61968 Messages (Part 3, 6, 8, 9) CIM University
Margaret Goodrich, Manager, Systems Engineering SISCO, Inc. 6605 19½ Mile Road Sterling Heights, MI 48314 USA Tel: +1-903-477-7176 Fax: +1-903-489-0063 E-Mail: [email protected]
Introduction • Information Model & Reference Model • Part 3 Network Operations
– Scope – Outage and FLISR Work Flows
• Part 6 Maintenance and Construction – Scope – Reference Model – Work Management System (WMS) Messages
• Part 8 – Scope – Reference Model – Customer Interface System (CIS) Work Flows
• Part 9 Meter Reading and Control – Scope – Reference Model – Metering Messages
Information Model for all Parts
• Classes for all Parts in the 61968 standard series are contained in IEC61968-Part 11 and IEC61970-301
• The classes and attributes may come from one or more of the packages contained in these documents.
WG14 Messaging Reference Model - Full
Key Outside the scope of 61968
61968 Part 9
Defined by other 61968 Parts
Service
Point
Metering System
Data Collection
Control and
Reconfiguration
[ 18 ]
[ 3 ]
Meter Maintenance
and
Asset Management
[ 2 ]
Meter
Data
Management
Customer
Information
and
Billing
[ 9 ]
[ 20 ]
[ 15 ]
{ 8 }
{ 14 }
[ 19 ]
[ 17 ]
{ 16 }
{ 11 }
Interface and protocol details of the
Service Point are outside the scope of
IEC 61968-9
[ 5 ]
[ 21 ]
[ 1 ]
Planning
and
Scheduling
[ 7 ]
[ 7 ][ 6 ]
[ 4 ]
[ 13 ]
[ 12 ]
{ 23 }
[ 22 ]
61968-3
61968-8
61968-5
[ 7 ][ 6 ]
[ 18 ]
[ 13 ]
{ 12 }
{ 12 }
[ 1 ] Account information
[ 2 ] Configuration, installation etc.
[ 3 ] Controls and signals
[ 4 ] Customer data set
[ 5 ] Data obtained by special read
[ 6 ] Demand response signals
[ 7 ] Disconnect/reconnect, demand reset
{ 8 } Install, remove, repair, disconnect, reconnect
[ 9 ] Load curves, Measurement history, etc.
[ 10 ] Load scenarios
{ 11 } Meter health and tamper detection
{ 12 } Meter history
[ 13 ] Meter readings
{ 14 } Meter service request
[ 15 ] On request read
[ 16 ] Outage and restoration verification
[ 17 ] Power reliability and quality events
[ 18 ] Readings, events and status
[ 19 ] Special read
[ 20 ] Tariffs, parameters
[ 21 ] Transaction information
[ 22 ] Transaction records
{ 23 } Tokens
Network
Operations
Work
Management
61968-6
Outage
Management
61968-3
[ 3 ]
Point
of
Sale
61968-10
[ 12 ]
{ 14 }
Load
Management
System
Load Analysis
Load Control
[ 10 ]
End-to-End Use Cases and Messages
Use Cases:
1. Initialize network
2. Non-telemetered fuse trips
3. Telemetered breaker trips
4. Tap for new subdivision
5. Maintenance on transformer
6. Meter replacement
Normal
State
Normal
State
Normal & asset
changes
Proposed normal
changes
Recommended normal
changes
Build Switching
Plan
Substation
IED
IED
IED
Device out &
fault dataDevice out &
fault data
Meters
down
Device out &
fault dataDevice Out
Device out
Energize
Switching Plan to energize
Fault location isolation steps
Restoration steps
AMI/
MDM
SCADA
OMS DMS
GIS Planning
Predict to
outage device Current
State
Current
State
Normal
State
Normal
StateCIS
WMS
MWF
Meter service
request
Meter service
order
Meter info &
complete
status
WMS
MWF
Isolation Steps
FLISR = Fault Location, Isolation,
and Restoration
Scope:
A - Outage Management
B - Network Model Synchronization
C - Maintenance
IEC61968 2011 Scope
Work
order
Current
State
Part 3 Scope
• An outage can be detected by: – AMI – Customer Call – Field Crew – SCADA
• An outage must be communicated between network operations systems, including trouble location, devices in abnormal state, and customers affected.
• Other Network Operations Fault Location, Isolation, and Supply Restoration (FLISR). – Fault location refers to the observations, signals, and analysis
necessary to identify the true cause of the outage. – Isolation is the process of switching and cutting that allows the fault
location to be safely isolated for repairs. – The process of restoring power to healthy islands of network around
the isolated area is referred to as supply restoration. • Other areas will be added to Part 3 as Use Cases are defined.
Outage Notification from a Field Crew
sd Outage Notification from Field Crew
«Fault Mgmt»
Part 3 - Network
Operation::NO-FLT
«Outage Analysis»
Part 3 - Network
Operation::NO-OA
«Trouble Call M...
Part 8 - Customer
Support::CS-TCMField Crew
Report Outage()
Created(Outage)
Created(Outage)
Outage Notification from a Field Crew
from to message description/payload
Field
Crew
NO-OA Report Outage
Field crew reports confirmed outage at known
location.
NO-OA NO-FLT Created
Outage
Notification of predicted outage at a specific
protective device in the network. This is a
confirmed protective device outage because it is
reported by a crew.
Payload:
- Protective Device ID
- Time of outage
- Status of device (phases on)
NO-OA CS-
TCM
Created
Outage
Notification of the customers out due to an outage.
Payload:
- Customer ID and time of outage for each
customer out.
- Estimated time of restoration of the outage.
Outage Notification from an AMI
sd Outage Notification from Meters
«Fault Mgmt»
Part 3 - Network
Operation::NO-FLT
«Outage Analysis»
Part 3 - Network
Operation::NO-OA
«Trouble Call M...
Part 8 - Customer
Support::CS-TCM
«AMI»
Part 9 - Meter
Reading and
Control::MR-AMIField Crew
Created(EndDeviceEvent)
Confirm Outage()
Outage Confirmed()
Created(Outage)
Created(Outage)
Outage Notification from an AMI from to message description/payload
MR-AMI NO-OA Created
EndDeviceEvent
AMI notifies of power off event at meter.
Payload: Meter ID, new meter status, and timestamp for change in meter
status.
NO-OA Field
Crew
Confirm Outage
Request field crew to confirm outage location.
Field
Crew
NO-OA Outage Confirmed
Field crew confirms outage location.
NO-OA NO-FLT Created
Outage
Notification of a confirmed outage at a specific protective device in the
network.
Payload:
- Protective Device ID
- Time of outage
- Status of device (phases on)
- Confirmed status (yes in this case)
NO-OA CS-TCM Created
Outage
Notification of the customers out due to an outage.
Payload:
- Customer ID and time of outage for each customer out.
- Estimated time of restoration of the outage.
Outage Notification from a Customer
sd Outage Notification from Trouble Call
«Trouble Call M...
Part 8 - Customer
Support::CS-TCM
«Fault Mgmt»
Part 3 - Network
Operation::NO-FLT
«Outage Analysis»
Part 3 - Network
Operation::NO-OA Field Crew
Created(Outage)
Confirm Outage()
Outage Confirmed()
Created(Outage)
Updated(Outage)
Outage Notification from a Customer from to message description/payload
CS-TCM NO-OA Created
Outage
Notification of customer-reported outage.
Payload:
- ID and time of outage for each customer.
NO-OA Field
Crew
Confirm Outage
Request field crew to confirm outage location.
Field
Crew
NO-OA Outage Confirmed
Field crew confirms outage location.
NO-OA NO-FLT Created
Outage
Notification of a confirmed outage at a specific protective
device in the network.
Payload:
- Protective Device ID
- Time of outage
- Status of device (phases on)
- Confirmed status (yes in this case)
NO-OA CS-TCM Updated
Outage
Notification of the customers out due to an outage.
Payload:
- Customer ID and time of outage for each customer out.
- Estimated time of restoration of the outage.
Part 6 Scope
• Specifies the information content for messages used to support business functions related to Maintenance and Construction.
• Typical uses of Part 6 messages include: – Planned Maintenance (Work Request)
– Meter Change Out (Service Order)
– Device Maintenance (Maintenance Order)
• Message types defined in other Parts of IEC61968 may also be relevant to these use cases.
Part 6 Reference Model
Operational
Planning &
Optimization
Network Operation
Simulation
(OP-SIM)
Network Operations
Fault Management
(NO-FLT)
Maintenance &
Construction - Field
Recording
(MC-FRD)
Mobile Workforce
[ 10 ]
[ 12 ]
Network Monitoring
NO-NMON
[ 1 ]
Customer Support
(CS)
Customer Service
CSRV
[ 11 ] Available / Used Materials
[ 12 ] Bill Of Materials / Material Status
[ 13 ] Crew Composition
[ 14 ] Actual Labor Cost
[ 15 ] Failure Event
[ 16 ] New/Updated or get Asset
[ 17 ] Special Read Request / Response
[ 18 ] Install, Remove, Repair, Connect and Disconnect
[ 19 ] Meter History
[ 20 ] Map
[ 21 ] Outage Notification from Field Crew
[ 22 ] Outage Confirmation Request
[ 1 ] SCADA Measurements, failures, conditions
[ 2 ] Switching Plan
[ 3 ] Request for Service
[ 4 ] Materials Reservation
[ 5 ] Request for Planned Maintenance/Inspection Work
[ 6 ] Request for Unplanned Work
[ 7 ] Follow-up Work
[ 8 ] Switching Order
[ 9] Work Request from Network Operations
[10 ] Work Order
[ 11 ]
[ 7 ]
[ 3 ]
Records & Asset
Management (AM)
General Inventory
Management (GINV)
Equipment hierarchy
[ 13 ]
[ 6 ]
Work Mgt Planning
[ 5 ]
Materials
Management
Crew
Composition
[ 4 ]
[ 16 ]
[ 2 ]
61968 Part 6
Defined by other 61968 Parts
Key
[ 14 ]
[ 8 ]
{ 15 }
Scheduling & Dispatch
[ 13 ]
[ 10 ]
Maintenance & Construction
Maintenance and Inspection
(MC-MAI)
Preventive Maintenance
Conditional Maintenance
[ 9 ]
Meter Reading &
Control
(MR&C)
[ 17 ]
[ 18 ]
{ 19 }
[ 20 ]
[ 12 ]
[ 12 ]
[ 16 ]
[ 10 ]
[ 21 ]
[ 22 ]
Part 6 Business Functions and Components Business Functions Business
Sub-Functions
Abstract Components
Maintenance and
Construction (MC)
Maintenance and Inspection
(MAI)
Maintenance Orders
Maintenance Rules
Inspection/Maintenance History
Work Procedures
Construction (CON) Work Flow
Cost Reconciliation
Work Approval
Permits
Customer Billing
Tracking
Project Costing
Design (DGN) Construction Engineering
Estimating
Bill of Materials
Compatible Units
Field Recording (FLD) As-built Reporting
Time Reporting
Asset Condition
Scheduling and Dispatching
(SCHD)
Resource Management
Work Planning
Work Allocation
Material Requisitioning
Planned Maintenance Use Case
• Triggered by maintenance and inspection, or by periodic schedule for work.
• Example activity is tree trimming or major maintenance on a power transformer.
• Uses Work Request message
Planned Maintenance Use Case
sd Carry out planned maintenance with temporary equipment
Part 6 - Maintenance
and
Construction::MC-MAI
«Work Sched & Di...
Part 6 - Maintenance
and
Construction::MC-SCHD
«Subst. & Network ...
Part 4 - Records and
Asset
Management::AM-EINV
«Geographic Inv.»
Part 4 - Records and
Asset
Management::AM-GINV
«Field Recording»
Part 6 - Maintenance
and
Construction::MC-FRD
«Network Ctrl»
Part 3 - Network
Operation::NO-CTL
Create(WorkRequest)
Create(OutageBooking)
Created(BookedOutage)
Create(MaintenanceOrder)
Get(Map)
Reply(Map)
Get(Asset)
Reply(Asset)
Create(MaintenaceOrder)
Execute(WorkOrder)
Changed(MaintenanceOrder)
Close(MaintenanceOrder)
Closed(WorkRequest)
Work Request Message
Meter Change Out Use Case
• May include one or more Meter Service Work items
• Each item may refer to a max of two meters to provide a means to replace a meter.
• Meter readings can be obtained as a part of the work.
• A Meter Service Request occurs due to:
– Change out a Meter due to a Problem (Alarm, Complaint or other event)
– Change out a Meter for Recalibration
Meter Change Out Use Case
• When a Meter Change-Out is performed the following steps must occur: – Send a MeterServiceRequest to the WMS
– Send a Meter Technician to:
• Take the final Meter Reading
• Remove the old Meter
• Install the new Meter
• Take the new Meter Reading
– The following messages are sent/received to Configure the Meter:
• EndDeviceConfig
• CustomerMeterDataSet
• MeterConfig
• MeterReadSchedule
Change-Out Meter Work Flow
Service Order Message
Part 8 Scope
• Specifies the information content for messages used to support business functions related to Customer Service and Trouble Call Management.
• Typical uses of Part 8 messages include:
– Trouble Ticket
– Incident Information
– Service Request
– Customer Agreement
• Message types defined in other Parts of IEC61968 may also be relevant to these use cases.
Part 8 Reference Model
Part 8 Customer Support (CS)
Customer
service (CSRV)
Trouble Call
Management
(TCM)
(3) Trouble Call
Management
(NO)
(6) Maintenance
and construction
(MC)
Other Systems
61968 Parts 3-9
(1) (2) (3) (5)
1. Trouble Ticket
2. Incident Information
3. Service Request
4. Work Request
5. Customer Agreement
6. Service Request
(4)
(6)
Part 8 Business Functions and Components Customer Support (CS)
Customer service (CSRV)
Service requests
Construction billing inquiry
Billing inquiry
Work status
Self-service inquiry
Customer connection
Turn on, turn off
Line losses
Service level agreements
Customer information analysis
Customer Information
management
Customer relationship
management
Trouble call management (TCM) Outage calls
Power quality
Planned outage notifications
Media communication
Performance indices
Restoration
projection/confirmation
Outage history
Point of sale (POS)
Trouble Ticket Use Case
sd Trouble Ticket
CS-TCM
(from Approved Actors)
NO-FLT
(from Approved Actors)
Call taker takes all
the relevent info
from the customer
and enters the
calls in the call
tracking
application()
Created(TroubleTicket)
Obtain connectivity topology ()
Reply(TroubleTicket)
Trouble Ticket XSD
Incident Information Use Case
sd Incident Information
NO-FLT
(from Approved Actors)
CS-CSRV
(from Approved Actors)
Update(IncidentInformation)
Update associated trouble ticket()
Incident Information XSD
Service Request Work Flow
sd Serv ice Request
MC-SCHD
(from Approved Actors)
CS-TCM
(from Approved Actors)
Customer or person creates a
service request()
CreatedServiceRequest()
Service Request XSD
Customer Agreement Use Case
sd Customer Agreement
Customer Support
(from Approved
Actors)
EXT-SAL
(from Approved
Actors)
CreatedCustomerAgreement()
Customer Agreement XSD
Part 9 Scope
• To Define the exchange of information between a Metering System and other systems within the Utility enterprise
• Specifies the information content of a set of message types that can be used to support many of the business functions related to Meter Reading and Control.
• Typical uses of the message types include: – Meter Event Messages
– Meter Control Messages
– Meter Reading Messages
Part 9 Scope
Enterprise
Applications
Head End
SystemsPAN
PAN
Device
PAN
Device
PAN
PAN
Device
PAN
Device
Meter
Meter or
Gateway
Meter or
Gateway
PAN
Device
Utility
Enterprise Integration
Infrastructure
(e.g. ESB, SOA, …)
Standard or Proprietary
Communication
Infrastructures
Messages defined by IEC
61968-9 and based upon
IEC CIM, conveyed using a
variety of integration
technologies
IEC 61968-9 Messages
Messages defined by
relevant standards or
vendors. May use a wide
variety of communication
technologies
Messages defined
by PAN/HAN
specifications
Mappings, translations
and/orforwardiing as
needed Mapping, translations
and/or forwarding as
needed
Customer
Customer
Customer
Area of Direct Impact
using IEC 61968-9
Area Causally/Indirectly
Impacted by or impacting
IEC 61968-9
Part 9 Reference Model - Partial
Key
Service
Point
Metering System
Data Collection
Control and
Reconfiguration
Readings, events
and status
Controls and signals
Meter
Data
Management
Scheduled
Read
Interface and protocol details of the
Service Point are outside the scope of
IEC 61968-9
Outside the scope of 61968
61968 Part 9
Defined by other 61968 Parts
Scheduled
Read
Tokens
Network
Operations
61968-3
Scheduled
Read
Customer
Information
and
Billing
61968-8
Exchange
Portal
Scheduled
ReadPeak
Price
(1)
Peak
Price (1)Load
Reduction
Peak
Price (1)
Load
Reduction
Peak
Price
(2)
Meter
Administration
Part 9 Reference Model
• The Reference Model provides examples of the logical components and data flows related to this standard.
• The Meter is treated as an “end device”
• An End Device: – Has a unique identity
– Is managed as a physical asset
– May issue events
– May receive control requests
– May collect and report measured values
– May participate in utility business processes
• The Reference Model describes the flows between the components.
Part 9 Business Functions and Components Business Functions Business
Sub-Functions
Abstract Components
Meter Reading and Control (MR) Metering System (MS) Data collection
End point controls
End point reconfiguration
Disconnect/reconnect
Demand reset
On request read
Point of sale
Outage detection and restoration verification
Power reliability and quality events
Metering system events
Meter Maintenance and Asset Management End point install, configure, remove, repair,
disconnect, reconnect
End point asset history
End point reconfiguration
Special read
Meter service request
Tariffs
Meter Data Management (MDM) Meter data repository
Usage history
Validation, estimation and editing
Customer billing data
End device controls and events
Demand Response
(DR)
Real-time pricing
Emergency reductions
Economic reductions
Program registration
Load Management (LM) Load analysis
Load control
Demand response
Performance measurements
Risk management
Part 9 Metering Messages
• There are currently 63 Metering Messages
• End Device Event Messages (includes PAN Messages)
• End Device Control Messages (includes PAN Messages)
• Meter Reading Messages
EndDeviceEvent Messages
• EndDeviceEvent Messages Convey events related to:
– Sustained and Momentary Outage Detection
– Low and High Voltage Threshold Detection
– Meter Health
– Tamper Detection
– Revenue Event
EndDeviceEvent Use Case for Outage Detection Event
EndDeviceEvent Message
EndDeviceEventType Enumerations
• EndDeviceEventType enumerations defines the event using four parts:
EndDeviceEventType := <EndDeviceType>.<EndDeviceDomain>.<EndDeviceSubdomain>.<EndDeviceEventorAction>
Where:
<EndDeviceType> = a numeric value from the EndDeviceType enumeration. Example: 3 is Electric Meter, 5 is a Gateway, 12 is a PAN Device, etc.
<EndDeviceDomain> = a numeric value from the EndDeviceDomain enumeration. Example: 26 is Power, 15 is Load Control, etc.
<EndDeviceSubdomain> = a numeric value from the EndDeviceSubdomain enumeration. Example: 0 is N/A, 28 is Power Quality, etc.
<EndDeviceEventorAction> = a numeric value from the EndDeviceEventorAction enumeration. Example: 85 is Failed, 81 is Opted-Out, etc.
Message Organization – Event Type Enumerations
EndDeviceEventType Description
3.26.0.85 Power off alarm
3.26.0.216 Power on
3.26.38.150 Low voltage
3.26.38.93 High voltage
3.26.38.37 Voltage Imbalance Cleared
3.12.1.38 Unauthorized Access attempt
3.12.0.257 Tamper detection
3.8.0.215 Demand reset occured
3.31.0.68 Disconnected
3.31.0.42 Connected
EndDeviceEvent XML Message Example Meter Power Off Event: Electric, Power, N/A, Failed
<ns1:EndDeviceEvents
xmlns:ns1="http://iec.ch/TC57/2011/EndDeviceEvents#">
<ns1:EndDeviceEvent>
<ns1:createdDateTime>2009-11-04T18:52:50.001-
05:00</ns1:createdDateTime>
<ns1:EndDeviceEventType ref=“3.26.0.85”/>
<ns1:description>Power off alarm</ns1:description>
<ns1:Assets>
<ns1:mRID>3dc53ee5-777e-50b4-8699-
a1c224f45f3d</ns1:mRID>
<ns1:Names>
<ns1:name>Meter23253</ns1:name>
</ns1:Names>
</ns1:Assets>
</ns1:EndDeviceEvent>
</ns1:EndDeviceEvents>
End Device Control Messages
• The EndDeviceControl message issues control commands related to:
– Load Control
– Demand Reset
– Connect/Disconnect
– Real-Time Pricing
EndDeviceControls Use Case – Remote Disconnect
EndDeviceControls Message
EndDeviceControlType Enumerations
• EndDeviceControlType enumerations defines the event using four parts:
EndDeviceControlType := <EndDeviceType>.<EndDeviceDomain>.<EndDeviceSubdomain>.<EndDeviceEventorAction>
Where:
<EndDeviceType> = a numeric value from the EndDeviceType enumeration. Example: 3 is Electric Meter, 5 is a Gateway, 12 is a PAN Device, etc.
<EndDeviceDomain> = a numeric value from the EndDeviceDomain enumeration. Example: 31 is RCDSwitch, 26 is Power, 15 is Load Control, etc.
<EndDeviceSubdomain> = a numeric value from the EndDeviceSubdomain enumeration. Example: 0 is N/A, 28 is Power Quality, etc.
<EndDeviceEventorAction> = a numeric value from the EndDeviceEventorAction enumeration. Example: 23 is Disconnect, 85 is Failed, 81 is Opted-Out, etc.
Message Organization – Control Type Enumerations
EndDeviceControlType Description
3.8.0.214 Demand reset
3.15.6.242.0 Load control started
3.15.6.243.1 Load control stopped
3.31.0.18 Close remote Connect/Disconnect Switch
3.31.0.22 Disable RCD Switch
3.31.0.23 Open remote connect/disconnect switch
3.31.0.26 Enable RCD switch
3.20.9.82 Price signal
EndDeviceControl XML Message Example - Meter Disconnect by Group: Electric, RCD Switch, N/A, Disconnect
<?xml version="1.0" encoding="UTF-8"?>
<!--Scheduled Disconnect on an End Device Group-->
<m:EndDeviceControls
xsi:schemaLocation="http://iec.ch/TC57/2010/EndDeviceControls#
EndDeviceControls.xsd" xmlns:m="http://iec.ch/TC57/2010/EndDeviceControls#"
xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance">
<m:EndDeviceControl>
<m:type>3.31.0.23</m:type>
<m:EndDeviceGroup>
<m:mRID>3dc53ee5-777e-50b4-8699-
a1c224f45f3d</m:mRID>
</m:EndDeviceGroup>
<m:scheduledInterval>
<m:start>2011-05-05T09:30:00.0Z</m:start>
</m:scheduledInterval>
</m:EndDeviceControl>
</m:EndDeviceControls>
Meter Reading Messages
• Examples of these types of Messages are:
– MeterReadSchedule
– MeterReading Message for the following types of requests: • Manual MeterRead
• On-Request/On-Demand Meter Read
• Historical Meter Data Access
• Billing Inquiry
• Bulk Readings
MeterReadings Message
• MeterReadings message allows for:
– Readings from one or more meters
– Reading values each have an associated reading type, timestamp and value
– Many Quality values can be associated with each reading value
– Readings can be supplied in the form of interval blocks if the common reading types are grouped together.
– Event Histories are returned with meter readings.
MeterReadings Message
• The request for meter reading should specify:
– A meter or group of meters
– A type of reading to collect
– A frequency
– A Duration of interest
• The scheduled frequency may consist of regular or irregular periods.
MeterReadings Message
• The MeterReadings request may be initiated by any of the following:
– The CIS (in an effort to collect billing determinants).
– A Planning and Scheduling application (in an effort to acquire engineering data about the distribution network).
– An OMS (in order to verify if a customer is affected by an outage or has been restored)
– An MDM system (in an effort to broker data for any or all of the above applications).
– The MS itself may also directly initiate a meter read
MeterReadings Use Case - Billing Inquiry
MeterReadings Message
Questions & Contacts
• Margaret Goodrich –
–Home Office: 903-489-1494
–Cell: 903-477-7176
–Email: [email protected]