14
This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No. 825496 5G-MOBIX Cross Border Corridors & Trial Sites Technical activities, status & roadmap Kostas Trichias (Technical Coordinator – WINGS ICT Solutions) 5G-MOBIX 1 st Webinar, September 16 th , 2019

5G-MOBIX Cross Border Corridors & Trial Sites · verification (D3.6) • Initial feedback and pilot site fine-tuning • Use case execution based on the trialing plan & methodology

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 5G-MOBIX Cross Border Corridors & Trial Sites · verification (D3.6) • Initial feedback and pilot site fine-tuning • Use case execution based on the trialing plan & methodology

This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No. 825496

5G-MOBIX Cross Border Corridors & Trial Sites

Technical activities, status & roadmap

Kostas Trichias (Technical Coordinator –WINGS ICT Solutions)

5G-MOBIX 1st Webinar, September 16th, 2019

Page 2: 5G-MOBIX Cross Border Corridors & Trial Sites · verification (D3.6) • Initial feedback and pilot site fine-tuning • Use case execution based on the trialing plan & methodology

LayoutX-Border focus of 5G-MOBIX

5G-MOBIX CBC/TS overview

2 Cross Border Corridors

5G-MOBIX CBCs / TSs – 5G Networks

5G-MOBIX CBCs / TSs – ITS Infra

5G-MOBIX CBCs / TSs – Vehicles

Roadmap

25G-MOBIX 1st Webinar - Slide

Page 3: 5G-MOBIX Cross Border Corridors & Trial Sites · verification (D3.6) • Initial feedback and pilot site fine-tuning • Use case execution based on the trialing plan & methodology

5G-MOBIX CBCs / TSs –X-Border Issues

X-border operation is the focus of 5G-MOBIX

Main X-border issues investigated in order to be tackled properly

4 main categories identified

Cross Border Telecommunication Issues

Service Quality/Continuity

Security and data protection

Automated driving/regulations

Distinct solutions to be applied and tested at the different CBCs / TSs

35G-MOBIX TR#1 - Slide

Page 4: 5G-MOBIX Cross Border Corridors & Trial Sites · verification (D3.6) • Initial feedback and pilot site fine-tuning • Use case execution based on the trialing plan & methodology

5G-MOBIX CBCs / TSs –X-Border Issues

Telecom Issues

Roaming (continuity, latency) Time

Difference

HO(gNB

change, fallback to

3G/4G)

Intereference @ the ITS Band

Coverage(Overlappi

ng, coverage

gaps)

Inter-MEC connectivi

ty

Hybrid Networking (inter-RAT

coms, IP addressing,

mobility

Geo-Networki

ng

4

Security -Privacy

Trust Model &

Certificate Policy

Data Protection & Privacy

Telecom Security

(Roaming, HO, Geo-

networking)

Automated Driving Security

Application Issues

V2X & Service

Continuity

Interopera-bility

Data Processing

Regulatory Issues

AD & Vehicle

regulations

Traffic & Road

conduct differenti

ation

Different spectrum allocation

s

Sensor regulation

s (Radar, Lidar)

HO Obligation

(no roaming

agreement in place)

Law Enforceme

nt

AV identification (AV vs Non-AV)

Network Neutrality

Page 5: 5G-MOBIX Cross Border Corridors & Trial Sites · verification (D3.6) • Initial feedback and pilot site fine-tuning • Use case execution based on the trialing plan & methodology

Overview of 5G-MOBIX CBCs / TSs

2 Cross-Border Corridors (CBC)

4 complementary European Trial Sites (TS)

2 complementary Asian Trial Sites (TS)

5 Use case categories based on 3GPP TS 22.186, focusing on x-border operation

24 SAE L4 automated vehicles

30 5G gNBs

Starting from NSA Architecture and evolving to SA during the project

55G-MOBIX 1st Webinar - Slide

Page 6: 5G-MOBIX Cross Border Corridors & Trial Sites · verification (D3.6) • Initial feedback and pilot site fine-tuning • Use case execution based on the trialing plan & methodology

Spain-Portugal Cross-Border Corridor

The Spain-Portugal corridor includesthe following use cases locations:

Spain - Vigo bay.

Spain - A-55 and AP-9 (nearCTAG). UC cat1.

Border - Old bridge. UC cat4

Border - New bridge. UC cat1

Portugal - A-28 (segment near thePorto airport and the BoatPassenger Terminal). UC cat1

Vigo-Porto highway roads with 5Gtests in the new bridge. UC cat5

M9 Project Review meeting, July 3rd 2019

Page 7: 5G-MOBIX Cross Border Corridors & Trial Sites · verification (D3.6) • Initial feedback and pilot site fine-tuning • Use case execution based on the trialing plan & methodology

ES-PT CBC Architecture

75G-MOBIX TR#1 - Slide

Internet

GRX International Connection

vMEC

Braga MEC

5G NSA Roaming with local break out

vMEC

Vigo MEC

S1-C

SGi SGi

S6a

S6a

S6a

S6a

5G gNB

4G eNB

S1-U

P-GW HSS

S5 S6a

S11

Madrid Lab Core

S-GW MME

P-GW HSS

S5 S6a

S11

Braga Lab Core

S-GW MME

S1-US1-C

S1-C

5G gNB

4G eNB

S1-U

S1-US1-CITS Platform

PORTUGALSPAIN

Page 8: 5G-MOBIX Cross Border Corridors & Trial Sites · verification (D3.6) • Initial feedback and pilot site fine-tuning • Use case execution based on the trialing plan & methodology

Greece-Turkey Cross Border Corridor

TMT Meeting – 4th of February 2019http://trakya.ticaret.gov.tr/saha-canli-goruntu/ipsala

Page 9: 5G-MOBIX Cross Border Corridors & Trial Sites · verification (D3.6) • Initial feedback and pilot site fine-tuning • Use case execution based on the trialing plan & methodology

GR-TR CBC Architecture

95G-MOBIX TR#1 - Slide

Page 10: 5G-MOBIX Cross Border Corridors & Trial Sites · verification (D3.6) • Initial feedback and pilot site fine-tuning • Use case execution based on the trialing plan & methodology

Overview of 5G-MOBIX CBCs / TSs – 5G NetworksMost sites will initially deploy 5G-NR over a 4G core (vEPC) –3GPP NSA Option 3x

NL and KR will deploy 3GPP SA Option 2 based on 5G core open source solutions and later upgrade

Home Routing (HR) and Local Break-Out (LBO) solutions will be investigated for inter-PLMN roaming in both CBCs.

Heterogeneous MEC implementations will be deployed and various experimentations frequencies will be utilized

Thorough description of 5G Architecture, ITS infra & Applications and Vehicles / OBUs in upcoming Deliverables D2.2, D2.3 and D2.4, respectively

105G-MOBIX TR#1 - Slide

CBC / TS3GPP Deployment

OptionNumber of gNBs

Experimentation Frequency

MEC Roaming Additional info

ES-PT 3X / (2) 72100 MHz (B1), 2600 MHz (B7),

3.5 GHz (n78)

Distributed (Far edge & central)

HR/LBO

GR-TR 3X / (2) 42600 MHz (B7),

3.5 GHz (n78)Edge computing

(SGi to PGW)HR/LBO

Coexistence with NB-IoT

DE 3X / (2) 2

2100 MHz (B1), 3.5 GHz (n78)

700 MHz (n12)

eRSUs withTUBMEC, DT MEC

Emulated PLMN,

Multi-Core

2x Core, DE RAN & TUB

RAN

FI 3X / (2) 2 3.5 GHz (n78)Commercial +

SDN basedMulti-PLMN

Multi-PLMN testing

FR 3X / (2) 2

700 MHz (4G), 800 MHz (4G), 1800 MHz

(4G), 2100 MHZ (3G/4G), 2600 MHz

(4G), 3700-3800 MHz (n77)

Yes

Satellite as infill for cellular

coverage gap

MEC optimization during inter-

PLMN HO

NL 3X / 2 8

800 MHz (LTE B20), 1800 MHz (LTE B3),

700 MHz (5G NR n28), 3.5 – 3.7 GHz (5G NR

n78)26.65 GHz (5G NR

n258)

Multiple

(Kubernetes based)

HR/LBOMulti-PLMN testing with

peering

CH 3X / (2) 2

3.5GHz(n78)

4.9 GHz(n79)

2.6GHz(n41)

Yes TBD

KR 2 3 22-23.6 GHz TBD N/A

Page 11: 5G-MOBIX Cross Border Corridors & Trial Sites · verification (D3.6) • Initial feedback and pilot site fine-tuning • Use case execution based on the trialing plan & methodology

Overview of 5G-MOBIX CBCs / TSs – ITS InfraRoad side infrastructure comprises RSUs, MEC, road sensors, edge / cloud platforms, CCAM applications, data collection tools, etc.

Focus on integration of road side infrastructure with the 5G network and CCAM enabled vehicles

Guarantee service / application continuity

High-level architecture describing the Physical, Functional and Communication view of the 5G-MOBIX deployment

Thorough description of all ITS infrastructure in D2.3

115G-MOBIX TR#1 - Slide

Page 12: 5G-MOBIX Cross Border Corridors & Trial Sites · verification (D3.6) • Initial feedback and pilot site fine-tuning • Use case execution based on the trialing plan & methodology

Overview of 5G-MOBIX CBCs / TSs –Vehicles

Large variety of SAE L4 vehicles with a multitude of on-board sensors

Different functional architecture utilized

Various OBU versions and functionalities

Starting from Rel.14 support and migrating to Rel.15 during the project lifetime

Supporting different Augmented Automated Driving Functions

125G-MOBIX TR#1 - Slide

Page 13: 5G-MOBIX Cross Border Corridors & Trial Sites · verification (D3.6) • Initial feedback and pilot site fine-tuning • Use case execution based on the trialing plan & methodology

5G-MOBIX Technical Roadmap until M24

Phase 1Development, procurement &

early deployment

Phase 2Development, deployment & trial planning

Phase 3Final roll-out,

integration & trial methodology

Early trialingInitial tests & trial readiness

verification

TrialingUse case

execution, result collection & evaluation

Jul. 2019 Oct. 2019 Jan. 2020

M9 M12 M15 M18 M21 M24

Apr. 2020 Jul. 2020 Oct. 2020

MS3 MS4

D3.1D3.2

D3.3

D3.4

D3.5

D2.2

D2.3

D2.4

D2.5

• Focus on roll-out plan per corridor (D3.1)

• Focus on development procurement and early deployment of components

• Finalize evaluation methodology (D5.1)

• Finalize CBC and TS trial plans (D4.1)

• Finalization of development

• Deployment of ALL components

• Initial integration efforts

• All functionalities & components ready and deployed

• Final technology roll-out & integration

• Testing of integrated functionality

• Trial methodology (D4.2)

• Initial functionality testing

• Trial readiness verification (D3.6)

• Initial feedback and pilot site fine-tuning

• Use case execution based on the trialing plan & methodology

• TSs contributions to CBCs

• Early evaluation results

D3.6

D5.1

D4.1

D4.2

135G-MOBIX TR#1 - Slide

Page 14: 5G-MOBIX Cross Border Corridors & Trial Sites · verification (D3.6) • Initial feedback and pilot site fine-tuning • Use case execution based on the trialing plan & methodology

www.5g-mobix.com

This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No. 825496

Thank you

Questions?