7 + 1 WASTES IN PROCESS ENVIRONMENT Gaurav Bijlani Manufacturing Engineer 28 th February 2014

7 + 1 Wastes Presentation for 28 Feb 2014

Embed Size (px)

Citation preview

Page 1: 7 + 1 Wastes Presentation for 28 Feb 2014

7 + 1 WASTES IN PROCESS ENVIRONMENT

Gaurav BijlaniManufacturing Engineer

28th February 2014

Page 2: 7 + 1 Wastes Presentation for 28 Feb 2014

Preface to the Presentation

The ideas contained herein are mostly ideas from my experience, training and online blogs.

Page 3: 7 + 1 Wastes Presentation for 28 Feb 2014

Your views

What is your understanding of Lean Manufacturing?

Can you give an example of waste?

Page 4: 7 + 1 Wastes Presentation for 28 Feb 2014

Value added activity

ExampleValue added time

Page 5: 7 + 1 Wastes Presentation for 28 Feb 2014

Value added in percentage

Essential waste consists of Goods in, Sales order processing, invoicing etc. this cannot be eliminated and is essential non-value added activity.

Let us aim to fight the 96%* waste and get it down.* - Source – The Lean Factory Group workshop presentation.

Value added activity

Non-value added activity (Essential)

Non-value added activity (Non-essential)

4% 96%

Page 6: 7 + 1 Wastes Presentation for 28 Feb 2014

7 + 1 Wastes in Manufacturing environment

T – Transportation I – Inventory M – Motion W – Waiting O – Overproduction O – Overprocessing D – Defects

S – Skills (Underutilized people)

Page 7: 7 + 1 Wastes Presentation for 28 Feb 2014

7 + 1 Wastes in Manufacturing environment video

http://leanman.hubpages.com/hub/Seven-Wastes

Page 8: 7 + 1 Wastes Presentation for 28 Feb 2014

7 + 1 Wastes in Manufacturing environment video

http://www.youtube.com/watch?v=3N89JJ991pE

Page 9: 7 + 1 Wastes Presentation for 28 Feb 2014

Toyota – 4P model

Page 10: 7 + 1 Wastes Presentation for 28 Feb 2014

Lean Temple Example

Page 11: 7 + 1 Wastes Presentation for 28 Feb 2014

Examples of Wastes from shop floor

Incorrect procedures/Waiting for Supervisor to confirm action

Lack of equipment's/sharing equipment's Waiting for components

Page 12: 7 + 1 Wastes Presentation for 28 Feb 2014

Questions?

Page 13: 7 + 1 Wastes Presentation for 28 Feb 2014

Appendix

[1] – The Toyota Way – Jeffrey K. Liker[2] – The Lean Factory Group Workshop,

Essex