23
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable) 01 31-Dec-2013 1300397781 N/A 6. ISSUED BY CODE N65236 7. ADMINISTERED BY (If other than Item 6) CODE S0302A SPAWAR-Systems Center Lant (CHRL) P.O. BOX 190022 North Charleston SC 29419-9022 [email protected] 843-218-5108 DCMA Phoenix TWO RENAISSANCE SQUARE, 40 NORTH CENTRAL AVE., SUITE 400 PHOENIX AZ 85004-4424 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and Zip Code) 9A. AMENDMENT OF SOLICITATION NO. KINETX 2050 EAST ASU CIRCLE, STE 107 TEMPE AZ 85284 9B. DATED (SEE ITEM 11) 10A. MODIFICATION OF CONTRACT/ORDER NO. [X] N65236-13-D-4891-0001 10B. DATED (SEE ITEM 13) CAGE CODE 06NT5 FACILITY CODE 11-Jul-2013 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS [ ]The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [ ] is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning one (1) copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 12. ACCOUNTING AND APPROPRIATION DATA (If required) SEE SECTION G 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. (*) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A. [ ] [ ] B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.)SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b). [ ] C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: [X] D. OTHER (Specify type of modification and authority) This modification is IAW FAR 52.232-22 E. IMPORTANT: Contractor [ X ] is not, [ ] is required to sign this document and return copies to the issuing office. 14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.) SEE PAGE 2 15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) Alan S Bates, Contracting Officer 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED BY /s/Alan S Bates 31-Dec-2013 (Signature of person authorized to sign) (Signature of Contracting Officer) NSN 7540-01-152-8070 PREVIOUS EDITION UNUSABLE 30-105 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA FAR (48 CFR) 53.243 1. CONTRACT ID CODE PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT U 1 2

6. ISSUED BY CODE N65236 7. ADMINISTERED BY (If … · ASME Y14.34M 1-Jan-96 Associated Lists ASME Y14.35M 8-Dec-97 Revision Engineering Drawings & Associated List e. Forms

  • Upload
    hathuy

  • View
    218

  • Download
    2

Embed Size (px)

Citation preview

Page 1: 6. ISSUED BY CODE N65236 7. ADMINISTERED BY (If … · ASME Y14.34M 1-Jan-96 Associated Lists ASME Y14.35M 8-Dec-97 Revision Engineering Drawings & Associated List e. Forms

2.  AMENDMENT/MODIFICATION NO. 3.  EFFECTIVE DATE 4.  REQUISITION/PURCHASE REQ. NO. 5.  PROJECT NO. (If applicable)

01 31-Dec-2013 1300397781 N/A6.  ISSUED BY CODE N65236 7.  ADMINISTERED BY (If other than Item 6) CODE S0302A

SPAWAR-Systems Center Lant (CHRL)

P.O. BOX 190022

North Charleston SC 29419-9022

[email protected] 843-218-5108

 

DCMA Phoenix

TWO RENAISSANCE SQUARE, 40 NORTH CENTRALAVE., SUITE 400

PHOENIX AZ 85004-4424

 

   8.  NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and Zip Code)   9A.  AMENDMENT OF SOLICITATION NO.

KINETX    2050 EAST ASU CIRCLE, STE 107    TEMPE AZ 85284   9B.  DATED (SEE ITEM 11)

         10A.  MODIFICATION OF CONTRACT/ORDER NO.

  [X]      N65236-13-D-4891-0001

    10B.  DATED (SEE ITEM 13)

CAGECODE

06NT5 FACILITY CODE   11-Jul-2013

11.  THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[   ]The above numbered solicitation is amended as set forth in Item 14.  The hour and date specified for receipt of Offers  [   ]   is extended, [   ]  is not extended.Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning one (1) copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separateletter or telegram which includes a reference to the solicitation and amendment numbers.  FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACEDESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.  If by virtue of this amendment youdesire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment,and is received prior to the opening hour and date specified.12.  ACCOUNTING AND APPROPRIATION DATA (If required)

SEE SECTION G 

13.  THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(*) A.  THIS CHANGE ORDER IS ISSUED PURSUANT TO:  (Specify authority)  THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. INITEM 10A.

[  ]   [  ] B.  THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date,

etc.)SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).    

[  ] C.  THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:  

[X] D.  OTHER (Specify type of modification and authority)This modification is IAW FAR 52.232-22

E.  IMPORTANT:  Contractor [ X ] is not, [   ] is required to sign this document and return       copies to the issuing office.14.  DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

SEE PAGE 2 

15A.  NAME AND TITLE OF SIGNER (Type or print) 16A.  NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

       Alan S Bates, Contracting Officer

15B.  CONTRACTOR/OFFEROR 15C.  DATE SIGNED 16B.  UNITED STATES OF AMERICA 16C. DATE SIGNED           BY /s/Alan S Bates 31-Dec-2013 

(Signature of person authorized to sign)   (Signature of Contracting Officer)  NSN 7540-01-152-8070PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (Rev. 10-83)Prescribed by GSAFAR (48 CFR) 53.243

 

 

                  1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT U 1 2

Page 2: 6. ISSUED BY CODE N65236 7. ADMINISTERED BY (If … · ASME Y14.34M 1-Jan-96 Associated Lists ASME Y14.35M 8-Dec-97 Revision Engineering Drawings & Associated List e. Forms

GENERAL INFORMATION

The purpose of this modification is to add incremental funding in the amount of $200,000.00. A conformed copy ofthis Task Order is attached to this modification for informational purposes only.

The Line of Accounting information is hereby changed as follows:

The total amount of funds obligated to the task is hereby increased from $445,828.19 by$200,000.00 to $645,828.19.

CLIN/SLIN Type Of Fund From ($) By ($) To ($)

000103 PMC 0.00 200,000.00 200,000.00

The total value of the order is hereby increased from $1,281,708.89 by $0.00 to $1,281,708.89.

 CONTRACT NO.

 N65236-13-D-4891 DELIVERY ORDER NO.

 0001 AMENDMENT/MODIFICATION NO.

 01 PAGE

 2 of 2 FINAL

 

Page 3: 6. ISSUED BY CODE N65236 7. ADMINISTERED BY (If … · ASME Y14.34M 1-Jan-96 Associated Lists ASME Y14.35M 8-Dec-97 Revision Engineering Drawings & Associated List e. Forms

SECTION B Supplies or Services and Prices

CLIN - SUPPLIES OR SERVICES  For Cost Type Items:  Item   PSC  Supplies/Services       Qty  Unit            Est. Cost        Fixed Fee           CPFF ------ ---  -----------------       ---- ----      ---------------  --------------- --------------  0001   R425  Decision                1.0  EA         $1,200,710.30      $80,998.59   $1,281,708.89              Superiority                                   Support Services                              Electronics and                               communications                                services and                                  solutions in                                  support of                                    mission                                       capabilities                                  within Decision                               Superiority (DS)                              Portfolio mission                             areas in                                      accordance with                               the Contract PWS.                             (Fund Type - TBD)                 000101 R425  ACRN: AA                           PR:                            1300342516-0001                DOC:                           M9545013RC24F36                COST CODE:                     3RC24F36124F                   NWA:                           100000805241-CMIT              (Fund Type - TBD)  000102 R425  ACRN: AB                           PR:                            1300342516-0001                DOC:                           M9545013RC34516                COST CODE:                     3RC34516111O                   NWA:                           100000834977-3CTR              (Fund Type - TBD)  000103 R425  ACRN: AC                           PR: 1300397781                 (PMC)               For FFP Items:  Item   PSC  Supplies/Services       Qty  Unit      Unit Price          Total Price                 

 CONTRACT NO.

 N65236-13-D-4891 DELIVERY ORDER NO.

 0001 AMENDMENT/MODIFICATION NO.

 01 PAGE

 1 of 21 FINAL

 

Page 4: 6. ISSUED BY CODE N65236 7. ADMINISTERED BY (If … · ASME Y14.34M 1-Jan-96 Associated Lists ASME Y14.35M 8-Dec-97 Revision Engineering Drawings & Associated List e. Forms

------ ---  -----------------       ---- ----      --------------- ----------------                 0004   R425  Contract Data           0.0  EA                 $0.00           $0.00              Requirements List                             (CDRL)                                        in accordance                                 with DD Form                                  1423, see Exhibit                             A (Fund Type -                                TBD)                              

 CONTRACT NO.

 N65236-13-D-4891 DELIVERY ORDER NO.

 0001 AMENDMENT/MODIFICATION NO.

 01 PAGE

 2 of 21 FINAL

 

Page 5: 6. ISSUED BY CODE N65236 7. ADMINISTERED BY (If … · ASME Y14.34M 1-Jan-96 Associated Lists ASME Y14.35M 8-Dec-97 Revision Engineering Drawings & Associated List e. Forms

SECTION C Descriptions and Specifications

PERFORMANCE WORK STATEMENT

SHORT TITLE:           AN/MRC-142 (AN/MRC-142) Support

1.         PLACE(S) OF PERFORMANCE

a.       SSC-LANT, Charleston, SC

b.       29 Palms, CA

c.        Camp Pendleton, CA

d.       Camp Lejeune, NC

e.        Albany, GA

f.        Contractor Facility

2.         REFERENCES

             a. Contract N65236-XXXX, lest only the references that are not listed in the main contract.               

            b. Military Standards and Specifications - Mandatory Compliance.

A separate waiver request must be prepared for each Military Specification or Standard listed in this section, whichdoes not have a Department wide waiver in effect. 

The listed standards are invoked in this PWS, and have DON waivers or have been identified as a standardpractice/interface standard/performance specification. 

MIL-STD-129P(4) 19-Sep-07 Military Marking for Shipment and Storage

MIL-STD-130N 15-Jun-07 Identification Marking of US Military Property

MIL-STD-2073-1D 10-May-02 DoD Standard Practice for Military Packaging

MIL-STD-6017A 2-Nov-06 Variable Message Format (VMF)

MIL-STD-6040A 30-Apr-09 United States Message Text  Format Description

 c.  Other Government Documents.  Unless otherwise stated, the following documents may be obtained from theDocument Automation and Production Service, Building 4/D, 700 Robbins Avenue, Philadelphia, PA  19111-5094or visit http://dodssp.daps.mil.

CJCS1 6510.01E 15-Aug-07Defense-in-Depth Information Assurance (IA) and ComputerNetwork Defense (CND)

DI-IPSC-81431A 10-Jan-00 System/Subsystem Specification (SSS)

DoDI 8510.01 28-Nov-07Department of Defense Information Assurance Certification andAccreditation Process (DIACAP)

DoDI 8500.2 6-Feb-03 Information Assurance (IA) Implementation

EKMS-1 5-Oct-04CMS Policy and Procedures for Navy Electronic KeyManagement System

NAVSEAINST 9310.1B 13-Jun-91 Naval Lithium Battery Safety Project

S9310-AQ-SAF-010 20-May-03Technical Manual for Batteries, Navy Lithium Safety ProjectResponsibilities and Procedures

TM 4750-15/1 1-Oct-86Painting and Registration Marking for Marine Corps Combatand Tactical Equipment

   (Application for copies of TM S9310-AQ-SAF-010 should be addressed to the Naval Weapons Support Center,Code 3057, Building 36, Crane, IN 47522-5060)

 CONTRACT NO.

 N65236-13-D-4891 DELIVERY ORDER NO.

 0001 AMENDMENT/MODIFICATION NO.

 01 PAGE

 3 of 21 FINAL

 

Page 6: 6. ISSUED BY CODE N65236 7. ADMINISTERED BY (If … · ASME Y14.34M 1-Jan-96 Associated Lists ASME Y14.35M 8-Dec-97 Revision Engineering Drawings & Associated List e. Forms

d. Industry Standards.

ASTM D3951-98 10-Nov-98 Standard Practice for Commercial Packaging

ANSI/ITAA EIA-649 1-Apr-04 National Consensus Standard for Configuration Management

ASME Y14.34M 1-Jan-96 Associated Lists

ASME Y14.35M 8-Dec-97 Revision Engineering Drawings & Associated List

e.  Forms.

Free Form MS Excel Current Monthly Funds Status Report

Free Form MS Project Current Weekly Schedule Status Report

Free Form MS Excel Current Contractor Status and Man Hour Expenditure Report Template

 3.         SPECIFICATIONS (Guidance only)

        N/A.

 4.         SECURITY REQUIREMENTS

              All Contractor personnel, excluding administrative and financial, involved in the performance of the TaskOrder must be eligible to obtain a minimum clearance level of SECRET.  Contractor’s request for visit authorizationshall be submitted in accordance with DoD 5220.22M (Industrial Security Manual for Safeguarding ClassifiedInformation) not later than one (1) week prior to visit.  Request shall be forwarded via SPAWARSYSCEN P.O. BOX190022, North Charleston, SC 29419, Attn:  Security Office, for certification of need to know by the specified COR. Overall, the DD-254 of the basic contract applies.

 5.         COR DESIGNATION

 The Technical COR for this task order is Taylor Lethco who can be reached at (843) 218-2615;    e-mail:

[email protected].  

 6.         DESCRIPTION OF WORK

 The Performance Work Structure (PWS) identifies the work break down structure and tasks that are required toprovide support to the AN/MRC-142 Tactical Communications Networks Program and Management contract. Thesupport is identified clearly in the scope and associated tasks of the work which includes Program Management(PM), Data and Asset Management (DM/AM), Material Procurement (MP), Material Fabrication (MF), MaterialIntegration (MI), Testing and Evaluation (T&E), and Logistics and Support (L&S) to MARCORSYSCOM(MCSC). The subsets of these tasks provides systems engineering support for the AN/MRC-142 to includerequirements engineering and management, technical documentation generation to include Test Plans, Test Reports,System Specification documents or other technical documentation to name a few as directed by the Project Engineer(PE). The tasks will provide the AN/MRC-142 Project Engineer (PE) with a process development, management,oversight, and team guidance, and improvement support for AN/MRC-142 as it applies to USMC TCS programsthat are supported by MARCORSYSCOM and SSC-LANT. 

 Work under this order will consist of that effort required to:         

              Sub-Task 1.       Perform Technical Project and Data Management as listed below IAW task J: ProgramManagement Support of the contract.

              1.A.      Scope. 

  The Contractors Program Manager shall be responsible for ensuring that all contract deliverables are tracked andsubmitted on time. Documentation shall be readily available to the Government point of contact.  Project Managementefforts include engineering reviews, In Progress Reviews (IPRs), weekly AN/MRC-142 team meetings, AnnualTactical Data Radios Users Conference, Annual Fielding Supportability Conference,  and other meetings deemednecessary by the SSC-LANT Project Manager. The contractor shall provide task management in allocating resourcesto meet the Government tasking within schedule and funding constraints allocated to this task. Monthly Progress

 CONTRACT NO.

 N65236-13-D-4891 DELIVERY ORDER NO.

 0001 AMENDMENT/MODIFICATION NO.

 01 PAGE

 4 of 21 FINAL

 

Page 7: 6. ISSUED BY CODE N65236 7. ADMINISTERED BY (If … · ASME Y14.34M 1-Jan-96 Associated Lists ASME Y14.35M 8-Dec-97 Revision Engineering Drawings & Associated List e. Forms

Reports shall be provided addressing monthly activities and financial status.

a.  Define requirements and plans for project lifecycle and deployment schedules.

b.  Provide and maintain master plan, project deliverables, milestones and management / requirements in accordanceto the contract CDRL's.

c.   Provide job task analysis and supporting documentation.

d.  Create and maintain technical and project related documentation.

e.   Provide technical and publication documentation / instructions with validation       and verification (V&V)support as required.

f.   Prepare presentations and related documentation as required.

g.   Plan, coordinate, support, and conduct meetings and formal reviews.

                 1.B.         Project Status and Financial Management

 a.                         Progress Reports. A progress report shall be submitted on a monthly basis and delivered to SPAWARSystems Center Charleston no later than the 15th of the following month. This report shall document all workactivity performed, project status and any issues associated with AN/MRC-142.

  b .                         Financial Reports. The contractor shall provide detailed Contractor Status and Man-hour Expenditure

Reports broken out by the sub-tasks identified in this PWS by the 15th of the following months in accordance with theControl Account Plan (CAP). The reports will be transmitted every month electronically to the PM with currentcontract financial status.  This report shall include all expenditures for the entirety of the reporting month. This reportshall include sub contractor expenditures reported in the following categories: Labor, Travel, Materials. Upon approval,accruals can be used until official sub contractor data is available. This report shall be consistent with the IMS andWBS. Additional labor information, such as functional area, work product, will be provided upon request.

  The contractor shall develop the following documents, as defined by, but are not limited to the CDRL Items asindicated:

 CDRL Description

A003      Conference, Meeting Minutes & Presentation Reports

A015      Technical Report, Contractor Status and Man-hour Expenditure

A017      Technical Report, Contractors Program Status Report               

 1.C.         Meeting, Formal Reviews, Conferences, and Audits.

 The contractor may plan, host, attend, coordinate, support, and conduct the meetings, formal reviews, conferences, andaudits (hereinafter called "reviews"). The reviews shall be conducted at Government and contractor facilities. Thecontractor personnel, when requested, shall prepare agendas and conference presentation materials, and provide minutesand reports following each review. A summary of all action items, responsible parties, and estimated completion datesshall be included with the minutes. The contractor shall develop, update, and maintain project status briefs,milestone charts, and presentation material, including view graph and hard copy.

  a. In Progress Reviews (IPR). In Process Reviews will be held on a quarterly basis or as needed basis, at a date andlocation mutually agreed upon.

 b. Test Readiness Review (TRR).  SPAWAR shall conduct a TRR approximately 30 calendar days prior totesting.  The purpose of the TRR is for the SPAWAR Engineering Staff to conduct a formal review of contractor’sreadiness for testing.  Emphasis shall be placed on system requirements using test results and their analysis. Remaining "problem areas" and their projected “get-well” dates shall be addressed.

 CONTRACT NO.

 N65236-13-D-4891 DELIVERY ORDER NO.

 0001 AMENDMENT/MODIFICATION NO.

 01 PAGE

 5 of 21 FINAL

 

Page 8: 6. ISSUED BY CODE N65236 7. ADMINISTERED BY (If … · ASME Y14.34M 1-Jan-96 Associated Lists ASME Y14.35M 8-Dec-97 Revision Engineering Drawings & Associated List e. Forms

 The Contractor shall develop the following documents, as defined by, but are not limited to the CDRL Items asindicated:

CDRL Description

A003      Conference, Meeting Minutes & Presentation Reports

             1.D.      Documentation Support

The contractor may provide documentation support to include writing and formatting of all project-related documents.The contractor shall prepare meeting minutes for project meetings (usually 1-2 meetings per week).

The contractor shall develop the following documents, as defined by, but are not limited to the CDRL Items asindicated:

CDRL Description

A003      Conference, Meeting Minutes & Presentation Reports

             1.E.      Data Management.

The contractor shall utilize and maintain a single, centralized system for management of all data required under thisPWS.  Specific data management functions shall include maintenance of deliverables, approval of deliverable format,distribution and delivery of data products.  The system shall include facilities for storage of all data developed orutilized for this PWS, and shall provide equal access to data by the Government.  The contractor shall ensure alldata is centrally available for Government review. SSC-LANT reserves the right to review all data associated withand developed for the AN/MRC-142 project.

a. Establish reporting system for management of all program data.

b. Provide Configuration Management (CM) support for all managed items.

c.  Maintain schedules and perform all publishing activities required per SOW.

d. Support and document fielding issues and resolutions.

e.  Develop and manage online training support systems as required.

                    Data Repository address: 

             1.F.      Schedule Planning and Management.

The contractor shall provide input to the integrated master schedule (IMS) to maintain an accurate schedule of programevents, which provide for the earliest delivery schedule while at the same time satisfying all requirements in a costeffective manner. The project schedule shall include all significant events and shall depict major tasks and events fromstart to completion of the PWS. This input shall be consistent with the AN/MRC-142 WBS format. This scheduleshall be maintained in Microsoft Project software.

             1.G.      Risk Management

The contractor shall provide input to the Risk Management Plan and Analysis to support the overall projectmanagement effort.

a.  Create risk mitigation and contingency plans.

             Sub-Task 2.       Prepare and provide Systems Engineering Support as listed below IAW task A: SystemsEngineering Support of the contract.

             2.A.      Scope:

The contractor shall provide systems engineering requirements analysis and design to support integration of newcommand and control (C2) applications into the AN/MRC-142 system architecture. The contractor shall perform the

 CONTRACT NO.

 N65236-13-D-4891 DELIVERY ORDER NO.

 0001 AMENDMENT/MODIFICATION NO.

 01 PAGE

 6 of 21 FINAL

 

Page 9: 6. ISSUED BY CODE N65236 7. ADMINISTERED BY (If … · ASME Y14.34M 1-Jan-96 Associated Lists ASME Y14.35M 8-Dec-97 Revision Engineering Drawings & Associated List e. Forms

technical, and engineering functions necessary to transfer a system need into a system enhancement through designmodification or new design of the systems hardware. 

 CDRL Description

 A025  System/Subsystem Specification (SSS)

 a.       Material Fabrication (MF)

                                                               i .      The contractor shall fabricate AN/MRC-142C components as required.

                                                              ii.      The contractor shall fabricate AN/MRC-142C cables are required.

                                                            iii.       The contractor shall fabricate AN/MRC-142C mounting kits as required.

b.       Material Integration (MI)

                                                               i .      The contractor shall integrate AN/MRC-142C systems in accordance withguidance provided.

                                                              ii.      The contractor shall integrate AN/MRC-142C systems into currently                undefined vehicles.      

CDRL Description

A004                      Technical Reports

              2.B.      Quality Assurance/Management

The contractor shall provide quality assurance support to the Project Engineer in accordance with contractor bestpractice and shall provide quality assurance monitoring, testing, review, and documentation. The contractor shallcritically review all design documentation and products based on the following criteria:

                a.             Contractual Requirements

                b.             Interface Requirements

                c.             Overall System Operational Effectiveness, and/or

                d.             Applicable Specifications and Standards.

The contractor shall implement, document, and demonstrate the ability to maintain a quality management programto be used in the performance of this PWS. The contractor shall make available all documentation to the ProjectEngineer to review upon request. The contractor shall ensure quality throughout all areas to include design,development, inspection, integration, test, validation, and verification. These QA/QM procedures are updatedaccording to improvement information derived during planning and performance of the contractor tasking.

a.  Provide Quality Assurance Plan (QAP).

 The contractor shall develop the following documents, as defined by, but are not limited to the CDRL Items asindicated:

CDRL Description

A041   Quality Program Plan

             2.C.      Technical Publications and Engineering Drawings

The contractor shall maintain the SSC-LANT approved AN/MRC-142 drawing package and technical publications. The contractor shall coordinate with LOGCOM in support of Physical Configuration Audit (PCA).  Once approved,the drawing package and tech manual will be entered and archived in the CM database by the contractor. TheUSMC provided engineering drawing package representing the AN/MRC-142 will be maintained and no changes

 CONTRACT NO.

 N65236-13-D-4891 DELIVERY ORDER NO.

 0001 AMENDMENT/MODIFICATION NO.

 01 PAGE

 7 of 21 FINAL

 

Page 10: 6. ISSUED BY CODE N65236 7. ADMINISTERED BY (If … · ASME Y14.34M 1-Jan-96 Associated Lists ASME Y14.35M 8-Dec-97 Revision Engineering Drawings & Associated List e. Forms

made to the documents without going through the formal Engineering Change Proposal process.

a.             Product Drawings.  The contractor shall develop a complete product drawing package and associatedlists.  Revised and newly created drawings shall be developed to document any design change and shall reflect allchanges resulting from AN/MRC-142 Project Manager approved ECP(s).  The drawings shall be used for themanufacture, assembly, provisioning, inspection, testing, and configuration management of the materials, parts,modules, subassemblies, and assemblies of the equipment covered under this contract.  The drawings and associatedlists shall not carry any proprietary markings and provide the necessary design, engineering, manufacturing, andquality assurance requirements information necessary to enable the procurement or manufacture of an interchangeableitem duplicating the physical and performance characteristics of the original product, without additional designengineering effort or recourse to the original design activity. 

b.             Vendor Item Control Drawing. The contractor shall prepare a vendor item control drawing forcommercial item(s) approved for use in the design and not covered by Government or nationally recognized industryassociation specifications and standards. The contractor shall provide evidence that the part complies with therequirements of the applicable part documentation. Existing test data (such as supplier originated objective evidenceof compliance or Government/Industry Data Exchange Project (GIDEP) reports) shall be used to the maximumextent possible.

c.             Technical Manual. The contractor shall develop a AN/MRC-142 TM in accordance with technicalmanual contract requirements (TMCR) CINS-FY-07-004 as required. 

The contractor shall develop the following documents, as defined by, but are not limited to the CDRL Items asindicated:

CDRL Description

A044   Technical Manual Contract Requirement –Technical Manual (TM)

             2.D.      Test and Evaluation

The contractor shall provide the necessary engineering and technical expertise to conduct a thorough test andevaluation of all operational, logistical and functional aspects of newly designed or modified systems, equipment orcomputer software.   The contractor shall participate in test and evaluation by preparing or reviewing test andevaluation plans and procedures or both. The contractor shall conduct laboratory and field tests at SPAWARSystems Center, LANT and at other designated government facilities as required.

The contractor may support the SSC-LANT and Marine Corps Systems Command test events by providing one ora combination of on-site maintenance, training, logistics, and technical support for the period of the test.

a .         Test Plans/Procedures. The contractor shall prepare in accordance with CDRL Item A007 the testplans/procedures for testing and evaluating the AN/MRC-142 system, subsystem, equipment, and software.  Thetest procedures shall clearly define the objectives of the test, the procedures that must be carried out by the test teamto meet these objectives, and the pass/fail criteria for the test.  Test procedures documentation shall be according tothe main contract.

b.     Interoperability Testing. The contractor may support Command and Control (C2) Interoperability TestingInitiatives to satisfy AN/MRC-142 requirements as required.  One of the new initiatives is for the AN/MRC-142suite to be able to receive, process, and transmit or forward IPv6 packets and should interoperate with other systemsand protocols in both IPv4 and IPv6 modes of operation.  These efforts may take place in Camp Pendleton, CA.Additionally the contractor is to provide on-site SME support for the following tests and exercises: Mojave Viper,Rolling Thunder, and other test events as required.  This is not an all-encompassing list, the contractor will readilysupport any other locations designated by the Project Offices.

c.     System Integration/Qualification Test

 The contractor may develop and implement System Integration/Qualification Test (SIT) procedures to demonstratethe adequacy and suitability of the contractor’s integration processes and procedures for achieving the performanceinherent in the design.  The results of the test shall demonstrate the techniques and processes employed do notdegrade the design and meet all requirements in the Performance Specification.  Contractors will be required to

 CONTRACT NO.

 N65236-13-D-4891 DELIVERY ORDER NO.

 0001 AMENDMENT/MODIFICATION NO.

 01 PAGE

 8 of 21 FINAL

 

Page 11: 6. ISSUED BY CODE N65236 7. ADMINISTERED BY (If … · ASME Y14.34M 1-Jan-96 Associated Lists ASME Y14.35M 8-Dec-97 Revision Engineering Drawings & Associated List e. Forms

support AN/MRC-142 testing to include, but not limited to, USMC platforms such as AAV, LAV, MRAP, BFSA,and Platform Integration.  

d.     Product Acceptance Test.

        The contractor may develop and implement Production Acceptance Test (PAT) procedures to demonstrate theadequacy and suitability of the contractor’s production processes and procedures for achieving the performanceinherent in the design.  The results of the test shall demonstrate the system meets all requirements identified in thePerformance Specification.  The contractor may conduct testing, which will ensure that the manufacturing processes,equipment, and procedures are effective.  These tests may be conducted on a number of samples taken at randomfrom the first production lot, and will be repeated if the manufacturing process or design change significantly, orwhen a second source is brought on line.

e. Test Reporting. The contractor may prepare detailed test reports, documenting the test and evaluation activitiesconducted to verify the military utility, safety, effectiveness, and suitability (including compatibility,interoperability, reliability, maintainability, and ILS requirements) for specified systems, equipment, and/orsoftware.  These reports shall include all data collected during the performance of T&E efforts relative to themeasurement and analysis of system and/or equipment design compliance with government specification fortechnical and operational performance.  Test reports shall be prepared in sufficient depth to permit technical riskassessment, determination of program progress, early identification of technological and engineering deficiencies, and(where applicable) to support the certification of system/equipment readiness for operation evaluation or direct fleetintroduction.

a.       The contractor shall perform T&E on AN/MRC-142C systems according to QAP.

b.       Perform condition assessments of equipment.

c.        Develop pre and post-integration testing procedures and reports.

d.       Perform evaluation and validation and verification activities to promote plan confidence per the contractsspecifications.

The contractor shall develop the following documents, as defined by, but are not limited to the CDRL Items asindicated:

CDRL Description

A007          Test Plan – Formal Testing and Verification (FT&V) Plan and Procedures

A009          Test Plan – Formal Testing and Verification (FT&V) Report

A007          Test Procedure – System Integration Test (SIT) Procedures

A009          Test/Inspection Report – System Integration Test (SIT) Report

A007          Test Procedure – Product Acceptance Test (PAT) Procedures

A009          Test/Inspection Report – Product Acceptance Test (PAT) Report

A007          Test and Evaluation Master Plan (TEMP)

 Sub-Task 3.    Prepare and provide Integrated Logistics Support as listed below IAW task G: Logistics Support of thecontract.

                3.A.         Scope.

The contractor shall provide engineering, technical, and analytical support to the AN/MRC-142 program logisticsupport efforts.  This support shall include the analysis, development, review, maintenance, and tracking of systemand equipment logistics support.

3.B.         Logistics Planning Support.

 CONTRACT NO.

 N65236-13-D-4891 DELIVERY ORDER NO.

 0001 AMENDMENT/MODIFICATION NO.

 01 PAGE

 9 of 21 FINAL

 

Page 12: 6. ISSUED BY CODE N65236 7. ADMINISTERED BY (If … · ASME Y14.34M 1-Jan-96 Associated Lists ASME Y14.35M 8-Dec-97 Revision Engineering Drawings & Associated List e. Forms

The contractor shall provide engineering, technical, and analytical support for all Integrated Logistic Support (ILS)elements and disciplines.

The contractor shall develop the following documents, as defined by, but are not limited to the CDRL Items asindicated:

CDRL Description

A052   Validation Completion Report

A049   Integrated Logistic Support Plan

A053   Supportability Assessment Plan

            3.C.         Fielding Support.

The contractor shall provide AN/MRC-142 fielding support as required to the USMC as their tactical distributionnetwork at I, II, III MEF, MARCENT, and MARFORRES.  The contractor shall provide fielding support functionsto include installation of the AN/MRC-142 system in coordination with each MEF/unit to ship, receive, and storeequipment for gaining commands.  The contractor shall provide a Master Site Inventory (MSI) to each unit gainingAN/MRC-142 updated systems, MARCORLOGCOM and to the MCSC AN/MRC-142 Project Office.  The MSIshall contain the NSN, and serialized inventory, System ID, and TAMCN of the AN/MRC-142.  The contractorshall coordinate a turnover schedule with gaining commands and perform a serialized “item by item” inventory withthe supply officer, or his representative, and obtain a signature for the acceptance of the AN/MRC-142 system.  Thecontractor shall provide as part of the turnover package, the MSI, SL-3, Fielding Plan (formerly called ULSS),technical manuals, warranty matrix (A049) and any other logistics documentation required. 

a.  Support and provide feedback to current and future Fielding Plans (FP).

b.  Provide on-site field support as required.

The contractor shall develop the following documents, as defined by, but are not limited to the CDRL Items asindicated:

CDRL Description

A004          Technical Report – Study/Services

A012          Trip Report

A049          Integrated Logistics Support Plan- Warranty Matrix               

             3.D.      Configuration Management

a.             Scope.  The Contractor shall provide SME support implementation of Configuration Management (CM)processes for the control of all configuration items AN/MRC-142 and various platform configurations to ensure eachitem delivered conforms to the approved CM Product Baseline.  The principles contained in EIA-649 andMIL-HDBK-61A may be used for guidance.  The Contractor’s CM program shall consist of configurationidentification, configuration control, configuration status accounting, and configuration audits.  The Contractor’sCM principles shall not conflict with the overarching TCS CM Plan. The contractor shall use SPAWAR SystemsCenter approved software to maintain CM. In addition, the contractor shall be familiar with automated CM tools,such as CMPRO, and SABER.

                                                                 i .      Provide Configuration Management Plan (CMP).

  b .                         Configuration Identification.  The contractor shall participate in a joint Government/contractorintegrated team to designate Configuration Items (CIs) to be managed by the contractor on behalf of the ProjectEngineer. The contractor shall develop, review, update, and maintain configuration identification records forAN/MRC-142 in a database to be identified by the Government.

 CONTRACT NO.

 N65236-13-D-4891 DELIVERY ORDER NO.

 0001 AMENDMENT/MODIFICATION NO.

 01 PAGE

 10 of 21 FINAL

 

Page 13: 6. ISSUED BY CODE N65236 7. ADMINISTERED BY (If … · ASME Y14.34M 1-Jan-96 Associated Lists ASME Y14.35M 8-Dec-97 Revision Engineering Drawings & Associated List e. Forms

c .                         Engineering Changes.  The contractor shall evaluate all Engineering Change Proposals (ECPs) forpotential system and/or equipment CM impact.  Upon approval of an ECP, the contractor shall incorporateengineering change data into the system configuration management data records.

The contractor shall assist the Project Engineer in the development of ECPs when changes are required to correctdefects, add or modify interface or interoperability requirements, make a significant and measurable effectivenesschange in the operational capabilities or logistics supportability of the system.

The contractor shall develop the following documents, as defined by, but are not limited to the CDRL Items asindicated:

CDRL Description

A006   Engineering Change Proposal (ECP)

d.                       Configuration Management Records and Reports.  The contractor shall establish, update, maintain, andreview CM records and generate the required CM reports (CDRL A028).

                              e .                         Master Site Inventory (MSI).  The contractor shall develop, update, and maintain siteinventory listing and shortage items lists for each site. The master site inventory listings be provided and reflect anaccurate indication of all items actually received by the site.   The contractor shall maintain the MSI viaWEB/SIPRNET or other means as identified by SPAWAR.

                              f .                         Material Tracking Database.  The contractor will also maintain hardware ConfigurationManagement (CM) and database tracking of the fielded AN/MRC-142 assets.  The MSI will be generated from thedatabase and upon return of fielding evolutions will be updated with corrections made on site.  Reports on fieldedhardware “as delivered” or “as fielded” to the gaining unit will be available to the as requested.

The contractor shall develop the following documents, as defined by, but are not limited to the CDRL Items asindicated:

CDRL Description

A038   Configuration Status Records/Reports

A002   Technical Report, Audit

A037   Configuration Management Plan (CMP)

A039   Master Site Inventory List

A032   Site Shortage Item Report

A038   Technical Report, Logistics System Support/Configuration Status Records

A028  Technical Reports, General- Configuration Management Records, and Reports

            3.E.   Packaging, Handling, Storage and Transportation.

The contractor shall be responsible for the preservation and packaging of all items to be delivered to the fleet.Packaging data shall be subject to Government approval prior to parts being shipped.  The contractor’s logisticspersonnel will assist in the coordination of the transportation of all currently fielded AN/MRC-142 systems and itsassociated equipment to be shipped from the fielded unit to SPAWAR for retrofit of technology insertion.

            3.F.         Services and Material Procurements.

In order to perform the activities specified in this task order, the contractor may be required to purchase material forthe Government. The contractor will provide incidental materials (e.g., batteries, cables, shipping, etc). Priorapproval by email from the COR is required for all purchases.  The contractor shall execute procurement activities inaccordance with all applicable federal procurement laws and regulations. Procure, track and report status of requiredmaterial items

 CONTRACT NO.

 N65236-13-D-4891 DELIVERY ORDER NO.

 0001 AMENDMENT/MODIFICATION NO.

 01 PAGE

 11 of 21 FINAL

 

Page 14: 6. ISSUED BY CODE N65236 7. ADMINISTERED BY (If … · ASME Y14.34M 1-Jan-96 Associated Lists ASME Y14.35M 8-Dec-97 Revision Engineering Drawings & Associated List e. Forms

3.G          Asset Management (AM).

Devise goals and policies reflecting Project Engineer’s (PE) guidance. Maintain asset inventory records according toCMP. Provide oversight to all CM activities during upgrades and engineering changes.

7.         GOVERNMENT FURNISHED INFORMATION (GFI)

The government shall provide all commercial off the shelf / government off the shelf (COTS & GOTS) or associatedindustry and government publications, with any associated licenses required by the government, per the contractsspecification and deliverable requirements.  These items will remain the property of the government and uponcompletion of contract work, all of the materials and assets will be returned to the government or destroyed asdirected by the COR.

8.         GOVERNMENT FURNISHED PROPERTY

8.1 GOVERNMENT FURNISHED EQUIPMENT (GFE)

The government shall provide access to the government owned data bases, equipment, and test bed facilities. Officespace will be provided for contractor personnel on an as-available basis. The government will provide governmentcomputers and software support to work in secured and unsecured facilities where applicable to support the contractrequirements data listings as directed by the COR. The items located in SABER inventoried AN/MRC-142 systemequipment that may be issued to the contractor to accomplish the efforts associated with the engineering, logistics,testing and fielding tasks set forth in this PWS.  The contractor will only receive and be held responsible for theequipment on the date that a properly executed NERP DD 1149 is issued.  Upon completion of the task, theequipment will be returned to the Government with a DD 1149 being properly documented.

This equipment will need to be transferred from the previous contract to the new contract.

See listing in SABER for complete list.

8.2 GOVERNMENT FURNISHED MATERIAL

The government shall provide government publications and associated materials where applicable to support thecontract requirements and deliverables. The government shall also provide any raw materials required in thefabrication of new systems components not already provided by furnished equipment and that require engineeringchanges as directed by the COR.     

 9.         CONTRACTOR ACQUIRED PROPERTY (CAP)

             9.1 CONTRACTOR ACQUIRED EQUIPMENT (CAE)

             The contractor will provide incidental materials (e.g., batteries, cables, shipping, etc).

             9.2 CONTRACTOR ACQUIRED MATERIAL (CAM)

             N/A

10.       TRAVEL REQUIREMENTS

             For estimating purposes only, it is anticipated that the following travel requirements may be necessary:          

From To # Trips # People # DaysCharleston, SC Camp Pendleton, CA 01 02 07Charleston, SC Camp Lejeune, NC 01 02 07Charleston, SC Albany, GA 01 02 07Charleston, SC 29 Palms, CA 02 03 21

*For estimation purposes only. The sponsor has not identified these specific locations yet.

 CONTRACT NO.

 N65236-13-D-4891 DELIVERY ORDER NO.

 0001 AMENDMENT/MODIFICATION NO.

 01 PAGE

 12 of 21 FINAL

 

Page 15: 6. ISSUED BY CODE N65236 7. ADMINISTERED BY (If … · ASME Y14.34M 1-Jan-96 Associated Lists ASME Y14.35M 8-Dec-97 Revision Engineering Drawings & Associated List e. Forms

Overtime is not anticipated, but is authorized if required.

11.       TRANSPORTATION OF EQUIPMENT/MATERIAL

For estimating purposes, it is anticipated that the following transportation requirements may be necessary:

Materiel will be delivered in-place for Government Acceptance Quality Assurance (QA) inspection. Most materielwill be transferred to the SSC-LANT representatives for subsequent shipping to the applicable destination. TheContractor will be able to ship materiel, especially small packages, support emergent quick-response requirementsfor shipping, and maintain tracking of all shipments from point of origin to destination. The Contractor will utilizethe existing shipment tracking log to incorporate tracking the shipping information for this task order. The log mustlist the intended recipient's company/organization with Point of Contact, the cost of the shipment, and informationto relate each shipment to the ship/site and event the shipment supports. The log will also track the materialrequired but not available at the time of the shipments (ship-short items).

 CONTRACT NO.

 N65236-13-D-4891 DELIVERY ORDER NO.

 0001 AMENDMENT/MODIFICATION NO.

 01 PAGE

 13 of 21 FINAL

 

Page 16: 6. ISSUED BY CODE N65236 7. ADMINISTERED BY (If … · ASME Y14.34M 1-Jan-96 Associated Lists ASME Y14.35M 8-Dec-97 Revision Engineering Drawings & Associated List e. Forms

12.       DATA DELIVERABLES

The contractor shall deliver work products as directed by SSC-LANT that are in keeping with the project schedule.All items developed, engineered, and integrated in support of the PWS are Government Property unless otherwisestipulated by intellectual property rights of a contractor and clearly identified to the Project Engineer. Alldeliverables shall be provided in electronic format and, when requested, in hard copy format.

Deliverables must incorporate SSC-LANT review comments for acceptance. SSC-LANT shall have at least fiveworking days to review deliverables and provide comments. For the deliverable to be accepted, it must have beenformally checked for quality. Deliverables found “unacceptable” shall be corrected and resubmitted within 10workdays of initial rejection.

Data Item Description CDRL TitleN/A A001 Hardware Requirements Specification (HRS),

Functional Requirements, Technical Specifications

DI-MISC-80508A A002 Technical Reports, Documentation Review, Audit

DI-ADMN-81250A A003 Conference, Meeting Minutes & PresentationReports

DI-MISC-80508A A004 Technical Report, Study/ServicesIEEE/EIA-12207 A006 Engineering Change Proposal (ECP)DI-QCIC-80553 or DI-NDTI-80566and DI-NDTI-81284

A007 Test Plans, Test and Evaluation Master Plan(TEMP), Test Procedure - System Integration Test(SIT) Procedures, Product Acceptance Test (PAT)Procedures, Test Plan - Formal Testing andVerification (FT&V) Plan

DI-NDTI-80809B A009 Test Reports, Test/Inspection Report - SystemIntegration Test (SIT) Report, Product AcceptanceTest (PAT) Report

DI-MGMT-80004 A010 Plans, Management/Performance/Performance/Development - Program Master Plan, Requirements Management Plan, RequirementsTraceability Matrix

DI-MISC-80652 A011 Informal Technical InformationDI-MISC-80508A A012 Trip/Technical ReportDI-DRPR-80651 A014 Engineering Drawings - Product Drawings/Models

and Associated ListsDI-MGMT-80227/DI-FNCL-81537 A015 Contractor Status and Man-hour  ExpenditureDI-MGMT-80227/DI-FNCL-81537 A017 Contractors Program and Status ReportDI-IPSC-81431A/ DI-IPSC-81431A

A025 System/Subsystem Specification (SSS)

DI-MISC-80508A

 

A028 Technical Reports, General - ConfigurationManagement Records and Reports

N/A A032 Site Shortage Item ReportDI-MISC-80508A A033 Installation/delivery/Design Engineering Plans

DI-IPSC-81434A A035 Interface Requirements Specification (IRS)DI-CMAN-80805B A037 Configuration Management Plan (CMP)

DI-MISC-80508A A038 Technical Report, Logistics System Support/Configuration Status Records

DI-MISC-80508A A039 Master Site InventoryN/A A041 Quality Program Plan

 CONTRACT NO.

 N65236-13-D-4891 DELIVERY ORDER NO.

 0001 AMENDMENT/MODIFICATION NO.

 01 PAGE

 14 of 21 FINAL

 

Page 17: 6. ISSUED BY CODE N65236 7. ADMINISTERED BY (If … · ASME Y14.34M 1-Jan-96 Associated Lists ASME Y14.35M 8-Dec-97 Revision Engineering Drawings & Associated List e. Forms

TMCR CINS-FY07-004 A044 Technical Manual Contract Requirement-Technical Manual

DI-ILSS-80095/ DI-ILSS-80531/DI-ILSS-80391

A049 Integrated Logistic Support Plan, LogisticsSupport Analysis Plan, User's Logistics SupportSummary

DI-MISC-80711A A052 Validation Completion ReportDI-MISC-80508A or ContractFormat

A053 Supportability Assessment Plan

 

 13.       SUBCONTRACTING REQUIREMENTS

As required.

14.       INSPECTION/ACCEPTANCE PLAN

Inspection and acceptance will be performed by the COR, AN/MRC-142 Government Leads and GovernmentQuality Assurance and Test & Evaluation Leads in conjunction with separately contracted teams.                       

15.       OTHER CONDITIONS/REQUIREMENTS

An extended workweek may be required and will require prior approval by the COR via email .

16.       LIST OF ATTACHMENTS

QASP

IGE 

Proposed Subcontractor Checklist

 CONTRACT NO.

 N65236-13-D-4891 DELIVERY ORDER NO.

 0001 AMENDMENT/MODIFICATION NO.

 01 PAGE

 15 of 21 FINAL

 

Page 18: 6. ISSUED BY CODE N65236 7. ADMINISTERED BY (If … · ASME Y14.34M 1-Jan-96 Associated Lists ASME Y14.35M 8-Dec-97 Revision Engineering Drawings & Associated List e. Forms

SECTION E Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS Supplies/services will be inspected/accepted at: CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY0001 Destination Government Destination Government000101 Destination Government Destination Government000102 Destination Government Destination Government

 CONTRACT NO.

 N65236-13-D-4891 DELIVERY ORDER NO.

 0001 AMENDMENT/MODIFICATION NO.

 01 PAGE

 16 of 21 FINAL

 

Page 19: 6. ISSUED BY CODE N65236 7. ADMINISTERED BY (If … · ASME Y14.34M 1-Jan-96 Associated Lists ASME Y14.35M 8-Dec-97 Revision Engineering Drawings & Associated List e. Forms

SECTION F Deliverables or Performance

The periods of performance for the following Items are as follows:

   

0001 7/11/2013 - 7/10/2014

0004 7/11/2013 - 7/10/2014

CLIN - DELIVERIES OR PERFORMANCE

 CONTRACT NO.

 N65236-13-D-4891 DELIVERY ORDER NO.

 0001 AMENDMENT/MODIFICATION NO.

 01 PAGE

 17 of 21 FINAL

 

Page 20: 6. ISSUED BY CODE N65236 7. ADMINISTERED BY (If … · ASME Y14.34M 1-Jan-96 Associated Lists ASME Y14.35M 8-Dec-97 Revision Engineering Drawings & Associated List e. Forms

SECTION G Contract Administration Data

REFERENCE: Payment instructions: PGI 204.7108 (d)(2)  252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JUN 2012)The contractor shall cite on each invoice/voucher, in addition to all other requirements of this contract/order, thecontract line item number (CLIN); the contract subline item number (SLIN) and accounting classification referencenumber (ACRN) for the portion, or portions of work being billed as specified in the contract or delivery order.  Foreach ACRN on the invoice/voucher, the contractor shall identify the amount being billed against that ACRN.  Invoices shall be submitted in accordance with Wide Area Work Flow as annotated by the basic contract. The contractor will electronically submit his invoices using the Wide Area Workflow (WAWF) web site located athttps://wawf.eb.mil.  The telephone number for assistance pertaining to Wide Area Work Flow is 800-559-9293. 

Cost Contracts Supply/Service WAWF Table

Invoice Type Cost Vouchers

Issued by N65236

Admin by DCMA ( S0302A )

DCAA Auditor DCAA ( HAA030 )

Service Approver DCMA ( S0302A )

Pay by DFAS Columbus ( HQ0339 )

 5252.232-9210 LIMITATION OF LIABILITY--INCREMENTAL FUNDING (JAN 1992)

This task/delivery order is incrementally funded and the amount currently available for payment hereunder is limitedto $645,828.19  inclusive of fee. It is estimated that these funds will cover the cost of performance through 30 June2014 . Subject to the provisions of the FAR 52.232-22 "Limitation of Funds" clause of this contract, no legalliability on the part of the Government for payment in excess of $645,828.19 shall arise unless additional funds aremade available and are incorporated as modifications to this contract.

Total Award Amount Total Funds Available Unfunded Amount $1,281,708.89  $645,828.19  $635,880.70

Accounting Data

SLINID PR Number Amount -------- ---------------------- ---------------------000101 1300342516-0001 380562.19  LLA : AA 1721109 4633 252 67854 067443 2D 4633B1 3RC24F36124F  Standard Number: M9545013RC24F36 ACRN: AA PR: 1300342516-0001 DOC: M9545013RC24F36 COST CODE: 3RC24F36124F NWA: 100000805241-CMIT  

 CONTRACT NO.

 N65236-13-D-4891 DELIVERY ORDER NO.

 0001 AMENDMENT/MODIFICATION NO.

 01 PAGE

 18 of 21 FINAL

 

Page 21: 6. ISSUED BY CODE N65236 7. ADMINISTERED BY (If … · ASME Y14.34M 1-Jan-96 Associated Lists ASME Y14.35M 8-Dec-97 Revision Engineering Drawings & Associated List e. Forms

000102 1300342516-0001 65266.00  LLA : AB 1731109 4633 252 67854 067443 2D 463300 3RC34516111O  Standard Number: M9545013RC34516 ACRN: AB PR: 1300342516-0001 DOC: M9545013RC34516 COST CODE: 3RC34516111O NWA: 100000834977-3CTR   BASE Funding 445828.19 Cumulative Funding 445828.19  MOD 01  000103 1300397781 200000.00  LLA : AC 17 3 1109 4633 252 67854 067443 2D 463300 3RC34516111O  Funding Documnet Number: M9545013RC34516 NWA: 100000834977-3CTR Fund Expire: 09/30/2015   MOD 01 Funding 200000.00 Cumulative Funding 645828.19 

 CONTRACT NO.

 N65236-13-D-4891 DELIVERY ORDER NO.

 0001 AMENDMENT/MODIFICATION NO.

 01 PAGE

 19 of 21 FINAL

 

Page 22: 6. ISSUED BY CODE N65236 7. ADMINISTERED BY (If … · ASME Y14.34M 1-Jan-96 Associated Lists ASME Y14.35M 8-Dec-97 Revision Engineering Drawings & Associated List e. Forms

SECTION H Special Contract Requirements

DISTRIBUTION: 

 

Contractor:KinetX2050 East ASU Circle, Suite 107Tempe, AZ 85284

 POC:  Tony Yarkosky/602-690-4945/[email protected]  

DCAA – HAA030 Arizona Branch Office

DFAS – HQ0339 Columbus Center

DCMA – S0302A Phoenix

 All electronically distributed. 

Contractor Local Address:

Name/Address of company

POC: Name/phone number/e-mail

SPAWARSYSCEN CODES:

CRM:  Liz Dawsey; [email protected]

Contract Administrator: Jillian Woppert;[email protected]

Ordering Officer: Bridgette Clayton; [email protected]  

COR: Taylor Lethco, [email protected]  Sponsor: Name/Activity/e-mail

 

 

SBA (If required): address, POC name/e-mail)

 CONTRACT NO.

 N65236-13-D-4891 DELIVERY ORDER NO.

 0001 AMENDMENT/MODIFICATION NO.

 01 PAGE

 20 of 21 FINAL

 

Page 23: 6. ISSUED BY CODE N65236 7. ADMINISTERED BY (If … · ASME Y14.34M 1-Jan-96 Associated Lists ASME Y14.35M 8-Dec-97 Revision Engineering Drawings & Associated List e. Forms

SECTION J List of Attachments

Revised QASP Part 1

Revised QASP Part 2

 CONTRACT NO.

 N65236-13-D-4891 DELIVERY ORDER NO.

 0001 AMENDMENT/MODIFICATION NO.

 01 PAGE

 21 of 21 FINAL