5S implimentation

Embed Size (px)

Citation preview

  • 8/6/2019 5S implimentation

    1/5

    5S is short for: Sort, Set in Order, Shine, Standardize and Sustain

    5S represents 5 disciplines for maintaining a visual workplace (visual controls andinformation systems).

    These are foundational to Kaizen (continuous improvement) and a manufacturing

    strategy based "Lean Manufacturing" (waste removing) concepts.5S is one of the activities that will help ensure our companys survival.

    1. Sort - All unneeded tools, parts and supplies are removed from thearea

    2. Set in Order - A place for everything and everything is in its place

    3. Shine - The area is cleaned as the work is performed

    4. Standardize - Cleaning and identification methods are consistently applied

    5. Sustain - 5S is a habit and is continually improved

    5S Training & Implementation

    5S is a philosophy and methodology for organizing and managing theworkplace and work flow with the intent of improving efficiency and safety by

    eliminating waste. Simply put, 5S is a method for organizing a workplace,especially a shared workplace (like a shop floor or an office space), and

    keeping it organized.

    To eliminate workplace hazards and waste of materials and resources,workplace organization, cleanliness, and standardization are imperative. The5S approach is highly effective at removing hazards and waste from your

    workplace and creating a safer, cleaner, and healthier work environment.Simple techniques are used to develop and improve effective workplace

    organization, safety, visual communication, and general cleanliness andhousekeeping.

  • 8/6/2019 5S implimentation

    2/5

    5S Workshop

    A critical factor to successfully implementing and sustaining the benefits of a

    5S program is the significant role your employees will play this 5S Workshopto be a practical hands-on experience. Actual areas of your facility are chosen

    for improvement. These areas serve as the practical hands-on exercises forthe application of each 5S technique. The 5S Workshop can be taught in

    either the office or shop floor environment.

    In keeping with Pinnacle's Lean EMS approach, the 5S program is sustainedwithin the context and culture of your environmental management system

    (EMS) or business operating system (BOS). Pinnacle provides the followingthree customizable models that are directly integrated into your current EMSor BOS:

    5S Work Environment- Process Map model of a Support Process forthe implementation and ongoing support/improvement of the 5S

    program

    5S Implementation Plan - Template of an implementation plan that

    ensures all pillars of a 5S program are considered, planned, andimplemented.

    5S Audit Checklist- Audit checklist that facilitates theongoing/routine measurement and monitoring of the 5S program.

    Upon completion of this 5S Workshop, participants will be able to understandand immediately apply the 5S concepts in your facility.

    Contact Pinnacle to schedule your 5S Workshop.

    5S Workshop Objectives

    1S - Sort

    Identify the items that are needed to perform work in the work areas. Clear

    (sort out) all other items from the work area. Benefits:

    Extra work space

    Improved safety

    Improved productivity

    Improved utilization of materials, supplies, and resource More visible work flow

    Improved employee satisfaction (better place to work)

    Improved quality

    2S - Set In Order

    http://www.pinnacleeg.com/services_HP_environmental-management-systems-EMS.php/page/services/service/environmental-management-systems-EMShttp://www.pinnacleeg.com/services_HP_environmental-management-systems-EMS.php/page/services/service/environmental-management-systems-EMShttp://www.pinnacleeg.com/services_HP_environmental-management-systems-EMS.php/page/services/service/environmental-management-systems-EMShttp://www.pinnacleeg.com/services_HP_environmental-management-systems-EMS.php/page/services/service/environmental-management-systems-EMShttp://www.pinnacleeg.com/services_SPEMS_process-mapping.php/page/services/service/processmappinghttp://www.pinnacleeg.com/services_SPEMS_lean-ems-curriculum.php/page/services/service/leanemscurriculum#leanemsdocumentationhttp://www.pinnacleeg.com/contact.php/page/contacthttp://www.pinnacleeg.com/services_HP_environmental-management-systems-EMS.php/page/services/service/environmental-management-systems-EMShttp://www.pinnacleeg.com/services_SPEMS_process-mapping.php/page/services/service/processmappinghttp://www.pinnacleeg.com/services_SPEMS_lean-ems-curriculum.php/page/services/service/leanemscurriculum#leanemsdocumentationhttp://www.pinnacleeg.com/contact.php/page/contact
  • 8/6/2019 5S implimentation

    3/5

    All needed items have a place in the work area and each needed item is inthe correct place. Improve ease of or need for retrieval. Benefits:

    Elimination of time, motion, and effort needed to search for or retrievetools and supplies (tools and supplies are located at point of use)

    Improved safety through an organized workplace Increased productivity

    3S - Shine

    Proactive/preventive housekeeping to keep work areas, work surfaces, andequipment clean and free from dirt, debris, oil, etc. Benefits:

    Cleaner and more satisfying place to work

    Improved Quality

    Maintenance issues exposed faster (planned downtime vs. unplanned

    downtime)

    Improved safety (fewer accidents)

    4S - Standardize

    Do things in a consistent and standard way. Standardize activities,

    procedures, instruction, schedules, and the persons responsible for helpingkeep the workplace clean and organized. Standardize work area layouts and

    storage techniques wherever possible.

    5S - Sustain

    Integrate 5S principles into the organization's EMS or BOS in order to sustainnew standards and continually improve the workplace.

    Some New Words

    Red Tag-Process for tagging, removing and disposing of items not needed in the workarea. Lean Manufacturing-concepts that seek continuous improvement by removing

    waste in processes Some Japanese words you need to know:Kaizen-(pronounced ki zen) - improvement

    Kaizen Event and 5S Event-Planned improvements to a

    specific area or process (usually take 3 to 5 days).

    5S Events focus on making 5S improvements.Muda-(pronounced moo da) - waste

    Gemba-(pronounced gim ba) - workplace

  • 8/6/2019 5S implimentation

    4/5

    New Words Continued

    Kanban-(pronounced kon bon) - Pull type inventory control system. Items are only

    produced to meet customer needs. The request to produce more is signaled from anupstream operation and/or customer orders.

    Value Stream Map - A diagram of all processes needed to make and deliver the product

    to the customer.

    OTHER PROBLEM SOLVING TOOLS

    TOC-Short for Theory of Constraints. Problem solving and constraint managementmethods. Use the 5 Step form of TOC to solve problems that you will encounter in your

    continuous improvement efforts.

    For Example

    Before 5S

    After 5S - Cleaned, organized and drawers labeled (less time and frustration hunting)

    4. Standardize - Cleaning and identification methods are consistently applied

    Departments have weekly 5S tours

    Every job has duties that use Sort, Set in Order and ShineWe all have common duties to do our part to keep all areas of the plant in shape -breakroom, restrooms, locker area, parking lot, etc

    5. Sustain - 5S is a habit and is continually improved5S is a simple concept with powerful results.

    You will get additional information on 5S so that you will be well equipped.

  • 8/6/2019 5S implimentation

    5/5

    Our experience is that the more we do 5S the better the work environment becomes:

    cleaner, safer, more organized, the work is easier, less confusion and less stress.

    Use the 5S (work\home\play) - The more you use it the easier it becomes and life justgets better and better.

    Some of the main forms of waste are:

    Overproduction

    Waiting for materials, machines, or instructionTransportation or movement

    Excessive inventory

    Inefficient machine processing and/or operation

    Producing defectsPart or line changeover or machine setup

    Inadequate housekeeping

    Miscommunication or inadequate instruction

    Conclusion

    5-S is for you.Clean-up and organize your work area every day so that each new day iseasier and safer than the day before

    Share your input with your leaders so that the tools you need will be available to you,

    increasing your efficiency.

    Volunteer to help with the 5S tours and 5S events.

    Take a good look around...Imagine zero waste/zero confusion!

    .