'5-S' Road map - To do Who ? When? What ? Where? Team Leader Team Members P-D-C-A Jul-07 Aug-07 Sep-07 Oct-07 Nov-07 Plan S0 S1 S2 S2 S0 Plan S0 S1 S2 S2 S0 Actual [Motivate people for 5- S Gemba-1 : [Sort out what is needed and Actua l [Do systematic arrangement for all [Ensure spic & span cleanliness with Gemba-2 : S4 = Seiketsu [Create a highly standardised workplace] S5 = Shitsuke [Self - discipline at workplace]

5S Implementation Plan at Work Place

  • Upload
    brock

  • View
    11

  • Download
    1

Embed Size (px)

DESCRIPTION

Step by STep plan drawn for implementing "5S" at work place.Includes detailed audit at each stage

Citation preview

Page 1: 5S Implementation Plan at Work Place

'5-S' Road map - DepartmentTo do Who ? When?

What ? Where? Team Leader Team Members P-D-C-A Jul-07 Aug-07 Sep-07 Oct-07 Nov-07 Dec-07

Plan S0 S1 S2 S2 S3

Actual S0

Plan S0 S1 S2 S2 S3

S0

Actual

S0 = Enablers [Motivate people for 5-S

implementation]

Gemba-1:

S1 = Seiri [Sort out

what is needed and what is not]S2 = Seiton

[Do systematic

arrangement for all needed

items]S3 = Seiso [Ensure spic & span

cleanliness with inspection]

Gemba-2:

S4 = Seiketsu [Create a

highly standardised workplace]

S5 = Shitsuke [Self - discipline

at workplace]

Page 2: 5S Implementation Plan at Work Place

'5-S' Road map - DepartmentWhen?

Remarks Why ? MOPJan-08 Feb-08 Mar-08

S4 S4 S5SHE

EFSHE

PQCD

S4 S4 S5PQCD

PQCD

Zero setup PQCDEFSHE

1 ] Demonstrate PQI by doing Kaizens 2 ] Remove 3 D's at Gemba

Zero defect

1 ] Develop criteria for need/want to release 50% place

Zero inventory/

More space

1 ] PEEP: Place for everything & everything in its place

Zero waiting

1 ] CLIA: Deploy Clean-Inspect-Lubricate-Adjust 2 ] CPCP

Zero accidents

1 ] SOPs Developed & Displayed 2 ] Establish SDCA

Zero breakdown

1 ] Through continuous education, training, display of results & PDCA improvement cycles

Page 3: 5S Implementation Plan at Work Place

ACTION PLAN FOR "S0" Enablers

Motivating people for 5S implementation (Jul - Aug 07)

Requisites Who Freq Status Remark

Official information HOD Once Ö

5-S Billboards / Camera TL X

Participation of all TL N/A Ö Gemba identified & teams formed

Effective training TL / TM Weekly X

PQCDEFSHE objectives TL / TM Qtr Ö 5S awareness sessions

1-30-300 principle TL / TM Qtr Ö 5S awareness sessions

Roadmap TL Once Ö Prepared & displayed

5-S as a part of Kaizen roadmap

Progress review TL / Auditor Qtr Ö

Publishing & widely communicating about the progress TM Monthly

Active involvement of the teams TL

Regular meetings TM Fortnight

Developing suggestion schemes TM Weekly

B3
Sachin: let us assign names
Page 4: 5S Implementation Plan at Work Place

ACTION PLAN FOR "S1" Seiri

Sorting out what is required & dipose unwanted (Aug - Sep 07)

Requisites Area Who Status Remark

Work Area

TM Ö

TM Ö

TM Ö

TM Ö

Classification in work areas

TM X

TM X

TM X

TM X

TL

X

X

X

X

Scrap Disposal

TM X

TM X

TM X

TM X

TM X

TM X

TM X

TM X

Audit / Visual Inspection of wants / wastes

Listing Wants in an Area after eliminating waste

C3
Sachin: let us assign names
Page 5: 5S Implementation Plan at Work Place

(S1) Waste Identification ChecklistGembaWork AreaTM

Process / Equipment / Item in areaUsage Condition Repairable

Waste

Freq. Rare Never Good Worst Yes No Yes No Yes No

Usage outside area

Better Substitute

avl

B5
Sachin: Over production / inventory
E5
Sachin: Transport / Delay in delivery
G5
Sachin: Expertise / Process
I5
Sachin: if yes transfer to that area
K5
Sachin: scope for improvement
M5
Sachin: If no usage / worst / not repairable
Page 6: 5S Implementation Plan at Work Place
Page 7: 5S Implementation Plan at Work Place

(S1) Waste Identification Checklist

Remark

Page 8: 5S Implementation Plan at Work Place
Page 9: 5S Implementation Plan at Work Place

ACTION PLAN FOR "S2" Seiton

Systematic Arrangement of wanted (Oct - Nov 07)

Requisites Area Who Status Remark

TM X

TM X

TM X

TM X

TM X

TM X

TM X

TM X

TM X

TM X

TM X

TM X

Organising wants in an area in terms of usage / value / importance to process / life cycle

Identifying amenities / infrastructure / tools required for correct organisation (P tags)

Organising in compliance with PEEP & Identifying missing / abnormal item or structure

C3
Sachin: let us assign names
Page 10: 5S Implementation Plan at Work Place

(S2) Systematic arrangement checklistGembaWork AreaTM

Process / Equipment / Item in area Usage Value Qty (Nos) Total Pref. No

0

0

0

0

0

0

0

0

0

0

0

0

Critical to process

Page 11: 5S Implementation Plan at Work Place

Item with pref. no "1" should always be the easiest accesible and further on

Scores can be 1/ 3/ 5 for low / Med / High categories repectively & Pref. no will be in descending order of total score

In case of consumables qty. to be re-ordered when inventory level for High / Med or Low value items reaches 25 % / 50 % levels

Arrangement to comply PEEP concept so that any missing / misplaced item can be identified by visual inspection

List down amenities / tools / structure for correct arrangement. When identified can be purchased or can be picked up from scrap

Page 12: 5S Implementation Plan at Work Place

ACTION PLAN FOR "S3" Seiso

Systematic Arrangement of wanted (Nov - Dec 07)

Requisites Area Who Status

TL / TM X

TL / TM X

TL / TM X

TL / TM X

TM X

TM X

TM X

TM X

TM X

TM X

TM X

TM X

External / Internal man power arrangement for through cleaning

Through cleaning done & scrap disposed safely

All Items / Process / Equipments easly identifiable / accesible / safe

C3
Sachin: let us assign names
Page 13: 5S Implementation Plan at Work Place

ACTION PLAN FOR "S3" Seiso

Systematic Arrangement of wanted (Nov - Dec 07)

Remark

Page 14: 5S Implementation Plan at Work Place

ACTION PLAN FOR "S4" Seiketsu

Systematic Arrangement of wanted (Jan - Feb 08)

Requisites Area Who Status Remark

TM X

TM X

TM X

TM X

TM X

TM X

TM X

TM X

Daily Inspection / Reporting abnormalities

Action for deviation / 5S awareness session or training

C3
Sachin: let us assign names
Page 15: 5S Implementation Plan at Work Place

ACTION PLAN FOR "S5" Shitsuke

Systematic Arrangement of wanted (Mar 08)

Requisites Area Who Status Remark

TL / Auditor X

TL / Auditor X

TL / Auditor X

TL / Auditor X

TL / TM X

TL / TM X

TL / TM X

TL / TM X

TL / TM X

TL / TM X

TL / TM X

TL / TM X

TL X

TL X

TL X

TL X

Monthly / Qtrly. "5S" audit by Internal / External accesor

Action for deviation / findings / document learnings

5S awareness session / training for continual improvement / Visits

Gains in terms of value, life cycle, availability to be published

C3
Sachin: let us assign names
Page 16: 5S Implementation Plan at Work Place

0 = Very Bad 1 = Bad 2 = Avg 3 = Good 4 = Very Good

1S Check Item DescriptionScore

0 1 2 3 4

SE

IRI

Materials / parts Does the inventory or in-process inventory include unneeded mtrl / parts

Machines / Equipment Are there any unused machines or other equipment

Papers / Plastic Mtrl Is there any paper / plastic scrap around

Visual Control Is the waste identified

Sub Total 0 0 0 0 0

2S Check Item DescriptionScore

0 1 2 3 4

SE

ITO

N

Location Indicators Are shelves and other storage areas marked with addresses

Item Indicators Do the shelves have signboards showing which items go where

Qty. Indicators Are Max / Min Inventory levels indicated

Walkway Demarcation Storage areas / Process Area / Units marked

Sub Total 0 0 0 0 0

3S Check Item DescriptionScore

0 1 2 3 4

SE

ISO Floor / Work station Are floors / work station shiny to spot any waste

M/c & Equipments Are they Dust free, running healthy with allowed noise / vibration

Cleaning Stewards Is there a dedicated staff / do they do it voluntarily

Sub Total 0 0 0 0 0

4S Check Item DescriptionScore

0 1 2 3 4

SE

IKT

SU Improvement Idea Is any action plan in place for its deployment

Standard procedure Is the 5S implementation plan documented / published / communicated

Future scope Any continual improvement idea / process / recognition

First 3S Is Seiri / Seiton / Seiso maintained

C31
Sachin: confirmed from images taken
Page 17: 5S Implementation Plan at Work Place

0 = Very Bad 1 = Bad 2 = Avg 3 = Good 4 = Very GoodSub Total 0 0 0 0 0

5S Check Item DescriptionScore

0 1 2 3 4

SH

ITS

UK

E

Equipments / Process Are they easily gettable / managable

Stock levels Is the inventory control adhered to

Training Is Training / 5S awareness in progress

Support Is top management active support available

5-S Billboards Are they updated

Sub Total 0 0 0 0 0

Grand Total 0

Page 18: 5S Implementation Plan at Work Place

0 = Very Bad 1 = Bad 2 = Avg 3 = Good 4 = Very Good

SEIRI 0

SEITON 0

0

SEISO 0

SEIKTSU 0

SHITSUKE 0

0

0

0

SEIRI

SEITON

SEISOSEIKTSU

SHITSUKE

0

0.5

1

Audit Result

Page 19: 5S Implementation Plan at Work Place