    Oil & Gas EngineeringServices

    DJEBEL GROUZ PROJECTSUPPLY SPECIFICATION FOR DIESEL ENGINE DRIVEN FIREWATER

    PUMP PA1100ACONTRACTOR Document N:

    55117-ENI-SF-SA-PA-301

    COMPANY Document N: Rev: 01

    Page : 1 of 20

    DJEBEL GROUZ PROJEC

    SUPPLY SPECIFICATION FOR DIESEL ENGINEDRIVEN FIREWATER PUMP

    PA1100A

    24/10/2011 01 Issued For Review S.G. S.H. M.E.

    23/10/2008 00 Issued For Comments A.S. K.B.M. M.E.

    Date Rev. Description of Revision Prepared by Verified by Approved byCompanyApproval

    ALPHA ENGINEERING Intl.Immeuble Jeaiem, A8, Avenue Yasser Arafat Sahloul 1, 4000 Sousse - Tunisie

    Code TVA : 950448R/A/M/000. R.C : B279902006Tl : +216 73 821 245 / 246 / 247 Fax : +216 73 821 249

    This document is the property of Alpha Engineering International who will safeguard its rights according to the civil and penal provisions of the Law.

  • 8/3/2019 55117-EnI-SF-SA-PA-301-01-Supply Specification for Diesel Engine Driven Firewater Pump PA 1100 A

    2/20

    Oil & Gas EngineeringServices

    DJEBEL GROUZ PROJECTSUPPLY SPECIFICATION FOR DIESEL ENGINE DRIVEN FIREWATER

    PUMP PA1100ACONTRACTOR Document N:

    55117-ENI-SF-SA-PA-301

    COMPANY Document N: Rev: 01

    Page : 2 of 20

    TABLE OF CONTENTS

    1. GENERAL ................................................................................................................................................4

    2. DEFINITIONS & ABBREVIATIONS ........................................................................................................4

    3. DESCRIPTION OF THE SUPPLY ...........................................................................................................5

    4. REFERENCED STANDARDS AND DOCUMENTS ................................................................................5

    4.1. DOCUMENTS.......................................................................................................................................... 54.2. ENI SPECIFICATIONS.............................................................................................................................. 64.3. INTERNATIONAL STANDARDS...................................................................................................................... 6

    5. ORDER OF PRIORITY OF THE DOCUMENTS ......................................................................................7

    6. AMBIENT CONDITIONS .........................................................................................................................7

    7. SCOPE OF SUPPLY ...............................................................................................................................8

    8. SCOPE OF SERVICES ............................................................................................................................8

    9. TECHNICAL REQUIREMENTS ...............................................................................................................8

    9.1. GENERAL.............................................................................................................................................. 8

    9.2. MECHANICAL REQUIREMENTS..................................................................................................................... 89.2.1. Fire Water Pump .......................................................................................................................89.2.2. Bearing and Bearing Housing ....................................................................................................99.2.3. Mechanical Seal and Packing ...................................................................................................99.2.4. Coupling .................................................................................................................................109.2.5. Driver Diesel Engine .............................................................................................................109.2.6. Diesel Fuel System .................................................................................................................119.2.7. Engine Lube Oil System ..........................................................................................................119.2.8. Engine Cooling System ..........................................................................................................119.2.9. Engine Exhaust System ..........................................................................................................119.2.10. Vibration and Critical Speeds ................................................................................................129.2.11. Starting System ....................................................................................................................139.2.12. Instrumentation ......................................................................................................................14

    9.2.13. Control Scheme and Control Panels .....................................................................................149.2.14. Electrical................................................................................................................................ 179.2.15. Structural Skid .......................................................................................................................17

    10. INSPECTION AND TESTING ..............................................................................................................17

    11. SURFACE PREPARATION AND PAINTING ......................................................................................18

    12. SPARE PARTS ....................................................................................................................................18

    13. PRESERVATION .................................................................................................................................19

    14. PREPARATION FOR SHIPMENT, TRANSPORT AND STORAGE ....................................................19

    15. DELIVERY ...........................................................................................................................................19

    ALPHA ENGINEERING Intl.Immeuble Jeaiem, A8, Avenue Yasser Arafat Sahloul 1, 4000 Sousse - Tunisie

    Code TVA : 950448R/A/M/000. R.C : B279902006Tl : +216 73 821 245 / 246 / 247 Fax : +216 73 821 249

    This document is the property of Alpha Engineering International who will safeguard its rights according to the civil and penal provisions of the Law.

  • 8/3/2019 55117-EnI-SF-SA-PA-301-01-Supply Specification for Diesel Engine Driven Firewater Pump PA 1100 A

    3/20

    Oil & Gas EngineeringServices

    DJEBEL GROUZ PROJECTSUPPLY SPECIFICATION FOR DIESEL ENGINE DRIVEN FIREWATER

    PUMP PA1100ACONTRACTOR Document N:

    55117-ENI-SF-SA-PA-301

    COMPANY Document N: Rev: 01

    Page : 3 of 20

    16. GUARANTEE .......................................................................................................................................20

    17. DOCUMENTS TO BE DELIVERED .....................................................................................................20

    ALPHA ENGINEERING Intl.Immeuble Jeaiem, A8, Avenue Yasser Arafat Sahloul 1, 4000 Sousse - Tunisie

    Code TVA : 950448R/A/M/000. R.C : B279902006Tl : +216 73 821 245 / 246 / 247 Fax : +216 73 821 249

    This document is the property of Alpha Engineering International who will safeguard its rights according to the civil and penal provisions of the Law.

  • 8/3/2019 55117-EnI-SF-SA-PA-301-01-Supply Specification for Diesel Engine Driven Firewater Pump PA 1100 A

    4/20

    Oil & Gas EngineeringServices

    DJEBEL GROUZ PROJECTSUPPLY SPECIFICATION FOR DIESEL ENGINE DRIVEN FIREWATER

    PUMP PA1100ACONTRACTOR Document N:

    55117-ENI-SF-SA-PA-301

    COMPANY Document N: Rev: 01

    Page : 4 of 20

    1. GENERAL

    This specification covers the minimum requirements for the design, manufacture, fabrication,

    testing, inspection, packaging and supply of a Diesel Engine Driven Fire Water Pumps,

    complete with components and accessories, to be installed in Djebel Grouz Field located at the

    South East of Tunisia.

    The Vendor and his sub-vendors shall comply with all requirements of this Specification, Data

    Sheets, and the latest editions of all specifications, codes, and standards referenced in this

    scope of work.

    The packages shall be designed and guaranteed for continuous service in the environmental

    conditions specified, and the specified process parameters.

    2. DEFINITIONS & ABBREVIATIONS

    For the purposes of clarification in the present specification, the following definitions apply:

    Vendor: The party which supplies Diesel Engine Driven Fire Water Pump to perform the

    duties specified by E.N.I.

    Company: E.N.I. Tunisia B.V.

    Site: Djebel Grouz Field at the South East of Tunisia.

    Manufacturer: The party which manufactures or supplies equipment and pipes toperform the duties specified by the Vendor.

    Shall: A term which indicates that a provision is a requirement.

    Should: A term which indicates that a provision is recommended as good practice but is

    not a requirement.

    May: A term which indicates that a provision is neither required nor prohibited.

    ALPHA ENGINEERING Intl.Immeuble Jeaiem, A8, Avenue Yasser Arafat Sahloul 1, 4000 Sousse - Tunisie

    Code TVA : 950448R/A/M/000. R.C : B279902006Tl : +216 73 821 245 / 246 / 247 Fax : +216 73 821 249

    This document is the property of Alpha Engineering International who will safeguard its rights according to the civil and penal provisions of the Law.

  • 8/3/2019 55117-EnI-SF-SA-PA-301-01-Supply Specification for Diesel Engine Driven Firewater Pump PA 1100 A

    5/20

    Oil & Gas EngineeringServices

    DJEBEL GROUZ PROJECTSUPPLY SPECIFICATION FOR DIESEL ENGINE DRIVEN FIREWATER

    PUMP PA1100ACONTRACTOR Document N:

    55117-ENI-SF-SA-PA-301

    COMPANY Document N: Rev: 01

    Page : 5 of 20

    NEC: National Electrical Code.

    SAE: Society of American Engineers.

    ASME:American Society of Mechanical Engineers.

    NFPA: National Fire Protection Association.

    IEC: International Electrotechnical Commission.

    DPDT: Double Pole, Double Throw.

    3. DESCRIPTION OF THE SUPPLY

    This specification defines the requirements for the supply of Diesel Engine Driven Fire Water

    Pump.

    The Vendor shall therefore be responsible for the design, manufacture and correct operation of

    the complete unit.

    Design and supply of the Unit shall be complete (Mechanical, Electrical, Instrument, etc.) in

    order to ensure proper Operation, Maintenance, Safety and Control within the Unit Battery

    Limits.

    4. REFERENCED STANDARDS AND DOCUMENTS

    The following documents, codes and standards are referenced in this specification:

    4.1.Documents

    55117-ENI-SF-DS-DA-004: Diesel Engine Technical Data Sheet.

    55117-ENI-SF-DS-PA-001: Diesel Firewater Pump PA 1100 A Technical Data Sheet.

    ALPHA ENGINEERING Intl.Immeuble Jeaiem, A8, Avenue Yasser Arafat Sahloul 1, 4000 Sousse - Tunisie

    Code TVA : 950448R/A/M/000. R.C : B279902006Tl : +216 73 821 245 / 246 / 247 Fax : +216 73 821 249

    This document is the property of Alpha Engineering International who will safeguard its rights according to the civil and penal provisions of the Law.

    http://www.asme.org/http://www.asme.org/
  • 8/3/2019 55117-EnI-SF-SA-PA-301-01-Supply Specification for Diesel Engine Driven Firewater Pump PA 1100 A

    6/20

    Oil & Gas EngineeringServices

    DJEBEL GROUZ PROJECTSUPPLY SPECIFICATION FOR DIESEL ENGINE DRIVEN FIREWATER

    PUMP PA1100ACONTRACTOR Document N:

    55117-ENI-SF-SA-PA-301

    COMPANY Document N: Rev: 01

    Page : 6 of 20

    55117-ENI-SF-DS-PA-101: Diesel Firewater Pump PA 1100 A Inspection Data Sheet

    (IDS).

    55117-ENI-SF-DS-PA-201: Diesel Firewater Pump PA 1100 A Required Documents Data

    Sheet (RDDS).

    4.2.ENI Specifications

    20000. VAR. PAI. FUN Rev.2 : Protective coating and hot dip galvanising functional

    specification

    15801. PIP. MEC. SDS Rev.1: Company specifications manual valves.

    07423. PKG. GEN. SPC Rev.0: Inspection and tests for package supplies.

    03023. MAC. MEC.SPC Rev.2: General Specification Diesel Engines

    4.3.International Standards

    NFPA 20: Standard for the installation of stationary pumps for fire protection, 2003

    Edition.

    IEC 62091: Low Voltage Switchgear-Controllers for drivers of stationary fire pump.

    IEC 60364: Electrical Installation of buildings.

    IEC 60529: Degree of Protection provided by enclosures.

    IEC 60947: Low voltage Switchgear and control gear.

    IEC 60439: Low Voltage Switchgear.

    ALPHA ENGINEERING Intl.Immeuble Jeaiem, A8, Avenue Yasser Arafat Sahloul 1, 4000 Sousse - Tunisie

    Code TVA : 950448R/A/M/000. R.C : B279902006Tl : +216 73 821 245 / 246 / 247 Fax : +216 73 821 249

    This document is the property of Alpha Engineering International who will safeguard its rights according to the civil and penal provisions of the Law.

  • 8/3/2019 55117-EnI-SF-SA-PA-301-01-Supply Specification for Diesel Engine Driven Firewater Pump PA 1100 A

    7/20

    Oil & Gas EngineeringServices

    DJEBEL GROUZ PROJECTSUPPLY SPECIFICATION FOR DIESEL ENGINE DRIVEN FIREWATER

    PUMP PA1100ACONTRACTOR Document N:

    55117-ENI-SF-SA-PA-301

    COMPANY Document N: Rev: 01

    Page : 7 of 20

    5. ORDER OF PRIORITY OF THE DOCUMENTS

    In the event of a conflict between this Specification, data sheets and the applicable codes and

    standards, the Vendor shall bring the matter to the Companys attention for positive clarification,

    resolution and review in writing before any work is started. In the absence of any guidance or

    agreement to the contrary, the most stringent requirements shall apply.

    Should any conflict occur as a result of applying data sheets and specifications, the order of

    precedence shall be as follows:

    Purchase Order.

    This Specification including data sheet.

    E.N.I. General Specifications.

    Codes and Standards.

    Other International Codes and Standards.

    6. AMBIENT CONDITIONS

    The Supplier shall consider the following design site ambient conditions for the package design:

    Air Temperature: Min: -5 C Max: 50C

    Humidity: Min: 40 %, Max: 90 %

    Elevation: 274 m above the sea level.

    Wind velocity Speed: 180 km/h.

    Rainfall (average): 25 mm/year.

    ALPHA ENGINEERING Intl.Immeuble Jeaiem, A8, Avenue Yasser Arafat Sahloul 1, 4000 Sousse - Tunisie

    Code TVA : 950448R/A/M/000. R.C : B279902006Tl : +216 73 821 245 / 246 / 247 Fax : +216 73 821 249

    This document is the property of Alpha Engineering International who will safeguard its rights according to the civil and penal provisions of the Law.

  • 8/3/2019 55117-EnI-SF-SA-PA-301-01-Supply Specification for Diesel Engine Driven Firewater Pump PA 1100 A

    8/20

    Oil & Gas EngineeringServices

    DJEBEL GROUZ PROJECTSUPPLY SPECIFICATION FOR DIESEL ENGINE DRIVEN FIREWATER

    PUMP PA1100ACONTRACTOR Document N:

    55117-ENI-SF-SA-PA-301

    COMPANY Document N: Rev: 01

    Page : 8 of 20

    7. SCOPE OF SUPPLY

    The Vendor shall be responsible for the provision of Diesel Engine Driven Fire Water Pump

    completely assembled which shall be painted and tested at shop.

    The Vendor shall provide all technical documentation relative to the Diesel Engine Driven Fire

    Water Pump.

    8. SCOPE OF SERVICES

    Services shall include but not limited to:

    Inspection and testing.

    Surface preparation and painting.

    Preservation for storage.

    Preparation for shipment.

    Delivery Ex-works.

    9. TECHNICAL REQUIREMENTS

    9.1. GENERAL

    The Vendor shall ensure that the Diesel Engine Driven Fire Water Pump is designed for

    maximum reliability, minimum maintenance and it shall be designed and constructed for a

    minimum service life of 20 years.

    9.2. MECHANICAL REQUIREMENTS

    9.2.1. Fire Water Pump

    The Firewater Pump shall be a Centrifugal Pump compliant to NFPA 20.

    ALPHA ENGINEERING Intl.Immeuble Jeaiem, A8, Avenue Yasser Arafat Sahloul 1, 4000 Sousse - Tunisie

    Code TVA : 950448R/A/M/000. R.C : B279902006Tl : +216 73 821 245 / 246 / 247 Fax : +216 73 821 249

    This document is the property of Alpha Engineering International who will safeguard its rights according to the civil and penal provisions of the Law.

  • 8/3/2019 55117-EnI-SF-SA-PA-301-01-Supply Specification for Diesel Engine Driven Firewater Pump PA 1100 A

    9/20

    Oil & Gas EngineeringServices

    DJEBEL GROUZ PROJECTSUPPLY SPECIFICATION FOR DIESEL ENGINE DRIVEN FIREWATER

    PUMP PA1100ACONTRACTOR Document N:

    55117-ENI-SF-SA-PA-301

    COMPANY Document N: Rev: 01

    Page : 9 of 20

    Pump shall have the possibility for local / manual operation as well as remote / Automatic

    operation.

    Pumps design data is shown on the attached Data Sheet 55117-ENI-SF-DS-PA-004. In the

    event of conflict between this specification and Data Sheet, the Data Sheet shall govern.

    Firewater pumps speed shall not exceed 1800 RPM.

    Firewater pumps shall be horizontal centrifugal pumps with radial displacement as per NFPA 20.

    The pumps shall have suction strainers in accordance with NFPA-20.

    Bearings housing shall be arranged so that bearings can be replaced without disturbing pump

    drivers or mounting.

    Mounting skid shall be separate and located sufficiently below from the main body flange in

    order to facilitate bolting on the body flange.

    9.2.2. Bearing and Bearing Housing

    Bearings shall be lubricated by constant-level oilers.

    9.2.3. Mechanical Seal and Packing

    Detail of mechanical seals offered by the Vendor shall require Company approval prior to

    installation.

    The Vendor shall recommend and describe number, size, and material of packing rings, lantern

    rings, etc.

    Stationary mechanical seal faces shall be O ring mounted with a radial pin to prevent face

    rotation.

    ALPHA ENGINEERING Intl.Immeuble Jeaiem, A8, Avenue Yasser Arafat Sahloul 1, 4000 Sousse - Tunisie

    Code TVA : 950448R/A/M/000. R.C : B279902006Tl : +216 73 821 245 / 246 / 247 Fax : +216 73 821 249

    This document is the property of Alpha Engineering International who will safeguard its rights according to the civil and penal provisions of the Law.

  • 8/3/2019 55117-EnI-SF-SA-PA-301-01-Supply Specification for Diesel Engine Driven Firewater Pump PA 1100 A

    10/20

    Oil & Gas EngineeringServices

    DJEBEL GROUZ PROJECTSUPPLY SPECIFICATION FOR DIESEL ENGINE DRIVEN FIREWATER

    PUMP PA1100ACONTRACTOR Document N:

    55117-ENI-SF-SA-PA-301

    COMPANY Document N: Rev: 01

    Page : 10 of 20

    9.2.4. Coupling

    The coupling between the engine and the gear shall be short coupled universal shaft with

    flanges for driver and driven shaft. It shall be sized to handle full engine power with a minimum

    service factor of 1.75.

    Coupling shall be designed to prevent engine vibration, caused by misalignment.

    Coupling shall allow the engine or the pump to be removed without disturbing the other.

    Coupling shall be dynamically balanced and rated for a minimum bearing life of 5000 hours.

    A removable non-sparking guard shall be provided around the coupling.

    All bolting for shaft guard shall be type 316 stainless steel with a minimum spacing of 150 mm

    and a minimum diameter of 10 mm.

    9.2.5. Driver Diesel Engine

    The diesel engine driver shall conform to NFPA-20 requirements and shall be approved for fire

    pump use.

    The intermittent engine shaft horsepower shall be at least 1.2 times the maximum horsepower

    required to drive the fire pump at 150% of its design capacity at the rated RPM, installed

    elevation and engine inlet air temperature. The required horsepower shall include the pump and

    all the engine auxiliaries. Engine power ratings shall comply with power test codes of S.A.E. and

    A.S.M.E.

    A hydro-mechanical governor with a positive locking control shall regulate engine speed within a

    range of 10% between shut-off and maximum load conditions of the pump. There shall be no

    manual throttle.

    ALPHA ENGINEERING Intl.Immeuble Jeaiem, A8, Avenue Yasser Arafat Sahloul 1, 4000 Sousse - Tunisie

    Code TVA : 950448R/A/M/000. R.C : B279902006Tl : +216 73 821 245 / 246 / 247 Fax : +216 73 821 249

    This document is the property of Alpha Engineering International who will safeguard its rights according to the civil and penal provisions of the Law.

  • 8/3/2019 55117-EnI-SF-SA-PA-301-01-Supply Specification for Diesel Engine Driven Firewater Pump PA 1100 A

    11/20

    Oil & Gas EngineeringServices

    DJEBEL GROUZ PROJECTSUPPLY SPECIFICATION FOR DIESEL ENGINE DRIVEN FIREWATER

    PUMP PA1100ACONTRACTOR Document N:

    55117-ENI-SF-SA-PA-301

    COMPANY Document N: Rev: 01

    Page : 11 of 20

    9.2.6. Diesel Fuel System

    The fuel system shall include a fuel filter with readily replaceable filter media. The fuel system

    shall be leak-free throughout all conditions of engine operation. The inlet to the fuel system shall

    be readily connectable to a fuel supply line employing connections designed in accordance with

    a recognized standard of the nation to which the engine is to be delivered.

    9.2.7. Engine Lube Oil System

    A full flow engine lubrication pressure system with pump, strainer, piping, heat exchanger and

    full flow oil filter equipped with a bypass valve and pressure gauge shall be provided.

    Filters shall be furnished with accessible and easily replaceable cellulose type filter elements.

    All piping downstream of lube oil filters shall be stainless steel.

    Flexible connections shall be wire braid reinforced type 316 stainless steel bellows type.

    9.2.8. Engine Cooling System

    The engine cooling system shall be included as part of the engine assembly and shall be a

    radiator type that includes a circulating pump driven by the engine, a radiator, an engine jacket

    temperature regulating device, and an engine-driven fan for providing positive movement of air

    through the radiator.

    9.2.9. Engine Exhaust System

    Exhaust system in accordance with NFPA 20, shall be complete with all piping, fittings, brackets

    and supports. A properly sized rain cap shall be provided.

    Exhaust ducting shall be carbon steel with expansion bellows of 316 stainless steel, seamless or

    welded corrugated design, mounted between engine outlet and exhaust pipe.

    Silencers shall be furnished with spark arresters and support straps with vibration isolators.

    ALPHA ENGINEERING Intl.Immeuble Jeaiem, A8, Avenue Yasser Arafat Sahloul 1, 4000 Sousse - Tunisie

    Code TVA : 950448R/A/M/000. R.C : B279902006Tl : +216 73 821 245 / 246 / 247 Fax : +216 73 821 249

    This document is the property of Alpha Engineering International who will safeguard its rights according to the civil and penal provisions of the Law.

  • 8/3/2019 55117-EnI-SF-SA-PA-301-01-Supply Specification for Diesel Engine Driven Firewater Pump PA 1100 A

    12/20

    Oil & Gas EngineeringServices

    DJEBEL GROUZ PROJECTSUPPLY SPECIFICATION FOR DIESEL ENGINE DRIVEN FIREWATER

    PUMP PA1100ACONTRACTOR Document N:

    55117-ENI-SF-SA-PA-301

    COMPANY Document N: Rev: 01

    Page : 12 of 20

    Engine exhaust manifold, and turbo charger if furnished, shall be water cooled.

    All other surfaces of exhaust system, silencer, flanges and expansion bellows shall be insulated.

    9.2.10. Vibration and Critical Speeds

    The Vendor shall assume full responsibility for performance of necessary torsional studies and

    elimination of any lateral or torsional vibrations that may adversely affect operation of completeunit within specified operating range.

    Torsional natural frequencies of engine and driven equipment shall not be closer than 10% to

    any specified running speed.

    The Vendor shall submit proof that required torsional vibration studies have been satisfactorily

    performed. Requirement shall be per Vendor Document Requirements.

    ALPHA ENGINEERING Intl.Immeuble Jeaiem, A8, Avenue Yasser Arafat Sahloul 1, 4000 Sousse - Tunisie

    Code TVA : 950448R/A/M/000. R.C : B279902006Tl : +216 73 821 245 / 246 / 247 Fax : +216 73 821 249

    This document is the property of Alpha Engineering International who will safeguard its rights according to the civil and penal provisions of the Law.

  • 8/3/2019 55117-EnI-SF-SA-PA-301-01-Supply Specification for Diesel Engine Driven Firewater Pump PA 1100 A

    13/20

    Oil & Gas EngineeringServices

    DJEBEL GROUZ PROJECTSUPPLY SPECIFICATION FOR DIESEL ENGINE DRIVEN FIREWATER

    PUMP PA1100ACONTRACTOR Document N:

    55117-ENI-SF-SA-PA-301

    COMPANY Document N: Rev: 01

    Page : 13 of 20

    9.2.11. Starting System

    All systems shall be furnished in accordance with NFPA 20 except where modified herein.

    Starting system shall be furnished with logic that prevents operation of starting motor when

    engine is running.

    Pump shall be capable of starting by either:

    Remotely initiated signal (electric) from Master Control Panel. Loss of signal shall start

    pump.

    Manually initiated signal (local).

    Pump shall be stopped by local manual action only, except when it is in its "Test" mode.

    The primary starting system shall be suitable for operation with compressed air, in EEx d IIB T1

    hazardous area.

    The secondary (backup) start system shall be nitrogen gas stored in high pressure cylinders. It

    shall provide sufficient volume for three (3) start attempts. The Vendor shall also provide the

    high pressure regulator in the nitrogen outlet manifold.

    The volume of the air/nitrogen tank shall be sized for 180 seconds of continuous cranking start

    attempts without recharging. Dry nitrogen will be fed to the volume bottle at 10.34 barg from high

    pressure nitrogen cylinders. The volume bottle shall be an ASME coded pressure vessel

    designed for 13.8 barg, and shall be protected by a relief valve, sized for fail-open capacity of

    the nitrogen regulator.

    The primary (air) and secondary (nitrogen) systems shall be with manifold such that either air or

    nitrogen will be available to the starter valve. A low pressure switch on the start air line shall

    initiate the flow of nitrogen to the starter.

    All valves in the air start and nitrogen start systems shall be carbon steel.

    ALPHA ENGINEERING Intl.Immeuble Jeaiem, A8, Avenue Yasser Arafat Sahloul 1, 4000 Sousse - Tunisie

    Code TVA : 950448R/A/M/000. R.C : B279902006Tl : +216 73 821 245 / 246 / 247 Fax : +216 73 821 249

    This document is the property of Alpha Engineering International who will safeguard its rights according to the civil and penal provisions of the Law.

  • 8/3/2019 55117-EnI-SF-SA-PA-301-01-Supply Specification for Diesel Engine Driven Firewater Pump PA 1100 A

    14/20

    Oil & Gas EngineeringServices

    DJEBEL GROUZ PROJECTSUPPLY SPECIFICATION FOR DIESEL ENGINE DRIVEN FIREWATER

    PUMP PA1100ACONTRACTOR Document N:

    55117-ENI-SF-SA-PA-301

    COMPANY Document N: Rev: 01

    Page : 14 of 20

    9.2.12. Instrumentation

    Vendor shall supply all controls and instrumentation, associated with pumps and drivers, to

    reach Company and NFPA-20 design philosophy.

    The low pressure switches monitoring the firewater header pressure shall be supplied and

    mounted on pump control panels by vendor.

    Level gauges on the nitrogen gas bottle shall be a reflex type.

    Vendor shall install all required pneumatic tubing on the skid. All tubing external to the panel

    shall be 3/8" O.D. 316 stainless steel, 0.035" wall minimum, supported in tubing trays. (Tubing

    strapped to pipe is not acceptable.)

    Tubing installations shall be neat, plumb, properly supported and exhibit professional

    workmanship.

    A Pressure Indicator shall be installed at pump discharge line.

    9.2.13. Control Scheme and Control Panels

    Panel and stand shall be mounted on skid.

    Pneumatic and wiring connection of the control panel shall be required to external piping and

    wiring circuits furnished by others. All necessary valves, regulators and gauges shall be supplied

    by Vendor.

    Pressure and temperature gauges shall be liquid filled, with stainless steel cases. Tubing shall

    be type 316 stainless steel.

    Panel enclosure shall be constructed of 316 stainless steel with a brushed finish, free of tool and

    clamp marks. All internal braces, enclosure hardware and instruments shall be 316 stainless

    steel. Panel shall have removable, full opening doors on rear side with heavy duty 316 stainless

    steel hinges and closures.

    ALPHA ENGINEERING Intl.Immeuble Jeaiem, A8, Avenue Yasser Arafat Sahloul 1, 4000 Sousse - Tunisie

    Code TVA : 950448R/A/M/000. R.C : B279902006Tl : +216 73 821 245 / 246 / 247 Fax : +216 73 821 249

    This document is the property of Alpha Engineering International who will safeguard its rights according to the civil and penal provisions of the Law.

  • 8/3/2019 55117-EnI-SF-SA-PA-301-01-Supply Specification for Diesel Engine Driven Firewater Pump PA 1100 A

    15/20

    Oil & Gas EngineeringServices

    DJEBEL GROUZ PROJECTSUPPLY SPECIFICATION FOR DIESEL ENGINE DRIVEN FIREWATER

    PUMP PA1100ACONTRACTOR Document N:

    55117-ENI-SF-SA-PA-301

    COMPANY Document N: Rev: 01

    Page : 15 of 20

    Panel nameplates shall be stainless steel, engraved type. All bulkhead connectors shall have

    nameplates both inside and outside the panel enclosure. Instruments shall be provided with

    permanently attached nameplates. Nameplates on the panel shall be mounted with 316

    stainless steel screws.

    Instrument air pressure to the panel shall be 7-10 bar. Regulators shall be provided to reducethe pressure to the required pressure needed by the logic circuits. While running, loss of

    instrument air to the panel shall not cause shutdown of the pump.

    Panel shall house pump stop/start controls and test/auto selector switch.

    While in auto mode, all shutdown devices shall be disarmed. All alarm and indication functions

    shall operate normally.

    Panel shall contain all procedures necessary to start pump if not already running. procedures

    shall control starting sequence in accordance with NFPA guidelines.

    Except when the pump is running in "Test" mode, low fuel level, low oil pressure, engine over

    speed and high jacket water temperature shall run an audible alarm and a red flashing alarm. In

    "Test" mode, these malfunctions shall shut down the pump.

    The pump status (run, fail) shall be transmitted to a remote control panel through an electrical

    signal. Pump running signal shall be generated from an oil pressure switch set at rated engine

    oil pressure to ensure running signal will not be displayed unless engine has started and

    achieved operational running speed.

    The following instruments shall be furnished as a minimum on control panel:

    Tachometer (range 0-125% rated speed), with adjustable over speed trip setting, over

    speed alarm, digital speed indicator and test function.

    Engine oil pressure gauge.

    Engine cooling water temperature gauge.

    ALPHA ENGINEERING Intl.Immeuble Jeaiem, A8, Avenue Yasser Arafat Sahloul 1, 4000 Sousse - Tunisie

    Code TVA : 950448R/A/M/000. R.C : B279902006Tl : +216 73 821 245 / 246 / 247 Fax : +216 73 821 249

    This document is the property of Alpha Engineering International who will safeguard its rights according to the civil and penal provisions of the Law.

  • 8/3/2019 55117-EnI-SF-SA-PA-301-01-Supply Specification for Diesel Engine Driven Firewater Pump PA 1100 A

    16/20

    Oil & Gas EngineeringServices

    DJEBEL GROUZ PROJECTSUPPLY SPECIFICATION FOR DIESEL ENGINE DRIVEN FIREWATER

    PUMP PA1100ACONTRACTOR Document N:

    55117-ENI-SF-SA-PA-301

    COMPANY Document N: Rev: 01

    Page : 16 of 20

    The following alarms and shutdowns shall be provided. Alarm signals shall be displayed on

    control panel by means of first-out indicators. All shutdowns shall be bypassed in auto mode.

    Shutdown

    Alarm (Test mode)

    Oil pressure - low X X

    Coolant temperature - high X X Over speed X X

    Engine fail to start X

    Fuel level - low X X

    Vendor shall furnish following independently mounted instruments and controls:

    Coolant level indicator.

    Fuel tank level gauge.

    Crank case dipstick.

    Jacket water inlet and outlet temperature indicator.

    Coolant flow indicator.

    Coolant inlet and outlet pressure gauge.

    Vendor shall submit the wiring and connection diagram of the control panel logic, bill of

    materials, panel front layout, and name tag list for Company approval prior to fabrication of the

    panel.

    ALPHA ENGINEERING Intl.Immeuble Jeaiem, A8, Avenue Yasser Arafat Sahloul 1, 4000 Sousse - Tunisie

    Code TVA : 950448R/A/M/000. R.C : B279902006Tl : +216 73 821 245 / 246 / 247 Fax : +216 73 821 249

    This document is the property of Alpha Engineering International who will safeguard its rights according to the civil and penal provisions of the Law.

  • 8/3/2019 55117-EnI-SF-SA-PA-301-01-Supply Specification for Diesel Engine Driven Firewater Pump PA 1100 A

    17/20

    Oil & Gas EngineeringServices

    DJEBEL GROUZ PROJECTSUPPLY SPECIFICATION FOR DIESEL ENGINE DRIVEN FIREWATER

    PUMP PA1100ACONTRACTOR Document N:

    55117-ENI-SF-SA-PA-301

    COMPANY Document N: Rev: 01

    Page : 17 of 20

    9.2.14. Electrical

    All skid mounted electrical control and instrumentation systems shall be installed in accordance

    with NFPA-70, NEC or IEC

    Vendor shall do the wiring from devices on the skid to the unit control panel. All controls and

    signals which go off-skid shall be wired to a separate junction box located on the edge of the

    skid. Provide six (6) spare terminals.

    Electric pressure switches and solenoid valves shall be explosion proof material. Pressure

    switches shall be DPDT Electrical form. All electric installations shall conform to NEC or IEC

    recommended practices for EEx d IIB T1 hazardous areas.

    9.2.15. Structural Skid

    Vendor shall be responsible for supplying the completed and assembled package on structural

    steel skids. Vendor shall be fully responsible for the detailed design. Each skid structure shall be

    designed for a single point lift. Lifting eyes shall be provided on skid.

    All equipment shall be mounted on structural members of the skid. Packaging shall be suitable

    for withstanding transportation loads during ocean and truck transportation.

    All load bearing members shall be connected by full penetration welds. All defected surfaces

    shall be continuously seal welded.

    10.INSPECTION AND TESTING

    Inspection and testing of the pumps and all associated auxiliary items shall be carried out in

    accordance with the relevant codes, standards, approved procedures and Inspection Plan.

    The Vendor shall provide an Inspection & Testing Plan for purchased review and comments.

    ALPHA ENGINEERING Intl.Immeuble Jeaiem, A8, Avenue Yasser Arafat Sahloul 1, 4000 Sousse - Tunisie

    Code TVA : 950448R/A/M/000. R.C : B279902006Tl : +216 73 821 245 / 246 / 247 Fax : +216 73 821 249

    This document is the property of Alpha Engineering International who will safeguard its rights according to the civil and penal provisions of the Law.

  • 8/3/2019 55117-EnI-SF-SA-PA-301-01-Supply Specification for Diesel Engine Driven Firewater Pump PA 1100 A

    18/20

    Oil & Gas EngineeringServices

    DJEBEL GROUZ PROJECTSUPPLY SPECIFICATION FOR DIESEL ENGINE DRIVEN FIREWATER

    PUMP PA1100ACONTRACTOR Document N:

    55117-ENI-SF-SA-PA-301

    COMPANY Document N: Rev: 01

    Page : 18 of 20

    The equipment shall be subject to inspection and witnessing of tests by the Company, as and

    when required.

    The Vendor shall provide free access to his work for the authorized representative of the

    Company. All necessary certification of materials, shop test data, etc, shall be made available to

    verify that the requirements of the Company are being met.

    Acceptances of shop Tests shall not relieve the vendor to meet field tests under specified

    operating condition, nor does the inspection relieve the Vendor of his responsibility.

    11.SURFACE PREPARATION AND PAINTING

    The preparation and painting procedures must comply with the attached ENI specification:

    20000. VAR. PAI. FUN.

    As option, the Vendor may include in the offer his standard painting procedure for approval.

    The Vendor shall paint the equipment and materials within his scope of supply, which shall be

    done at Vendors facilities to the maximum extent possible. Paint materials to be used shall be in

    accordance to the paint specification attached.

    12.SPARE PARTS

    The Vendor shall provide all spare parts required for construction, pre-commissioning,

    commissioning and Start-up.

    The vendor shall provide quotation for Spare Parts of the various components of the supply

    according to his experience as follow:

    Capital spare

    Two Years of Operation.

    Each part shall be separately quoted.

    ALPHA ENGINEERING Intl.Immeuble Jeaiem, A8, Avenue Yasser Arafat Sahloul 1, 4000 Sousse - Tunisie

    Code TVA : 950448R/A/M/000. R.C : B279902006Tl : +216 73 821 245 / 246 / 247 Fax : +216 73 821 249

    This document is the property of Alpha Engineering International who will safeguard its rights according to the civil and penal provisions of the Law.

  • 8/3/2019 55117-EnI-SF-SA-PA-301-01-Supply Specification for Diesel Engine Driven Firewater Pump PA 1100 A

    19/20

    Oil & Gas EngineeringServices

    DJEBEL GROUZ PROJECTSUPPLY SPECIFICATION FOR DIESEL ENGINE DRIVEN FIREWATER

    PUMP PA1100ACONTRACTOR Document N:

    55117-ENI-SF-SA-PA-301

    COMPANY Document N: Rev: 01

    Page : 19 of 20

    Spare parts definition shall include sectional drawings and/or exploded view to identify the listed

    parts on the relevant Spare Parts Form.

    13.PRESERVATION

    The extent of preservation to be applied shall be based on the assumption that a minimum of

    06 months will pass before the equipment is ready for initial start-up. The Vendor shall specify

    his recommendation for the preservation for both indoor and outdoor storage.

    Provided manuals shall list all the conservation applied and all measures required for up-

    keeping the Diesel Engine Driven Fire Water Pump until installation time.

    14.PREPARATION FOR SHIPMENT, TRANSPORT AND STORAGE

    The Diesel Engine Driven Fire Water Pump, shall be crated, properly protected and marked for

    export and shipment.

    It shall be adequately preserved and sealed to withstand any adverse condition evolving from

    the mode of transportation (trucks in desert and bad condition road; dusty environment).

    15.DELIVERY

    The Diesel Engine Driven Fire Water Pump shall be delivered Ex-works.

    Its Vendors responsibility to provide all necessary paper work and documentation for

    transportation and customs clearing (if any).

    ALPHA ENGINEERING Intl.Immeuble Jeaiem, A8, Avenue Yasser Arafat Sahloul 1, 4000 Sousse - Tunisie

    Code TVA : 950448R/A/M/000. R.C : B279902006Tl : +216 73 821 245 / 246 / 247 Fax : +216 73 821 249

    This document is the property of Alpha Engineering International who will safeguard its rights according to the civil and penal provisions of the Law.

  • 8/3/2019 55117-EnI-SF-SA-PA-301-01-Supply Specification for Diesel Engine Driven Firewater Pump PA 1100 A

    20/20

    Oil & Gas EngineeringServices

    DJEBEL GROUZ PROJECTSUPPLY SPECIFICATION FOR DIESEL ENGINE DRIVEN FIREWATER

    PUMP PA1100ACONTRACTOR Document N:

    55117-ENI-SF-SA-PA-301

    COMPANY Document N: Rev: 01

    Page : 20 of 20

    16.GUARANTEE

    The Diesel Engine Driven Fire Water Pump, component parts shall be guaranteed by the

    Vendor against defective materials, design and workmanship for a period of 12 months after

    start-up or 18 months after delivery.

    If any mal-performance or defect occurs during the guarantee period, the Vendor shall make all

    necessary alterations, repair and replacements free of charge.

    17.DOCUMENTS TO BE DELIVERED

    The following documents shall be provided prior to the shipment of the Diesel Engine Driven

    Fire Water Pump:

    Material certificate

    Certificate of Conformity

    Certificate of shop visual inspection by third party Inspector

    Certificate of shop Hydro test by third party Inspector

    Installation, operating and maintenance instructions.

    ALPHA ENGINEERING Intl.Immeuble Jeaiem, A8, Avenue Yasser Arafat Sahloul 1, 4000 Sousse - Tunisie

    Code TVA : 950448R/A/M/000. R.C : B279902006Tl : +216 73 821 245 / 246 / 247 Fax : +216 73 821 249

    This document is the property of Alpha Engineering International who will safeguard its rights according to the civil and penal provisions of the Law.