20 Classrooms Boys School (5-10) at Sur Hilal ,Wilayat Al-Suwaiq in Batinah North Governorate Kiosk building - Setting out works for 500 mm dia CFA piles. Kiosk building. - Concrete Temperature Test (SRC M30) for 500mm dia CFA Piles

6 .Photo 06, 19-04-2015.new.xls

Embed Size (px)

DESCRIPTION

Continuous flight auger Pile foundation

Citation preview

Page 1: 6 .Photo 06, 19-04-2015.new.xls

20 Classrooms Boys School (5-10) at Sur Hilal ,Wilayat Al-Suwaiq in Batinah North Governorate

Kiosk building - Setting out works for 500 mm dia CFA piles.

Kiosk building. - Concrete Temperature Test (SRC M30) for 500mm dia CFA Piles

Page 2: 6 .Photo 06, 19-04-2015.new.xls

20 Classrooms Boys School (5-10) at Sur Hilal ,Wilayat Al-Suwaiq in Batinah North Governorate

Kiosk building. - Slump Test ( SRC M30) for for 500mm dia CFA Piles.

Kiosk building. -Concrete Cube Test (SRC M30) for for 500mm dia CFA Piles

Page 3: 6 .Photo 06, 19-04-2015.new.xls

20 Classrooms Boys School (5-10) at Sur Hilal ,Wilayat Al-Suwaiq in Batinah North Governorate

Kiosk building. -SRC M30 Poured into Concrete Pump.

Kiosk building -Boring of 500mm dia CFA Piles @ 1m Below Ground Level

Page 4: 6 .Photo 06, 19-04-2015.new.xls

20 Classrooms Boys School (5-10) at Sur Hilal ,Wilayat Al-Suwaiq in Batinah North Governorate

upto Pile Head level.

at 13m Below Ground Level.Kiosk building -Termination Depth of 500 mm dia Bored CFA Piles

Kiosk building -Installation of Epoxy coated rebar Cages for 500 mm dia CFA piles

Page 5: 6 .Photo 06, 19-04-2015.new.xls

20 Classrooms Boys School (5-10) at Sur Hilal ,Wilayat Al-Suwaiq in Batinah North Governorate

Expansion-1- Pile Static load Test for CFA Pile No- P230 in School building

Page 6: 6 .Photo 06, 19-04-2015.new.xls

20 Classrooms Boys School (5-10) at Sur Hilal ,Wilayat Al-Suwaiq in Batinah North Governorate

level to receive Pile Caps in exp-1.

Pile Foundation - Earthwork excavation to receive Pile Caps in exp-1.

Pile Foundation -Trimming of CFA pile head upto Pile cut off

Page 7: 6 .Photo 06, 19-04-2015.new.xls

20 Classrooms Boys School (5-10) at Sur Hilal ,Wilayat Al-Suwaiq in Batinah North Governorate

level to receive Pile Caps in exp-2.

load test in Pile No- 206 in expansion- 3

Pile Foundation - Earthwork excavation& Trimming of Concrete upto Pile cut off

School Building - Preparation of Pile head level to required height for Static