Rev. 2, DEP 30.10.60.18 May 2004,& NACE MR 0175.

    SP 1176 Rev. 2, DEP 30.10.02.17 Feb. 2011,

    GR A.I. ABB PDO

    Scope of InspectionREMARKSSL.NO STAGE / ACTIVITY TYPE OF CHECK REFERENCE DOCUMENT

    SP 1246 Part 1,2,3,4 Rev. 2 & Part 5 Rev. 3, DEP 31.22.20.31- Gen. Feb. 2011,

    ACCEPTANCE NORMS FORMAT OF RECORD

    G.R.ENGINEERING PRIVATE LTD. -TARAPUR

    INSPECTION & TEST PLAN (QAP) FOR V 6901

    5.0

    Visual & dimensional inspection, weld edge,cut back, root - gap, offset, alignment & cleanliness

    etc. for long seams of shell, dished end & nozzles

    H H 10%W5 %W

    Visual & dimensional inspection, weld edge, cut back, root - gap, offset, alignment & cleanliness etc. for circular seam, neck to flange, nozzles on shell / head

    H W 10%W5 %W

    PT of weld edges to detect linear discontinuties.

    ASME Sec. VIII Div. 2 /Approved Drawing /

    SNG-69-42000P-MS-6038-539-0000

    ASME Sec. VIII Div. 2 Inspection Report H R10%W

    5 %W

    5.2 Intermediate Inspection of welds Visual / Interpass temperature / PT insp. after backchip

    ASME Sec. VIII Div. 2 & Sec. IX / Approved Drawing

    /SNG-69-42000P-MS-6038-517-0000,

    SNG-69-42000P-MS-6038-539-0000

    ASME Sec. VIII Div. 2 & Sec. IX

    Inspection Report H R S S

    Visual inspection for reinforcement, undercuts, surface

    defects etc.

    ASME Sec. VIII Div. 2 & Sec. V / Approved Drawing

    / SNG-69-42000P-MS-6038-517-0000

    ASME Sec. VIII Div. 2 & Sec. V / Approved Drawing

    Inspection Report H W W W

    Welder Identification stamp on completed weld (Die stamp)

    MT of welds

    ASME Sec. VIII Div. 2/Approved Drawing

    /SNG-69-42000P-MS-6038-540-0000

    ASME Sec. VIII Div. 2 Inspection Report H R S SPT shall also be carried out for the tack

    welds(after removal & ground flush) utilized to aid construction.

    Radiography Test

    ASME Sec. VIII Div. 2/Data sheet /

    Approved Drawing /SNG-69-42000P-MS-

    6038-536-0000

    ASME Sec. VIII Div. 2 RT Report H R RA RA Review of Radiography films

    5.3Base Metal Welding

    (Inspection of completed CS weld)

    Inspection during fabrication

    5.1

    ASME Sec. VIII Div. 2 / Approved Drawing

    /SNG-69-42000P-MS-6038-517-0000

    Weld edge perparation & setup of pressure parts

    ( Long seam, circular seam, nozzle neck

    to flange, nozzle on shell/head)

    ASME Sec. VIII Div. 2 / Approved Drawing

    Inspection Report

    Form No. GR 11 Rev. 02 FOR DETAILED NON DESTRUCTIVE EXAMINATION REQUIREMENTS REFER ANNEXURE "A"

  • 732/QAP/90 Page 5 of 8...

    CLIENT : ABB S.p.A - Italy. QAP No. : 732/QAP/90 Rev. 6P.O. No. : 4580041305/01 DTD 14-03-2013. DATE : 19/05/2014EQUPT. No. : V 6901. CODE OF CONSTRUCTION : ASME SEC. VIII DIV 2 ED 2010 ADDENDA 2011PROJECT NAME : SAIH NIHAYDA CONDENSATE STABILIZATION PLANT (SNCP) DRG. No. : 732-E-90CONTRACTOR JOB No. : 20036 INSPECTION : AI (LR Insurance, Inc.)

    SPECIFICATIONS FOR PRESSURE VESSELS

    :SP 2069 Rev. 0, SP 2051 Rev. 2, DEP 31.10.00.10 Sep. 2011,

    SP 2041 Rev. 2, DEP 30.10.60.18 May 2004,& NACE MR 0175.

    SP 1176 Rev. 2, DEP 30.10.02.17 Feb. 2011,

    GR A.I. ABB PDO

    Scope of InspectionREMARKSSL.NO STAGE / ACTIVITY TYPE OF CHECK REFERENCE DOCUMENT

    SP 1246 Part 1,2,3,4 Rev. 2 & Part 5 Rev. 3, DEP 31.22.20.31- Gen. Feb. 2011,

    ACCEPTANCE NORMS FORMAT OF RECORD

    G.R.ENGINEERING PRIVATE LTD. -TARAPUR

    INSPECTION & TEST PLAN (QAP) FOR V 6901

    Visual inspection for reinforcement, undercuts, surface

    defects etc.

    ASME Sec. VIII Div. 2/ SNG-69-42000P-MS-

    6038-517-0000

    ASME Sec. VIII Div. 2/ Approved Drawing

    Inspection Report H W W W

    PT of final layer

    ASME Sec. VIII Div. 2/ Approved Drawing

    / DEP 31.22.20.31 CL 6.5 /SNG-69-42000P-MS-

    6038-539-0000

    ASME Sec. VIII Div. 2, Appendix 8

    Inspection Report H R W W

    Chemical analysis of weld overlay

    ASME Sec. VIII Div. 2 /Approved Drawing

    / ASME Sec. II C / SP 2069ASME Sec. II C Inspection Report H R RA RA

    Chemical analysis of one seam from each shell course and one seam from each head.

    Alloy elements to be checked as per ASME II Sec. C

    Visual / Dimensional Inspection H R R R

    PT for fillet welds of lifting lugs and other

    pressure bearing weldsH R R R

    Final visual & dimensional Inspection

    ASME Sec. VIII Div. 2 / Approved Drawing / SNG-69-42000P-MS-

    6038-517-0000

    ASME Sec. VIII Div. 2 / Approved Drawing

    Inspection Report H W H H

    MT of finish welds

    ASME Sec. VIII Div. 2 & Sec. V , DEP 31.22.20.31 /

    Approved Drawing / SNG-69-42000P-MS-

    6038-540-0000

    ASME Sec. VIII Div. 2 Inspection Report H R S S

    RT of finish welds

    ASME Sec. VIII Div. 2/Data sheet /

    Approved Drawing /SNG-69-42000P-MS-

    6038-536-0000

    ASME Sec. VIII Div. 2 Inspection Report H R RA

    Mechanized UT of Category A, B (above 50mm thk) & D welds

    ASME Sec. VIII Div. 2 /Data sheet /

    Approved Drawing / SNG-69-42000P-MS-

    6038-525-0000

    ASME Sec. VIII Div. 2 Inspection Report H R W W

    5.5 Fitment & Welding of Internal & External attachments etc.

    ASME Sec. VIII Div. 2 & Sec. V / Approved Drawing

    / SNG-69-42000P-MS-6038-517-0000,

    SNG-69-42000P-MS-6038-539-0000

    ASME Sec. VIII Div. 2 & Sec. V / Approved Drawing

    5.4Overlay welding

    (Clad restoration)

    Inspection Report

    5.6 Inspection of the equipment before PWHT

    Form No. GR 11 Rev. 02 FOR DETAILED NON DESTRUCTIVE EXAMINATION REQUIREMENTS REFER ANNEXURE "A"

  • 732/QAP/90 Page 6 of 8...

    CLIENT : ABB S.p.A - Italy. QAP No. : 732/QAP/90 Rev. 6P.O. No. : 4580041305/01 DTD 14-03-2013. DATE : 19/05/2014EQUPT. No. : V 6901. CODE OF CONSTRUCTION : ASME SEC. VIII DIV 2 ED 2010 ADDENDA 2011PROJECT NAME : SAIH NIHAYDA CONDENSATE STABILIZATION PLANT (SNCP) DRG. No. : 732-E-90CONTRACTOR JOB No. : 20036 INSPECTION : AI (LR Insurance, Inc.)

    SPECIFICATIONS FOR PRESSURE VESSELS

    :SP 2069 Rev. 0, SP 2051 Rev. 2, DEP 31.10.00.10 Sep. 2011,

    SP 2041 Rev. 2, DEP 30.10.60.18 May 2004,& NACE MR 0175.

    SP 1176 Rev. 2, DEP 30.10.02.17 Feb. 2011,

    GR A.I. ABB PDO

    Scope of InspectionREMARKSSL.NO STAGE / ACTIVITY TYPE OF CHECK REFERENCE DOCUMENT

    SP 1246 Part 1,2,3,4 Rev. 2 & Part 5 Rev. 3, DEP 31.22.20.31- Gen. Feb. 2011,

    ACCEPTANCE NORMS FORMAT OF RECORD

    G.R.ENGINEERING PRIVATE LTD. -TARAPUR

    INSPECTION & TEST PLAN (QAP) FOR V 6901

    5.7 Inspection of the equipment before PWHT PMI examination of

    alloy materials & welds

    ASME Sec. II- B/C, / DEP 31.10.00.10, SP 2069,

    SNG-69-42000P-MS-6180-523-0000

    ASME Sec. II- B/C PMI Report H R W W

    5.8 Post Weld Heat Treatment of equipment Review of Heat Treatment Cycle

    ASME Sec. VIII Div. 2 /Approved Drawing

    /SNG-69-42000P-MS-6026-519-0000

    ASME Sec. VIII Div. 2 /Approved Drawing

    Heat Treatment Chart H R RA R

    PWHT of equipment Soaking Temperature :- 61010C.

    Soaking Time :- 135 minutes minimum.

    100 % PT of weld overlay machine surface

    ASME Sec. VIII Div. 2/ Approved Drawing

    / DEP 31.22.20.31 CL 6.5 /SNG-69-42000P-MS-

    6038-539-0000

    ASME Sec. VIII Div. 2, Appendix 8

    Inspection Report H R W W

    RT of Pressure part butt welds for thk below 50mm

    ASME Sec. VIII Div. 2/Data sheet /

    Approved Drawing /SNG-69-42000P-MS-

    6038-536-0000

    ASME Sec. VIII Div. 2 Inspection Report H R RA

    MT of Pressure part welds

    ASME Sec. VIII Div. 2/Approved Drawing

    /SNG-69-42000P-MS-6038-540-0000

    ASME Sec. VIII Div. 2 Inspection Report H R RA

    Mechanized UT of Category A, B (above 50mm thk) & D welds

    ASME Sec. VIII Div. 2 /Data sheet /

    Approved Drawing / SNG-69-42000P-MS-

    6038-525-0000

    ASME Sec. VIII Div. 2 Inspection Report H R W W

    Hardness test of welds, HAZ

    ASME Sec. VIII Div. 2 / Approved Drawing /

    SP 2069 Appendix-8, DEP 31.22.20.31 CL 6.2, SNG-69-42000P-MS-6061-526-0000

    ASME Sec. VIII Div. 2 / Approved Drawing

    Hardness test report H R W W

    248 HV10 maximum for ferritic metals in process services, including H2 and sour

    service conditions.

    5.9 NDE after PWHT

    Form No. GR 11 Rev. 02 FOR DETAILED NON DESTRUCTIVE EXAMINATION REQUIREMENTS REFER ANNEXURE "A"

  • 732/QAP/90 Page 7 of 8...

    CLIENT : ABB S.p.A - Italy. QAP No. : 732/QAP/90 Rev. 6P.O. No. : 4580041305/01 DTD 14-03-2013. DATE : 19/05/2014EQUPT. No. : V 6901. CODE OF CONSTRUCTION : ASME SEC. VIII DIV 2 ED 2010 ADDENDA 2011PROJECT NAME : SAIH NIHAYDA CONDENSATE STABILIZATION PLANT (SNCP) DRG. No. : 732-E-90CONTRACTOR JOB No. : 20036 INSPECTION : AI (LR Insurance, Inc.)

    SPECIFICATIONS FOR PRESSURE VESSELS

    :SP 2069 Rev. 0, SP 2051 Rev. 2, DEP 31.10.00.10 Sep. 2011,

    SP 2041 Rev. 2, DEP 30.10.60.18 May 2004,& NACE MR 0175.

    SP 1176 Rev. 2, DEP 30.10.02.17 Feb. 2011,

    GR A.I. ABB PDO

    Scope of InspectionREMARKSSL.NO STAGE / ACTIVITY TYPE OF CHECK REFERENCE DOCUMENT

    SP 1246 Part 1,2,3,4 Rev. 2 & Part 5 Rev. 3, DEP 31.22.20.31- Gen. Feb. 2011,

    ACCEPTANCE NORMS FORMAT OF RECORD

    G.R.ENGINEERING PRIVATE LTD. -TARAPUR

    INSPECTION & TEST PLAN (QAP) FOR V 6901

    6.0

    6.1Final Visual & Dimensional

    Inspection(Internal & External)

    Dimensions, completeness of the assembly, as built thickness measurement

    ASME Sec. VIII Div. 2 & Sec. V / Approved Drawing

    / DEP 30.22.20.31, SNG-69-42000P-MS-6038-554-0000

    ASME Sec. VIII Div. 2 /Approved Drawing

    Inspection Report H H H H

    6.2 Trial assembly of supplied Internals Trial fitting of internals P.O. /

    Internals supplier Drawings P.O. /

    Internals supplier Drawings Inspection

    Report H W W

    6.3 Interior & exterior cleaning

    All completed equipment shall be cleaned internally and externally to remove scale, weld spatter,dirt,

    and foreign material.

    Approved Drawing / DEP 30.22.20.31 Approved Drawing

    Inspection Report H R R

    6.4 Hydrostatic Testing (Horizontal) Leak check

    / Pressure drop

    ASME Sec. VIII Div. 2 /Approved Drawing

    / DEP 31.22.20.31 CL 6.9, SP 2069 CL 6.2,

    SP 2051 CL 6.4.4,SNG-69-42000P-MS-

    6180-520-0000

    ASME Sec. VIII Div. 2 /Approved Drawing

    Inspection Report H H H H

    6.5 Drying of equipment CleanlinessApproved Drawing

    / DEP 31.22.20.31 CL 6.9, SP 2069 CL 6.2.

    Approved Drawing Inspection Report H ----

    6.6 External Surface preparation Visual Inspection for worksmanship, profile check H ----

    6.7 PaintingVisual inspection for

    workmanship, DFT checking, Adhesion

    H ---- W W

    Painting shall be checked for surface chloride contaimination , Holiday / pinhole, Adhesion test & DFT test.Criteria

    of Acceptability as per specification SP-1246

    Part-1 Table B1

    7.0 Inspection of Mandatory & Commissioning spares Verification of spares20036-0100-M31-MR-42000 / Approved Drawing / P.O.

    20036-0100-M31-MR-42000 / Approved Drawing / P.O. Spares List H ---- H

    FINAL INSPECTION

    Approved Drawing / Data Sheet /

    SP -1246 (PCS-1), SNG-69-42000P-MS-

    6180-521-0000

    Approved Drawing / Data Sheet /

    SP -1246 (PCS-1)

    Inspection Report

    Form No. GR 11 Rev. 02 FOR DETAILED NON DESTRUCTIVE EXAMINATION REQUIREMENTS REFER ANNEXURE "A"

  • 732/QAP/90 Page 8 of 8...

    CLIENT : ABB S.p.A - Italy. QAP No. : 732/QAP/90 Rev. 6P.O. No. : 4580041305/01 DTD 14-03-2013. DATE : 19/05/2014EQUPT. No. : V 6901. CODE OF CONSTRUCTION : ASME SEC. VIII DIV 2 ED 2010 ADDENDA 2011PROJECT NAME : SAIH NIHAYDA CONDENSATE STABILIZATION PLANT (SNCP) DRG. No. : 732-E-90CONTRACTOR JOB No. : 20036 INSPECTION : AI (LR Insurance, Inc.)

    SPECIFICATIONS FOR PRESSURE VESSELS

    :SP 2069 Rev. 0, SP 2051 Rev. 2, DEP 31.10.00.10 Sep. 2011,

    SP 2041 Rev. 2, DEP 30.10.60.18 May 2004,& NACE MR 0175.

    SP 1176 Rev. 2, DEP 30.10.02.17 Feb. 2011,

    GR A.I. ABB PDO

    Scope of InspectionREMARKSSL.NO STAGE / ACTIVITY TYPE OF CHECK REFERENCE DOCUMENT

    SP 1246 Part 1,2,3,4 Rev. 2 & Part 5 Rev. 3, DEP 31.22.20.31- Gen. Feb. 2011,

    ACCEPTANCE NORMS FORMAT OF RECORD

    G.R.ENGINEERING PRIVATE LTD. -TARAPUR

    INSPECTION & TEST PLAN (QAP) FOR V 6901

    7.1Verification of Name plateand authorise for ASME

    certification markName plate review Approved Drawing Approved Drawing Inspection Report H H H

    7.2Attachment of Stamped

    name plate on the equipment

    Name plate attachment confirmation Approved Drawing Approved Drawing

    Rub off / Photo copy

    of name plateH W

    7.3 Inspection Release Note / Despatch ClearanceVerification of documents & issue

    of IRN 20036-0100-M31-MR-42000 / Approved Drawing / P.O.

    20036-0100-M31-MR-42000 / Approved Drawing / P.O. IRN R --- H R

    7.4 Signing of Manufacturer's Data Report (MDR) Review of MDRASME Sec. VIII Div. 2 / Approved Drawing

    ASME Sec. VIII Div. 2 / Approved Drawing MDR H H H R

    7.5 Check of packing & packing listVisual inspection /

    Varification P.O. /

    20036-0100-M31-MR-42000 P.O. /

    20036-0100-M31-MR-42000 Packing list H --- W

    7.6 Manufacturing Record Book(MRB) Review of MRB P.O. /

    20036-0100-M31-MR-42000 P.O. /

    20036-0100-M31-MR-42000 MRB H ---- H R

    Legends :

    S. NAIK P. V. GHANEKARQA Engineer QA Manager Authorised Inspector

    H- Hold ( Do not proceed without approval), W- Witness(Give due notice, work may proceed after schedule date), R- Document Review,RA- Approval of Documents RW-Random Witness, S- Survellance, NDE- Non Destructive Examination, PT - Dye Penetrant Test, RT - Radiographic Examination, UT - Ultrasonic Test, P.O.- Purchase Order, CS - Carbon steel, PMI - Positive Material Identification, TDC - Technical Delivery Condition, HAZ - Heat Affected Zone

    Form No. GR 11 Rev. 02 FOR DETAILED NON DESTRUCTIVE EXAMINATION REQUIREMENTS REFER ANNEXURE "A"