7/12/09 CLIC Module WG: “CLIC Quadrupoles Prototype Status” Michele Modena – CERN TE/MSC. 1): Main Beam Quadrupole prototypes (LONG and SHORT) 1a) Procurement STATUS at TESLA– UK (coils manufacturing): - PowerPoint PPT Presentation

Citation preview

Page 1: 7/12/09 CLIC Module WG:   “CLIC  Quadrupoles  Prototype Status” Michele Modena – CERN TE/MSC

7/12/09 CLIC Module WG: “CLIC Quadrupoles Prototype Status”

Michele Modena – CERN TE/MSC

Page 2: 7/12/09 CLIC Module WG:   “CLIC  Quadrupoles  Prototype Status” Michele Modena – CERN TE/MSC

1): Main Beam Quadrupole prototypes (LONG and SHORT)

1a) Procurement STATUS at TESLA– UK (coils manufacturing):- Drawings “for manufacturing: completed after an iteration due

to Tesla request (see after)- Materials (steel): delivered from CERN- Manufacturing plan: completed- Production: started

During the engineering of the coils exit, TESLA encountered some problem in respecting the requested dimension. So, they required to have slightly more space to develop the heads coils winding. We accept it and slightly changed the length of the iron yoke to leave unchanged the OVERALL length of the magnets (this apply to the LONG and SHORT prototypes)

2

7 Dec. 09 : “CLIC Quadrupoles STATUS” at CLIC M

odule WG (M

. Modena)

Page 3: 7/12/09 CLIC Module WG:   “CLIC  Quadrupoles  Prototype Status” Michele Modena – CERN TE/MSC

3

7 Dec. 09 : “CLIC Quadrupoles STATUS” at CLIC M

odule WG (M

. Modena)

Page 4: 7/12/09 CLIC Module WG:   “CLIC  Quadrupoles  Prototype Status” Michele Modena – CERN TE/MSC

4

7 Dec. 09 : “CLIC Quadrupoles STATUS” at CLIC M

odule WG (M

. Modena)

Page 5: 7/12/09 CLIC Module WG:   “CLIC  Quadrupoles  Prototype Status” Michele Modena – CERN TE/MSC

1): Main Beam Quadrupole prototypes (LONG and SHORT)

1b) Procurement STATUS at Heeze – NL (steel quadrants manufacturing):- Drawings “for manufacturing: completed after an iteration due to TESLA request

on coils longitudinal dimension: steel quadrants are now slightly SHORTER (1844 1827 mm; 344 332 mm):

- Materials (steel): delivered from CERN- High precision machining: started

It will be done in 2 steps: 1st at Heeze (machining), 2nd at “De Rooij Slijperij” (final high-precision grinding)Despite our request to have the LONG quadrants done before, the Company strongly asked to produce some samples and the SHORT quadrants before. We now expect to have the short quadrant ready for beginning of January and the long for end of January…

- By discussions (and samples) with the Company on how design the most performing (most precise) quadrants assembly, we decided to have the short quadrants machined with an alternative assembly solution (see photo and samples).

5

7 Dec. 09 : “CLIC Quadrupoles STATUS” at CLIC M

odule WG (M

. Modena)

Page 6: 7/12/09 CLIC Module WG:   “CLIC  Quadrupoles  Prototype Status” Michele Modena – CERN TE/MSC

6

Standard (for LONG proto)

Alternative (for SHORT proto)

7 Dec. 09 : “CLIC Quadrupoles STATUS” at CLIC M

odule WG (M

. Modena)

Page 7: 7/12/09 CLIC Module WG:   “CLIC  Quadrupoles  Prototype Status” Michele Modena – CERN TE/MSC

2): EXTRA quadrant (LONG) procurement

Procurement status at OSTROJ – CZ (for one steel quadrant manufacturing):

- LONG type quadrant, standard (CERN) drawing, no extra slots by wire-erosion), no extra holes for transport, no changes…They are starting the manufacturing; delivery expected also in January.

7

7 Dec. 09 : “CLIC Quadrupoles STATUS” at CLIC M

odule WG (M

. Modena)

Page 8: 7/12/09 CLIC Module WG:   “CLIC  Quadrupoles  Prototype Status” Michele Modena – CERN TE/MSC

3): Dipole Corrector for MB quads

Study for a dipole corrector to be integrated in each MB quad (H. Smickler on September 09) :

- Required kick strength: 4 mT m (ex. 0.4T over 1 cm of magnetic ∙length).

- To be “attach” to each MB quad- First computation (A. Vorozhtsov) to investigate a design

compatible (ex. partially “nested”) with the MB quadrupole (see next slides)

- Detailed magnetic cross-talk computation (3D) ongoing.

8

7 Dec. 09 : “CLIC Quadrupoles STATUS” at CLIC M

odule WG (M

. Modena)

Page 9: 7/12/09 CLIC Module WG:   “CLIC  Quadrupoles  Prototype Status” Michele Modena – CERN TE/MSC

9

7 Dec. 09 : “CLIC Quadrupoles STATUS” at CLIC M

odule WG (M

. Modena)

Page 10: 7/12/09 CLIC Module WG:   “CLIC  Quadrupoles  Prototype Status” Michele Modena – CERN TE/MSC

10

7 Dec. 09 : “CLIC Quadrupoles STATUS” at CLIC M

odule WG (M

. Modena)

Page 11: 7/12/09 CLIC Module WG:   “CLIC  Quadrupoles  Prototype Status” Michele Modena – CERN TE/MSC

11

7 Dec. 09 : “CLIC Quadrupoles STATUS” at CLIC M

odule WG (M

. Modena)

Page 12: 7/12/09 CLIC Module WG:   “CLIC  Quadrupoles  Prototype Status” Michele Modena – CERN TE/MSC

12

7 Dec. 09 : “CLIC Quadrupoles STATUS” at CLIC M

odule WG (M

. Modena)

Page 13: 7/12/09 CLIC Module WG:   “CLIC  Quadrupoles  Prototype Status” Michele Modena – CERN TE/MSC

13

7 Dec. 09 : “CLIC Quadrupoles STATUS” at CLIC M

odule WG (M

. Modena)

Page 14: 7/12/09 CLIC Module WG:   “CLIC  Quadrupoles  Prototype Status” Michele Modena – CERN TE/MSC

14

7 Dec. 09 : “CLIC Quadrupoles STATUS” at CLIC M

odule WG (M

. Modena)

Page 15: 7/12/09 CLIC Module WG:   “CLIC  Quadrupoles  Prototype Status” Michele Modena – CERN TE/MSC

15

7 Dec. 09 : “CLIC Quadrupoles STATUS” at CLIC M

odule WG (M

. Modena)

Page 16: 7/12/09 CLIC Module WG:   “CLIC  Quadrupoles  Prototype Status” Michele Modena – CERN TE/MSC

16

7 Dec. 09 : “CLIC Quadrupoles STATUS” at CLIC M

odule WG (M

. Modena)

Page 17: 7/12/09 CLIC Module WG:   “CLIC  Quadrupoles  Prototype Status” Michele Modena – CERN TE/MSC

17

7 Dec. 09 : “CLIC Quadrupoles STATUS” at CLIC M

odule WG (M

. Modena)

Page 18: 7/12/09 CLIC Module WG:   “CLIC  Quadrupoles  Prototype Status” Michele Modena – CERN TE/MSC

18

7 Dec. 09 : “CLIC Quadrupoles STATUS” at CLIC M

odule WG (M

. Modena)

Page 19: 7/12/09 CLIC Module WG:   “CLIC  Quadrupoles  Prototype Status” Michele Modena – CERN TE/MSC

19

7 Dec. 09 : “CLIC Quadrupoles STATUS” at CLIC M

odule WG (M

. Modena)

Page 20: 7/12/09 CLIC Module WG:   “CLIC  Quadrupoles  Prototype Status” Michele Modena – CERN TE/MSC

20

7 Dec. 09 : “CLIC Quadrupoles STATUS” at CLIC M

odule WG (M

. Modena)

Page 21: 7/12/09 CLIC Module WG:   “CLIC  Quadrupoles  Prototype Status” Michele Modena – CERN TE/MSC

21

7 Dec. 09 : “CLIC Quadrupoles STATUS” at CLIC M

odule WG (M

. Modena)

• DB Quadrupoles:- Remind: in CLIC layout, DB quad gradient is varying from 8.12 to 81.2 T/m- For CLIC and CLEX Test Program we propose to procure 6-8 prototypes eventually investigating different technologies and design (Ex. standard EM design and Hybrid Permanent Magnet design)- In order to advance we need to decide which gradient will be necessary in the CLEX layout: last news says it should be in the range 0-8 T/m. Waiting a final confirmation from CLIC Physic Team.