Scope of Work for BSNL GSM 14.37M

ZTE Confidential Proprietary © 2011 ZTE Corporation. All rights reserved.

Table of Contents

1  Share of Responsibilities ...................................................................... 1 

Page 3: 6.1 ZTE_Scope of Work for BSNL GSM 14.37

7/27/2019 6.1 ZTE_Scope of Work for BSNL GSM 14.37

http://slidepdf.com/reader/full/61-ztescope-of-work-for-bsnl-gsm-1437 3/30

Scope of Work for BSNL GSM 14.37M

ZTE Confidential Proprietary © 2011 ZTE Corporation. All rights reserved. 1

Share of Responsibilities

This document summarizes the tasks to be performed for theProject Implementation of BSNL GSM/UMTS14.37M line project. Itincludes planning, supply, delivery, installation, supervision and

commissioning, 

,, 

, 

swap, redeployment of the works included in the

scope of the project as well as related services and procedures tobe fulfilled to ensure the proper implementation within the plannedtime schedule.

Main parties involved in the project are Purchaser (BSNL) and ZTE.If another party will be involved as subcontractor or supplier, theresponsibility of related supply/task remains with the main partyPurchaser (BSNL) or ZTE who requires the involvement of this otherparty.

For the tasks lists below the responsibility can be with:

Prime Responsibility, Purchaser (BSNL) or ZTE: respective column

marked ‘R’.

Support Responsibility, Purchaser (BSNL) or ZTE: respective

column marked ‘S’ 

If any note or additional information is included, it will be referred to

by a note number.

Page 4: 6.1 ZTE_Scope of Work for BSNL GSM 14.37

7/27/2019 6.1 ZTE_Scope of Work for BSNL GSM 14.37

http://slidepdf.com/reader/full/61-ztescope-of-work-for-bsnl-gsm-1437 4/30

Scope of Work for BSNL GSM 14.37M

ZTE Confidential Proprietary © 2011 ZTE Corporation. All rights reserved. 2

Table 1: Share of Responsibilities

0. SummaryZTE BSNL

  Project Management R S

 Network Design / Network Planning

R S

 Customer Logistics

R S

 Site Acquisition

S R

 Construction Works

R  

 Implementation

R S

  BTS Implementation R S

 Core Implementation

R S

AMC ImplementationR S

1. Project Start-UpZTE BSNL

Issue of firm PO with BOM & list of sites etc(architecture ofexisting network, technical specifications of existingnetwork elements etc) to ZTE

R

 

Setting up of project Office & Required Infrastructure forProject Management R

 

Page 5: 6.1 ZTE_Scope of Work for BSNL GSM 14.37

7/27/2019 6.1 ZTE_Scope of Work for BSNL GSM 14.37

http://slidepdf.com/reader/full/61-ztescope-of-work-for-bsnl-gsm-1437 5/30

Scope of Work for BSNL GSM 14.37M

ZTE Confidential Proprietary © 2011 ZTE Corporation. All rights reserved. 3

 

Prepare & submit Project Plan, Quality plan, ResourcePlan, Acceptance procedure, Implementation Plan &Communication plan

R  

 

Approve for Project Plan, Quality plan, Resource Plan,

Acceptance procedure, Implementation Plan &Communication plan R

 Prepare signaling network plan

R S

 Approve signaling network plan

R

 Provide signaling specification for the PSTN (PublicSwitched Telephone Network)

R

 Obtain import licenses for supplied technology equipment

S R

 Obtain license for testing & measuring equipment

R S

 

Provide detailed existing network coverage maps , 

,, 

,  data,

and detail site information(latitude, longitude, type oftower, height etc)

R

 Provision of Addresses for all Acquired Sites requiring SiteInspection and Line of Sight Survey

R

 Arrange for and provide frequency allocation permits

R

 Arrange for and provide microwave frequency allocationpermits

R

2. Project Management   

  Overall Project Management ZTE BSNL

 Prepare Project Plan

R  

Page 6: 6.1 ZTE_Scope of Work for BSNL GSM 14.37

7/27/2019 6.1 ZTE_Scope of Work for BSNL GSM 14.37

http://slidepdf.com/reader/full/61-ztescope-of-work-for-bsnl-gsm-1437 6/30

Scope of Work for BSNL GSM 14.37M

ZTE Confidential Proprietary © 2011 ZTE Corporation. All rights reserved. 4

 Approve Project Plan

R

 Define escalation and emergency action procedures for 3rdparty equipment (not supplied by ZTE)

RS

 

Propose procedures for communication, reporting(including fault reporting), meetings, escalation,emergency action, risk management, and information flow

R  

 

Agree on procedures for communication, reporting(including fault reporting), meetings, escalation,emergency action, risk management, and information flow

R

 

Follow procedures for communication, reporting(including fault reporting), meetings, escalation,emergency action, risk management, and information flow

R S

 Define procedure for identifying and implementing changesto the project

R  

 

Provide approval and input to change identification where

applicableR

 Provide access to customer's premises for ZTE & ZTEsubcontractor's personnel

R

 Handle faulty hardware

R S

 Plan and manage SW upgrades during Implementationphase

R  

 Provide Project Management Planning & Tracking tool(window based)

 Approve for the Provided tool & provide the login detailsfor people to extend rights.

R

 Furnishing of the Planned & actual data in the projectmanagement tool R S

3. Logistics   

 Equipment Delivery / Import / Logistics ZTE BSNL

Page 7: 6.1 ZTE_Scope of Work for BSNL GSM 14.37

7/27/2019 6.1 ZTE_Scope of Work for BSNL GSM 14.37

http://slidepdf.com/reader/full/61-ztescope-of-work-for-bsnl-gsm-1437 7/30

Scope of Work for BSNL GSM 14.37M

ZTE Confidential Proprietary © 2011 ZTE Corporation. All rights reserved. 5

 Issue written and firm Purchase Orders for ZTE HW, SWand Services

R

 Ordering of 3rd party equipment (not manufactured by ZTE) R

 

Ensuring the 3rd party equipment availability forinstallation according to rollout schedule R

 Preparing Import documents and Import clearance

R S

 

Delivery of equipment to CustomsR

 Transport Insurance to Customs

R

 Obtaining import licenses and other required documents toimport the products into the country

S R

  Customs clearance procedure R S

 

Insurance in CustomsR

 Payment of customs duties for equipment

R

 Payment of other local taxes (VAT) and fees

R

 Delivery of equipment from Customs to warehouse

R S

Transport Insurance from Customs to warehouseR

 Receiving of the material at the warehouse and providingproof of delivery

S R

 Storage of equipment, inbound/outbound handling at thewarehouse/Drop Off Point

R R

Page 8: 6.1 ZTE_Scope of Work for BSNL GSM 14.37

7/27/2019 6.1 ZTE_Scope of Work for BSNL GSM 14.37

http://slidepdf.com/reader/full/61-ztescope-of-work-for-bsnl-gsm-1437 8/30

Page 9: 6.1 ZTE_Scope of Work for BSNL GSM 14.37

7/27/2019 6.1 ZTE_Scope of Work for BSNL GSM 14.37

http://slidepdf.com/reader/full/61-ztescope-of-work-for-bsnl-gsm-1437 9/30

Scope of Work for BSNL GSM 14.37M

ZTE Confidential Proprietary © 2011 ZTE Corporation. All rights reserved. 7

 Approval of the test equipments tools to be used

R

 Definition of the post-processing tools to be used (in casea common platform is requested by the Customer)

R  

  Accept of the post-processing tools to be used R

 Definition of Verification & Acceptance Methodology

R  

 

Approval of Verification & Acceptance MethodologyR

 Radio Planning ZTE BSNL

 Definition of Verification of Objective Documents (clusterspecific)

R  

 Approval of Verification of Objective Documents (clusterspecific)

R

 Delivery of terrain maps R  

 Digitalization of maps

R  

 CW Test

R  

 Model tuning

R  

 Development of nominal cell plan and RF Design

R  

 Developing nominal plan for new towns which will bedemarked for ZTE will form a cluster

R  

 Approve the nominal cell plan

R

 Provide Search Rings

R  

Page 10: 6.1 ZTE_Scope of Work for BSNL GSM 14.37

7/27/2019 6.1 ZTE_Scope of Work for BSNL GSM 14.37

http://slidepdf.com/reader/full/61-ztescope-of-work-for-bsnl-gsm-1437 10/30

Scope of Work for BSNL GSM 14.37M

ZTE Confidential Proprietary © 2011 ZTE Corporation. All rights reserved. 8

 Complete Objective Definition Documents (cluster specific)

R  

 Approve the Objective Definition Documents (clusterspecific)

R

  Site survey for all RF sites, includes mutual sharing ofresources, tools & logistics R S

 Preparation of Frequency Plan, Hand-off details, Neighborlist etc.

R  

 Forward Link versus Reverse Link Limitation in terms ofrange to be provided

R  

 Submission of below listed BTS Site data:

 

 a) Number of channel elements

R S

 b) Effective radiated power

R S

 c) Antenna radiation centre above ground level R S

 d) Sector/Omni antennas and directions

R S

 e) Acceptable Feeder loss

R S

 f) Antenna patterns

R S

 g) Down tilt angle, built in or man made

R S

 h) Coverage & Interference Maps (Soft copies)

R S

 i) ZTE Global Parameters Justification, power based onLink Budget

R  

 RF design parameters, RF Database Implementation as perinputs from BSNL.

R  

Page 11: 6.1 ZTE_Scope of Work for BSNL GSM 14.37

7/27/2019 6.1 ZTE_Scope of Work for BSNL GSM 14.37

http://slidepdf.com/reader/full/61-ztescope-of-work-for-bsnl-gsm-1437 11/30

Scope of Work for BSNL GSM 14.37M

ZTE Confidential Proprietary © 2011 ZTE Corporation. All rights reserved. 9

 

Provide coverage exception boundaries range for a Swaptown. After deployment of ZTE BTS, the acceptance will bebased on comparison of pre-Post drive test

S R

 

Submission of Final Radio Network Design documentsR  

 Approval of Verification & Acceptance of Network Design

 R

 Network Planning for SWAP & Redeployment sites ZTE BSNL

 Provide current network design with detail productinformation (Details of Existing Swap sites)

R

 Provide all relevant site information R

 Review all relevant site information R S

 

Prepare the new site RF layout with the relevant

documentation (decoupling, newantennas/cabling/branching)

R  

 Approve the new site RF layout R

 Prepare the transmission/capacity expansion (if needed) R  

  Accept the transmission/capacity expansion project R

 Provision of Network Plan/ Layout Plan, Cable Laying List,DDF Plan (new equipment)

R  

 Provision of Routing Plan, Numbering Plan (existingequipment)

R

  Provision of Routing Plan, Numbering Plan (newequipment) R  

 Propose the databases default parameter settings R  

Page 12: 6.1 ZTE_Scope of Work for BSNL GSM 14.37

7/27/2019 6.1 ZTE_Scope of Work for BSNL GSM 14.37

http://slidepdf.com/reader/full/61-ztescope-of-work-for-bsnl-gsm-1437 12/30

Scope of Work for BSNL GSM 14.37M

ZTE Confidential Proprietary © 2011 ZTE Corporation. All rights reserved. 10

 Accept the databases default parameter settings R

 Definition of the test & Analysis equipments tools to beused

R  

  Approval of the test & Analysis equipments tools to beused R

 Site visit and engineering survey R

 

 Backup the existing OMC data R

 Finalization of drive routes R  

 Acceptance of drive routes R

 drive test for existing site ( Pre- cut) R

 

 Implement site swapping R

 

 Drive test for all ZTE site (Post - cut) R

 

 Processing the Drive Test data R

 

 Compare (Pre-& Post ) both the Drive test result andprepare the report

 Approval of Compare(Pre-Post ) Network ElementAcceptance Certificates

R

 New site    

 Regular Drive Tests of in-service sites R  

 Validation of need for additional/new sites for coverage orcapacity purposes proposed by BSNL

R  

Page 13: 6.1 ZTE_Scope of Work for BSNL GSM 14.37

7/27/2019 6.1 ZTE_Scope of Work for BSNL GSM 14.37

http://slidepdf.com/reader/full/61-ztescope-of-work-for-bsnl-gsm-1437 13/30

Scope of Work for BSNL GSM 14.37M

ZTE Confidential Proprietary © 2011 ZTE Corporation. All rights reserved. 11

 RF Optimization and Drive Test of the cluster, whenevernew sites or new carriers are added to an existing BTS site

R  

 Submission of RF Optimization report , with specificrecommendations

R  

 

Carrying out recommended physical changes at the BTSsite (antennae tilts, orientation, heights & related changesetc.)

R  

  Carrying out recommended parameter changes at the OMC R  

 Accept the Recommended changes & databases defaultparameter settings

R

 Submit the Final Coverage AT report R  

 Accept the Final Coverage AT report R

 

Transmission Planning ZTE BSNL

 Delivery of terrain maps

R  

 Digitalization of maps

R  

 Perform path survey

R  

 Prepare the nominal transmission plan

R  

 Approve the nominal transmission plan

R

 Core Network Planning ZTE BSNL

 Provide preferred site locations for network elements (e.g.Core Network Elements)

R

 Provide an implementation schedule for Core NetworkElements

R  

Page 14: 6.1 ZTE_Scope of Work for BSNL GSM 14.37

7/27/2019 6.1 ZTE_Scope of Work for BSNL GSM 14.37

http://slidepdf.com/reader/full/61-ztescope-of-work-for-bsnl-gsm-1437 14/30

Scope of Work for BSNL GSM 14.37M

ZTE Confidential Proprietary © 2011 ZTE Corporation. All rights reserved. 12

 Approve the implementation schedule for Core NetworkElements

R

 Provide detailed specifications of connection criteria to thePSTN

R

  Propose design, engineering, safety and securitystandards for Core Network Element sites R  

 Approve the design, engineering, safety and securitystandards for Core Network Element sites

R

5. Site Acquisition   

Site Identification & Evaluation ZTE BSNL

 Site survey & Site Nominal Plan

R  

 Search for candidates & Finalization of the same

R S

 Produce Site Acquisition Reports (maximum of 3) R  

 Evaluate candidates

S R

 Acquisition of Site to be utilized for implementation of ZTEswitching nodes and Power equipment.

S R

 Leasing & Technical Site Survey ZTE BSNL

 Approve the Lease Agreement & Documentation

R

 Approve the Permit Agreement & Documentation

R

 Schedule & complete Technical Site Surveys (TSS) R  

 Attend Technical Site Survey (TSS)

R S

Page 15: 6.1 ZTE_Scope of Work for BSNL GSM 14.37

7/27/2019 6.1 ZTE_Scope of Work for BSNL GSM 14.37

http://slidepdf.com/reader/full/61-ztescope-of-work-for-bsnl-gsm-1437 15/30

Scope of Work for BSNL GSM 14.37M

ZTE Confidential Proprietary © 2011 ZTE Corporation. All rights reserved. 13

 Specify location of equipment & prepare for design

R S

 Complete Technical Site Survey reports

R  

  Define final Site (and route) Selection R  

 Negotiate lease/contracts with property owners

 R

 Finalize content of lease contracts

 R

 Approve content and amendments of lease contracts

R

 Arrange for signature of per site leaseagreements/contracts

R

 Arrange payment of site lease/contract fees or rent

R

  Define & agree co-location criteria of equipment R S

 Provide access to customers premises

R

 Approve final survey report

R

5. Site Design & Permitting   

 Site Design ZTE BSNL

 Prepare design and construction work specifications

R  

 Approve design and construction work specifications R

 Define CW acceptance procedure, CW check list and sitefolder documentation

R S

Page 16: 6.1 ZTE_Scope of Work for BSNL GSM 14.37

7/27/2019 6.1 ZTE_Scope of Work for BSNL GSM 14.37

http://slidepdf.com/reader/full/61-ztescope-of-work-for-bsnl-gsm-1437 16/30

Scope of Work for BSNL GSM 14.37M

ZTE Confidential Proprietary © 2011 ZTE Corporation. All rights reserved. 14

 Approve CW acceptance procedure, CW check list and sitefolder documentation

R

 Prepare CW site Acceptance plan.

R  

  Approve CW Site Acceptance plan. R

 Civil Engineering Design based upon Site InvestigationReport for all Acquired BTS Sites.

R S

 Permitting (Municipal Clearance) ZTE BSNL

 Production of civic body requirements required forpermits

R  

 Submit permit Applications

R  

 Provisioning of Statuary fees for the permit application

R

 Obtain all permits required for construction of sites R  

 Escalate permitting potential permitting delays toCustomer

R  

 Issue 'Build on Risk' instructions to commenceconstruction works

R

 Accept or reject 'Build on Risk' instructions

R  

 

Participation in Technical Site Survey, preparation ofTechnical Site Survey Report and delivery ofcomprehensive general arrangement drawings

R  

 

Preparation permitting design and documentation

R  

 Apply all needed permissions to conduct CW at site

R  

 

Obtaining all needed permissions to conduct CW at siteR  

Page 17: 6.1 ZTE_Scope of Work for BSNL GSM 14.37

7/27/2019 6.1 ZTE_Scope of Work for BSNL GSM 14.37

http://slidepdf.com/reader/full/61-ztescope-of-work-for-bsnl-gsm-1437 17/30

Scope of Work for BSNL GSM 14.37M

ZTE Confidential Proprietary © 2011 ZTE Corporation. All rights reserved. 15

 Delivery of the fee settlement to the authorities

R  

6. Construction Works (CW)ZTE BSNL

 

Participation in Technical Site Survey, preparation ofTechnical Site Survey Report and delivery ofcomprehensive general arrangement drawings

R S

 

Detailed construction works design including constructiondetails, power supply, mechanical and electrical designwith bill of quantities of materials

R  

 Review/approve detailed site design

S R

 

Ordering electrical power connectionsR S

 

Timely connection of power to the siteR S

 Pay for electrical power application fees

R

 Pay for necessary upgrades to electrical power to make ituseable for the site

R

 Pay for electrical power consumed by the site

R

 Providing power generator for sites

R  

 Preparation of as-built drawings after completion of all siteworks

R  

 

Saving all site specific CW documentation including as-

built drawings in the project database

R  

 Supply all CW material defined in detailed site design

R  

 Complete all foundation works

R  

Page 18: 6.1 ZTE_Scope of Work for BSNL GSM 14.37

7/27/2019 6.1 ZTE_Scope of Work for BSNL GSM 14.37

http://slidepdf.com/reader/full/61-ztescope-of-work-for-bsnl-gsm-1437 18/30

Scope of Work for BSNL GSM 14.37M

ZTE Confidential Proprietary © 2011 ZTE Corporation. All rights reserved. 16

 Arrange for hauling & hoisting of equipment & material

R  

 Perform all construction works needed to construct a sitein accordance with the detailed site design

R  

  Installation of all CW material needed to construct a siteaccording to detailed site design R  

 Manage and coordinate all CW related logistics needed toconstruct a site

R  

 Health & Safety arrangements during site construction

R  

 Site security arrangements until final site acceptance &Takeover by BSNL

R

 Dispose of all debris following construction

R  

 CW site quality assurance and quality assessments

R  

 

Arrange CW acceptance meeting for the individual sitebetween ZTE, Customer and Subcontractor in accordancewith the agreed site acceptance procedure

R  

 Site CW acceptance according to the agreed siteacceptance procedure

R

 

Create and submit all CW related site specificdocumentation in accordance with the agreed siteacceptance procedure

R  

 

Preparation of Non BSNL sites as per tender conditionsR  

 

Security at BSNL sitesR

  Security at non BSNL sites up to the Takeover by BSNL R  

7. Implementation   

Page 19: 6.1 ZTE_Scope of Work for BSNL GSM 14.37

7/27/2019 6.1 ZTE_Scope of Work for BSNL GSM 14.37

http://slidepdf.com/reader/full/61-ztescope-of-work-for-bsnl-gsm-1437 19/30

Scope of Work for BSNL GSM 14.37M

ZTE Confidential Proprietary © 2011 ZTE Corporation. All rights reserved. 17

 General ZTE BSNL

 Issue notification of site ready for implementation ( i.eHandover in case of NBSNL & RFI in case of BSNL sites)

R

 

Preparation and Submission of time schedule for thedelivery and implementation of material and equipmentdelivered by ZTE.

R  

 Confirm for the site readiness

R  

  Provide 24/7 access to the site R

 

Provide copy of site leasing agreementR

 Establish a schedule for implementation works(installation, commissioning and integration)

R  

 

Approve the schedule for implementation works

(installation, commissioning and integration)R

 Provide equipment and tools for implementation(installation, commissioning and integration)

R  

 Deliver 3rd party equipment

R  

 Deliver installation materials to the sites

R  

 

Preparation of Site in accordance with the requirementsstated in approved Survey report for BSNL sites includingavailability of DC Power.

R  

 Preparation of Site in accordance with the requirements forNon-BSNL sites as per contract

R  

 Visually inspect of equipment, cable and accessories R  

 

Record serial numbers for installed base and otherEquipment R  

Page 20: 6.1 ZTE_Scope of Work for BSNL GSM 14.37

7/27/2019 6.1 ZTE_Scope of Work for BSNL GSM 14.37

http://slidepdf.com/reader/full/61-ztescope-of-work-for-bsnl-gsm-1437 20/30

Scope of Work for BSNL GSM 14.37M

ZTE Confidential Proprietary © 2011 ZTE Corporation. All rights reserved. 18

 Preparing a site material list (report) of the installedproducts and materials

R  

 Quality control and testing of all installation materials, e.g.cables, antennas, etc

R  

  Acceptance for the implementation work carried out on thesite R

 Arrange for the E1 as and when required for the site

R

 Dispose of all debris following installation of the site

R  

 

Prepare site documentation and drawings as part of theSite Folder for one network element or a site with allequipment as in contract

R  

 

Preparation and Application of all Permits required for 3-Phase Electrical Meter and Mains Power Supply for allAcquired Sites, to relevant Govt. Authority supported by

BSNL.

R S

 Responsibility for obtaining any other Permits, approvalsby relevant Govt. Authority, for all Acquired Sites.

R S

  Implementation of BTS sites ZTE BSNL

 

Engineering Survey of all Sites in accordance withapproved cell plan. Prepare the data needed forcommissioning and integration

 

Production of Site Implementation and CommissioningDocumentation in accordance with approved SiteSurvey/Engineering Technical Criteria.

 Complete antenna system installation ( Outdoor work) & TI(indoor work)

R  

 

Test antenna systemR  

Page 21: 6.1 ZTE_Scope of Work for BSNL GSM 14.37

7/27/2019 6.1 ZTE_Scope of Work for BSNL GSM 14.37

http://slidepdf.com/reader/full/61-ztescope-of-work-for-bsnl-gsm-1437 21/30

Scope of Work for BSNL GSM 14.37M

ZTE Confidential Proprietary © 2011 ZTE Corporation. All rights reserved. 19

 

Complete Implementation of power supply equipment,including battery back-up system R  

 Installation of ZTE BTS Equipment.

R  

 Complete Installation as defined in the ZTE Manuals R  

 Connecting of ZTE Power Equipment to AC DistributionPanel in Non-BSNL site and to DC power in BSNL sites.

R  

 Connect cross-connection cables in distribution frames

R  

 Complete Commissioning as defined in the ZTE Manuals

R  

 

Complete Integration as defined in the ZTE ManualsR  

 

Acceptance testing of the Installed BTSR

 Configure Network Element in OSS/OMC

R  

8. Acceptance   

 Acceptance Test Plan & Acceptance Procedures ZTE BSNL

 Define the Acceptance Test Plan (ATP) (including NetworkElement Integration Tests, Network Acceptance Tests)

R  

 Preparation of test schedules for acceptance testing.

R  

 

Submission of ZTE Standard Acceptance Test Procedures,

for all ZTE supplied subsystems and equipment. R  

 

Approve the Acceptance Test Plan (ATP) (includingNetwork Element Integration Tests, Network AcceptanceTests)

R

Page 22: 6.1 ZTE_Scope of Work for BSNL GSM 14.37

7/27/2019 6.1 ZTE_Scope of Work for BSNL GSM 14.37

http://slidepdf.com/reader/full/61-ztescope-of-work-for-bsnl-gsm-1437 22/30

Scope of Work for BSNL GSM 14.37M

ZTE Confidential Proprietary © 2011 ZTE Corporation. All rights reserved. 20

 

Approve the Network DesignR

 

Approve the Unit Acceptance Test Manuals (including CW

acceptance, installation acceptance, commissioning test,integration, etc.) R

 

Approve the Site Documentation Acceptance (Master SiteFile Index) R

 

Define the PAC Acceptance Test ProcedureR  

 

Approve the PAC Acceptance Test ProcedureR

  Site Acceptance ZTE BSNL

 

Site readiness for acceptance in all respects-ZTE, suppliedequipment and services. R

 

 

Demonstration of integration for all ZTE suppliedsubsystems and equipment.

R    

 

Delivery of Factory test Certificate according to Contractterms & conditions R  

 

Perform unit acceptance tests (including CW acceptance,installation acceptance, commissioning test, integration,etc.) and record results

R  

 

Review and approve unit acceptance (including CWacceptance, installation acceptance, commissioning test,integration, etc.) test results

R

Page 23: 6.1 ZTE_Scope of Work for BSNL GSM 14.37

7/27/2019 6.1 ZTE_Scope of Work for BSNL GSM 14.37

http://slidepdf.com/reader/full/61-ztescope-of-work-for-bsnl-gsm-1437 23/30

Scope of Work for BSNL GSM 14.37M

ZTE Confidential Proprietary © 2011 ZTE Corporation. All rights reserved. 21

 Issue Provisional Acceptance Certificate (PAC)

R

 

Perform the Network Element Integration TestsR  

 

Review and approve results of the network integration testR

 Issue Network Element Integration Acceptance Certificate

R

 Place Site "on-air"

R S

 Place Site into commercial operation

R

 Collection of acceptance certificate from BSNL.

R  

 Network Acceptance ZTE BSNL

 Perform Network Acceptance Test measurements

R  

 Review Network Acceptance Test measurements andprotocol

R

 Issue Network Acceptance Certificate (NAC)

R

 Monitor site during equipment warranty period

S R

 Issue Final Acceptance Certificate (FAC)

R

  ACCESS NETWORK MSC – PSTN/PLMN    

 Specification of PSTN/PLMN routing and connectivityrequirements for PSTN/PLMN - POI connection.

R

 Recommendation of connectivity requirements forPSTN/PLMN - POI connection.

R

Page 24: 6.1 ZTE_Scope of Work for BSNL GSM 14.37

7/27/2019 6.1 ZTE_Scope of Work for BSNL GSM 14.37

http://slidepdf.com/reader/full/61-ztescope-of-work-for-bsnl-gsm-1437 24/30

Scope of Work for BSNL GSM 14.37M

ZTE Confidential Proprietary © 2011 ZTE Corporation. All rights reserved. 22

 Provision of connectivity requirements for PSTN/PLMN -POI connection.

R

 Identification of PSTN/PLMN routing

R  

  Preparation of schedule for the Backbone connection tothe access network R S

 Specification and Supply of DDF for connection.

R S

 Termination/Connection of PSTN/PLMN lines to DDF.

R S

 Termination/Connection of Cables from MSC to DDF.

R S

 Cross connection between MSC lines and access lines

R S

 ACCESS NETWORK BSC-BTS FOR NON BSNL SITES    

 Supply of Microwave transmission System. R  

 Provision of approved Access Network frequencies andsub-bands from relevant authorities.

R

 Preparation of Documentation for approval by relevantauthorities.

R  

 Approval from relevant authorities.

S R

 Design, engineering and implementation of transmissionnetwork at Non-BSNL site.

R S

 SWITCHING CENTRE (MSC/BSC )    

 Initial Site Survey and Engineering Inspection of SwitchingSite

R  

 

Site Survey - Engineering Report with Punch-List directlyrelated to placement and intended implementation of ZTEswitching nodes and Power Equipment.

R  

Page 25: 6.1 ZTE_Scope of Work for BSNL GSM 14.37

7/27/2019 6.1 ZTE_Scope of Work for BSNL GSM 14.37

http://slidepdf.com/reader/full/61-ztescope-of-work-for-bsnl-gsm-1437 25/30

Scope of Work for BSNL GSM 14.37M

ZTE Confidential Proprietary © 2011 ZTE Corporation. All rights reserved. 23

 Approval of Site Survey – Engineering Report

R

 Submission of Exchange Requirements Questionnaire.

S R

  Technical Specification of Exchange Requirements inresponse to submitted questionnaire. R  

 Preparation of detailed Implementation Design for ZTEMSC/BSC, and Power Equipment

R  

 Refurbishment of Switching Site in accordance with therequirements stated in the Survey report

R

 

Submission of Site Hand over Date for InstallationCommencement of ZTE MSC/BSC, and Power Equipment R

 

Site Inspection for Installation CommencementR  

 Site Inspection Report with Punch List R S

 

Correction of remarks listed in Site Inspection ReportPunch List (if applicable) R

 Re-Inspection of Site for Installation (if applicable)

R  

 Decision for installation commencement

R S

 

Installation Commencement approvalR

 Implementation of ZTE supplied Hardware and Software asper Bill Of Quantities, in Switching rooms. R  

 DC Distributions Panel R  

 Acceptance of switching nodes R

Page 26: 6.1 ZTE_Scope of Work for BSNL GSM 14.37

7/27/2019 6.1 ZTE_Scope of Work for BSNL GSM 14.37

http://slidepdf.com/reader/full/61-ztescope-of-work-for-bsnl-gsm-1437 26/30

Scope of Work for BSNL GSM 14.37M

ZTE Confidential Proprietary © 2011 ZTE Corporation. All rights reserved. 24

 Civil and Electrical Works at Switching Site:    

 a) False flooring (if applicable) R

 

b) False ceiling (if applicable) R

 c) Fire protection & alarm system R

 d) MSC room locking device (computer based) andExploitation room.

R

 E) Lighting & internal electrical works R

 

h) Provision of uninterrupted power supply 230 V forterminals and –48 V DC for the equipment. R R

 

i)Provision of Server rooms for billing & VASR

 j) Access for Cables R R

 

k) Procurement, Implementation of 3-Phase Mains PowerSupply Distribution Board (MDB) R

 

l) Climate Control / Air Conditioning Unit including ductingR

 

o) Earthing / Grounding Rods for Equipment in accordancewith ZTE standards R R

 p) Installation of electrical gears, transformers andconnection to it.

R

 IN/ PRE-PAID    

Page 27: 6.1 ZTE_Scope of Work for BSNL GSM 14.37

7/27/2019 6.1 ZTE_Scope of Work for BSNL GSM 14.37

http://slidepdf.com/reader/full/61-ztescope-of-work-for-bsnl-gsm-1437 27/30

Scope of Work for BSNL GSM 14.37M

ZTE Confidential Proprietary © 2011 ZTE Corporation. All rights reserved. 25

 

Provision of space to be utilized for IN/ Pre-paid node androuter equipment R

 

Initial site survey and Engineering for IN equipmentR  

 Site infrastructure including civil works, power, AC, raisedfloor etc

R

 Site inspection and preparation of punch list (if applicable) R  

 

Correction of remarks listed in inspection reportR

 Switching Network dimensioning for IN/ Pre-paid

R  

 Implementation of IN node equipment

R  

 

Recording of voice prompts

R S

 Recording of IVR/ announcement messages prepared bybuyer on specified format

R  

 Carrying out User activities like Pre-paid vouchergeneration, printing and management

S R

 Connectivity

   

 a)  Transmission media (Inter- MSC)

R

 b)  External data networks (internet/intranet)

R

 c)  PLMNs

R

 d)  Transmission media and H/W connectivity of IVR

R

Page 28: 6.1 ZTE_Scope of Work for BSNL GSM 14.37

7/27/2019 6.1 ZTE_Scope of Work for BSNL GSM 14.37

http://slidepdf.com/reader/full/61-ztescope-of-work-for-bsnl-gsm-1437 28/30

Scope of Work for BSNL GSM 14.37M

ZTE Confidential Proprietary © 2011 ZTE Corporation. All rights reserved. 26

 e)  Internal LANs

R

 Subscriber Administration & Billing system modifications

S R

  System acceptance R

 Multivendor Interface Verification ZTE BSNL

 

Coordinate between vendors, manage the information flow,enter into contractual agreement with all the vendorsinvolved in the Interoperability

S R

 Ensure that the other vendor(s) support the Customer andZTE in the Interoperability effort

S R

 Provide SIM, terminals cards for the testing and testequipment

R

 

Create Interoperability process proposalR  

 Accept the Interoperability process proposal

R S

 Nominate ZTE Interoperability PM and project organization(names, roles, responsibilities)

R  

 

Nominate BSNL Interoperability PM and projectorganization (names, roles, responsibilities) R

 

Ensure the other vendor(s) nominate respectiveInteroperability PM and project organization (names, roles,responsibilities)

R

 

Ensure the Other vendor(s) participate in theCreation/review, agreement of Interoperability processproposal

R

 

Provide Network element, interface and protocoldescriptions for other vendor’s equipment that areinterfaced with ZTE Network's equipment

R

Page 29: 6.1 ZTE_Scope of Work for BSNL GSM 14.37

7/27/2019 6.1 ZTE_Scope of Work for BSNL GSM 14.37

http://slidepdf.com/reader/full/61-ztescope-of-work-for-bsnl-gsm-1437 29/30

Scope of Work for BSNL GSM 14.37M

ZTE Confidential Proprietary © 2011 ZTE Corporation. All rights reserved. 27

 Provide implementation schedules for Interoperabilityrelated equipment, subsystems from the other vendor(s)

S R

 Propose Interoperability test plan (incl. Interoperability testcases and test procedures)

R  

  Ensure the other vendor(s) participate in thecreation/review agreement on the Interoperability test plan R

 Ensure the other vendor(s) perform Interoperability testingaccording to the Interoperability test plan

S R

  Organize Kick-off meeting for Interoperability R  

 

Participate Kick-off meeting & Ensure the other vendor(s)participate Kick-off meeting R

  Provide facilities, access until end of the Interoperability R

  Create Interoperability integration report R  

  Create Interoperability Verification Acceptance Certificate R  

  Sign Interoperability Verification Acceptance Certificate R

9 Validation TestZTE BSNL

 Issue Authorized letter for BSNL VT committee & dedicatedVT implementation team

R

Define ZTE VT team organization R  

Define VT test case procedure R  

  Approve and Sign off VT test case procedure R

  Define VT test plan R

  Approve VT test plan R

  Carry out tests in filed R R

  Generate final VT test report S R

Page 30: 6.1 ZTE_Scope of Work for BSNL GSM 14.37

7/27/2019 6.1 ZTE_Scope of Work for BSNL GSM 14.37

http://slidepdf.com/reader/full/61-ztescope-of-work-for-bsnl-gsm-1437 30/30

Scope of Work for BSNL GSM 14.37M

ZTE Confidential Proprietary © 2011 ZTE Corporation. All rights reserved. 28

Signed for and on behalf of Signed for andon behalf of

BSNLthe Bidder: ZTE Corporation

Signature: Signature:

Title: TitleDate: Date: