    Promotion of Small Hydropower InNepal

    Sridhar Devkota, Project Manager

    Small Hydropower Promotion Project,

    SHPP-GTZ

  • 7/28/2019 720_en_Promotion of Small Hydro in Nepal

    2/25

    2

    1. Nepal

    Location: Latitude 26022 N to 30027N

    Longitude 800

    4 E to 880

    12E Sandwiched inbetween two big countries China and India.

    Area = 147,181 Sq. Km

    Population = 23.1 Million ( 2001 Census) Literacy rate = 54%

    GNI per Capita = US$340 (WB 2007)

    Life Expectancy Male = 63 years

    Female = 64 years

  • 7/28/2019 720_en_Promotion of Small Hydro in Nepal

    3/25

    3

    Religion Hindu = 82%

    Buddhist = 11%

    Others = 7%

    Major River Basins Koshi

    Gandaki

    Karnali

    Mahakali

    Average Annual Precipitation = 1700mm (May September)

    1. Nepal .contd.

  • 7/28/2019 720_en_Promotion of Small Hydro in Nepal

    4/25

    4

    Estimated Total Annual Average run-off for thecountries 600 perennial river = 200billion m3

    Estimated water storage potential = 88billion m3

    Estimated theoretically potential hydropower =83000MW

    Estimated Technically viable Hydropower = 43000MW

    Present Status of Energy Hydro Installed capacity 555MW (GoN 400MW,

    IPP155MW)

    Thermal Installed Capacity 54MW (GoN) Electricity Access to people 42% of Population

    1. Nepal .contd.

  • 7/28/2019 720_en_Promotion of Small Hydro in Nepal

    5/25

    5

    2. Hydropower Policy

    No license required up to 3MW capacity projects. Implementation of projects on BOOT basis Encourage to develop Storage and multi purpose

    projects, public private partnership approach Mobilization of internal capital market for investment Electricity Export Encouragement of community /cooperatives / local

    bodies Foreign investment on HP generation/ transmission and

    distribution Private sector establishment shall not be nationalized

    during license period Exchange facilities to foreign investors, can repatriate

    the amount in foreign currency at the prevailing rate

  • 7/28/2019 720_en_Promotion of Small Hydro in Nepal

    6/25

    6

    3. License Royalty

    Yearly12500 US$100MW 500MW

    Yearly125 US$/MW5MW 100MW

    Yearly25000 US$500MW - Above

    yearly625 US$1MW 5MW

    -Up to 1MW

    PeriodRoyaltyInstalled Capacity

  • 7/28/2019 720_en_Promotion of Small Hydro in Nepal

    7/25

    7

    4. Power Purchase Agreement

    27%esc

    10

    -

    $0.0875/kWh

    $0,05/kWh

    1

    -

    12%esc

    5

    -

    15%esc

    6

    -

    18%esc

    7

    20%

    21%esc

    8

    24%esc

    9

    ---Income Tax

    Dry Season(Jan April)

    9%esc

    6%esc

    3%esc

    Wet season

    (May Dec)

    432Year

    esc = escalation

  • 7/28/2019 720_en_Promotion of Small Hydro in Nepal

    8/25

    8

    5. Small Hydropower PromotionProject (SHPP)

    1.Objectives:

    German Technical Cooperation (GTZ) startedSmall Hydropower Promotion Project (SHPP) in2001 with the aim that private entrepreneurparticipate in the development of Small

    Hydropower Sector Facilitate the establishment of a market for SHP

    leading to investments and associated economic

    activities in rural areas,

  • 7/28/2019 720_en_Promotion of Small Hydro in Nepal

    9/25

  • 7/28/2019 720_en_Promotion of Small Hydro in Nepal

    10/25

  • 7/28/2019 720_en_Promotion of Small Hydro in Nepal

    11/25

  • 7/28/2019 720_en_Promotion of Small Hydro in Nepal

    12/25

    12

    7. Achievements .contd

    2. Synchonization Synchronization of isolated mini/micro-

    hydropower plants into the grid Establishment of mini-grid

    End use diversification in isolated plantsand introduction to energy efficiency e.g.,efficient lighting.

    3. IPPs becoming capable in the sector

    4. Improved communication amongstsector actors through seminars,workshops and training

    5. Organizational Development Trainingfor Rural Electric Comminutes Over 295 rural community members trained

    in distribution of electricity

    6. Backstopping support to Micro-hydropower sector through ESAP,

    Danida & AEPC, GoVN

  • 7/28/2019 720_en_Promotion of Small Hydro in Nepal

    13/25

    13

    7. Achievements .contd

    Feasibility Study report Review / Assessment < 100kW 270 projects

    >100 kW 100 projects

    Site Verification 110 Projects Construction Supervision technical support

    Piluwa 3 MW Thoppal 1.65 MW

    Sunkoshi 2.6 MW Feme 0.995 MW

    Sange 0.183 MW Pati 0.996 MW

    Baramchi 0.98 MW Phawa 5 MW

    Rairang 0.5 MW Seti II 0.979 MW

    Riddhi Khola 2.4MW Handi Khola 0.991 MW

    Sisne 0.75 MW Mardi Khola 3.1 MW

    Chaku 1.5 MW Mailung Khola 5 MW

  • 7/28/2019 720_en_Promotion of Small Hydro in Nepal

    14/25

    14

    7. Achievements .contd

    Projects initiation has made possible the investmentby private sector and financial institutions on SmallHydropower Sector reached to:

    45M EURO loan dispersed to 37 Power Stations whosetotal worth is 67M EURO.

    Further Investment on new projects are in the process.

  • 7/28/2019 720_en_Promotion of Small Hydro in Nepal

    15/25

    15

    8. Stake Holders Interactive Meet

    1. Project Finance & Risk Management2. Discussion on Financial Analysis of Hydropower

    Projects

    3. Power Development Fund and Financing of SmallHydropower

    4. Issues Pertaining to Insurance of Small Hydropower

    Project

    A. Finance & Insurance

  • 7/28/2019 720_en_Promotion of Small Hydro in Nepal

    16/25

    16

    B. Technical

    1. Model Contract for SHP Civil Works Construction

    Contract Introduction and Industry DiscussionForum

    2. Sedimentation Problems on Hydropower Projects

    and Silt ing Problems of Existing HydropowerPlants in Nepal

    3. Water Conveyance Systems in Small Hydropower

    Development,4. Interconnection Manual and Interconnection

    Agreement for Small Hydropower Plants

    8. Stake Holders Interactive Meet ..contd

  • 7/28/2019 720_en_Promotion of Small Hydro in Nepal

    17/25

    17

    5. Issues Pertaining to Insurance of Small hydropowerProjects

    6. Opportunities in Hydropower Investment in Nepal,

    7. Grid Connection of Micro/Small Hydropower Plants,

    8. Use of New Technology for Penstock Pipe on SmallHydropower Plants Glass Reinforced Pipe (GRP)

    8. Stake Holders Interactive Meet ..contd

  • 7/28/2019 720_en_Promotion of Small Hydro in Nepal

    18/25

  • 7/28/2019 720_en_Promotion of Small Hydro in Nepal

    19/25

    19

    DGIS Activities- Support to REEs

    1. Organizational Development / FinancialManagement Training

    2. Training for Trainers / electrical safety3. End Use Promotion,

    4. Financial Planning / Accounting

    5. House wiring Training

    8. Stake Holders Interactive Meet ..contd

  • 7/28/2019 720_en_Promotion of Small Hydro in Nepal

    20/25

    20

    1. Sharing of Experience on Leased out Small

    Hydropower by NEA

    2. Achievements and Challenges of PiluwakholaSmall Hydropower Project (3 MW), Experience

    Sharing

    3. Operational Experiences of Small Hydropower IPPsin Nepal

    4. Media Training, Pokhara, Nepalgunj, Biratnagar,Chitawan - to Energy Journalists

    C. Experience Sharing and Others

    8. Stake Holders Interactive Meet ..contd

  • 7/28/2019 720_en_Promotion of Small Hydro in Nepal

    21/25

    21

    Objectives:

    A. Symposium

    -To arrange Common plat farm to get together Policy Makers,

    Entrepreneur, Investors, Regulatory Bodies, Power Purchaser,Financial Institutions, Insurance Agencies, Independent PowerProducers, Contractors, Consultants, Suppliers

    -To interface to be well acquainted with investment opportunities in

    Small Hydropower-To create environment for the interested to network and talk businesswith various players to finalize implementation of hydropower projects

    B. Exposition

    - To set up respective pavilion of interested off takers, developers,Financial Institutions, Independent Power Producers, Manufacturers,Developers, Contractors, Suppliers, sponsors to show their VisionMission, present work and future plan

    9. Hydropower Investment Mart

  • 7/28/2019 720_en_Promotion of Small Hydro in Nepal

    22/25

    22

    10. Publication

    1. Mini Hydropower Design Aids, 2006

    1. Organizational and Staff DevelopmentTraining for Rural Electric Entities, 2007

  • 7/28/2019 720_en_Promotion of Small Hydro in Nepal

    23/25

    23

    11. Activities

    Capacity Building of rural ElectricEntities

    Technology Pilot project on connecting isolated

    mini hydro to the national grid Two NEA owned isolated mini-hydropower

    stations are successfully connected to the grid

  • 7/28/2019 720_en_Promotion of Small Hydro in Nepal

    24/25

    24

    Implication of grid connecting micro/mini hydro

    - As a result of government subsidy andaggressive promotion strategy large number of

    micro-hydropower plants are being installed.During the current 10th Five Year Plan, the targetis to achieve 2 MW of Micro-hydro installedcapacity/year

    If such MHP can be synchronized with the grid,NEA could just buy the electrical energygenerated (i.e., standard PPA) and need not

    compensate the plant owner. Thus, a resource that is about to be wasted is

    optimally used

    11. Activities ..contd

  • 7/28/2019 720_en_Promotion of Small Hydro in Nepal

    25/25

    25

    Thank you!!!