Step by STep plan drawn for implementing "5S" at work place.Includes detailed audit at each stage
Citation preview
'5-S' Road map - DepartmentTo do Who ? When?
What ? Where? Team Leader Team Members P-D-C-A Jul-07 Aug-07 Sep-07 Oct-07 Nov-07 Dec-07
Plan S0 S1 S2 S2 S3
Actual S0
Plan S0 S1 S2 S2 S3
S0
Actual
S0 = Enablers [Motivate people for 5-S
implementation]
Gemba-1:
S1 = Seiri [Sort out
what is needed and what is not]S2 = Seiton
[Do systematic
arrangement for all needed
items]S3 = Seiso [Ensure spic & span
cleanliness with inspection]
Gemba-2:
S4 = Seiketsu [Create a
highly standardised workplace]
S5 = Shitsuke [Self - discipline
at workplace]
'5-S' Road map - DepartmentWhen?
Remarks Why ? MOPJan-08 Feb-08 Mar-08
S4 S4 S5SHE
EFSHE
PQCD
S4 S4 S5PQCD
PQCD
Zero setup PQCDEFSHE
1 ] Demonstrate PQI by doing Kaizens 2 ] Remove 3 D's at Gemba
Zero defect
1 ] Develop criteria for need/want to release 50% place
Zero inventory/
More space
1 ] PEEP: Place for everything & everything in its place
Zero waiting
1 ] CLIA: Deploy Clean-Inspect-Lubricate-Adjust 2 ] CPCP
Zero accidents
1 ] SOPs Developed & Displayed 2 ] Establish SDCA
Zero breakdown
1 ] Through continuous education, training, display of results & PDCA improvement cycles
ACTION PLAN FOR "S0" Enablers
Motivating people for 5S implementation (Jul - Aug 07)
Requisites Who Freq Status Remark
Official information HOD Once Ö
5-S Billboards / Camera TL X
Participation of all TL N/A Ö Gemba identified & teams formed
Effective training TL / TM Weekly X
PQCDEFSHE objectives TL / TM Qtr Ö 5S awareness sessions
1-30-300 principle TL / TM Qtr Ö 5S awareness sessions
Roadmap TL Once Ö Prepared & displayed
5-S as a part of Kaizen roadmap
Progress review TL / Auditor Qtr Ö
Publishing & widely communicating about the progress TM Monthly
Active involvement of the teams TL
Regular meetings TM Fortnight
Developing suggestion schemes TM Weekly
ACTION PLAN FOR "S1" Seiri
Sorting out what is required & dipose unwanted (Aug - Sep 07)
Requisites Area Who Status Remark
Work Area
TM Ö
TM Ö
TM Ö
TM Ö
Classification in work areas
TM X
TM X
TM X
TM X
TL
X
X
X
X
Scrap Disposal
TM X
TM X
TM X
TM X
TM X
TM X
TM X
TM X
Audit / Visual Inspection of wants / wastes
Listing Wants in an Area after eliminating waste
(S1) Waste Identification ChecklistGembaWork AreaTM
Process / Equipment / Item in areaUsage Condition Repairable
Waste
Freq. Rare Never Good Worst Yes No Yes No Yes No
Usage outside area
Better Substitute
avl
(S1) Waste Identification Checklist
Remark
ACTION PLAN FOR "S2" Seiton
Systematic Arrangement of wanted (Oct - Nov 07)
Requisites Area Who Status Remark
TM X
TM X
TM X
TM X
TM X
TM X
TM X
TM X
TM X
TM X
TM X
TM X
Organising wants in an area in terms of usage / value / importance to process / life cycle
Identifying amenities / infrastructure / tools required for correct organisation (P tags)
Organising in compliance with PEEP & Identifying missing / abnormal item or structure
(S2) Systematic arrangement checklistGembaWork AreaTM
Process / Equipment / Item in area Usage Value Qty (Nos) Total Pref. No
0
0
0
0
0
0
0
0
0
0
0
0
Critical to process
Item with pref. no "1" should always be the easiest accesible and further on
Scores can be 1/ 3/ 5 for low / Med / High categories repectively & Pref. no will be in descending order of total score
In case of consumables qty. to be re-ordered when inventory level for High / Med or Low value items reaches 25 % / 50 % levels
Arrangement to comply PEEP concept so that any missing / misplaced item can be identified by visual inspection
List down amenities / tools / structure for correct arrangement. When identified can be purchased or can be picked up from scrap
ACTION PLAN FOR "S3" Seiso
Systematic Arrangement of wanted (Nov - Dec 07)
Requisites Area Who Status
TL / TM X
TL / TM X
TL / TM X
TL / TM X
TM X
TM X
TM X
TM X
TM X
TM X
TM X
TM X
External / Internal man power arrangement for through cleaning
Through cleaning done & scrap disposed safely
All Items / Process / Equipments easly identifiable / accesible / safe
ACTION PLAN FOR "S3" Seiso
Systematic Arrangement of wanted (Nov - Dec 07)
Remark
ACTION PLAN FOR "S4" Seiketsu
Systematic Arrangement of wanted (Jan - Feb 08)
Requisites Area Who Status Remark
TM X
TM X
TM X
TM X
TM X
TM X
TM X
TM X
Daily Inspection / Reporting abnormalities
Action for deviation / 5S awareness session or training
ACTION PLAN FOR "S5" Shitsuke
Systematic Arrangement of wanted (Mar 08)
Requisites Area Who Status Remark
TL / Auditor X
TL / Auditor X
TL / Auditor X
TL / Auditor X
TL / TM X
TL / TM X
TL / TM X
TL / TM X
TL / TM X
TL / TM X
TL / TM X
TL / TM X
TL X
TL X
TL X
TL X
Monthly / Qtrly. "5S" audit by Internal / External accesor
Action for deviation / findings / document learnings
5S awareness session / training for continual improvement / Visits
Gains in terms of value, life cycle, availability to be published
0 = Very Bad 1 = Bad 2 = Avg 3 = Good 4 = Very Good
1S Check Item DescriptionScore
0 1 2 3 4
SE
IRI
Materials / parts Does the inventory or in-process inventory include unneeded mtrl / parts
Machines / Equipment Are there any unused machines or other equipment
Papers / Plastic Mtrl Is there any paper / plastic scrap around
Visual Control Is the waste identified
Sub Total 0 0 0 0 0
2S Check Item DescriptionScore
0 1 2 3 4
SE
ITO
N
Location Indicators Are shelves and other storage areas marked with addresses
Item Indicators Do the shelves have signboards showing which items go where
Qty. Indicators Are Max / Min Inventory levels indicated
Walkway Demarcation Storage areas / Process Area / Units marked
Sub Total 0 0 0 0 0
3S Check Item DescriptionScore
0 1 2 3 4
SE
ISO Floor / Work station Are floors / work station shiny to spot any waste
M/c & Equipments Are they Dust free, running healthy with allowed noise / vibration
Cleaning Stewards Is there a dedicated staff / do they do it voluntarily
Sub Total 0 0 0 0 0
4S Check Item DescriptionScore
0 1 2 3 4
SE
IKT
SU Improvement Idea Is any action plan in place for its deployment
Standard procedure Is the 5S implementation plan documented / published / communicated
Future scope Any continual improvement idea / process / recognition
First 3S Is Seiri / Seiton / Seiso maintained
0 = Very Bad 1 = Bad 2 = Avg 3 = Good 4 = Very GoodSub Total 0 0 0 0 0
5S Check Item DescriptionScore
0 1 2 3 4
SH
ITS
UK
E
Equipments / Process Are they easily gettable / managable
Stock levels Is the inventory control adhered to
Training Is Training / 5S awareness in progress
Support Is top management active support available
5-S Billboards Are they updated
Sub Total 0 0 0 0 0
Grand Total 0
0 = Very Bad 1 = Bad 2 = Avg 3 = Good 4 = Very Good
SEIRI 0
SEITON 0
0
SEISO 0
SEIKTSU 0
SHITSUKE 0
0
0
0
SEIRI
SEITON
SEISOSEIKTSU
SHITSUKE
0
0.5
1
Audit Result
0 = Very Bad 1 = Bad 2 = Avg 3 = Good 4 = Very Good 0