5Whys Templete

  • Upload
    jsh100

  • View
    11

  • Download
    0

Embed Size (px)

DESCRIPTION

Lean Manufacturing Training

Citation preview

5WhysCorrective Action5 Whys Studywith ResponsibilityDateDefine symptomA problem well defined is a problem half solvedUse this path forthe specificAnonconformancebeing investigated(Define Problem)WHY?ThereforeRoot CausesUse this path to investigate why the problem was not detectedWHY?ThereforeWHY?ThereforeBWHY?ThereforeWHY?ThereforeAUse this path to investigate the systemic root cause (Quality System Failures)WHY?ThereforeProblem definitionWHY?ThereforeCWHY?ThereforeWHY?ThereforeBNextReported byWHY?ThereforeBreak PointDateWHY?ThereforeRevisionReference PNProduct / ProcessWHY?ThereforeCNextProblem Resolution CompleteCommunicate to .. Date:Process Change Break Point Date:Implement System Change Date:Lessons Learned:Team Members:Javier Rubio Barragn, Cadiz Spain Europe.

A good 5-Why will answer Yes to the five PDCA questions:PLANDOCHECKACT1. Is the problem statementCLEAR and ACCURATE?

2. Has the SYSTEMICroot cause(s) beenidentified for all legs?3. Has IRREVERSIBLECORRECTIVE ACTION(s)been implemented forALL root causes?4. Has a plan been identifiedto verify theEFFECTIVENESSof all correctiveactions?5. Has a plan been identifiedto STANDARDIZE and takeall lessons learned acrossproducts, processes,plants, functional areas, etc.?Understand the problemExecute the PlanFollow-upStandardizeA problem well definedis a problem half solved5-Why:Specific problem: Why did we have the problem?Problem not detected:Why did the problem reach the Customer?System failure:Why did our system allow it to occur?

&APage &P&APage &P