6TSI13118.pdf

Embed Size (px)

Citation preview

  • 8/18/2019 6TSI13118.pdf

    1/132

    77

    CHAPTER VI

    CONCLUSION AND RECOMMENDATION

    6.1. Conclusion

    Based on the analysis of obtained data, some conclusions can be drawn as

    follows:

    1) Water supply system applied by PDAM Kabupaten Kupang is similar to

    common water supply system, except there is no treatment facilities. Each

    water source have their own system and service zone. There is no point to

    collect water from all water sources. There are two types of water sources i.e.

    spring and drilling well.

    2) Water supply system that applied by PDAM Kabupaten Kupang partially

    meets the parameters of referred standar i.e. quality, quantity, continuity, and

    PDAM managements and fully meets the accessibility and affordability.

    3) The root cause of PDAM Kabupaten Kupang problem is its management both

    technical (i.e. PDAM Kabupaten Kupang cannot afford a better water supply

    system than the water supply system that they have now) and non technical

    (powerless of regulation and law enforcement) aspects.

    6.2. 

    Recommendation

    To overcome the problem of PDAM Kabupaten Kupang, The

    recommendation is PDAM should renew its management both technical and non

    technical management.

  • 8/18/2019 6TSI13118.pdf

    2/132

    78

    1) The technical management includes:

    • 

    PDAM Kabupaten Kupang should have water treatment facilities

    •  Completeness of its pipeline systems instrument

    •  Effectiveness of its pipeline lane by considering the topography of Kupang

    City area

    •  Effectiveness of its water supply system by considering the number of

    water sources that serve each service zone. As the result, the water should

    reach each house hold in the service zone even the most remote one in

    equal quantity

    2) 

    The non technical management is includes enforcement of regulations and

    law, i.e punishment to any one who violate it.

  • 8/18/2019 6TSI13118.pdf

    3/132

    79

    REFERENCES

    Kamlasi, Agustin R. Y., 2012, Pengelolaan dan Sanitasi Air PDAM Kabupaten

    Kupang, Thesis Universitas Gadjah Mada Yogyakarta, Yogyakarta.

    Kodoatie, J. R., dkk. 2002, Pengelolaan Sumber Daya Air Dalam Otonomi

     Daerah, Yogyakarta: Andi.

    Kodoatie, R., 2003, Manajemen dan Rekayasa Infrastruktur , Pustaka Pelajar,

    Semarang. Linsley, Ray K.1992. Water Resources Engineering. Singapore:

    McGraw-Hill.

    Martono, Nanang. 2010.  Metode Penelitian Kuantitatif: Analisis Isi dan Analisis

     Data Sekunder . Jakarta: PT. RajaGrafindo Persada.

    Regulation of Health Minister No. 416/MEN.KES/PER/IX/1990 About

    Requirements and Monitoring of Water Quality.

    Regulation of Public Work Minister No. 18/PRT/M/2007 about Implementation

    of Water Supply System Development.

    Sekilas Pandang Perusahaan Daerah Air Minum Kabupaten Dati II Kupang, 1995. 

    Sugiarto, dkk., 2003, Teknik Sampling. Jakarta: PT. Gramedia Pustaka Utama.

    UU No. 7 about water resources, 2004.

    Erende Pos, 2011, Bupati Kupang Malu Dengan Konsumen PDAM  http://sindikasi.inilah.com/read/detail/1792758/bupati-kupang-malu-dengan-

    konsumen-pdam (Retrived on 12/01/2012, 6 : 40 PM)

    Francis, Farry Dj, 2010, PDAM Kupang untuk siapa?

    http://kupang.tribunnews.com/read/artikel/56716  (Retrived on 14/01/2012, 2 :

    20 PM)

    Gunadarma University Modul of Environmental Engineering

    http://elearning.gunadarma.ac.id/docmodul/rekayasa_lingkungan / bab2_

    sistem_penyedian_air_bersih.pdf (Retrived on 26/01/2012, 1 : 18 AM) 

    Hormat, George, 2008, Dunia di Tengah Krisis Air Bersihhttp://www.nttzine.com/articles/38-ekonomi-politik/57-krisis-air-bersih-

    dunia.html (Retrived on 09/02/2012, 2 : 44 AM)

  • 8/18/2019 6TSI13118.pdf

    4/132

    80

    Rumiyanto, 2009, Strategi Peningkatan Pelayanan Pdam Dalam Penyediaan Air

     Bersih Bagi Masyarakat Kota Kupang 

    http://kupang.tribunnews.com/read/artikel/56716.html  (Retrived on

    21/12/2011, 2 : 15 AM)

    Tim Website Kota Kupang, 2010, Warga Kota Kupang Keluhkan Layanan PDAM

    http://kupangkota.go.id/webkota/ content/view /710/66/   (Retrived on

    14/01/2012, 2: 27 PM)

    Asian Development Bank, 2012, Concept paper of Democratic Republic of

    Timor-Leste: Second District Capitals Water Supply Project 

    http://www2.adb.org/Documents/Concept-Papers/TIM/46160-002-tim-cp.pdf  

    (Retrived on 16/10/2012, 1: 22 PM)

  • 8/18/2019 6TSI13118.pdf

    5/132

  • 8/18/2019 6TSI13118.pdf

    6/132

    ffiM,,ffi$

  • 8/18/2019 6TSI13118.pdf

    7/132

    PEMERINTA}I

    KABUPATEN

    KUPANG

    BADAN

    KESATUAN

    BANGSA,

    POLITIK

    DAN INFORMASI

    KOMUNIKASI

    JL.

    Timor

    Raya

    Knr.37

    Oelamasi

    Ncmor

    Lampiran

    Pcrihal

    07ol

    16

    /BKPI/KPG

    t

    1"9t20',2

    liin

    Penelitiq4

    Oelamasi,24

    Z

    2012.

    Kepada

    Yth.iJirektur

    &iiu,

    [ab .l,iupanq.

    di-

    Tempat

    N/lenunjuk

    surat

    0ekr.n

    F::kul-ii:s

    Teltnik Universitr:,s

    :l"tiji,,r. J,t;r,1

    Yogyakarie.,tan$ga1

    17

    Febr:ueri

    ?.A'12,ilt:mnr

    Cii

    :f

    _,:,T

    ;j i2Al2

    l':iil:,ri

    I

    jin

    -Henelitiitn,

    dan

    setelah

    mempelajari prcposalirencana penelitian yang

    diajukan

    peneliti, dengap

    iri

    diberikan

    ijin

    kepada

    : ,'t

    Nama

    NIM

    P e

    kerja a

    n

    :lviahi:siswa

    Alamat

    K:bangsaan

    :Inacio

    Pi;ir-iil

    :feona.l

    iie

    I':,it-in:a

    :Q81313118

    .-B-ak

    .f ekniir

    Univ

    .

    tma

    J

    ,,--.i

    Yo

    gyi:1

  • 8/18/2019 6TSI13118.pdf

    8/132

    PEMERINTAH

    PROVINSI

    NUSA

    TENGGARA

    TIMUR

    KANTOR

    PELAYANAN

    PERIZINAN

    TERPADU

    SATU PINTU

    (KPPTSP)

    Jalan

    Advokat

    No.10

    -

    Telp

    I

    Fax.

    (0380)

    833080

    KUPANG

    -

    NTT -

    Kodepos

    85117

    Nomor

    Sifat

    Lampiran

    Hal

    070[.438

    1KJPTSPt2012

    Biasa

    Izin

    Penelitian

    Nama

    NIM

    Jurusan

    /

    Prodi

    Kebangsaan

    Pengikut

    Lamanya

    Penelitian

    Penanggung

    Jawab

    Yth.

    Kupang,

    t7

    Jdi

    2012

    Kepada

    Walikota

    Kupang

    Cq.

    Kepala

    Badan

    Kesbang

    Linmas

    Kota

    Kupang

    di-

    KUPANG

    INACIO

    MARIA DEONAL

    DE FATIMA

    081313118

    Teknik Sipil

    -

    Internasional

    Indonesia

    1

    (satu)

    minggu

    Dekan

    Fakultas

    Teknik

    Universitas Atma

    Jaya

    Yogyakarta

    Menunjuk

    Surat Dekan

    Fakultas

    Teknik

    Universitas Atma

    Jaya Yogyakarta

    Nomor

    :1,4611X1N12072

    tanggal

    10

    Juli

    2012,

    peihal

    Mohon

    Izin

    Pelaksanaan

    Penelitian

    dan

    setelah mempelajari rencana

    kegiatan/proposal yang

    diajukan, maka

    dapat

    diberikan

    Izin

    Penelitian

    kepada mahasiswa:

    Untuk melakukan

    penelitian

    dengan

    judul

    :

    "STUDY

    OF WATER- SUPPLY

    SYSTEM

    IN PDAM KUPANG

    DISTRIC

    "

    I-okasi

    : Kelurahan

    Naikoten

    I

    Kecamatan

    Kota

    Raja Kota

    Kupang

    Peneliti

    berkewajiban menghormatilmentaati

    peraturan

    dan tata

    tertib

    yang

    berlaku

    di

    daerah

    setempat

    dan melaporkan hasil penelitian

    kepada

    Gubernur Nusa

    Tenggara

    Timur

    Cq.

    Kepala

    Kantor

    Pelayanan Perizinan

    Terpadu

    Satu Pintu

    Provinsi

    Nusa

    Tenggara

    Timur

    dan

    Walikota

    Kupang.

    Demikian

    pemberitahuan

    ini dan

    atas

    perhatian

    disampaikan

    terima

    kasih.

    TENGGARATIMUR

    KEPALA

    PERIZINAN

    TERPADU

    SATU PINTU

    ioNccanarrMUR,

    7

    rI

    19t603

    t ot6

    Tembulqn:

  • 8/18/2019 6TSI13118.pdf

    9/132

    -

    PET$ERINTAH

    KOTA

    tsADAN KESATUAH

    BANGSA,

    POI-ITIK

    DAil

    PERLINDUNGAN

    MASYARAKAT

    Jl.

    S" K. Lerik

    Telp"

    {0380}

    826s73

    suRAy

    (ETERANGAN

    nfiErA,K(rKAN

    pENEilTtAN

    /

    S-URVE|

    Nomor

    : BKBPPM.

    070

    I

    3B4t

    I

    ttl

    I

    07

    I

    2A12

    Berdosorkon :

    Surot Kepolo Kontor Peloyonon

    Perizinon

    Terpodu

    Sotu Pintu

    Propinsi

    NTT Nomor

    : O7O/1438IKPPTSP/2A12,

    Tonggol

    17

    Juli

    zAn

    perihot

    Permohonon

    ljin Penelition.

    Menimbong

    : Bohwo

    demi keloncoron

    tugos

    dimoksud,

    perlu

    dikeluorkon

    suotu

    rekomendosi.

    WALIKOTA

    KUPANG

    menerongkon:

    ====

    TICIAK

    K.f,tsERATAN

    ====

    kepodo

    :

    engon ini

    Nomo

    NIM

    Pekerjoon

    Fokultos/Juruson

    Alqmot

    Untuk

    Lomo

    Lokosi

    Pengikut

    :

    INAC]O

    IAARIA

    DEONAT

    DE FAIltttA

    :

    0813131l8

    :

    Mohosiswo

    : Tehnik

    Sipil-lnternosionol

    : Kel. Kelopo

    Limo

    Meloksonokon

    Penelition

    dengon

    judul

    :

    "

    Sludy

    Woler

    -

    Supply

    System

    ln PDArl/l

    Kupong

    Dislric "

    :

    I

    {Sotu}

    Minggu. Terhitung

    Mutoi

    Tonggol

    Surot

    inidi

    keluqrkon.

    :

    Wiloyoh Kelurohon

    Noikoten

    I

    :-

    Dengon ketentuon

    :

    1. Wojib memberitohukon

    moksud

    don iujuon

    kepodo

    lnstonsi

    Pemerintoh

    I

    Swosto

    yong

    hendok

    diteliti.

    2. Selomo melokukon

    penelition,

    iidok

    diiiinkon

    melokukon

    kegioton

    di

    bidong

    loin

    yong

    menggonggu

    keterfibon

    mosyorokot.

    3. Woiib meloporkon

    hosil

    penelition

    kepodo Wolikoto

    Kupong

    Cq. Kepolo

    Bodon

    Kesotuon Bongso,

    Politik

    don Perlindungon

    Mosyorokot Koto

    Kupong.

    4.

    ljin Penelition ini

    okon

    dicobut don

    dinyotokon

    iidok

    berlqku logi

    opobilo

    Pihok

    Peneliti

    melonggor

    ketentuon

    tersebut

    di

    otos.

    Demikion Surot Keterongon

    ini

    diberikon

    untuk

    diipergunokon

    sebogoimono

    mestinyo

    don dihoropkon

    CIgor

    pihok

    -

    pihok

    yong

    mendopot

    tembuson

    surot

    ini

    memberikon

    bontuon

    sesucri

    dengon ketentuon

    peroturon

    yong

    berloku"

    Kupong,

    23 Juli

    2012

    I

    on. Wolikoio

    Kupong

    I

    Plh. Kepolo

    Bodon

    Kesotuon

    Bongso,

    politik

    ,Feffibino

    Tki.

    I

  • 8/18/2019 6TSI13118.pdf

    10/132

    DEf,_rEE liJT

    i

    J

    ]{nT

    A

    1(

    D

    i

    1114

    FLirii-iaiii

    i rai

    -

    -\-\i

    i ia r\riirrAir-g

    KEC.-AU .AT.A.N

    KOTA RAJA

    Jl.Alfonsus

    Nisnani

    tdc. O9

    -

    Kelurahan

    Naikoten

    t

    Telp.

    (ffi$A)

    ffi0200

    KUPANG

    CAI#AT

    KOTA RAJA

    TIFTA IZ TZEEIEE' ATAi,I

    ------

      iUAr\ i\LPLRF i Fil

    -----

    D^-l^-^-I-^-

    Eiriuir-al

    n'ri

    i

    I t^^:at^^^^

    ivaEi

    ilt t iaicla is,

    nrrliiiui,

    NIM

    Pekerjaan

    r^t-..1r^^ I 1,,-,,^^^

    -dnultciu

    ,

    uui

    UDcii

    a

    Alamat

    Untuk

    I arnanrra

    Lokasi

    Pengikut

    arlFl- auFtFA l\t.-all

    lIFl aarlllt Ilr hFllFl

    rTalla

    -L'i\A

    '

    N.E.

    '

    E,R,iIIIJA'I

    TUIELAT\U]\AII TEIIE,I.I

    T TAII

    Nomor:

    Kec.

    KR.

    07 0

    l206Nll 120 12

    - o..--r ta^L^-^^-^- tr-l^l-,,1.^^

    n^-^l:r:^- )^-i

    lr^-^l^

    l)-J^-

    lr-^^L.

    t--

    : Oijlal f\glgiaiigAii

    ivicici.\Uncrii

    rtillgill.iarii uciii

    r\UP.ria,

    Dauaia

    I-\EDdaud

    Bangsa,

    Politik dan

    Perlindungan

    Masyarakat

    Kota

    Kupang

    Nomo

    BKBPPM. OT

    O

    1384i

    i tlll3T

    i20i2,23

    iuii

    2012.

    .

    E

    ^L..,^

    .I^mi lz^laaa^ran L-aaia{^^

    zl;m^lzar

    r;.1

    ^^r

    .{il.^l ^.L-^^ iiin

    . Eaiiifu"A U-iiii

    n-iciaiucii€lll

    a\Ugi(,(clai u...ictAi,iju,

    Pciiu

    \ii^-iudi^.ciii

    Uii.

    rekomendasi

    :

    tt l^tA ltthtI RFAIIaI

    RF

    Fa? tla

    iilIA\,.\-, rraAi\lA LrLrlrlrr{r-

    LrL

    rA

    a lauaA

    0813'131 18

    Mahasiswa

    T^L-:t- 6:-:l l^l^--^^;^-^l

    r

    Er

    rr

    Ilr\

    urPli-ii

    itEI i idDl\,,l

    lcll

    Kelurahan

    Kelapa

    Lima

    Melakukan

    Peneiitian

    cjaiam

    rangka

    penyusunan

    Skripsi dengan

    juclui

    :

    t.ra-FA 6trF6'

    r,6lr6tFaa tl,

    hA

    4f,a Lra n a a 67614 tt

    -

    5 i aiDi ta-A

    i

    ErI.-'JLrrrL

    i

    J 7J,

    Ettt

    ,N ruArll l\urANg rrrJ, trrr/.

    :

    1

    (satu)

    minggu, terhltung

    mula tanggal

    dikeluarkannya

    surat ini

    :

    Wilayah

    Keiurahan

    Naikoien

    i.

    Denqan

    Keteniuan

    :

    1.

    Wajib memberitahukan maksud dan

    tujuan

    kepada Lurah setempat

    dan

    lnstansi Pemerintahan

    Swasta tempat

    penelitian

    dilakukan;

    2.

    Selama

    meiakukan

    penelitian

    iidak

    diijinkan

    melakukan kegiaian

    dibidang

    iain

    yang

    menggangg

    ketertiban

    masyarakat;

    3.

    Wajib

    melaporkan

    hasil

    Penelitian

    kepada eamat

    Kota

    Raja.

    1. ljin

    Penelitian

    ini akan

    dicabut dan

    dinyatakan'.idak

    berlaku

    iagi apabiia

    ketentuan

    tersebui

    diaia

    dilanggar.

    n-: ' --

    '--,iei-angan

    ini ciiberikan

    untuk

    dipergunakan sebagaimana

    mesiinya.

    eililKtall

    Kg

    Tembusan

    : Disampaikan

    dengan

    hormat kepada

    :

    1.

    Waiikota Kupang

    ,

    cii

    Kupang

    (sebagai iaporan);

    2.

    Dekan Fak.Tehnik Univ.Atma Jaya Yogyakarta, di

    3.

    Li.iiah

    iiaikoieii

    i,

    cii

    Kupaiig.

    #

    tu..---- 4,

    l,.l:

    ^na4

    \uPclllg,

    Z+

    \rull

    eU

    iz.

    An.Camat

    Kota Raia

    96302101997031002

    Yogyakarta

    ;

  • 8/18/2019 6TSI13118.pdf

    11/132

    AFfr

  • 8/18/2019 6TSI13118.pdf

    12/132

    PEMERINTAH

    KABUPATEN KUPANC

    PERUSAHAAN DAERAH

    AIR

    MINUM

    Jln.

    Anggrek

    No. 14

    Oepura-Kupang

    Telp.

    (0380)

    825964

    SURAT

    KETERANGAN

    SELESAI

    PE}IELITIAN

    Nomor

    '.

    1391

    PDAM-KPG

    A/ll/

    2A12

    Yang bertanda

    tangan

    ditlawah

    ini

    :

    Nama

    : JOHANISS.OTTEMOESOE'SE

    Jabatan

    :

    Direktur

    Utama

    PDAM

    Kabupaten

    Kupang

    Alamat

    :

    Jln" Anggrek No.

    14 Oepura

    *

    Kupang

    Menerangkan bahwa

    mahasiswai

    yang

    namanya

    tersebut dibawah

    ini

    :

    N

    a

    m

    a

    '.

    Inacio

    Maria

    Deonal

    De

    Fatima

    NIM :

    081313118.

    Status :

    Mahasiswa.

    Jurusan/Prog

    Studi

    :

    Fakultas

    Teknik Sipil.

    Universitas

    :

    Atma

    Jaya

    Yogyakarta.

    Benar-benar

    telah

    selesai

    melakukan

    Penelitian

    di

    PDAM Kabupaten

    Kupang dengan

    judul

    "Siste

    Penyedfuan

    Air klinum

    yang

    diterupkan

    oleh

    PDAM,

    Pelanggan,

    Cakupan

    Wiluyah Peluyana

    dan

    ProJile

    Perusnhaan Daeruh

    Air Minum

    (PDAM)

    Kabupaten

    Kupang"

    Selama

    melakukan

    Penelitian

    I

    (satu)

    bulan

    yakni

    Bulan

    Maret

    2012,

    yang

    bersangkutan

    berla

    positif,

    rnentaati dan

    mengindahkan ketentuan

    yang

    berlaku di

    PDAM

    Kabupaten Kupang.

    Demikian

    Surat

    Keterangan ini

    dibuat

    untuk

    dipergunakan

    sebagaimana

    mestinya.

    Kupang,

    25

    .Iuli

    2AI2

    Dire

    ur Utama

    Tembusan

    : disampaikan

    kepada

    :

    1.

    Kepala

    Badan Kesbang. Politik

    &

    lnformasi

    Komunikasi

    Kab.

    Kupang.

    2.

    Dekan Fakultas

    Teknik

    Universitas Atma

    Jaya

    Yogyaka(a

    3.

    Mahasiswa

    yang

    bersangkutan.

    4.

    Arsip

    ffinI

    rfi,rlr

    K["rAN{

  • 8/18/2019 6TSI13118.pdf

    13/132

    PEMERINTAH

    KABUPATEN

    KUPANG

    KAI\ITOR

    KESATUAN

    BANGSA

    DAN

    POLITIK

    JL. Timor

    Rava

    I(M.36

    Oelamasi

    SURAT

    KETERANGAN

    SELESAI

    PENELITIAN

    Nomor :

    A70l

    556/KSB.POL/

    KPG/VfilzAD

    Yang bertandatangan

    dibawah

    ini :

    Nama :

    Jesua

    Richard

    Benu,

    SH

    Jabatan

    :

    Kepala Kantor

    Kesatuan

    Bangsa dan Politik

    Kabupaten

    Kupang

    Menunjuk

    Surat

    Selesai Penelitian dari

    Perusahaan Air

    Minum

    Daerah

    Kabupaten

    Kupang

    Nomor : l39iPDAM-Y-PGNlll2012,

    Tanggal

    25 Juli 2Al2,maka dengan

    ini

    menerangkan

    Bahwa:

    Nama

    Alamat

    Pekerjaan

    Kebangsaan

    Judul

    Penelitian

    :

    ,SISTEM

    PEIIYEDIAAN

    AIR

    MINUM

    YAI\G

    DITERAPKAN

    OLEH

    PDAM,PELANGGANI,CAI(UPAN

    WILAYAH

    PELAYANIAFI

    DAN PROFILE

    PERUSAHAAN DAERAII AIR MINUM

    (PDAM)

    KABUPATEN.''

    Telah

    selesai melalcukan

    penelitian

    di

    Perusahaan

    Daerah

    Air

    Minum

    Kabupaten

    Kupang dengan

    baik.

    Demikian

    Surat Keterangan ini dikeluarkan

    untuk

    dipergunakan sebagaimana

    mestinya

    atas

    kerjasamayangbaik

    diucapkan

    terima

    kasih.

    Oelamasi,2T

    Juli20l2

    Kepala

    Kantor

    Kesatuan

    Bangsa

    dan

    Inacio

    Maria

    Deonal

    De Fatima

    Fakultas

    Teknik Univ.Atma

    Jaya Jogyakarta

    Mahasiswa

    Indonesia

    Tembusan:

    JESUA

    RICHARD

    BENU,

    SH

    Penata

    Tk.

    I

    NIP.

    19670606 198903

    t

    0t2

  • 8/18/2019 6TSI13118.pdf

    14/132

    PEMERINTAH

    KOTA

    KUPANG

    KECAMATAN

    KOTA RAJA

    KELURAIIAIT

    NAIKOTEIT

    I

    Jl. Aduokat

    Nomor

    OB

    ;

    Telp.

    (0380)

    82436A

    ;

    Kode

    Pos

    851

    18

    KUPANG

    SURAT

    KETERANGAN

    SELESAI

    PENETITIAN

    /

    SURVEY

    Nomor

    :

    Ke .Nkt.l 074

    l)671

    Yllt

    I

    2012

    t

    Yong bertondo

    tongon

    di

    bowoh

    ini

    :

    :

    SUSANA

    DA

    COSTA,

    S.Sos

    :

    197709262A01122404

    :

    KASIE KESOS

    KEL. NAIKOTEN

    I

    Nomo

    NIP

    Joboton

    Menerongkon

    dengon

    sebenornyo

    bohwo

    :

    Nomo

    NIM

    Pekerjoon

    Fokultos

    /

    Jur

    :

    Teknik

    Sipil

    lnternosionol

    Universitos

    :

    ATMA

    JAYA

    JOGJAKARTA

    yong

    b,ersongkulon

    benor

    -

    benor

    teloh

    selesoi melokukon

    penelition

    yong

    diloksonokon

    di

    Wiloyoh

    Kelurohon

    Noikoten

    I

    Kecomoton

    Koto

    Rojo

    koto

    Kupong

    muloi

    Tonggol

    24

    Juli

    s/d

    31 Juli

    2A12

    dengon

    judul

    penelition

    :

    "STUDY

    OF

    WATER.SUPPI.Y

    SYSTEM

    N

    PDAM OF

    KUPANG D'SIN'CT "

    Demikion

    Surot Keterongon

    ini

    dibuot

    untuk

    dopot

    dipergunokon

    sebogoimono

    mestinyo.

    Kupong,

    28

    Agustus 2012

    :

    INACIO,I,IARIA

    DEONAL

    DE

    FATIA,IA

    :

    081313.l

    18

    :

    Mohosiswo

  • 8/18/2019 6TSI13118.pdf

    15/132

    PEMERINTAH

    KOTA

    KUPAIIIG

    KECAMATAN

    KOTA

    RAJA

    ,.ti.

    t:.ijottsus

    rvisnonf wo.

    vl

    -

    ieiuratutn

    xaircttrcrL

    I

    relp"

    LrrDAtr4.

    i1 viEii--

    psaAl

    dJUZUU

    atthrF rt-aEhrrr^

    rrr AErEaat

    sErrErtaf

    lar ,

    -rtFrrEtt

    .:rta5l

    E F==tE.-UE:ii.15J=:E =,E/ir-r-=jeE E-fri==i--iEEiaiE , ----:5_\y=-E

    Nomor :

    Kec.KR.U'/ 4

    I

    152

    I

    V III

    I

    2012.

    ri-i-IiB+- i,Ui

    Ua -4jiii

    7 , 1-LII i-i' iii_E_ri

    i"t:a:iiiIii- -i-._r_ii

    i,i],iii-

    ir_+;.i_.

    : DANIEL

    ZACHARIAS, S.Sos, M.Si

    1d-^Adanlnnun6anAA

    : Sekretaris Camat Kota Raja

    ,111'

    iyr

    i.-

    i ri_

    : .t-

    i- :-i: i=a- i-

    i,

    iici

    iti 4 i

    b=. i_i=i

    iiai

    i i v

    a

    _rai i iY

    a

    Nama

    i ir-

    Jabatan

    Nama

    1r t tv_t

    Pekeriaan

    I"akultas

    /Jurusan

    Semester

    A1:=lt

    Universitas

    INACIO MARIA DBONAL

    DE

    FATIMA

    44

    <

    ^

    <

    4

    {

    ' ^

    JO

    -LU -L\i

    -L

    IO

    Mahasiswa

    'l'eknrk

    Sipil

    lnternasronal

    IX

    (Sembilan)

    l'^ciu:aha:: l'^clapa

    l-l::::

    Atma Jaya Jogjakarta

    I l

    1 1

    t 1

    t

    i

    I 1.r.

    I 1

    I

    1-(a iY L;=i:->=-iiE4=Ll-L=-ii iiciioi-1jaalL1 i -.i.ili --=i=::=i riicid_ts=Lj_t==_ii i_r=i-iciilid_ii Lid_iq_ i i ij-ii=:.=

    pen5rusunan

    Skripsi

    yang

    dilaksanakan

    di

    wilayah

    Kecamatan

    Kota Raja

    Ko

    Krroang.

    se_iak

    tanggal

    24 J:uli 2At2 samoai denqan

    31 Juli

    2012. densan

    iud

    1 1L1

    y\-lrLrl'

    Lrd"r-t..

    =E J_E'E

    7JE

    UU-AL_E

    -

    ^=Arr

    EE-r4-j3-2 liE rLtIaiTE

    Demikian keterangan

    ini dibuat

    untuk

    dapat

    diperqunakan

    sebagaimana

    mestinya

    Kupang,

    28

    Agustus

    2012.

    Tem,busan:

    Disampaikan

    dengan

    hormat

    kepada

    :

    1 Wsliknte Krrnnnq

    di

    Krrneng

    (setrasai

    lannran\.

    i n

    t tr

    ,

    l'lii.

    Lriliii

  • 8/18/2019 6TSI13118.pdf

    16/132

    PEMERIhITAI.I

    KOTA

    KUPANG

    tsADAN

    KESATI.JAN

    BANGSA,

    FOLITIK

    DAN

    PERUNDUNGAN MA,SYARAKA.T

    il-

    S-

    K"

    Lerik

    Tetp.

    (0380)

    826573

    SURAT KETENANGAN

    SEIESAI MEIAKUKAN

    P-ENELITIAN

    /

    SUTVEY

    Nomor

    :

    BKBPPM.070.04

    /7046 /Ul

    l0B

    12012

    Berdosorkcn

    Surot Comot Koio Rojo

    Nomor

    :

    Kec.KR.A74/1521V1il/2A12,

    Tonggol

    28 Agusius 2A12

    Perihol

    Surot

    Keterongon Selesoi Melokukon

    Penelition

    /

    Survey

    serto

    loporcn

    yang

    bersongkuton,

    moko

    dengon ini

    diterongkon bohrvo

    :

    Nomo

    NIM

    Pekerir:on

    Fokultos/Juruson

    DT / I lnirrarci*nc

    r t,

    ultrv9rJt1\JJ

    Teloh melokukon

    penelitiqn

    dolom

    Muloi

    Tonggol

    24

    Juli

    s/d 3l

    Juli

    nanr rlicnn Qlzrinci r{annnn ir rr.lr

    rl

    i\/Vr

    rvrrJvr r JN ryJr Vvr

    r\rsr r

    .lvvv,

    INACIO

    MARIA

    DEONAL

    DE

    TATIIIAA

    080r313r

    r8

    Mohosiswo

    Teknik

    Sipil

    lnternqsionol

    Alma larra lnniaUar*n

    ^rr

    r r\:r

    J\,ayv JvsrJ\rNur

    ru

    Wiloyoh

    Kecomoion Koto

    Rojo

    Kupcng,

    ter"hitung

    2A12,

    gunq

    memperoleh

    doto

    dolom

    rongko

    "

    SI[rDv

    AF

    WATER-SUPPLY

    SYSIEI],

    IN PDAM

    OF

    KUPANG DTSFR

    CT

    "

    Demikion Suroi Keterongon ini diberikon uniuk dipergunokon

    sebogoimono mesiinyo.

    Kupcng.

    30

    Agustus

    2012.

    on.

    Wolikoto

    Kupong

    TamL.roan r{F, F\i.nmn^ilr^^ DannAn

    l9l I IVVJ\al I

    \ll

    l.

    UIJUI

    I ll',UlNL.l

    I t\vl./\J\l\l

    =

    ;, [i]F(

    'tFWAPl,l\

    Al trY :

      u r^\#.dL,r

    r

    a1r\ v9

    , \LLr\

    "Pembino,tjtomo

    Mudo

    NIPI:1959J:231

    '199003

    I

    09I

  • 8/18/2019 6TSI13118.pdf

    17/132

    AtrNHffiM

  • 8/18/2019 6TSI13118.pdf

    18/132

    PEFTI..,SAF&L\N

    E}AEFTAH

    AIR

    MTNL'M

    KABUPATEN

    KUPANG

    I ,qeO'RIN

    KEUANGAN

    PERBI

    DESEMBER2.OO9

    .Hffift

    :

    ',

    1;u,ri{}#i

    PEMBUKUIIN

    @2(l09

  • 8/18/2019 6TSI13118.pdf

    19/132

    I.

    PEBUSAU.*JTIq

    DAEB.IU

    JTIE

    IIIIIUIT

    (PD.*[T}

    TJItrUN

    2009

    Pendahuluan

    Pendirian

    PDAI\{

    KabuPaten

    KuPang

    a. Dasar

    Pendirian

    Perusahaan

    Daerah

    Air Minurn

    (PDAM)

    Kabupaten

    Kupang

    didirikan

    berdasarkau

    Peraturan

    Daerah

    Kabupaten

    Tingkat

    tr

    Kupang

    Nomor

    1

    T'ahun

    1986 tentang

    pendirian

    Perusahaan

    Daerah

    Air

    Mimun Kabupaten

    Kupang'

    b.

    Kedudukan,

    Tugas

    Pokolq

    dan

    Fungsi

    PDAM

    Kabupaten

    Kupang

    dididkan

    sebagai

    kelengkapan

    ekonomi

    daerah

    yang

    diselenggarakan

    atas dasar

    azas ekonomi

    perusahaan

    dalam kesatuan

    sistem

    pembinaan

    ekonomi

    Indonesia

    berdasarkan

    Pancasila,

    yang

    menjamin

    kelangsungan

    demolaasi

    ekonomi

    dan berfirngsi sebagai

    alat untuk

    meningkatkan

    kesejahteraan masyarakat.

    Tugas

    pokok

    PDAM adalah

    menyelenggarakan

    pengelolaan

    air

    minum

    untuk

    meningkatkan

    kesejahteraan

    masyarakat

    yang

    mencakup aspek

    sosial,

    kesehatan, dan

    pelayanan umum.

    c.

    Struktur

    Organisasi

    dan

    Uraiau

    Tugas

    Strukfur organisasi dan

    uraian tugas ditetapkan

    bordasarkan Surat Keputusan

    Bupati

    Kupang

    Nomor 19i2000, tanggal

    14

    Septembor

    2000, tentang Struktur Organisasi

    dan

    Tata

    Kerja PDAM Kupang.

    KondisiPDAM

    1. Aspek Administrasi/Il{anajemen

    1.1.

    Umum

    a.

    Badau Pengawas

    Berdasarkan Keputusan

    Bupati

    Kupang

    No 525/SKEP/HK/2000 tanggal

    19 Desember

    20(10,

    '

    Susunan badan Pengawas

    terdiri dari

    5

    (lima

    )

    orang rnasing-masing

    seorang

    ketua,

    sekretaris

    dan

    3

    (tiga)

    orang anggota.

    Sehubungan

    dengan

    telah

    berakhimya

    masa

    jabatan

    dan

    dalam rangka

    efisiensi

    deng6n

    koputusan

    Bupati Kupang

    No

    74

    tahun 2005

    tentang Pemberhentian

    dan

    Perpanjangari

    Masa

    Jabatan Badan

    Pengawas

    PDAM, ditetapkan

    Badan Pengawas

    hanya

    2

    orang

    yaihr:

    - Drs. M.N.Nunuhitu,

    M.Si,

    Sebagai

    Ketua dan

    -

    Ir.Piter Djami

    Rebo

    M.Si

    sebagai

    Anggota

    b.

    Direksi

    tr.

  • 8/18/2019 6TSI13118.pdf

    20/132

    tanggal

    18

    januari

    2006

    maka

    komposisi

    Direksi

    periode

    2000-2004

    yang

    terdiri

    dari

    4

    (empat)

    Direkrur

    menjadi

    2

    (dua)

    orang

    Direktur

    yaitu:

    -

    Drs.

    Masya

    Djonu

    M.Si

    sebagai

    Plt

    Direktur

    Utama

    juga

    melaksanakan

    tugas

    Direktur

    Umum

    dan

    Direltur

    Keuangan

    -

    Drs. M.Ali

    Nurawi

    sebagai

    PLT

    Direktur

    Teknik

    perubahan

    tersebut

    dilakukan

    mengingat

    masa

    tugas

    Direksi

    Periode

    2000-2004

    telah

    berakhir

    sekaligus

    sebagai

    tindakan

    efisiensi

    PeeawaiPDAM

    Status

    Pegawai

    2008

    2009

    Direksi

    2

    2

    Pegawai

    tetap

    196

    190

    Pegawai Honor

    t2

    t2

    Jumlah

    210

    204

    1

    Aspek

    Teknik Operasional

    2.1. Umum

    1. Penduduk

    Kota Madya Kupang

    2. Penduduk

    Kabupaten Kupang

    3.

    Total

    4.

    Jumlah Sumber

    5.

    Jenis

    Sistim

    6. Jenis Sumber

    7. Tarif

    Dasar

    Bulan/Thn

    Penetapan

    8. Jumlah

    Langganan

    aktif

    -

    Rumah

    Tangga

    -

    Sosial

    - Komersial

    294.304

    Jiwa

    394,196

    Jiwa

    688.500

    Jiwa

    29

    tlnit

    Grafitasi

    dan Pompa

    Mata

    afu'dan sumur bor

    Rp.

    1.500,-

    Agustus

    2006

    25.360

    Unit

    23.274

    Unit

    481

    Unit

    1.605

    Unit

    Aktif

    2008 dan 2009

    enis

    'ahun

    Jenis Pelanssan

    2008

    2009

    Sosial

    Umum

    141

    150

    Sosial

    Khusus

    331

    331

    Rumah

    TanesaA

    21.258

    22.267

    Rumah

    TansgaB

    967

    1.007

    Instansi Pemerintah

    233

    250

    Niaca

    Kecil

    778

    797

    NiaeaBesar

    s33

    55s

    lndustri Kecil

    1

    2

    Industri Besar

    I

    Jumlah

    24243 25.360

  • 8/18/2019 6TSI13118.pdf

    21/132

    9.

    Cakupan

    PelaYanan

    -

    Kota

    -

    Kabupaten

    (dosa)

    -Total

    Kota&KabuPaten

    1

    0.

    Kapasitas

    terpasang

    1

    1. Kapasitas

    Dioperasikan

    12.

    Jam Operasi

    Produksi

    13.

    Jam Operasi

    Distribusi

    63,68Yo

    (187.404

    jiwa)

    2,53

    o/o

    (

    9.970

    jiwa)

    28,67Yo

    (191.314

    iiwa)

    531.50

    1/d*

    270.96

    ydtk

    24

    dan

    l0jam

    24

    dan

    l0jam

    Penduduk

    Penduduk

    terlayani

    gslkupan

    pelaYanan

    (%)

    Kota

    2943O4

    1E7,404

    63.68

    Kabupaten

    (Desa) 394,195

    2:2-79.

    2.53

    Total

    kota

    &

    Desa

    688,500

    t97374

    28.67

  • 8/18/2019 6TSI13118.pdf

    22/132

    $t}fiEER

    AIR DAN KAP.

    PRODUKSI

    PDANN

    KABUPATEN

    1,151,064.00

    1S7,100.00

    a5147.20

    197,100.00

    7,945,652"88

    .@tah

    Air

    yang

    diproduksi

    fuhh

    Air

    Yaug

    didistribusi

    Air

    Terjual

    2009

    Kehilangan

    Air

    m3

    m3

    m3

    (3.049.871

    m3

    )

    9.40'1.016

    6.357.145

    6.357.145

    32,42

    %

  • 8/18/2019 6TSI13118.pdf

    23/132

    Qerusafroan

    (Daerafr

    f,k

    gvlinum

    Jl.A"Sg.eL

    \o.

    t+

    Qepuru

    T"lp.blao)

    azr96+

    LAPORAN

    KEUANGAN

    TAHUN 2A1A

    ffiW

    TIHTE

    il[t-&f;Mlt

    ffE*tcBotlQxly

  • 8/18/2019 6TSI13118.pdf

    24/132

    I.

    Perusahaan

    Daerah

    Air

    Minum (PDAM)

    I(abupaten

    Kupang

    Tahun

    2010

    Pendahuluan

    Pendirian

    PDAM

    Kabupaten

    KuPang

    a. Dasar Pendirian

    Perusahaan

    Daerah

    Air

    ivlinuir

    (PDAM)

    I(abupaten

    I(Lrpang didirikan

    berdasarkan

    Peraturan Daerah Kabupaten

    Tingkat

    II

    I(upang

    Nomor

    I

    'lahun

    1986 tentang

    pendirian

    Perusahaan

    Daerah Air

    NIinum I(abupaten

    l(upang.

    b.

    Kedudul

  • 8/18/2019 6TSI13118.pdf

    25/132

    l

    :

    j

    i

    l

    2.

    o

    Simon

    Lopo,SE

    sebagai Ketua

    o

    J.Nenobahan,SH.M.Hum

    sebagai

    Seketaris

    o lr.Muhamad

    S.Nurawi,M.Sc.H.Eng

    sebagai

    Aiiggota

    o John

    Y.Norne,SH.Mhum

    sebagai

    Anggota

    o

    Victor

    F.CHNeno

    Siki,SH

    sebagai

    ANggota

    b.

    Direksi

    Pejabat

    Sementara Direktur

    Utama

    PDAM Kabupaten

    Kupang

    adalah

    lr. Joao

    M.M.E

    Mariano,CES

    yang

    ditetapkan

    dengan

    Surat

    Keputusan

    Bupati

    Kupang Nomor

    23lSKEPlt1W2010

    tanggal 18 Februari

    2010

    untuk masa

    6

    (enam)

    bulan

    terhitung

    mulai

    ianggai

    18

    Februari 2010

    dan

    pengangkatan

    kembaii sebagai Pejabat

    Sementara

    Direktur

    utama PDAM

    Kabupaten

    Kupang

    sesuai Surat

    Keputusan

    Bupati

    Kupang

    Nomor

    286/SKEPlHKj2ua

    tanggal

    18

    oktober

    20'10

    untuk masa

    6

    (enam)

    bulan

    terhitung

    mulai tanggal 18

    Oktober 2010.

    c.

    Peeawai

    PDAM

    sumber daya

    manusia

    PDAM

    Kabupaten

    Kupang

    per

    31

    Desember

    2010

    sebanyak 196

    orang

    dan

    per

    31 Desember

    2009

    sebanyak

    '190

    orang terdiri

    dari:

    No

    UMIAN

    TAllt

    'lzlt0

    TII{U{2tXP

    Fega,i

    T&p

    Fq6s

    l6rtrak

    Jurbh

    Peg#i i

    PA#i

    €rap

    fiontrd(

    Jutrlah

    1

    lDireksi

    0

    1 1

    0

    1

    Z

    l@ian

    hbuangan

    22 0

    n

    0

    3

    B4ian

    ftmbukan

    dan Rekering

    0

    12

    la

    0

    4

    84ian tlnun

    dan

    Felsorelia

    21

    0 Z

    0

    )n

    5

    -Eele[ArE:-9-*-_lerse ,1

    35

    3 s

    v

    0

    #

    o

    B4ian Dstrifusi

    dan funyanbLngan

    54

    1

    56 55

    0

    55

    7

    EruieL&t_e1plu ]q< 'x

    7

    0

    7 b

    0 6

    I

    B4ian

    Feravdan

    s 0

    s

    10

    0

    10

    I

    B4ian Rd*d

    dan Lkit Tarus

    12

    a

    15

    16

    0

    Ib

    KK

    11 16

    12

    0

    l1

    Jwdafi

    183 IJ

    1$

    189

    tg]

    Aspek

    Teknik

    Operasional

    2.i.

    Umum

    1, Penduduk

    Kota

    Madya

    Kupang

    2.

    Penduduk

    Kabupaten

    Kupang

    3.

    Total

    4.

    Jumlah

    Sumber

    5.

    Jenis

    Sistem

    6.

    Jenis

    Sumber

    7. TarifDasar

    :

    294.304

    Jiwa

    :

    394.196

    Jiwa

    ;

    688.500

    Jiwa

    ..

    29

    Unit

    :

    Grafitasi

    dan Pompa

    : Mata

    air dan sumur

    bor

    : Rp.

    2,500,-

  • 8/18/2019 6TSI13118.pdf

    26/132

    Bulan/Thn

    Penetapan

    Juurlah

    Langganan

    aktif

    -

    RumahTangga

    -

    Sosiai

    -Komersial

    jeriis

    Pelanggan Alitif Tahun

    : Desember

    2009

    :24.243

    Unit

    :22.458

    Unit

    :

    472

    Unit

    :

    1.313

    Unit

    2009

    dan 2010

    Jenis Pelanggan

    2009

    2010

    1. Rumah

    Tanqoa

    23.275

    23.94t)

    2. Sosial

    481

    325

    3.

    Usaha

    1.352

    1.380

    4.

    lndustri

    J

    5. lns Pem/ABRI

    250

    243

    6.

    HU/MCK/TA

    158

    Jumlah

    25.361

    26.O49

    9.

    CakupanPelayanan

    Jurnlah

    penduduk

    yang

    terlayani

    pada

    tahun

    2010

    adalah

    sebanyak

    zl7

    -585

    jiwa

    atau

    30,60% dari

    jurnlah

    penduduk

    seluruhnya

    di Kabupaten

    Kupang

    tahun

    2010

    sebanyak

    711 .173

    jiwa.

    Selama

    tahun

    2010, terdapat

    penambahan

    pelanggan

    sejumlah

    688 sambungan.

    1 1. Kapasitas produksi

    :

    i2.Jam

    Operasj

    Produksi

    :

    13.Jam

    Operasi Distribusi

    :

    549

    l/dtk

    301,66

    l/dtk

    24

    dan l0

    jam

    24 dan I0jam

  • 8/18/2019 6TSI13118.pdf

    27/132

    l4.Jurnlah

    Produksi

    Air

    l5.Jurnlah

    Air

    Yang

    didistribusi

    16.Jumlah

    Air

    Terjual

    2010

    1 T.Jurnlah

    I(ehilangan

    Air

    :9.382.677.rn3

    :

    8.1l5.l87.mi

    :6.672.340.n't3

    :

    1

    7 .1 8%(1.442.880,25)

  • 8/18/2019 6TSI13118.pdf

    28/132

    J

    ,t

    S

    U

    u$Q

    \)uga

    I

    c)

    ld

    C

    (E

    E

    .o

    c

    (E

    t

    o)

    o-

    .Y

    E

    5

    c

    o

    -)a

    oo

    .EE

    H rO

    - L

      d.-

    =.c

     

    EP

    E

    ;_g

    P

    €.P

    s

    o6

    a

    610.

    't

    d

    E.s

    r..-

    o >6

    =sHp

    .rE

    ti,'a

    E

    de E

    -E

    6

    El8

    8.8I

    Ol

    ;

    c.i

  • 8/18/2019 6TSI13118.pdf

    29/132

    "s

    l.

    l-t(6

    H

    J frI E

    E5 SEI

    E

    E*Ng

    a9.

    j

    'El

    :f,

     

    6l

    E

    : o-31&

    ii

    --->l

    .;

    l:

    ,Pl

    (E

    "vAl"g

    o

    1

    (/)l

    Jr

    c

    (5

    a

    o

    3o

    o)

    C

    (,

    IL

    od

    d

    c

    o

    L

    o

    (L

    ci,

    o

    -o

    o

    v

    S

    z

    (,

    z

    E

    IU

    t-

    [,i

    \e

    ,n

    $

    t

    r',J

    to

    I

    )

    k

    \\

    \

    ,\.

    4r

    $

    l

    $

    t

    \

    Yl

    ,:.

    N

    .lr

    rd

    $

    t

    g{

    sfi

    aa

  • 8/18/2019 6TSI13118.pdf

    30/132

    DATA

    SUMBER

    AIR PDAM KAB.

    KUPANC

    NO

    SUlt,tBER

    AIR DEBIT

    1 itA

    BAUTilATA

    2IAA.

    OEPURA

    3,1,1A.

    HAUKOLO

    4 I1A. OELEU

    5l,tA.

    A.l,lNESl

    6

    T,U.

    DENDENG

    7 t'AA. KOLHUA

    8

    l\IA. SAGU

    62

    Ltr/dtk

    4 Ltr/dtk

    20 Ltr/dtk

    15 Ltr/dtk

    15

    Ltr/dtk

    10

    Ltr/dtk

    15

    Ltr/dtk

    106

    Ltr/dtk

    JU,l,tl-AH

    283

    Ltrldtk

    9

    FOMPA

    BONEI,T

    10 SIKUI'IdNA

    11

    orroNA

    1

    12 OETONA

    2

    13

    POiTPA KETJPA

    LI}IA

    14 POATPA RsS

    O6APA

    15 POMPA NAMOSAIN

    16 POMPA AI.AK

    17 POMPA

    SMKK

    tS PomPA

    PRAr\tut(Ar,,

    19 POMPAOENESU

    20

    PO^APA POLI.A

    1

    21 POMPA

    POLII2

    25.0

    Ltr/dtk

    6.0

    Ltr/dtk

    15.0

    Ltr/dtk

    15.0

    Ltr/dtk

    10.0

    Ltr/dtk

    5.0 Ltr/dtk

    10.0 Ltr/dtk

    15.0

    Ltrldtk

    4.0

    Ltr/dtk

    2.5 Ltr(tk,

    13.0

    Ltr/dtk

    10.0

    Ltr/dtk

    9.0

    Ltr/dtk

    fi6si

    rata-nta

    =

    10

    Jam/hari

    JU}TIAH

    139.5

    Ltr/dtk

    litong

    =

    60 Ltr/dtk

    a

    / f

    ,

    t.

    Uol

    1

    SB. Nasipanaf

    2 SB.

    Viquam

    3

    Pompa

    Oeba

    4 Pompa

    Air Sagu

    15

    Ltr/dtk

    5

    Ltr/dtk

    15

    Ltr/dtk

    5

    Ltr/dtk

    40 Ltr/dtk

    ,4di;'\

    (

    rer.so

    )

    \3',j9l

    Adutn

    6i

    oNn'

    Catatan :

  • 8/18/2019 6TSI13118.pdf

    31/132

    PRODUKSIAIR

    PDAM.

    KABUPATEN

    KUPANG

    Januari

    2011

    Sumber

    dan lab.

    No

    Narria

    sumber

    Sistim

    pensaliran

    "Q"TerPsg. "Q'

    sat

    ini

    Wkt.Oors.

    Produksi

    Keterangan

    (L/Det)

    (L/Det)

    (Jam

    )

    (M3

    )

    1

    MA. Oepura

    Grafitasi

    40

    30

    744

    80352

    2 MA.

    Baumata

    Grafitasi

    75

    45

    7M

    120528

    3

    MA. Haukolo

    Grafitasi

    20

    10

    744

    26784

    4

    MA. Oeleu

    Grafitasi

    15

    10

    744

    26784

    5

    MA.

    Sagu I

    Grafitasi

    70

    40

    744

    107t36

    6 MA.

    Sagu ll

    Grafitasi

    70

    38

    744

    101779

    7

    MA. Amnesi

    Grafitasi

    15

    5

    744

    L3392

    8

    MA. Dendene

    Grafitasi

    t0

    10

    744

    26784

    9 MA.

    Kolhua

    Grafltasi

    15

    10

    744

    26784

    10

    11

    12

    MA. Bonen

    pompa-graf

    25

    25

    496

    44640

    M{,Tq1gs

    SB. Sikumana

    pompa

    9

    9

    496

    L6070

    pornql-gfgI

    _

    P9 P1-

    _

    pompa

    6

    6

    teq

    496

    1071d

    1,3

    34

    s_B:

    _o_919 a

    I

    SB. Oetona

    ll

    15 15

    26784

    15

    15

    496

    26J9:4

    17856

    B. Kelapa

    Lima

    pompa

    10

    10

    496

    1C)

    77

    SB.

    RSS/Liliba pomoa

    5

    __i_ ,_

    10

    496

    gs?g

    15624

    26784

     L_Ne lg:r_il

    Sb. AIak

    PgrnPl

    10

    434

    18

    pompa

    15

    15

    496

    19 SB.

    Pramuka

    pompa

    3

    3

    32

    346

    20 SB.

    SMKK

    . P-9 P1__

    PomPg:9t1i

    pompa-graf.

    4

    4

    496

    _ l 42_

    t9642

    1

    MA.

    Oenesu

    1L

    11

    496

    22

    SB. Polla

    I

    L5

    15

    496

    2678

    1t070

    ?

    24

    SB. Polla

    ll

    P_g,rnP?-_cJ?i

    pompa

    7,5

    7,5

    410

    58. Penfui

    Timur

    4

    200

    2880

    JUMLAH

    484,5

    352,5

    792371

    Mengetahui,

    A'Y

    (GEON

    GREGORIUS

    )

    Kabag.

    Tehnik

    Tembusan

    :

    1. Plt.

    Direktur

    Utama

    2.

    Kabag.

    Tehnik.

    3.

    Kabag.

    Umum

    dan

    Keuangan

    4.

    Kabag.

    Hubungan

    langganan.

    5. Arsip.

    Kupang,

    Januari

    2011

    Dlsiapkan

    oleh,

    Kasubag.

    Sumber

    & Lab.

  • 8/18/2019 6TSI13118.pdf

    32/132

    PRODUKSIAIR

    PDAM.

    KABUPATEN

    KUPANG

    Pebruari

    2011

    Sumber dan lab,

    No

    Nama

    sumber

    Sistim

    pengaliran

    "Q"TerPsg.

    "Q"

    sat ini

    Wkt.Oors.

    Produksi

    Keterangan

    (L/Det)

    L/Det)

    (Jam

    1

    (M3)

    1 MA.

    Oepura

    Grafitasi

    40

    40

    672

    96768

    2 MA. Baumata

    Grafitasi

    75

    45

    672

    108864

    3 MA. Haukolo

    Grafitasi

    20

    10

    672

    24192

    4

    MA.

    Oeleu

    Grafitasi

    L5

    10

    672

    _

    ?4+e7

    t71283

    6

    MA. Sagu

    I

    Grafitasi

    70

    46

    672

    MA.

    Sagu ll

    Grafitasi

    70

    43

    672

    104026

    7

    MA. Amnesi

    Grafitasi

    15

    15

    672 36288

    8 MA.

    Dendeng

    Grafitasi

    10

    10

    672

    24192

    9 MA.

    Kolhua

    Grafitasi

    15

    15

    672 36288

    10 MA.

    Bonen

    pompa-graf

    25

    75

    32

    2880

    11

    MA. Tarus pompa

    9

    9

    420

    13608

    _v

    AJ

    SB. Sikumana

    pompa-graf

    6

    6

    496

    10713,6

    SB.

    Oetona

    I

    pompa

    15

    15

    179

    470

    2s380

    14

    15

    SB.

    Oetona ll

    teieFtr

    Li,

    pompa

    15

    15

    2s380

    pompa

    1"0

    10

    _

    _{9q

    460

    1_6_sqg

    8280

    ,

    $

    L9

    20

    ss._ f /_ti a

    SB. Namosain

    pompa

    5

    5

    pompa

    10 10

    434

    __

    _

    1s_q?4

    2 g4o

    346

    6624

    Sb. Alak

    pompa

    15

    15

    464

    SB. Pramuka

    se.

    iMiK

    pompq

    pompa

    3

    3

    32

    4

    4

    460

    2

    ??

    23

    24

    MA.

    Oenesu

    sB.

    Poita

    i-

    pompa-graf.

    11

    11

    s19

     49

    400

    20196

    23760

    ompa-graf.

    15

    15

    SB. Polla ll

    SB. Peniui

    fimur

    P9 1P:a:EI?t:

    oomoa

    7,5

    7,5

    1080q

    2304

    4

    160

    JUMLAH

    484,5

    388,5

    773388

    Mengetahui,

    GEON

    GREdORIUS

    Kupang,

    Pebruari

    2011

    Kasubag.

    Sumber

    & Lab.

    ___.

    rbusan

    :

    1. Plt.

    Direktur

    Utama

    2.

    Kabag.

    Tehnik.

    3. Kabag.

    Umum

    dan

    Keuangan

    4.

    Kabag.

    Hubungan

    langganan.

    5.

    Arsip.

  • 8/18/2019 6TSI13118.pdf

    33/132

    PRODUKSIAIR

    PDAM.

    KABUPATEN

    KUPANG

    Maret

    20L1

    Sumber

    dan lab.

    No

    Nama

    sumber

    Sistim

    pensaliran

    "Q"TerPsg.

    "Q"

    sat

    ini

    Wkt.Oprs.

    Produksi

    Keterangan

    (L/Det)

    (L/Det)

    (Jam

    )

    (M3)

    7

    MA.

    Oepura

    Grafitasi

    40

    40

    744

    707736

    2 MA.

    Baumata

    Grafitasi

    75

    50

    744

    133920

    3

    MA.

    Haukolo

    Grafitasi

    20

    10

    7M

    26784

    4

    MA.

    Oeleu

    Grafitasi

    15

    8

    744

    21427

    5 MA.

    Sagu I

    Grafitasi

    70

    46

    744

    __

    1_4?9g

    1L5171

    MA.

    Sagu

    ll

    Grafitasi

    70

    43

    744

    7

    MA. Amnesi

    Grafitasi

    15

    10

    744

    26784

    I MA. Dendeng

    Grafitasi

    10

    10

    7M

    26744

    9 MA.

    Kolhua

    Grafitasi

    15

    15

    *7

    9q

    129

    360

    40176

    _19

    11

    MA.

    Bonen

     9-nt 3:glg

    25

    20

    4032

    MA.

    Tarus

    pompa

    9

    9

    _ Fqq8

    7776

    2

    SB.

    Sikumana

    pompg:gE :

    6

    6

    13 58.

    Oetona

    I pompa

    15

    15

    360

    79440

    t4

    15

    SB.

    Oetona ll

    ss.

    r;iapa

    rim;

    -

    -

    pompa

    15

    15

    360

     e tg

    1 7q60

    ompa

    10

    L0

    360

    16

    18

    SB. RSS/L|liba

    pompa

    5

    5

    350

    6480

    SB. Namosain

    _rymP-1

    10

    10

    L20

    _

    431-0

    ?nq7n

    D. AIAK

    pompa

    15

    15 380

    1

    SB.

    Pramuka

    pompa

    3

    3 3)

    ?,d.A

    2A SB.

    SMKK

    pompa

    4

    4

    _

    _ le.q

    25

    561 6

    ?1

    22

    MA.

    Oenesu

    PgT -a_-gBf.

    pompa-graf.

    u

    15

    6

    540

    58. Polla I

    15

    360 IqALO

    21

    24

    58.

    Poll?__ll

    SB. Penfui

    Timur

    P9Sp3_6 '9-f

    pomoa

    7;

    4

    -

    *7.5-

    -

    4

    ?80

    180

    7s69

    7qq)

    JUMLAH

    484,5

    376,5

    766058

    Mengetahui,

    qV

    (

    GEON

    GREGORIUS

    )

    Kabag.

    Tehnik

    '

    rbusan:

    I.-Plt.

    Direktur

    Utama

    2.

    Kabag. Tehnik.

    3.

    Kabag.

    Umum

    dan

    Keuangan

    4.

    Kabag.

    Hubungan

    langganan.

    5.

    Arsip.

    SAI\4SUL/ACHRI

  • 8/18/2019 6TSI13118.pdf

    34/132

    PRODUKSIAIR

    PDAM.

    KABUPATEN

    KUPANG

    April 2011

    Sumber dan lab.

    No

    Nama

    sumber

    Sistim

    oensaliran

    "Q"TerPsg.

    "Q"

    sat ini

    Wkt.Oprs.

    Produksi

    Keterangan

    (L/Det) (L/Det)

    (Jam)

    (M3

    )

    1

    MA.

    Oepura

    Grafitasi

    40

    40

    72C

    103680

    z MA.

    Baumata

    Grafitasi

    75

    60 72C

    155520

    3

    MA. Haukolo

    Grafitasi

    20 10

    720 25920

    4 MA.

    Oeleu

    Grafitasi

    15

    15 720

    38880

    5

    MA.

    Sagu

    I

    Grafitasi

    70

    46

    720 119232

    6 MA. Sasu ll

    Grafitasi

    7A 43

    720

    111456

    7

    MA. Amnesi

    Grafitasi

    L5

    10 720

    2s924

    I

    MA.

    Dendeng

    Grafitasi

    10 10

    720

    25920

    9

    MA.

    Kolhua

    Grafitasi

    15

    15

    720

    38880

    10 MA. Bonen

    pompa-graf

    25 20

    50

    4320

    11 MA.

    Tarus pompa

    9

    9

    4?0

    13608

    t2

    13

    SB.

    Sikumana

    pompa-graf

    6

    6

    300

    6480

    SB. Oetona I pompa

    15 15

    360

    L9440

    1"4

    SB.

    Oetona

    ll pompa

    15

    15

    300

    16200

    1q

    1

    6

    18

    SB.

    Kelapa

    Lima

    pompa

    10 10

    360 12960

    SB. RSS/Liliba

    pompa

    5 5

    360

    6480

    SB.

    Namosain pompa

    10

    10

    360 12960

    Sb.

    Alak

    pompa

    15

    15

    200

    10800

    19

    20

    SB. Pramuka

    pompa

    3

    3 32

    346

    SB.

    SMKK pompa

    4

    4

    350

    5184

    2t MA.

    Oenesu pompa-graf.

    11

    6

    350

    7776

    22

    23

    SB.

    Polla

    I

    sB. i;ita-u

    -

    --

    pompa-graf.

    15

    1l_

    7,5

    360

    19440

    pompa-graf

    7,s

    310

    8370

    24

    SB.

    Penfui

    Timur

    oomoa

    4

    4

    779

    2577,6

    JUMLAH

    484,5

    393,5

    792349

    Mengetahui,

    Kupang,

    April

    2011.

    Kasubag,Sfmber

    &

    Lab.

    (

    GEON

    GREGORIUS

    }

    Kabag.

    Tehnik

    -

    rbusan:

    1.-Plt.

    Direktur

    Utama

    2.

    Kabag. Tehnik.

    3. Kabag.

    Umum

    dan

    Keuangan

    4.

    Kabag.

    Hubungan

    langganan.

    5. Arsip.

  • 8/18/2019 6TSI13118.pdf

    35/132

    PRODUKSIAIR

    PDAM.

    KABUPATEN

    KUPANG

    Mei 2011

    Sumber

    dan lab.

    No

    Nama

    sumber

    Sistim

    oenealiran

    "Q"TerPse.

    "Q"

    sat

    ini

    Wkt.Oprs.

    Produksi

    Keterangan

    (L/Det)

    (L/Det)

    jam

    )

    (M3

    )

    7

    MA.

    Oepura

    Grafitasi

    40

    40

    744

    107136

    2 MA. Baumata

    Grafitasi

    75 60

    744

    160704

    3

    MA. Haukolo Grafitasi

    20 10

    744

    26784

    4

    MA. Oeleu

    Grafitasi

    15

    10

    744

    26784

    5

    MA.

    Sagu I

    Grafitasi

    70 30

    744

    80352

    6 MA.

    Sagu ll

    Grafitasi

    70

    43

    744 1\517L

    7

    MA. Amnesi

    Grafitasi

    15

    6

    744

    16070

    8 MA. Dendene

    Grafitasi

    10 10

    744

    26784

    9 MA.

    Kolhua

    Grafitasi

    1,5 15

    744

    40 76

    10

    MA. Bonen pompa-graf

    25 20

    22

    1584

    tt MA.

    Tarus pompa

    9

    9

    420

    13608

    t2

    SB.

    Sikumana pompa-graf

    5

    6

    _

    190

    270

    6480

    13

    SB.

    Oetona I

    pompa

    15

    15

    14580

    L4

    SB.

    Oetona

    ll

    pompa

    15 15

    360

    19440

    7

    SB.

    Kelapllim1

    _penLpa

    10 10

    360

    12960

    1

    ls:EVUQa

    pompa

    5 5

    360 6480

    SB.

    Namosain

    pompa

    _lt_

    15

    10 360

    _

    -

    1,1seg

    t9440

    t Sb. Alak

    pompa

    15

    360

    19

    SB. Pramuka

    pompa

    3

    3

    32

    346

    20

    SB. SMKK

    pompa

    4

    4

    360 5184

    27

    22

    MA. Oenesu

    is.

    porla

    r

    pompa-graf.

    11

    6

    360

    7776

    P9[P9:9I3f:

    pompa-graf.

    15

    15

    360

    _

    t?449

    9720

    2548,8

    23

    24

    SB. Polla

    ll

    sa.

    Penluiii;;

    -

    --

    7r1

    -

    -J s-

    4

    _

    _

    _-

    __3qg

    777

    omoa

    JUMLAH

    484.5

    358,5

    752508

    Mengetahui,

    -

    -

  • 8/18/2019 6TSI13118.pdf

    36/132

    PRODUKSIAIR

    PDAM.

    KABUPATEN KUPANG

    Juni 2011

    laba

    umber dan lab.

    No

    Nama sumber

    Sistim

    oenpaliran

    "Q"TerPsR.

    "Q"

    sat ini Wkt.Oprs.

    Produksi

    Keterangan

    (L/Det)

    (L/Det) (Jam

    )

    (M3

    )

    1. MA. Oepura

    Grafitasi 40

    40

    720

    1036801

    2 MA. Baumata

    Grafitasi

    75

    50

    720 1s55201

    3

    MA. Haukolo Grafitasi

    20 10 72Al 259201

    4

    MA. Oeleu

    Grafitasi

    15 10 7201 259201

    5

    MA.

    Sagu

    I

    Grafitasi 70 46 720

    tL9232

    6

    MA. Sagu ll

    Grafitasi 70

    43

    720

    11,1456

    7 MA. Amnesi

    Grafitasi

    15 10

    720 25920

    -_q

    9

    MA. Den{eng

    Grafitasi

    10

    10 720

    25920

    MA. Kolhua

    Grafitasi

    15 15 720 38880

    10 MA. Bonen

    pompa-graf

    25 25

    160 14400

    11

    MA. Tarus

    pompa

    9 9

    4ZO

    13608

    72 SB.

    Sikumana

    pompa-graf

    6 6

    400 8640

    t3 SB.

    Oetona

    I

    pompa

    15

    15

    706

    381?4

    t4

    SB.

    Oetona

    ll

    pornpa

    15 15

    706

    38724

    15

    SB.

    Kelapa Lima pompa

    10 10

    620 22320

    11160

    6

    sB. RsS/Liliba

    pompa

    5

    5

    620

    SB.

    Namosain pompa

    10 10

    408

    14688

    18 Sb. Alak

    pompa

    15 15

    420

    22680

    t9 SB.

    Pramuka

    pompa

    3

    3

    32

    14q

    9648

    0

    SB. SMKK

    pompa

    4

    4

    670

    21 MA. Oenesu

    pompa-graf

    11

    8 490

    L4112

    22

    SB.

    Polla

    I

    pompa-graf

    15 15

    496

    26784

    2t

    24

    SB.

    Polla

    ll

    pompa-graf

    7,5 7,5

    480

    _

    rsqg

    1874,4

    B. Penfui

    Timur oomoa

    4

    4

    126

    JUMLAH

    484,5

    395,s

    881856

    Kupang,

    Juni

    2011..

    isiapkan

    oleh,

    SAI\(SULJACHRI

    Kasubag.

    Sumber

    &

    Lab.

    (

    GEON

    GREGORIUS

    )

    Kabag.

    Tehnik

    rbusan

    :

    1. Plt. Direktur

    Utama

    2. Kabag. Tehnik.

    3. Kabag. Umum

    dan Keuangan

    4. Kabag.

    Hubungan

    langganan.

    5. Arsip.

  • 8/18/2019 6TSI13118.pdf

    37/132

    PRODUKSIAIR

    PDAM. KABUPATEN KUPANG

    Juli 2011

    Sumber

    dan lab.

    No

    Nama

    sumber

    Sistim

    pengaliran

    "Q"TerPsg.

    "Q"

    sat

    ini Wkt.Oprs.

    Produksi

    Keterangan

    (L/Det) (L/Det)

    (Jam)

    (M3)

    1

    MA.

    Oepura Grafitasi

    40

    35 744

    9374r',

    2

    MA. Baumata Grafitasi

    75

    60 744

    160704

    3

    MA. Haukolo Grafitasi

    20 10

    744

    26784

    4 MA. Oeleu

    Grafitasi 15 10 744 26784

    5

    MA.

    Sagu

    I

    Grafitasi

    70

    46

    7M

    123206

    6

    MA.

    Sagu

    ll

    Grafitasi

    70

    43 744

    715177

    MA. Amnesi

    Grafitasi

    15

    15

    744

    40776

    MA. Dendeng

    Grafitasi

    10 10 744

    26784

    MA.

    Kolhua

    'Grafitasi

    15 15 744

    40176

    1C

    MA. Bonen

    pompa-graf

    25 20 362 26064

    lt MA. Tarus

    pompa

    9

    9

    486 L5746

    12 SB. Sikumana

    pompa-graf

    6 6 496

    to7t3,6

    l-5

    SB.

    Oetona

    I

    pompa

    15 15

    496

    26784

    t4

    SB. Oetona ll

    pompa

    15 15

    496

    26784

    15 SB.

    Kelapa Lima

    pompa 10 10

    510 18360

    1

    I

    SB. RSS/Liliba

    oomDa 5 5

    496

    8928

    SB.

    Namosain

    pompa

    10 10 408

    14688

    1f Sb. Alak

    pompa

    15 15 496

    26784

    1,9

    SB.

    Pramuka

    pompa

    3

    3

    32

    346

    20

    SB. SMKK

    pompa

    4 4

    510 7344

    2t

    MA. Oenesu

    pompa-graf

    11 6 496

    to7t4

    22 SB.

    Polla I

    pompa-graf

    15

    15

    7$

    38340

    23

    24

    se.P- 1

    SB.

    Penfui Timur

    pompa-graf

    7,5 7.5 480

    12960

    pomna

    4

    4

    204 2880

    JUMLAH

    484.5 388.5

    900965

    Kupang,

    Juli 2011.

    Dlsiapkan

    oleh,

    SAM\UL

    EACHRI

    Kasubag.

    Sumber & Lab.

    (

    6EON GREGORIUS

    )

    Kabag.

    Tehnik

    nbusan

    :

    1. Plt. Direktur

    Utama

    2. Kabag. Tehnik.

    3.

    Kabag. Umum

    dan Keuangan

    4. Kabag.

    Hubungan

    langganan.

    5. Arsip.

  • 8/18/2019 6TSI13118.pdf

    38/132

    PRODUKSIAIR

    PDAM.

    KABUPATEry

    KUPANG

    Agustus

    2011

    5U

    Sumber

    dan lab.

    No

    Nama

    sumber

    Sistim

    Densaliran

    "Q"TerPsR.

    "Q"

    sat ini

    Wkt.Oors-

    Produksi

    Keterangan

    {L/Det)

    (L/Det)

    (Jam

    )

    (M3

    )

    1 MA.

    Oepura

    Grafitasi

    40

    30

    720

    77760

    2

    MA.

    Baumata

    Grafitasi

    75

    55

    720

    142560

    3

    MA. Haukolo Grafitasi

    70

    ___1-0_

    8

    720 25920

    4

    MA.

    Oeleu

    Grafitasi

    15

    720

    20736

    5

     , 41ery-1

    Grafitasi

    70

    42

    720

    108864

    E

    MA. Saeu

    ll

    Grafitasi

    70

    40

    720

    103680

    7 MA. Amnesi

    Grafitasi

    L5

    10

    720

    25920

    8

    MA.

    Dendeng

    Grafitasi

    10

    10

    720

    25920

    9 MA. Kolhua

    Grafitasi

    15

    10

    720

    25920

    10 MA. Bonen

    pompa-graf.

    25

    20

    400

    28800

    .11

    L2

    MA. Tarus

    pompa

    9

    9

    420

    13608

    SB.

    Sikumana pompa-graf.

    6

    6

    700

    15120

    13 SB. Oetona

    I

    pompa

    1.5

    15

    719

    38826

    1,4

    15

     .p,

    oe]9n3

    tl

    $.{s -, t-Li r.

    pompa

    _-_11__

    10

    __1L__

    10

    __219

    710

    38-q?q

    25560

    ompa

    SB. RSSlLiliba

    pompa

    5

    5

    7to

    t2780

    SB. Namosain

    pompa

    10

    L0

    408

    14688

    1€

    Sb.

    Alak pompa

    15

    15

    420

    22680

    19

    SB. Pramuka

    pompa

    1_

    4

    3

    32

    -

    _338

    10224

    t

    SB. SMKK

    pompa

    4

    770

    27

    MA. Oenesu

    pompa-graf.

    11

    6

    701

    15L42

    ?2

    23

    SB. Polla I

    pompa-graf

    15

    15

    _

    qeq

    472

    1l_692

    177 _4

    2880

    SB.

    Polla

    ll

    pompa-graf

    7,5

    7.5

    24

    SB. Penfui

    Timur

    oomoa

    4

    4

    200

    JUMTAH

    484,5

    359,5

    847195

    Kupang,

    Agustus

    2011.

    isiapkan

    oleh,

    Kasubag.

    Sumber

    & Lab.

    abag.

    Tehnik

    nbusan

    :

    1. Plt.

    Direktur

    Utama

    2. Kabag.

    Tehnik.

    3. Kabag.

    Umum

    dan

    Keuangan

    4. Kabag.

    Hubungan

    langganan.

    5. Arsip.

  • 8/18/2019 6TSI13118.pdf

    39/132

    PRODUKSIAIR

    PDAM.

    KABUPATEN

    KUPANG

    September

    2011

    Sumber

    dan lab.

    No

    Narna

    sumber

    Sistim

    pensaliran

    "Q"TerPsg. "Q"

    sat ini

    Wkt.Oprs.

    Produksi

    Keterangan

    (L/Det) (L/Det)

    (Jam)

    (M3

    )

    1

    MA.

    Oepura__

    Grafitasi

    40

    30

    744

    80352

    2 MA.

    Baurnata

    Grafitasi

    75

    50

    744

    133920

    3

    MA. Haukolo Grafitasi

    20 10

    744 26784

    4

    MA. Oeleu

    Grafitasi

    15

    8

    744

    27427

    5 MA.

    Sagu

    I

    Grafitasi

    70

    42

    744

    172493

    6

    \44:saelL-

    Grafitasi

    70

    40

    744

    107136

    MA.

    Amnesi

    Grafitasi

    15

    10

    744

    26784

    8

    MA.

    Dendeng

    Grafitasi

    10

    10

    744

    26784

    9

    MA.

    Kolhua

    Grafitasi

    15

    10

    744

    26784

    1_0

    MA. Bonen

    pompa-graf

    25

    25

    300

    27000

    11

    MA. Tarus

    pompa

    9

    9

    420

    13608

    12

    SB.

    Sikumana pompa-graf

    5

    6

    707

    75271

    13 SB. Oetona I

    pompa

    15

    15

    710

    38340

    T4

    SB.

    Oetona ll

    pompa

    15

    15

    7tc

    3q330

    22320

    I

    L6

    s .[slqee_Lire

    pompa

    10 10

    62C

    SB. RSS/Liliba pompa

    5 5

    62C

    11160

    58. Namosairr

    pompa

    10

    10

    430

    15480

    1€ Sb. Alak

    pompa

    15

    15

    520

    28080

    19

    SB.

    Pramuka

    pompa

    3

    3

    32

    346

    20

    SB. SMKK

    pompa

    4

    4

    670

    9648

    27 MA.

    Oenesu

    pompa-graf.

    11

    8

    660

    19008

    2?

    23

    SB. Polla

    I

    -P9rnqe:ry

    15 15

    720

    38880

    58. Polla

    ll

    pompa-graf

    7,5

    7,5

    480 72960

    24

    SB.

    Penfui

    Timur

    oomoa

    4

    4

    225

    3240

    JUMLAH

    484,5

    361,s

    856145

    Kabag.

    Tehnik

    nbusan

    :

    1.'Plt.

    Direktur

    Utama

    2. Kabag.

    Tehnik.

    3. Kabag.

    Umum

    dan Keuangan

    4.

    Kabag.

    Hubungan

    Iangganan.

    5. Arsip.

  • 8/18/2019 6TSI13118.pdf

    40/132

    PRODUKSIAIR

    PDAM.

    KABUPATEN

    KUPANG

    Oktober

    2011.

    subag.

    Sumber

    dan lab.

    No

    Nama

    sumber

    Sistim

    pensaliran

    "Q'TerPsg.

    "Q"

    sat ini

    Wkt.Oprs.

    Produksi

    Keterangan

    (L/Det)

    (L/Det)

    (Jam

    )

    (M3

    )

    1 MA.

    Oepura

    Grafitasi

    40

    30

    744

    803s2

    2

    MA.

    Baumata

    Grafitasi

    75

    50 744

    133920

    3

    MA. Haukolo Grafitasi

    20 10

    744 26784

    MA. Oeleu

    Grafitasi

    L5

    8

    744

    2L427

    5

    \44-_sags_]_

    Grafitasi

    70

    42

    7M

    1L2493

    c

    MA.

    Sagu ll

    Grafitasi

    70

    40 744

    107136

    7

    MA. Amnesi

    Grafitasi

    15

    10

    7M

    26784

    8 MA. Dendeng

    Grafitasi

    10

    10

    744

    26784

    9

    MA. Kolhua

    Grafitasi

    15

    10

    744

    26784

    10

    MA. Bonen

    pompa-graf.

    _

    _2:

    ,_

    9

    20

    470

    33840

    11

    MA.

    Tarus

    pompa

    9

    420

    13608

    12 SB. Sikumana

    pompa-graf.

    6 6

    450

    9720

    13

    58.

    Oetona I

    pompa

    15

    15

    472

    25488

    I

    15

    SB. Oetona ll

    pompa

    15

    15

    472 25488

    SB.

    Kelapa Lima

    pompa

    10 10

    500

    18-000

    9000

    ,

    SB.

    RSS/Liliba

    pompa

    5

    5

    500

    SB. Namosain

    _t9i s1

    10

    10

    408

    14688

    18 Sb. Alak

    pompa

    15

    15

    472

    25488

    19

    SB. Pramuka

    pompa

    3

    3

    32

    __?4q

    7200

    0 SB. SMKK

    pompa

    4

    4

    500

    27

    MA.

    Oenesu

    pompa-graf

    11

    6

    472

    10195

    22

    SB. Polla

    I

    -L9tr .?_Elaj-_

    pompa-graf.

    15

    15

    510

    27540

    23

    24

    SB. Polla ll

    7,5

    7,5

    480

    12960

    sB.

    Penfui

    Timur

    pompa

    4

    4

    209

    3009,5

    JUMLAH

    484,5

    354,5

    799034

    Mengetahui,

    ,"'-i.*4

    (

    GEON

    GREGORIUS

    )

    Kabag.

    Tehnik

    rbusan

    :

    1.-Plt.

    Direktur

    Utama

    2. Kabag.

    Tehnik.

    3.

    Kabag.

    Urnum dan

    Keuangan

    4.

    Kabag.

    Hubungan

    langganan.

    5. Arsip.

    Kupang,

    Oktober

    2011.

    SAIWUT,/BACHRI

    Kasubag.

    Sumber

    & Lab.

  • 8/18/2019 6TSI13118.pdf

    41/132

    PRODUKSIAIR

    PDAM.

    KABUPATEN

    KUPANG

    Nopember

    2011

    su

    Sumber

    dan lab.

    No

    Nama

    sumber

    Sistim

    oensaliran

    "Q"TerPsg.

    "Q"

    sat ini

    Wkt.Oprs.

    Produksi

    Keterangan

    L/Det)

    (L/Det)

    (Jam

    )

    (M3)

    7

    MA.

    Oepura

    Grafitasi

    40

    20

    720

    51840

    z MA. Baumata

    Grafitasi

    75

    30

    720

    77750

    3

    MA. Haukolo Grafitasi

    20 10

    720

    25920

    4

    MA.

    Oeleu

    Grafitasi

    15

    8

    720

    20736

    5 MA.

    Sasu I

    Grafitasi

    70

    42

    720

    108864

    6

    MA.

    Sagu ll

    Grafitasi

    70

    40

    720

    103580

    7 MA. Amnesi

    Grafitasi

    15

    10

    720

    25920

    8

    MA. Dendeng

    Grafitasi

    10

    10

    720

    2s920

    9 MA.

    Kolhua

    Grafitasi

    15

    10

    720

    25920

    10

    MA. Bonen pompa-graf

    25

    20

    160

    11q,20

    13608

    1

    MA. Tarus

    pompa

    9

    9

    4ZO

    1?

    a5

    SB. Sikumana pompa-graf

    6

    6

    400 8640

    SB.

    Oetona

    I pompa

    15 15

    610

    32940

    'J_4

    SB. Oetona ll pompa

    15

    15

    610

    32940

    15

    SB.

    Kelapa Lima pompa

    10

    10

    714 25560

    16

    ,7

    SB. RSS/Liliba

    pomoa

    5

    5

    7lO

    1,2780

    SB. Namosain

    pompa

    10

    10

    408

    14688

    18 Sb.

    Alak

    pompa

    l5

    15

    420

    22680

    19

    SB.

    Pramuka

    pompa

    3

    3

    32

    346

    20

    SB.

    SMKK pompa

    4

    4

    7lO

    10224

    77

    MA. Oenesu

    pompa-graf.

    L1

    6

    490

    10584

    ??

    23

    SB.

    Polla

    I

    pompa-graf.

    15

    15

    715

    38610

    SB. Polla ll pompa-sraf

    7,5

    7,5

    480

    12960

    24

    SB.

    Penfui

    Timur pompa

    4

    4

    226

    3254,4

    JUMLAH

    484,s

    324,5

    717894

    Melqetahui,

    '

    A);,q

    -/

    (GEON

    GREGORIUS

    )

    Kabag.

    Tehnik

    nbusan

    :

    1:Plt.

    Direktur

    Utama

    2. Kabag.

    Tehnik.

    3. Kabag.

    Umum

    dan

    Keuangan

    4.

    Kabag.

    Hubungan

    langganan.

    5. Arsip.

    SAMXUL

    BACHRI

    ber &

    Lab.

  • 8/18/2019 6TSI13118.pdf

    42/132

    PRODUKSIAIR

    PDAM.

    KABUPATEN

    KUPANG

    Desember

    201.1

    Sumber

    dan lab.

    No

    Nama

    sumber

    Sistim

    penealiran

    "Q"TerPsP.

    "Q" sat ini

    Wkt.Oprs.

    Produksi

    .

    Keterangan

    (L/Det)

    (L/Det)

    Jam

    )

    (M3

    )

    L

    MA.

    Oepura

    __

    Grafitasi

    40

    20

    744

    53568

    2

    MA. Baumata

    Grafitasi

    75

    30

    744

    80352

    a

    MA.

    Haukolo

    Grafitasi

    20

    10

    744

    26784

    4

    MA.

    Oeleu

    Grafitasi

    15

    8

    744

    21427

    5 MA.

    Sagu

    I

    Grafitasi

    70

    35

    744

    9374/;

    6

    MA.

    Sagu ll

    _

    Grafitasi

    7A

    32

    744

    85709

    7 MA.

    Amnesi

    Grafitasi

    15

    5

    744

    73392

    B

    MLqun9eLe_

    Grafitasi

    10

    10

    744

    26784

    9

    MA. Kolhua

    Grafitasi

    15

    5

    744

    13392

    10 MA.

    Bonen

    pompa-graf

    25

    25

    160

    14400

    11

    MA.

    Tarus pompa

    9

    9

    420

    13508

    t2

    SB.

    Sikumana pompa-graf.

    6

    6

    400

    8640

    13

    SB. Oetona

    I

    pompa

    15

    15

    635

    34290

    1,4

    SB.

    Oetona ll

    pompa

    15

    15

    635

    3429C

    t5

    58. Kelapa

    Lima

    pompa

    10

    10

    620

    2232C

    16

    1

    SB.

    RSS/Liliba pompa

    5

    5

    624

    1116r

    SB.

    Namosain

    pompa

    10

    10

    408

    14688

    18

    Sb.

    Alak

    pompa

    15

    15

    420

    22680

    19

    SB. Pramuka

    pompa

    3

    3

    32

    346

    tu

    56.SMKK

    pompa

    4

    4

    520

    8928

    21

    MA.

    Oenesu

    pompa-graf.

    Ll

    8

    560

    16128

    22

    58. Polla I pompa-graf.

    15

    15

    720

    38880

    23 SB.

    Polla

    ll

    pompa-graf.

    7,5

    7,5

    480

    12960

    24

    58. Penfui

    Timur

    DOmOa

    4

    4

    239

    3M1,6

    JUMLAH

    484,5

    306,5

    6719L1.

    Kupang,

    Desember

    2011.

    Mengetahui,

    (

    6EON

    GREGORIUS

    )

    Kabag. Tehnik

    nbusan:

    f. Plt.

    Direktur

    Utama

    2. Kabag.

    Tehnik.

    3. Kabag.

    Umum

    dan

    Keuangan

    4. Kabag.

    Hubungan

    langganan.

    5.

    Arsip.

    SAMSUL

    BACHRI

  • 8/18/2019 6TSI13118.pdf

    43/132

    DATA

    SUMBER

    AIR

    DAN

    KAPASITAS

    PRODUKSI

    PDAM.

    KAB.

    KUPANG

    TAHUN

    2012

    JANUARI

    2012.

    NAMA

    SUMBER

    AIR

    SISTIM

    KAPASITAS

    KONDISISAAT

    INI

    JAM

    OPERASI

    KABUPATEN

    KUPANG

    1

    2

    3

    4

    5

    6

    7

    8

    9

    0

    1

    5

    6

    IMA.

    OEPURA

    lro. rorroro

    lro.

    *or*o,-o

    lro. or'-r,

    l*o. too,

    ,

    I

    lMA.

    SAGU il

    lMA.

    AMNEST

    ln,tn.

    oEruornc

    L

    MA. KOLHUA

    lro. ro*.*

    MA.

    TARUS

    SB.

    SIKUMANA

    SB.

    OETONA I

    -8.

    OETONA

    II

    SB. KELAPA

    LIMA

    SB.

    RSS/LILIBA

    SB. NAMOSAIN

    SB. ALAK

    SB. PRAMUKA

    SB. SMKK

    MA. OENESU

    SB. POLLA

    I

    SB. POLLA

    II

    SB.

    PENFUITIMUR

    GRAFITASI

    GRAFITASI

    GRAFITASI

    GRAFITASI

    GRAFITASI

    GRAFITASI

    GRAFITASI

    GRAFITASI

    GRAFITASI

    POMPA.GRAF

    POMPA.

    POMPA-GRAF

    POMPA.

    POMPA.

    POMPA.

    POMPA.

    POMPA-GRAF

    POMPA.

    POMPA.

    POMPA.

    POMPA.GRAF

    POMPA.

    POMPA.

    POMPA.

    40

    75

    20

    15

    70

    7A

    15

    L0

    15

    25

    9

    6

    15

    15

    10

    5

    10

    15

    3

    4

    11

    15

    7.5

    4

    20

    35

    10

    10

    35

    32

    5

    10

    5

    25

    9

    6

    15

    15

    10

    5

    10

    15

    3

    4

    11

    15

    7..5

    +

    744

    744

    744

    744

    744

    744

    744

    744

    744

    495

    496

    496

    658

    668

    640

    690

    434

    496

    32

    640

    496

    660

    410

    200

    53568

    93744

    26784

    26784

    93744

    8s709

    13392

    25784

    13392

    44640

    16070

    L07L4

    36072

    36072

    23040

    72420

    L5624

    26784

    346

    92L6

    19642

    35640

    11070

    2880

    SUBJUMLAH

    A

    484.5

    31,6.5

    734730

    BU

    KOTA KECAMATAN

    (

    IKK

    MA. OENAEK

    MA. MA.

    BENU

    lA.DEPE

    MA. BOLOW

    GRAFITASI

    GRAFITASI

    GRAFITASI

    POMPA.GRAF.

    0

    -

    5

    5

    5

    SUBJUMLAH

    B

    Mengetahui,

    r

    Kupang,

    31 Januari

    2012

    oiliapkan

    oteh,

    -\,,,

    (

    SAMSUL

    BACHRI

    )

    Kasubag.

    Sumber

    &

    Lab.

    etol

    enE6-oarus

  • 8/18/2019 6TSI13118.pdf

    44/132

    KUPANG

    PEBRUARI

    2012.

    NAMA

    SUMBER

    AIR

    SISTIM

    KAPASITAS

    VOL

    PRODUKSI

    TERPASANG

    KONDISI

    SAAT INI

    JAM

    OPERASI

    L/Det

    L/Det

    JAM

    M3

    KABUPATEN

    KUPANG

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    1..

    15

    16

    17

    18

    19

    20

    27

    22

    23

    24

    IMA.

    OEPURA

    lro. rorroro

    lrvn.

    rnuro,-o

    lva.

    oruru

    lva. sacu r

    lro.

    soe

    , ,,

    lrva. nrr,lrupsr

    lrn.

    or*oer,re

    IMA. KOLHUA

    lrn.

    so*E*

    lrn. ro*rt

    Itu.

    s'*uro*o

    lsa.

    ortoNa

    r

    -rB.

    OETONA ll

    lse.

    *rmoe

    i,,uro

    lsB.

    Rss/LtLrBA

    ISB. NAMOSAIN

    SB. ALAK

    SB. PRAMUKA

    ISB. SMKK

    lro.

    or*rsu

    lse.

    eor-La r

    SB.

    POLLA

    II

    SB.

    PENFUITIMUR

    GRAFITASI

    GRAFITASI

    GRAFITASI

    GRAFITASI

    GRAFITASI

    GRAFITASI

    GRAFITASI

    GRAFITASI

    GRAFITASI

    POMPA-GRAF

    POMPA.

    ponapa-e

    nRr

    i.POMPA.

    POMPA.

    POMPA.

    POMPA.

    POMPA-GRAF

    POMPA.

    POMPA.

    POMPA.

    POMPA.GRAF

    POMPA.

    POMPA.

    POMPA.

    40

    75

    20

    15

    70

    70

    15

    10

    15

    25

    9

    6

    15

    15

    10

    5

    10

    15

    3

    4

    11

    15

    7.5

    4

    40

    35

    10

    10

    35

    32

    10

    10

    15

    25

    9

    6

    15

    15

    10

    5

    10

    15

    3

    4

    11

    15

    7.5

    4

    695

    696

    696

    696

    695

    696

    696

    596

    696

    s20

    464

    s60

    668

    668

    640

    690

    434

    496

    32

    640

    496

    660

    4to

    200

    100224

    87696

    25056

    25056

    87696

    80179

    25056

    25055

    37584

    46800

    15034

    12096

    36072

    36072

    23040

    12420

    7s624

    26784

    345.6

    9216

    79642

    35640

    11070

    2880

    SUBJ U

    M LA

    HA

    484.5

    351.5

    796338

    IBU

    KOTA KECAMATAN

    (

    IKK

    25

    26

    2'

    zlr

    MA.

    OENAEK

    MA.

    MA.

    BENU

    4A.DEPE

    MA. BOLOW

    GRAFITASI

    GRAFITASI

    GRAFITASI

    POMPA.GRAF.

    5

    10

    5

    5

    SUB] U M LA

    HB

    Kupang,

    29 PEBRUAR|

    2012

    (

    GEON

    GREGORIUS

    )

    Kabag. Teknik

    Di$iapkan

    oleh,

    (

    SAMSUL

    BACHRI

    )

    Kasubag.

    Sumber

    & Lab.

  • 8/18/2019 6TSI13118.pdf

    45/132

    DATA

    SUMBER

    AIR

    DAN KAPASITAS

    PRODUKSI

    PDAM.

    KAB.

    KUPANG

    TAHUN

    2012

    MARET 2012.

    NAMA SUMBER AIR

    srsTtM

    K,APASITAS

    VOL.

    PRODUKSI

    ERPASANG

    KONDISISAAT

    INI JAM OPERASI

    L/Det

    L/Det

    IAM

    M3

    KABUPATEN

    KUPANG

    I

    /

    3

    4

    5

    6

    7

    8

    9

    10

    11

    t2

    13

    1.._

    15

    16

    t7

    18

    19

    20

    2t

    22

    23

    24

    MA.

    OEPURA

    MA, BAUMATA

    MA. HAUKOLO

    MA. OELEU

    MA.

    SAGU

    I

    MA.

    SAGU

    II

    MA. AMNESI

    MA.

    DENDENG

    MA. KOLHUA

    MA. BONEN

    MA.

    TARUS

    SB.

    SIKUMANA

    SB.

    OETONA

    I

    ,,8.

    OETONA II

    I

    lsB.

    KELAPA LIMA

    lse.

    nss/lu-rsn

    I

    lsB.

    NAMOSATN

    lss. aLAr

    lsr. o*orr*o

    I

    lsB.

    sMKK

    lrva.

    orrursu

    lsr.

    oorro

    ,

    lss.

    por-LA

    rr

    Itu.

    rr*t,

    T'MUR

    GRAFITASI

    GRAFITASI

    GRAFITASI

    GRAFITASI

    GRAFITASI

    GRAFITASI

    GRAFITASI

    GRAFITASI

    GRAFITAST

    POMPA.GRAF.

    POMPA.

    POMPA.GRAF.

    POMPA.

    POMPA.

    POMPA.

    POMPA.

    POMPA-GRAF.

    POMPA.

    POMPA.

    POMPA.

    POMPA.GRAF.

    POMPA.

    POMPA.

    POMPA.

    40

    75

    20

    15

    70

    70

    15

    10

    15

    25

    9

    6

    15

    15

    10

    5

    10

    15

    3

    4

    11

    15

    7.5

    4

    40

    50

    10

    15

    35

    32

    15

    10

    15

    25

    6

    15

    15

    10

    5

    10

    15

    3

    4

    11

    15

    7.5

    4

    744

    744

    744

    744

    744

    744

    744

    744

    744

    774

    348

    714

    703

    703

    720

    720

    348

    348

    80

    720

    489

    720

    720

    271

    707736

    133920

    26784

    40176

    93744

    85709

    40t76

    26784

    40176

    64260

    11275

    15422

    37962

    37962

    25920

    12960

    1.2528

    18792

    864

    10368

    19364

    38880

     9440

    3902

    SUBJUMLAH A

    484.5

    3'16.s

    924505

    BU KOTA KECAMATAN

    (

    I

    :K)

    25

    26

    2'

    za'

    IMA.

    OENAEK

    I

    lMA.

    MA,

    BENU

    lA.DEPE

    rMA.

    BOLOW

    GRAFITASI

    GRAFITASI

    GRAFITASI

    POMPA-GRAF.

    5

    10

    5

    5

    SUBJUMLAH

    B

    Kupang,

    31

    Maret

    2012

    Dlsiapkan

    oleh,

    SAMSDI

    BACHRI

    Kasubag.

    Sumber

    &

    Lab.

  • 8/18/2019 6TSI13118.pdf

    46/132

    April2Ol2.

    NAMA SUMBER AIR

    SISTIM

    KAPASITAS

    VOL. PRODUKSI

    ERPASANG

    KONDISISAAT INI

    JAM

    OPERASI

    L/Det L/Det

    JAM

    M3

    KABUPATEN KUPANG

    7

    2

    3

    4

    5

    6

    7

    o

    o

    9

    MA,

    OEPURA

    MA. BAUMATA

    MA. HAUKOLO

    MA. OELEU

    MA. SAGU

    I

    MA.

    SAGU II

    MA. AMNESI

    MA, DENDENG

    MA. KOLHUA

    MA.

    BONEN

    MA.

    TARUS

    SB.

    SIKUMANA

    SB.

    OETONA I

    cB. OETONA ll

    SB. KELAPA LIMA

    SB, RSS/LILIBA

    SB.

    NAMOSAIN

    SB. ALAK

    SB.

    PRAMUKA

    SB.

    SMKK

    MA. OENESU

    SB, POLLA

    I

    SB.

    POLLA

    II

    SB.

    PENFUITIMUR

    GRAFITASI

    GRAFITASI

    GRAFITASI

    GRAFITASI

    GRAFITASI

    GRAFITASI

    GRAFITASI

    GRAFITASI

    GRAFITASI

    POMPA.GRAF

    POMPA.

    POMPA-GRAF

    POMPA.

    POMPA.

    POMPA.

    POMPA.

    POMPA.GRAF

    POMPA.

    POMPA.

    POMPA.

    POMPA.GRAF

    POMPA.

    POMPA.

    POMPA.

    ool

    ,51

    20

    15

    70

    70

    15

    10

    15

    25

    9

    6

    15

    15

    10

    5

    10

    15

    3

    4

    11

    15

    7.5

    4

    40

    60

    20

    15

    54

    52

    L5

    10

    15

    25

    I

    6

    15

    15

    10

    5

    10

    15

    3

    4

    11

    15

    7.5

    4

    720)

    l

    720)

    720

    720

    720

    720

    720

    720

    720

    697

    336

    697

    t07

    707

    710

    7LO

    336

    336

    80

    770

    650

    7to

    7LO

    266

    103680

    155520

    51840

    38880

    139968

    734784

    38880

    25920

    38880

    52730

    10886

    15055

    38178

    38178

    2s560

    12780

    12096

    18144

    864

    L0224

    25740

    38340

    19170

    3830

    SUBJUMLAH

    A

    484.5 435.5

    r-060128

    rBU KOTA KECAMATAN

    (

    B

    K)

    8

    MA.

    OENAEK

    MA, MA.

    BENU

    4A.DEPE

    MA.

    BOLOW

    GRAFITASI

    GRAFITASI

    GRAFITASI

    POMPA-GRAF.

    5

    1.0

    5

    5

    SUBJUMLAH B

    DATA SUMBER

    AIR DAN

    KAPASITAS

    PRODUKSI

    PDAM. KAB.

    KUPANG

    TAHUN

    2012

    Kupang,

    30

    April

    2012

    Kabag.

    Teknik

    Kasubag.

    Sumber &

    Lab.

    Mengetahuin

  • 8/18/2019 6TSI13118.pdf

    47/132

    DATA

    SUMBER AIR DAN

    KAPASITAS

    PRODUKSI

    PDAM.

    KAB. KUPANG

    TAHUN

    2012

    Mel2A12.

    Kupang,31

    Mei

    2012

    ')y

    Kasubag.

    Sumber

    & Lab.

    NAMA SUMBER AIR

    SISTIM

    KAPASITAS

    VOL.

    PRODUKSI

    ERPASANG

    KONDISISAAT INI

    JAM OPERASI

    L/Det

    L/Det

    JAM

    M3

    KABUPATEN

    KUPANG

    1l

    2l

    3l

    4l

    5

    6

    7

    8

    9

    MA.

    OEPURA

    MA.

    BAUMATA

    MA. HAUKOLO

    MA.

    OELEU

    MA. SAGU

    I

    MA. SAGU II

    MA, AMNESI

    MA. DENDENG

    MA.

    KOLHUA

    MA. BONEN

    MA.

    TARUS

    SB.

    SIKUMANA

    SB.

    OETONA I

    --8.

    OETONA II

    SB. KELAPA LIMA

    SB.

    RSS/LILIBA

    SB.

    NAMOSAIN

    SB.

    ALAK

    SB. PRAMUKA

    ISB.

    SMKK

    IMA.

    OENESU

    I

    ISB.

    POLLA

    I

    SB. POLLA II

    I

    lss.

    prNrrurIMUR

    GRAFITASI

    GRAFITASI

    GRAFITASI

    GRAFITASI

    GRAFITASI

    GRAFITASI

    GRAFITASI

    GRAFITASI

    GRAFITASI

    POMPA.GRAF

    POMPA.

    POMPA-GRAF

    POMPA.

    POMPA,

    POMPA.

    POMPA.

    POMPA.GRAF

    POMPA.

    POMPA.

    POMPA.

    POMPA-GRAF

    POMPA.

    POMPA.

    POMPA.

    40

    75

    20

    15

    70

    70

    15

    10

    15

    25

    9

    6

    15

    15

    10

    5

    10

    15

    3

    4

    11

    15

    7.5

    4

    40

    60

    2A

    15

    54

    52

    15

    10

    15

    25

    9

    5

    15

    15

    10

    5

    10

    15

    3

    4

    11

    15

    7.5

    4

    744

    744

    744

    744

    744

    744

    744

    744

    744

    723

    348

    72L

    7?3

    723

    720

    720

    348

    348

    80

    720

    406

    720

    120

    315

    707136

    1.60704

    53s58

    40776

    t44634

    139277

    40176

    26784

    40L76

    65070

    11275

    15574

    39042

    39042

    25920

    12960

    12528

    18792

    864

    10368

    16078

    38880

    19440

    4536

    SUBJUMLAH A

    484.5

    435.5

    1082999

    IBU KOTA KECAMATAN

    (

    IKK

    )

    IMA. OENAEK

    I

    lMA.

    MA.

    BENU

    IA.DEPE

    tMA. BOLOW

    GRAFITASI

    GRAFITASI

    GRAFITASI

    POMPA.GRAF.

    5

    10

    5

    5

    SUBJUMLAH B

  • 8/18/2019 6TSI13118.pdf

    48/132

    A4

  • 8/18/2019 6TSI13118.pdf

    49/132

    )

    6

    E

    o

    z4

    s;

    Zs

    E=

    -----/,

    '

    n/.'/'

    //'

    ,'J

    //

    f/

    /

  • 8/18/2019 6TSI13118.pdf

    50/132

    na Fi i

    '

    ?r

    ,

    HFi'itrri\

    r,

    i,

    l{ttlitlt[r,;

    r r

    lJJlrluLillLrrr

    lR

    IE

    lG.

    I o-

    rl

    I2

    :t

    q:

    rl

    Ei

    t-

    t"

    .q

    .;

    ;l

    ?r

    ?l:

    .l

    rl:

    ii

    d:

    .F

    rl

    rL

    ll'

    I

    I

    .l

    ,I

    t,

    +--

    1..,

    I

    aF

    :r llr

    :l

    rF

    ::

    .,4

    ii lr

    I

    .l

    1