17
postal: 47 Tyne Street offices: 3rd Floor, Imperial Building contact: 03-477-0462 office 021-294-7430 mobile Roslyn, Dunedin 1 Dowling Street, Dunedin [email protected] PROJECT CLIENT DWG ISSUE DATE REVISION PROJECT # DWG # REVISION DATE # SCALE DRAWN PLOT DATE CONTRACTOR MUST CONFIRM CRITICAL DIMENSIONS ON SITE PRIOR TO COMMENCEMENT 14/5/15 TITLE NEW CLASSROOM BLOCK GOLDFIELDS PRIMARY SCHOOL 5195.2.4 A01 March 2015 n/a SM INDEX: A01 TITLE A02 SITE PLAN A03 PROPOSED FLOOR PLAN A04 SLAB PLAN A05 ROOF FRAMING & ROOF PLAN A06 BRACING & PLUMBING / DRAINAGE PLAN A07 REFLECTED CEILING & ELECTRICAL PLAN A08 SECTIONS A09 ELEVATIONS A10 INTERNAL CLASSROOM ELEVATIONS A11 INTERNAL CLASSROOM ELEVATIONS A12 DETAILS A13 DETAILS A14 DETAILS A15 DETAILS A16 WINDOW / DOOR SCHEDULE A17 FIXING SCHEDULE/ SELECTIONS & TYPICAL PLUMBING DETAILS M01 MECHANICAL SERVICES - SITE, SECTION & SCHEDULES M02 MECHANICAL SERVICES - HEATING LAYOUT E1.1 ELECTRICAL SERVICES PLAN E2.1 ELECTRICAL SITE PLAN SOUTH WEST PERSPECTIVE Scale: 1:50 2 NORTH WEST PERSPECTIVE Scale: 1:50 1 Diagrammatic only, not for construction purposes SOUTH EAST PERSPECTIVE Scale: 1:50 3

5195.2.4 goldfields classroom block consent set 2015-05-14 · 2015. 5. 25. · a11 internal classroom elevations a12 details a13 details a14 details a15 details a16 window / door

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

  • postal: 47 Tyne Street offices: 3rd Floor, Imperial Building contact: 03-477-0462 office 021-294-7430 mobileRoslyn, Dunedin 1 Dowling Street, Dunedin [email protected]

    PROJECT

    CLIENT

    DWG

    ISSUE DATE REVISION

    PROJECT #

    DWG #

    REVISION

    DATE #

    SCALE

    DRAWN

    PLOT DATE

    CONTRACTOR MUST CONFIRM CRITICAL DIMENSIONS ON SITE PRIOR TO COMMENCEMENT

    14/5/15

    TITLE

    NEW CLASSROOM BLOCK

    GOLDFIELDS PRIMARY SCHOOL5195.2.4

    A01March 2015

    n/a

    SM

    INDEX:A01 TITLEA02 SITE PLAN A03 PROPOSED FLOOR PLANA04 SLAB PLANA05 ROOF FRAMING & ROOF PLANA06 BRACING & PLUMBING / DRAINAGE PLANA07 REFLECTED CEILING & ELECTRICAL PLAN A08 SECTIONSA09 ELEVATIONSA10 INTERNAL CLASSROOM ELEVATIONSA11 INTERNAL CLASSROOM ELEVATIONSA12 DETAILSA13 DETAILSA14 DETAILSA15 DETAILSA16 WINDOW / DOOR SCHEDULEA17 FIXING SCHEDULE/ SELECTIONS &

    TYPICAL PLUMBING DETAILS

    M01 MECHANICAL SERVICES - SITE, SECTION & SCHEDULESM02 MECHANICAL SERVICES - HEATING LAYOUT

    E1.1 ELECTRICAL SERVICES PLANE2.1 ELECTRICAL SITE PLAN

    SOUTH WEST PERSPECTIVEScale: 1:502

    NORTH WEST PERSPECTIVEScale: 1:501

    Diagrammatic only, not for construction purposes

    SOUTH EAST PERSPECTIVEScale: 1:503

  • postal: 47 Tyne Street offices: 3rd Floor, Imperial Building contact: 03-477-0462 office 021-294-7430 mobileRoslyn, Dunedin 1 Dowling Street, Dunedin [email protected]

    PROJECT

    CLIENT

    DWG

    ISSUE DATE REVISION

    PROJECT #

    DWG #

    REVISION

    DATE #

    SCALE

    DRAWN

    PLOT DATE

    CONTRACTOR MUST CONFIRM CRITICAL DIMENSIONS ON SITE PRIOR TO COMMENCEMENT

    14/5/15

    SITE PLAN

    NEW CLASSROOM BLOCK

    GOLDFIELDS PRIMARY SCHOOL5195.2.4

    A02March 2015

    1:500 @ A2

    SM

    Pla

    y A

    rea

    Pav

    ing

    Blo

    cks

    AC

    C S

    IZE

    TO

    CO

    NF

    IRM

    PHYSICAL ADDRESS:

    GOLDFIELDS PRIMARY SCHOOL25B Gilling PlaceCromwell 9310

    LEGAL DESCRIPTION:

    SEC 121 PT SEC 30 BLK III CROMWELL SD - GOLDFIELDSPRIMARY SCHOOL

    Area = 2.43 ha apx

    SITE PLANScale: 1:5001

    GILLING PLACE

    New classroom block

    New verandah

    Bou

    ndar

    y

    EXISTINGSCHOOL

    BUILDINGS

    Boundary

    Boundary

    New verandah 1000

    2000

    7700

    3000

    30250

    1270

    0

    GENERAL NOTES:

    1. Install and maintain temporary work site fencing with access gate or other site security, 2m high from the ground as required to comply with NZBC F5/AS1 for site security and protection of the public. Reinstate gate and lock at the end of every day to stop public access onto the construction site.

    2. Make good to existing asphalt & paving and extend to finish flush with concrete verandah slabs

    3. 30mm thick Asphalt path on 100mm compacted AP20 on 200mm min. compacted AP40 bearing onto good ground

    4. Level and top dress all grassed areas to finish flush with existing lawn as required, sow new grass seed to match existing

    Site requirements Cromwell Altitude 200m above sea levelSnow Zone = N5Snowloading = 1.0kPaWind Zone= HIGHEarthquake Zone = 2Exposure zone = B

    Site CoverageTotal classroom block area =232.9m²Total verandah area =151.2m²Total site coverage of new block =384.1m²

    Boun

    dary

    Bound

    ary

    Boundary Boun

    dary

    Boundary

    Boundary

    Boun

    dary

    Retain eucalyptus tree, remove all other trees in consultation with principle

    1.2m wide x100mm thick 17.5MPa reinforced concrete path with 1:150mm fall away from building, ensure path finishes 150mm below FSL

    Existing Asphalt

    Existing concrete paving

    Extend concrete paving, ramp up to finish level with new concrete verandah ensuring 1:12 max. slope for accessible access

    Extend concrete paving finishing 150mm below FSL at building face with 1:150mm fall away from building

    Existing irrigation controller pillar box, contractaor to estabilish location of all under ground services prior to excavation.

    Extend & make good to asphalt path as required with 1:150mm fall away from buildingExisting

    Asphalt

  • PROPOSED FLOOR PLANScale: 1:1001

    LINTEL / BEAM SCHEDULE

    WIN / DOOR / BEAM REF

    LINTEL SIZE (mm) SPAN (mm)

    LOADED DIMENSION

    LINTEL FIXING

    COMMENTS

    W01 2 / 150x45 HySpan 1500 4.85 TYPE G DesignIT Cert.W02 2 / 150x45 HySpan 1500 4.85 TYPE G DesignIT Cert.W03 2 / 150x45 HySpan 1500 4.85 TYPE G DesignIT Cert.W04 2 / 150x45 HySpan 1500 4.85 TYPE G DesignIT Cert.W05 2 / 150x45 HySpan 1500 4.85 TYPE G DesignIT Cert.W06 2 / 150x45 HySpan 1500 4.85 TYPE G DesignIT Cert.W07 2 / 150x45 HySpan 1500 4.85 TYPE G DesignIT Cert.W08 2 / 150x45 HySpan 1500 5.35 TYPE G DesignIT Cert.W09 2 / 150x45 HySpan 2000 5.35 TYPE G DesignIT Cert.W10 2 / 150x45 HySpan 2000 5.35 TYPE G DesignIT Cert.W11 2 / 150x45 HySpan 1500 5.35 TYPE G DesignIT Cert.W12 2 / 150x45 HySpan 1500 5.35 TYPE G DesignIT Cert.W13 2 / 150x45 HySpan 2000 5.35 TYPE G DesignIT Cert.W14 2 / 150x45 HySpan 2000 5.35 TYPE G DesignIT Cert.W15 2 / 150x45 HySpan 1000 3.90 TYPE F DesignIT Cert.W16 2 / 150x45 HySpan 1000 3.90 TYPE F DesignIT Cert.W17 2 / 140x45 head trimmer 2400 - TYPE E NZS3604:2011W18 2 / 140x45 head trimmer 2400 - TYPE E NZS3604:2011

    D01 2 / 150x45 HySpan 1000 4.85 TYPE G DesignIT Cert.D02 2 / 150x45 HySpan 2000 4.85 TYPE G DesignIT Cert.D03 2 / 150x45 HySpan 1000 4.85 TYPE G DesignIT Cert.D04 2 / 150x45 HySpan 2000 4.85 TYPE G DesignIT Cert.D05 2 / 150x45 HySpan 2000 5.35 TYPE G DesignIT Cert.D06 2 / 150x45 HySpan 2000 5.35 TYPE G DesignIT Cert.D07 2 / 150x45 HySpan 2000 5.35 TYPE G DesignIT Cert.D08 2 / 190x45 head trimmer 3580 - TYPE E EngineerD09 2 / 190x45 head trimmer 3580 - TYPE E EngineerD10 2 / 90x45 head trimmer 970 - TYPE E NZS3604:2011

    VB1 190x63 Prolam 3000 1.50 2/M12 bolts Prolam Cert.

    NOTE: Lintels supporting roof only for all wind zones up to 1.5KPa snow load - SG8

    1A11

    1A11

    2 A11

    2 A11

    Window / Door setout

    NEW CLASSROOM RM13Internal floor area =74.3m²

    NEW CLASSROOM RM12Internal floor area =74.3m²

    NEW LEARNING COMMONSInternal floor area =52.5m²

    LEGEND:-Vertical corrugate cladding on timber framing / GIB linings

    -Internal timber framing / GIB linings

    -Jacobsen Shaw Welcome entry carpet tile mat, colour to be advisedTILE MAT

    Concrete paving & verandah 1

    RES

    OU

    RCE

    RO

    OM

    Inte

    rnal

    flo

    or

    area

    =21

    .9m

    ²

    90

    W02 D01

    VB1 Verandah beam over

    shel

    ving

    4.8m

    ben

    ch w

    ith

    shel

    ving

    abo

    ve

    TILE MAT

    -Vinyl flooring

    TILE MAT

    2.4x

    2.0x

    0.4m

    Pot

    ters

    whi

    tebo

    ard

    unit

    Sin

    k &

    benc

    h

    9920 140 6920 140 9920 90 2940 90

    30250

    9075

    2090

    7700

    W01 D03 D04

    D06D07

    D08 D09

    D10

    W06

    W09W10W11W12W13W14

    W17 W18

    Concrete paving & verandah 22000

    3000

    -carpet tile flooring-carpet tile flooringW15

    W16

    GENERAL DESIGN NOTES:D08 & D09 - CS for doors cavity slider overtaking doors in 140mm framed braceWALL CS unit, Doors to be New Yorker aluminium framed with laminated safety glass panels

    W15 & W16 - Internal laminated single glazed windows in timber reveal & glazing beads, paint finish

    Lintels continuous over the following windows & doors with double studs between:

    W03 - D01W04 - D02 - W05W08 - D03W09 - D05 - W10W11 - D06 - W12W13 - D07 - W14

    D02

    D05

    TILE MAT

    TILE MATTILE MATTILE MATTILE MAT

    -car

    pet t

    ile fl

    oorin

    g

    shel

    ving

    shel

    ving

    Roo

    f out

    line

    Roo

    f out

    line

    2.4x

    2.0x

    0.4m

    Pot

    ters

    whi

    tebo

    ard

    unit

    901355 1500 1355 1500 1355 1500 90 1000 265

    140880 1500 90 2000 90 1500 860

    1401355 1500 1355 1500 1355 1500 90 1000 265

    90460 2000 480

    9090

    1460

    1000

    2600

    1000

    1460

    90

    90 1870 2000 90 2000 90 2000 1870 140880 1500 90 2000 90 1500 860140 1870 2000 90 2000 90 2000 1870 90 2940 90

    75 3011 3011 3011 3011 3011 3011 3011 3011 3011 3011 70Verandah post setoutto both verandahs

    Window / Door setout

    Internal Window/Door setout

    90

    1200

    2400

    250

    3580

    90

    WindowDoorsetout

    W03 W04 W05 W07 W08

    Continuous lintel over windows & door with double studs between, refer NOTE 5

    Accessible ramp into classrooms, centre on opening door leaf, refer SLAB PLAN

    rampramp

    Continuous Lintel

    Continuous Lintel

    Continuous Lintel

    Continuous Lintel

    Continuous Lintel

    Continuous Lintel

    Continuous Lintel

    VB1 Verandah beam over

    VB1

    VB1

    Link roof outline with verandah beams each side

    Total classroom block area =232.9m²Total verandah area =151.2m²Total site coverage of new block =384.1m²

    900

    2000

    ABD

    CA10

    EFH

    GA10

    MNP

    OA11

    970

    IJL

    KA11

    LINE OF EXISTING CLASSROOMEXISTING VERANDAH

    postal: 47 Tyne Street offices: 3rd Floor, Imperial Building contact: 03-477-0462 office 021-294-7430 mobileRoslyn, Dunedin 1 Dowling Street, Dunedin [email protected]

    PROJECT

    CLIENT

    DWG

    ISSUE DATE REVISION

    PROJECT #

    DWG #

    REVISION

    DATE #

    SCALE

    DRAWN

    PLOT DATE

    CONTRACTOR MUST CONFIRM CRITICAL DIMENSIONS ON SITE PRIOR TO COMMENCEMENT

    14/5/15

    PROPOSED FLOOR PLAN

    NEW CLASSROOM BLOCK

    GOLDFIELDS PRIMARY SCHOOL5195.2.4

    A03March 2015

    1:100 @ A2

    SM

  • postal: 47 Tyne Street offices: 3rd Floor, Imperial Building contact: 03-477-0462 office 021-294-7430 mobileRoslyn, Dunedin 1 Dowling Street, Dunedin [email protected]

    PROJECT

    CLIENT

    DWG

    ISSUE DATE REVISION

    PROJECT #

    DWG #

    REVISION

    DATE #

    SCALE

    DRAWN

    PLOT DATE

    CONTRACTOR MUST CONFIRM CRITICAL DIMENSIONS ON SITE PRIOR TO COMMENCEMENT

    14/5/15

    SLAB PLAN

    NEW CLASSROOM BLOCK

    GOLDFIELDS PRIMARY SCHOOL5195.2.4

    A04March 2015

    1:100 @ A2

    SM

    FOUNDATION / SLAB PLANScale: 1:1001

    100mm thick 20MPa reinforced concrete slab with grade 500E SE62 mesh on DPM on 50mm sand blinding layer on 150mm min. compacted hard fill

    25mm deep saw cut / control joint

    line of foundation site concrete under

    Line of 20 series block foundation

    100mm thick 20MPa reinforced concrete verandah slab with 100mm set down below FFL and 25mm fall to outside

    line of institu concrete foundation under

    200fall

    Fill all saw cuts to verandahs with cement grout

    GENERAL NOTES:

    1. All dimensions are to the face of the concrete block foundations / insitu concrete foundations.

    2. All block work to be carried out by qualified tradesmen in accordance with NZS 3604, NZS 4229 & NZS 4210.

    3. Ensure finshed floor levels are 225mm above Finished ground levels (FGL), allow a further 100mm. min. below FGL to cleared ground level (CGL) for top soil. Contractor to ensure 200mm min. bearing depth of foundation below CGL.

    4. Fill all visable saw cuts to verandah slabs with cement grout

    5. All finished surfaces on all access routes shall comply with NZBC D1/AS1, 2.1 slip resistance.

    6. All work to comply with NZS 3604: 2011 amendments 1&2 & NZBC

    7. All materials & products installed to manufacturers specification and best trade practice

    CONCRETE SURFACE FINISHES:

    1. Powerfloat machine finish CCANZ level U4 specification to internal concrete slabs

    2. Broom finish level CCANZ level U5 specification to verandah slabs

    25m

    m d

    eep

    saw

    cut

    / co

    ntro

    l joi

    nt

    25m

    m d

    eep

    saw

    cut

    / co

    ntro

    l joi

    nt

    25m

    m d

    eep

    saw

    cut

    / co

    ntro

    l joi

    nt

    25m

    m d

    eep

    saw

    cut

    / co

    ntro

    l joi

    nt

    fallfallfall

    35mm deep rebate2000

    90

    ACCESSIBLERAMP

    200mm deep slab thickening (ST1) for CS for Doors BraceWall hold down fixing

    ST1

    ST1

    35mm deep rebate

    35mm deep rebate

    45mm deep rebate

    45mm deep rebate

    35mm deep rebate

    fallfallfall

    35mm deep rebate2000

    90

    ACCESSIBLERAMP

    25m

    m d

    eep

    saw

    cut

    25m

    m d

    eep

    saw

    cut

    25m

    m d

    eep

    saw

    cut

    25m

    m d

    eep

    saw

    cut

    25m

    m d

    eep

    saw

    cut

    25m

    m d

    eep

    saw

    cut

    25m

    m d

    eep

    saw

    cut

    25m

    m d

    eep

    saw

    cut

    25m

    m d

    eep

    saw

    cut

    25m

    m d

    eep

    saw

    cut

    fallfall

    Line of accessible ramp with 1:12 max slope, ensure concrete is recessed off cladding and door sill as detailed, REFER Sheet A15 Detail 3

    B B B B B B B B B B B

    B B B B B B B B B B B

    4050

    2000

    7700

    30250

    3000

    190

    240

    7080

    fallfallfallline of slab

    60

    12001200

    3400

    1200

    1000

    45

    ACCESSIBLE RAMP

    LEGEND:

    Accessible concrete ramp with 1:12 max slope, centre on opening

    door leaf. Construct rebates to provide clearances to cladding and Al.

    door with fall to outside for drainage, refer door threshold detail

    SHEET A15 Detail 3

    Cast-in Bowmac B197 stainless steel brackets for verandah postsB

    75 3011 3011 3011 3011 3011 3011 3011 3011 3011 3011 70Verandah post setoutto both verandahs

    400

    1200

    40016940mm to slab edge

    2560

    1200

    9880mm to slab edge

    8745 1000 2875 2000 1000 815 2000 570

    90759090

    75

    Seal new concrete slab with Ardex WPM 300 HydrEpoxy at least 7 days prior to laying floor coverings to ensure no moisture transfers to flooring while concrete curring, apply HydrEpoxy to manu. spec., refer spec.

    6550 20002000

  • ROOF PLANScale: 1:1002

    LEGEND:0.55mm Colorsteel metal profiled longrun roofing Dimond Veedek or similar on self-supporting roof underlay on purlins on trusses

    Clearlite profiled polycarbonate roofing profile to match colorsteel roofing on PVC coated galv. safety mesh on purlins on rafters

    0.55mm Colorsteel metal longrun flashings to ridge, barge & apron-change of pitch, colour to match roofing

    Ø80 uPVC Downpipe - paint out to match verandah posts & spouting

    uPVC spouting - paint out to match verandah framing

    1.5mm Butynol membarne roof link - colour black

    Ø80 DP

    CL

    M

    uPVC spouting

    2A12

    5A12

    barg

    e

    ridge

    20° fall

    20° fall

    5° fall

    5° fall

    CL

    1A12

    4A12

    Ø80 DP

    Ø80 DP

    Ø80 DP

    Ø80 DP

    barg

    eba

    rge

    barg

    e

    barg

    eba

    rge

    barg

    eba

    rge

    9A12

    2° fall M

    EXISTING CLASSROOM

    EXISTING VERANDAH Extend existing spouting on timber

    fascia board along link roof

    uPVC spouting uPVC spoutingØ80 DP

    Ø80 DP

    uPVC spoutinguPVC spouting

    CLCL

    Apron - change of pitch

    CLCLCL

    Apron - change of pitch

    postal: 47 Tyne Street offices: 3rd Floor, Imperial Building contact: 03-477-0462 office 021-294-7430 mobileRoslyn, Dunedin 1 Dowling Street, Dunedin [email protected]

    PROJECT

    CLIENT

    DWG

    ISSUE DATE REVISION

    PROJECT #

    DWG #

    REVISION

    DATE #

    SCALE

    DRAWN

    PLOT DATE

    CONTRACTOR MUST CONFIRM CRITICAL DIMENSIONS ON SITE PRIOR TO COMMENCEMENT

    14/5/15

    ROOF & ROOF FRAMING PLAN

    NEW CLASSROOM BLOCK

    GOLDFIELDS PRIMARY SCHOOL5195.2.4

    A05March 2015

    1:100 @ A2

    SM

    ROOF FRAMING PLANScale: 1:1001

    Gable end truss, refer truss design & PS1

    Trusses @ 900crs, refer Truss design & PS1

    5 pairs of diagonal roof bracing evenly spaced along roof- install Lumberlok Multi brace complete with tensioner to manu. spec., refer Specification for manu. typical details

    GENERAL NOTES:

    1. Truss design by others, refer to Truss Manufacturers drawings and PS1

    2. Purlins evenly spaced ( 900crs max)

    3. Refer Beam / lintels schedule Sheet A03 & DesignIT / Prolam certificates

    4. Details derived from best assumptions of existing, if find construction method unsuitable with details drawn inform designer immediately for alternative solution.

    5. All work to comply with NZS 3604: 2011 amendments 1&2 & NZBC

    6. All glazing to comply with NZS4223: 1999

    7. All materials & products installed to manufacturers specification and best trade practice

    Ridge

    roof bracing

    roof bracing

    roof bracing

    roof bracing

    roof bracing

    roof

    brac

    ing

    roof

    brac

    ing

    roof

    brac

    ing

    roof

    brac

    ing

    roof

    brac

    ing

    Ridge

    190x63 Prolam verandah beam, refer Prolam cert.

    90x45 purlins equally spaced @ 900crs max.

    140x45 Laserframe verandah rafters equally spaced (900crs max), refer DesignIT Cert. member 1

    140x45 Laserframe verandah rafters equally spaced (900crs max), refer DesignIT Cert. member 1

    190x63 Prolam verandah beam, refer Prolam cert.

    400400

    90x45 purlins as required for change of pitch, refer Sheet A12 Detail 5

    90x45 purlins equally spaced @ 900crs max.

    EXISTING CLASSROOM

    EXISTING VERANDAH

    190x63 Prolam verandah beam each side, refer Prolam cert.

    New flat membrane link roof on Ecoply on140x45 rafters

    Existing verandah post

    Extend existing spouting on timber fascia board along link roof

  • BRACING PLANScale: 1:1001

    LEGEND:

    Bracing length

    Bracing type

    Bracing element

    GENERAL NOTES:

    1. Install all bracing elements to manufacturers specification, refer Specification appendix for manufacturers bracing installation manuals from:

    a. GIB bracing b. James hardie HomeRab bracing c. CS for Doors BraceWall bracing

    2-1/

    BL1

    -H/1

    .2

    B1/JHD/1.8

    A1/JHD/1.2

    B2/JHD/2.4 B3/JHD/2.4 B4/LHD-N/4.81-

    1/JH

    D1.

    4

    A2/JHD/1.2

    2-2/

    CS

    1980

    /1.0

    2-1/

    BL1

    -H/1

    .2

    4-1/

    GS

    1-N

    /3.6

    5-1/

    JHD

    /2.4

    7700

    BA

    10080

    27060

    310035

    43075

    51

    A3/JHD/1.2 A4/JHD/1.2 A5/JHD/2.2 A6/JHD/1.2 A7/JHD/1.2 A8/JHD/0.7 A9/JHD/0.5

    1-2/

    JHD

    /2.4

    1-3/

    JHD

    1.4

    3-2/

    CS

    1980

    /1.0

    3-1/

    BL1

    -H/1

    .2

    5-2/

    JHD

    /2.4

    Provide 90x45 blocking to truss bottom chord

    Trusses at 900crs to manu. spec.

    Lumberlok multibrace with tensioner fixed to the bottom chord of each truss with a minimum of 3/30x3.15 nails, ends fixed manu. spec.

    Trusses at 900crs to manu. spec.

    Provide 90x45 blocking to truss bottom chord,blocking to extend to lines of cross bracing

    postal: 47 Tyne Street offices: 3rd Floor, Imperial Building contact: 03-477-0462 office 021-294-7430 mobileRoslyn, Dunedin 1 Dowling Street, Dunedin [email protected]

    PROJECT

    CLIENT

    DWG

    ISSUE DATE REVISION

    PROJECT #

    DWG #

    REVISION

    DATE #

    SCALE

    DRAWN

    PLOT DATE

    CONTRACTOR MUST CONFIRM CRITICAL DIMENSIONS ON SITE PRIOR TO COMMENCEMENT

    14/5/15

    BRACING PLAN

    NEW CLASSROOM BLOCK

    GOLDFIELDS PRIMARY SCHOOL5195.2.4

    A06March 2015

    1:100 @ A2

    SM

    FOUL WATER PIPE SIZING GRADIENT

    Waste pipe & trap to sink Ø40mm PVC to AS/NZS 3500 1:40Waste pipe & trap to HWC Tundish Ø50mm UPVC to AS/NZS 3500 1:40Vents to FS drains Ø50mm UPVC to AS/NZS 3500 n/a

    FS drains & traps to GT Ø100mm UPVC to AS/NZS 3500 1:60

    HOT WATER PIPE TYPE STANDARD15mm pipework to Wash hand Basin Polybutylene AS/NZS 2642:Parts 1,2 & 320mm pipework 600mm from HWC Copper NZS 3501

    STORMWATER DRAINAGE STANDARD80mm UPVC downpipes AS/NZS 1260UPVC Inspection pipe AS/NZS 1260

    PLUMBING SCHEDULE:

    Overflow relief gully (ORG) at head of branch drain with Ø50 vent installed through verandah terminating above roof with dektite flashing

    LEGEND:-NEW Ø100 1:100 Stormwater drain connects to existing

    -NEW Ø100 1:60 Foul Sewer drain connects to existing

    -NEW uPVC downpipe fixed to verandah posts / cladding with

    galzanised munzing ring downpipe clamp with threaded spacers

    -Inspection Point

    -Overflow relief gully at head of new branch drain complete with

    Ø50 vent installed through verandah terminating above roof with

    dektite flashing

    - Rheem under bench mains pressure HWC complete with PRV

    & tundish over stainless steel overflow tray discharging to ORG,

    refer specification & SHEET A17 for Typical Plumbing details

    SW

    IP

    ORG

    FS

    DP

    PLUMBING & DRAINAGE PLANScale: 1:1002

    Gutter Calculations: NZBC E1/AS1 Figure 15

    Roof catchment plan area = 395m²X-sectional area of external gutter = 31000mm²

    uPVC spouting to match existing with minimum X-sectional area of 5100mm² which services a maximum roof plan area of 45m² apx.

    Downpipie requirements to meet gutter capacity for roof plan area:

    # of DP's for gutter capacity = 31000/5100= 6x � Downpipes minimum required

    Install 6xØ80 uPVC Downpipes, 3 each side as shown

    Downpipe Calculations: NZBC E1/AS1 Table 5

    Roof catchment plan area = 395m²Roof pitch = 20°Ø80 DP services 85m² of roof plan area

    # of DP = 395/85 = 5x Ø80 Downpipes required

    Ø80 DP

    Ø80 DP

    Ø80 DP

    Ø80 DP

    Ø80 DP

    Ø80 DP

    ORGØ50 vent

    HWC

    SINK

    HWC

    SW

    SW SW SW SW SW SW

    SW

    SW SW SW SW SW SW SW

    SW

    SW

    SW

    SW

    FS FS FS

    FS

    IP

    Connect new FS & SW drains to existing

    GENERAL PLUMBING NOTES:

    1. All plumbing & drainage works & materials to comply with NZBC G13/AS3 (AS/NZS 3500.1 sec 2,3,4 & appendix C) and Acceptable Solutions E1/AS1 - surface water. Test all PVC drainage pipes below ground in accordance with AS/NZS 2032 section11.

    2. All plumbing & drainage is diagramatic only, Sub-contractor to confirm all pipe routes and site levels prior to commencing and provide AS-BUILT drawings as required for Code of Compliance by the local Territorial Authority.

    3. Sub-contractor to supply & install hot & cold water feeds to all fixtures as required to comply with NZBC G12: AS1. Test all water supply pipework prior to concealment with 1500kPa pressure test for 15 minutes, visually inspect for leaks & have local TA inspect & confirm test on site.

    4. Sub-contractor to supply & install frost protection lagging to all piping outside building thermal envelop & hot water pipes between HWC & outlets with 13mm thick min. closed cell foam polymer insulation.

    5. Sub-contractor to install tempering valve to all hot water supply to hygiene fixtures to not exceed 55°C in accordance with the NZBC E3/AS1.

    6. Contractor to liaise with Client and confirm all fixtures, fittings, accessories for selection & ensure availability to plumbing sub-contractor as & when required.

    7. Main contractor to allow to install blocking as required for fixing of all fixtures, fittings & accessories.

    8. Sub-contractor to install bond break sleeving to all pipework through concrete slab & foundations with 25mm flexible Aqua sleeve tubing or similar approved.

  • postal: 47 Tyne Street offices: 3rd Floor, Imperial Building contact: 03-477-0462 office 021-294-7430 mobileRoslyn, Dunedin 1 Dowling Street, Dunedin [email protected]

    PROJECT

    CLIENT

    DWG

    ISSUE DATE REVISION

    PROJECT #

    DWG #

    REVISION

    DATE #

    SCALE

    DRAWN

    PLOT DATE

    CONTRACTOR MUST CONFIRM CRITICAL DIMENSIONS ON SITE PRIOR TO COMMENCEMENT

    14/5/15

    REFLECTED CEILING/ELECTRICAL

    NEW CLASSROOM BLOCK

    GOLDFIELDS PRIMARY SCHOOL5195.2.4

    A07April 2015

    1:100 @ A2

    SM

    REFLECTED CEILING PLANScale: 1:1001

    LEGEND:

    1200x600 Daiken acoustic ceiling tiles in exposed 2-way suspended grid system to match existing

    Pre-painted metal profiled longrun roofing over verandah on purlins on rafters

    Clearlite profiled polycarbonate roofing profile to match roofing on galv. safety mesh on purlins on rafters

    Rexel 2x18W LED light fitting 1200mm with wrap around anti-glare prismatic diffuser 400K

    Projector / interactive whiteboard unit supplied by school, electrical contractor to provide power & associated cabling for system, liaise with school principle for position & requirements

    Smoke Detector - refer Electrical Services documentation

    L1

    P

    SD

    Long run pre-painted metal barge

    Long run spouting on long run pre-painted metal fascia fixed to verandah beam

    L1 L1L1

    L1 L1L1

    L1 L1L1

    L1 L1L1

    L1 L1L1

    L1 L1L1

    L2L2

    L2L2

    L1 L1

    L1 L1

    L1 L1

    L1

    L1

    L1

    P P

    Fibre cement soffit lining with PVC jointers installed to gable ends

    Verandah purlins equally spaced @ 900crs max.

    Verandah rafters equally spaced @ 900crs max.

    Verandah beam, refer Prolam Certificate

    Verandah posts, refer Prolam Certificate

    New flat membrane link roof on Ecoply on140x45 rafters & 190x63 Prolam beams each side

    Extend existing spouting on timber fascia board along link roof

    Verandah spouting continuous above flat membrane link roof

    EXISTING CLASSROOM

    EXISTING VERANDAH Ex.

    post

    SD SD SD

    SD

    LIGHTING / FIRE DESIGN PLANScale: 1:1002

    FIRE DESIGN REQUIREMENTS:

    Rexel Quicklift Exit 3W LED maintained non maintained illuminated exit sign complying with NZBC,install above external fire exit doors

    Manual call points - fire alarm

    Manual call points & Sounder- fire alarm

    Refer Specification appendex for the following:1. Fire engineers design report2. Manufacturers lighting design

    EXIT

    MCP

    MCP

    S EXIT

    LEGEND:

    Surface mounted Rexel 2x18W LED light fitting 1200mm with wrap around anti-glare prismatic diffuser 400K

    Surface mounted Inge R80 double1x1500mm fluorescent light fittings

    Rexel Escort 14W LED bulkhead IP65 rated outdoor wall light

    Switchboard - PDL superboard DBF flush mount , refer electrical engineers design

    Double socket outlet

    Data socket outlet - install CAT 6 cable for supply of phone & internet

    Projector / interactive whiteboard unit supplied by school, electrical contractor to provide power & associated cabling for system, liaise with school principle for position & requirements

    Light switch - gang all switches

    Light switch - 2 way

    Under bench mains pressure hot water cylinder with tempering valve, refer internal elevations & spec.

    Thermostat for radiator heating, refer heating design

    Radiator, refer Mechanical Services heating documentation

    L1

    2D

    HWC

    P

    2

    TH

    SWITCHING NOTES:

    Schneider Electric 600 series.All switches vertical & sockets horizontal.Confirm all substitutions prior to installation

    COLOUR:Cover plate - WhiteSwitch colour - White.

    INSTALLATION HEIGHT:Switches 1300mm centre off FFLSwitches & sockets 150mm centre off benchtopsSockets 300mm centre off FFL

    Align sockets & switches vertically where appropriateGang switching on one plate where possible

    Also refer specification for selections

    L1 L1L1

    L1 L1L1

    L1 L1L1

    L1 L1L1

    L1 L1L1

    L1 L1L1

    L1 L1

    L1 L1

    L1 L1

    L1

    L1

    L1

    EXITEXIT

    EXITEXIT

    NEW CLASSROOM RM13NEW CLASSROOM RM12 NEW LEARNING COMMONSRESOURCE

    ROOM

    EXIT

    Install power etc to ceiling to supply projector / interactive whiteboard, confirm position with principle prior to installation

    PP

    2

    2

    L2L2

    L2L2

    SB

    MCP

    S

    MC

    P

    RR R R R R R

    RRR

    R

    SB

    800h x 600w x 600d data cabinet, refer ELECTRICAL ENGINEERS DRAWINGS & internal elevations

    HWC MCP

    S MC

    P SEXIT

    MC

    P

    MC

    P

    L2

  • postal: 47 Tyne Street offices: 3rd Floor, Imperial Building contact: 03-477-0462 office 021-294-7430 mobileRoslyn, Dunedin 1 Dowling Street, Dunedin [email protected]

    PROJECT

    CLIENT

    DWG

    ISSUE DATE REVISION

    PROJECT #

    DWG #

    REVISION

    DATE #

    SCALE

    DRAWN

    PLOT DATE

    CONTRACTOR MUST CONFIRM CRITICAL DIMENSIONS ON SITE PRIOR TO COMMENCEMENT

    14/5/15

    SECTIONS

    NEW CLASSROOM BLOCK

    GOLDFIELDS PRIMARY SCHOOL5195.2.4

    A08March 2015

    1:50 @ A2

    SM

    FFL

    20.00°

    CLASSROOMRM13

    0.55mm vertical longrun corrugate cladding on Horizontal Cavibat cavity battens on JH HomeRab board on 90x45 framing @ 400crs complete with wall insulation

    Double glazed aluminium windows to match existing

    0.55mm pre-painted profiled longrun metal roofing on self-supporting roofing underlay on purlins on trusses complete with roof insulation

    Trusses diagramatic only,refer truss design

    2720

    ove

    r top

    pla

    te

    100mm thick 20MPa reinforced concrete slab with grade 500E SE62 mesh on rigid polystyrene under slab insulation on DPM on 50mm sand blinding layer on 150mm min. compacted hard fill

    20.0

    CLASSROOM CROSS SECTIONScale: 1:502

    Acoustic ceiling tiles in exposed 2-way suspended grid system

    0.55mm pe-painted longrun metal ridge flashing notched to roofing profile

    4300

    apx

    2455

    roof apex

    3A12

    3A15

    10A12

    5A12

    1A12

    2A15

    1A14

    3A14

    2A14

    GL

    9A12

    1A15

    8A12

    2540

    5.0°

    5.0°

    VERANDAHVERANDAH

    Profiled clearlite polycarbonate roofing on safety mesh on purlins on verandah rafters

    PottersWhiteboard unit

    LONG SECTIONScale: 1:501

    FFL

    GL

    2A12

    3A12

    10mm GIB Standard wall linings, also refer bracing plan

    Trusses diagramatic only,refer truss design

    2720

    ove

    r top

    pla

    te

    RESOURCE ROOMCLASSROOMRM13

    LEARNINGCOMMONS

    CLASSROOMRM12

    1A14

    3A14

    2A14

    7A14

    6A14

    5A14

    1A15

    4A15

    3A15

    similar

    2A14

    1A15

    FFL

    GL

    2A12

    3A12

  • postal: 47 Tyne Street offices: 3rd Floor, Imperial Building contact: 03-477-0462 office 021-294-7430 mobileRoslyn, Dunedin 1 Dowling Street, Dunedin [email protected]

    PROJECT

    CLIENT

    DWG

    ISSUE DATE REVISION

    PROJECT #

    DWG #

    REVISION

    DATE #

    SCALE

    DRAWN

    PLOT DATE

    CONTRACTOR MUST CONFIRM CRITICAL DIMENSIONS ON SITE PRIOR TO COMMENCEMENT

    14/5/15

    ELEVATIONS

    NEW CLASSROOM BLOCK

    GOLDFIELDS PRIMARY SCHOOL5195.2.4

    A09April 2015

    1:100 @ A2

    SM

    DPDPDP

    CL

    CR

    CL CL

    CC

    F

    CRF

    CC

    CL

    CR

    CL CL

    CC

    F

    CRF

    CC

    4300

    roof apex

    VERANDAH 1

    FFL

    150

    Original GLGL

    WEST ELEVATIONScale: 1:1004

    225

    Extend & make good to existing paving & ramp up to finish flush with verandah slab

    Make good to ground levels - finish smooth without undulations, top dress and sow lawn

    1.2m wide x100mm thick 17.5MPa reinforced concrete path with 1:150mm fall away from building, ensure path finishes 150mm below FSL

    Make good to ground levels - finish smooth without undulations gradually sloping away from classroom, top dress and sow lawn

    EAST ELEVATIONScale: 1:1002

    CL

    CR

    VERANDAH 2

    CL CL

    CC

    F

    Outline of existing classrooms beyond

    Outline of existing classrooms beyond

    CRF

    CC

    DPDPDP

    FFL 150

    GL

    225

    Align membrane roof fascia with existing classroom, extend spouting along link

    CL

    LEGEND:0.55mm Colorsteel metal profiled longrun roofing Dimond Veedek or similar to match existing

    Clearlite profiled polycarbonate roofing profile to match colorsteel roofing on galv. safety mesh

    0.55mm Colorsteel metal corrugate longrun cladding or similar to match existing

    0.55mm Colorsteel metal longrun flashings to ridge, barge, apron-change of pitch, valley gutters & change of roofing profile, colour to match roofing

    Ø80 uPVC Downpipe with galzanised munzing ring downpipe clamp with threaded spacers

    GENERAL NOTES:1. All fascia, barge boards and spouting to be selected in colorsteel

    2. All exterior door and window joinery to be double glazed aluminium unless otherwise noted, refer Door & Window schedule Sheet A20

    CC

    CR

    Ø80 DP

    DPDP

    NORTH ELEVATIONScale: 1:1001

    Outline of existing classrooms adjacent

    VERANDAH 1VERANDAH 2

    FFL 150

    GL

    Original GL to be made goodCCF

    Post Post

    F

    SOUTH ELEVATIONScale: 1:1003

    DP DP

    CC

    4300

    roof apex

    VERANDAH 1 VERANDAH 2

    New flat membrane link roof

    Existing verandah post, confirm exact location on site

    Extend existing spouting on timber fascia board along link roof

    Outline of existing classrooms adjacent

    FFL

    225

    GL

    Original GL

  • postal: 47 Tyne Street offices: 3rd Floor, Imperial Building contact: 03-477-0462 office 021-294-7430 mobileRoslyn, Dunedin 1 Dowling Street, Dunedin [email protected]

    PROJECT

    CLIENT

    DWG

    ISSUE DATE REVISION

    PROJECT #

    DWG #

    REVISION

    DATE #

    SCALE

    DRAWN

    PLOT DATE

    CONTRACTOR MUST CONFIRM CRITICAL DIMENSIONS ON SITE PRIOR TO COMMENCEMENT

    14/5/15

    INTERNAL ELEVATIONS

    NEW CLASSROOM BLOCK

    GOLDFIELDS PRIMARY SCHOOL5195.2.4

    A10April 2015

    1:50 @ A2

    SM

    INTERNAL ELEVATION A Scale: 1:50A

    Radiator

    CLASSROOM RM12

    INTERNAL ELEVATION F Scale: 1:50F

    100

    610

    4010

    0

    2400 with 4 Eq divisions

    750

    HWC

    sink

    NOTE: JOINER MUST CONFRIM JOINERY UNIT PRIOR TO MANUFACTURE

    ITEM DESCRIPTION COLOUR/FINISH

    Benchtop High pressure laminate Formica / square edge / 100mm upstand TBCJoinery fronts & haffits Embossed melteca low pressure laminate MDF TBCCarcass Embossed melteca low pressure laminate MDF WhiteHandles Std 100mm brushed S/S or chrome TBC Stainless Steel Drawers Blum soft close Hafele soft closeCupboard Blum 3-way adjustable joinery hinges Hafele soft closeSink Mercer EC107 Bella stainless steel sink with overflow 304 Stainless steelSink mixer Methven Futura sink mixer - code FTKCP ChromeHWC 385x405 25L Rheems under bench mains pressure HWC n/a

    JOINERY SCHEDULE:

    INTERNAL ELEVATION EScale: 1:50E

    Vinyl tarkett on concrete slab

    40x12 bevelled MDF architraves, paint finish

    Composition on 10mm GIB lining installed to manu. spec.

    Joinery unit with S/S sink, refer joinery schedule

    60x12 bevelled MDF skirting, paint finish

    80 570

    650

    20

    Radiator

    INTERNAL ELEVATION HScale: 1:50H

    INTERNAL ELEVATION GScale: 1:50G

    Radiator Radiator, refer Mechanical Services heating drawings

    INTERNAL ELEVATION BScale: 1:50B

    CLASSROOM RM13 2Scale: 1:50D

    PottersWhiteboard unit

    Contractor to confirm location of interactive projector & provide blocking for fixing as required

    INTERNAL ELEVATION CScale: 1:50C

    Carpet tiles on concrete slab

    40x12 bevelled MDF architraves, paint finish

    Composition on 10mm GIB lining installed to manu. spec.

    60x12 bevelled MDF skirting, paint finishRadiatorRadiator

    LEARNING COMMONS

  • postal: 47 Tyne Street offices: 3rd Floor, Imperial Building contact: 03-477-0462 office 021-294-7430 mobileRoslyn, Dunedin 1 Dowling Street, Dunedin [email protected]

    PROJECT

    CLIENT

    DWG

    ISSUE DATE REVISION

    PROJECT #

    DWG #

    REVISION

    DATE #

    SCALE

    DRAWN

    PLOT DATE

    CONTRACTOR MUST CONFIRM CRITICAL DIMENSIONS ON SITE PRIOR TO COMMENCEMENT

    14/5/15

    INTERNAL ELEVATIONS

    NEW CLASSROOM BLOCK

    GOLDFIELDS PRIMARY SCHOOL5195.2.4

    A11April 2015

    1:50 @ A2

    SM

    INTERNAL ELEVATION IScale: 1:50I

    Radiator

    INTERNAL ELEVATION KScale: 1:50K

    60x12 bevelled MDF architraves, paint finish

    Composition on 10mm GIB lining installed to manu. spec.

    60x12 bevelled MDF skirting, paint finishRadiator Radiator

    Carpet tiles on concrete slab

    INTERNAL ELEVATION JScale: 1:50J

    Composition on 10mm GIB lining installed to manu. spec.

    60x12 bevelled MDF skirting, paint finish

    60x12 bevelled MDF architraves, paint finish

    Carpet tiles on concrete slab

    INTERNAL ELEVATION LScale: 1:50L

    60x12 bevelled MDF architraves, paint finish

    Composition on 10mm GIB lining installed to manu. spec.

    Contractor to confirm location of interactive projector & provide blocking for fixing as required

    Carpet tiles on concrete slab

    PottersWhiteboard unit

    60x12 bevelled MDF skirting, paint finish

    INTERNAL ELEVATION MScale: 1:50M

    Carpet tiles on concrete slab

    775

    40

    7500

    Bench

    INTERNAL ELEVATION PScale: 1:50P

    INTERNAL ELEVATION NScale: 1:50N

    INTERNAL ELEVATION OScale: 1:50O

    4.8m long x 600mm deep x 40mm thick high pressure MDF Melamine laminate bench top with bull nose to front edge, colour TBC

    60x12 bevelled MDF skirting, paint finish

    JOINERY UNIT GENERAL NOTES:

    20mm thick low density MDF melamine shelving complete with 2mm bullnose clashing strip all round

    Also refer specification for joinery

    Provide brackets to fix shelving to studs @ 1.2m crs for seismic restraint

    Powdercoated Bowmac B567 angle bracket with gusset @ 800crs fixed to studs with 3/ M10 coach screws with powdercoated heads to match & 3/30mm tex screw to underside of bench top

    5x modular shelving units fixed directly to wall

    Line of shelving

    775

    Acoustic tile suspended grid system

    825

    600

    1600

    60x12 bevelled MDF skirting, paint finish

    1200 1200 1200 1200 1200

    10mm GIB lining, paint finish

    600h x 1200w x 400d low pressure MDF Melamine laminate fixed shelving units fixed directly to wall, main contractor to provide continous blocking top & bottom of shelving for fixing

    60x12 bevelled MDF architraves, paint finish

    Bench

    Compositionabove bench

    1600h x 1200w x 400d low pressure MDF Melamine laminate adjustable shelving unit fixed directly to wall, main contractor to provide continuous blocking for fixing

    1200 1200 1200 1200 1200 1200

    2200h x 1200w x 400d low pressure MDF Melamine laminate adjustable shelving units fixed directly to wall, main contractor to provide continuous blocking for fixing, colour TBC

    2200h x 1200w x 400d low pressure MDF Melamine laminate adjustable shelving units fixed directly to wall, main contractor to provide continuous blocking for fixing, colour TBC

    60x12 bevelled MDF architraves, paint finish

    10mm GIB lining, paint finish

    Radiator

    700

    800h x 600w x 600d Data cabinet with 90° hinge opening, refer ELECTRICAL ENGINEERS DRAWINGS

    Switchboard, refer ELECTRICAL ENGINEERS DRAWINGS

    Data cabinet beyond shelving, refer ELECTRICAL ENGINEERS DRAWINGS

    CLASSROOM RM13 RESOURCE ROOM

  • postal: 47 Tyne Street offices: 3rd Floor, Imperial Building contact: 03-477-0462 office 021-294-7430 mobileRoslyn, Dunedin 1 Dowling Street, Dunedin [email protected]

    PROJECT

    CLIENT

    DWG

    ISSUE DATE REVISION

    PROJECT #

    DWG #

    REVISION

    DATE #

    SCALE

    DRAWN

    PLOT DATE

    CONTRACTOR MUST CONFIRM CRITICAL DIMENSIONS ON SITE PRIOR TO COMMENCEMENT

    14/5/15

    ROOF & SLAB DETAILS

    NEW CLASSROOM BLOCK

    GOLDFIELDS PRIMARY SCHOOL5195.2.4

    A12March 2015

    1:10 @ A2

    SM

    200 cover200 co

    ver

    0.55mm Colorsteel profiled metal longrun roofing on self supporting roof underlay

    0.55mm Colorsteel ridge flashing notched to suit profiled metal cladding

    stop end

    Roofing screw & rubber washer

    Truss, refer truss design

    TYPICAL RIDGE DETAILScale: 1:101

    5.00

    °

    0.55mm Colorsteel profiled longrun roofing or Clearlite polycarbonate roofing on safety mesh on 90x45 purlins equally spaced @ 900crs max on rafters @ 900crs

    50

    Colorsteel longrun spouting

    Powdercoated colorsteel snow straps installed to manu. spec.

    PLVR12H3 200PP GL12 190x63 Prolam verandah beam fixed to post with 2/M12 bolts & washers

    VERANDAH BEAM TO POST CONNECTIONScale: 1:109

    5050

    Colorsteel longrun fascia

    PLP8 135PP 112x112 Prolam timber verandah post with 10mm round edges

    25

    5.00

    °

    0.55mm Colorsteel profiled longrun roofing or Clearlite polycarbonate roofing on safety mesh on 90x45 purlins equally spaced @ 900crs max on rafters @ 900crs

    50

    Colorsteel longrun spouting & fascia

    Powdercoated colorsteel snow straps

    PLVR12H3 200PP GL12 190x63 Prolam verandah beam

    VERANDAH RAFTER TO BEAM CONNECTIONScale: 1:108

    140x45 rafters @ 900crs max. fixed to beam with multi grips each side nailed with 6/30x3.15 annular grooved nails each flange

    PLP8 135PP 112x112 Prolam timber verandah post with 10mm round edges fixed to bracket with 2/M12 galv. bolts

    Bowmac B197 post bracket cast into concrete footing

    200 min

    R10 stirrups at 600crs lap 600mm into slab

    20 MPa reinforced concrete footing, bearing into good ground with 300 min. depth below cleared ground

    GL

    VERANDAH POST TO INSITU FOUNDATIONScale: 1:1010

    2/D12 horz.

    100mm thick 20MPa concrete slab with grade 500E SE62 mesh on DPM on 50mm sand blinding on 150mm min. compacted hard fill.,

    Note: 75mm cover to all reinforcing below ground

    FFL

    2/D12

    FALL

    Form 15mm fillet to perimeter of slab edge

    600 min. lap

    140x45 rafters @ 900crs max fixed to top plate with 3/90x3.15 skew nails & 2 wire dog 'Z' nails

    CHANGE IN PITCH APRON FLASHINGScale: 1:105

    250 min. 15 min.

    250 min. 0.55mm colorsteel change of pitch apron flashing with hem to top edge & notched to suit roofing profile

    Fix above flashingRoof underlay laps over flashing

    0.55mm Colorsteel profiled longrun roofing or Clearlite polycarbonate roofing on safety mesh on 90x45 purlins equally spaced @ 900crs max on rafters

    Stop end

    Profiled foam sealing strips to suit roofing to seal

    Suspended grid ceiling

    0.55mm colorsteel flashing notched around rafters with hem to top and fold & crush to bottom edge, rivet to cladding as per manu. spec.

    19mm thick No.1 clears H3.2 coverboard installed between rafters, ensure tight fix to purlin above and bottom edge aligns with bottom of rafter

    19mm wide No.1 clears H3.2 timber finishing bead continuous under coverboard & rafters above

    140x45 H1.2 blocking as required to close off roof space & align with front face of cladding

    20.0

    Vertical corrugate cladding on horiz. 45x18 Cavibat cavity battens on JH Rab board on 90x45 framing @ 400crs with wall insulation

    10mm ventilation gap

    Horiz. Cavibat & cavity closure to close ventilation gapDirection of air flow out of cavity & corrugation to outside

    5.00

    °

    100

    VERANDAH SLAB TO FOUNDATIONScale: 1:106

    30

    100

    D12 starter bars @ 600mm crs chemset 120mm min. embedment to foundation & 600min lap to mesh

    NOTE: AP40 hardfill compacted in 200mm layers

    100mm thick 20MPa concrete slab with grade 500E SE62 mesh on DPM on 50mm sand blinding on 150mm min. compacted hard fill

    50

    VERANDAH BEAM JOINT DETAILScale: 1:107

    PLVR12H3 200PP GL12 190x63 Prolam verandah beam fixed to post with 2/M12 bolts & washers

    PLP8 135PP 112x112 Prolam timber verandah post with 10mm round edges

    130

    6565

    60

    65 65

    FGL

    140

    240 NOTE: 75mm min cover to reinforcing below ground

    NOTE: AP40 hardfill compacted in 200mm layers

    Vertical corrugate cladding on horiz. 45x18 Cavibat cavity battens on JH Rab board on 90x45 framing @ 400crs with wall insulation

    WARNING: Do not count blocks for pricing, confirm site condition prior to pricing.

    R10 starter bars alternating @ 600mm crs

    600 overlap

    50

    150mm min. to paved ground - PGL225mm min. to finished ground - FGL

    20MPa concrete garage slab with 665 grade 500E mesh on polystyrene insulation on DPM on 50mm sand blinding layer on compacted hardfill

    D12

    CONCRETE BLOCK FOUNDATIONScale: 1:103

    5 ga

    p

    30

    100

    50

    0.55mm Colorsteel box base flashing with 10° slope, hem to top and drip edge to bottom, install flexible flashing tape over flashing

    Horiz. Cavibat & cavity closure to baseBitumen impregnated continuous foam seal to close cavity of corrugate

    90x45 bottom plate on DPC fixed to concrete slab with Lumberlock header block anchors @ 600mm crs max.

    2/D12 longitudinal bars

    20 series concrete block foundation with 17.5 MPa concrete infill

    100mm to cleared ground level, place100mm top soil up to FGL or Compacted sand blinding as required for pavingCGL

    200mm min. depth below CGL

    17.5MPa concrete footing

    50

    FSL

    BARGE DETAIL TO VERANDAHScale: 1:104

    2 crests

    Colorsteel barge flashing

    100

    6mm JH hardiflex soffit lining fixed to manu. spec. on 70x45 raking soffit bearer & blocking

    400

    Colorsteel longrun barge board

    0.55mm Colorsteel profiled longrun roofing on self-suporting roof underlay on 90x45 purlins equally spaced @ 900crs max on trusses

    19mm wide No.1 clears H3.2 continuous timber finishing bead

    5 gap

    Ceiling system installed to manu. spec.

    BARGE / GABLE END DETAILScale: 1:102

    2 crests

    Colorsteel barge flashing

    100

    6mm JH hardiflex soffit lining fixed to manu. spec. on 70x45 raking soffit bearer & blocking

    Vertical corrugate cladding on horiz. 45x18 Cavibat cavity battens on JH Rab board on 90x45 framing @ 400crs with wall insulation

    0.55mm colorsteel eave flashing with hem under soffit and fold & crush to bottom edge, rivet to cladding as per manu. spec.

    MS Silicon sealant

    400

    Colorsteel longrun barge board

    0.55mm Colorsteel profiled longrun roofing on self-suporting roof underlay on 90x45 purlins equally spaced @ 900crs max on trusses

    5 gap

  • postal: 47 Tyne Street offices: 3rd Floor, Imperial Building contact: 03-477-0462 office 021-294-7430 mobileRoslyn, Dunedin 1 Dowling Street, Dunedin [email protected]

    PROJECT

    CLIENT

    DWG

    ISSUE DATE REVISION

    PROJECT #

    DWG #

    REVISION

    DATE #

    SCALE

    DRAWN

    PLOT DATE

    CONTRACTOR MUST CONFIRM CRITICAL DIMENSIONS ON SITE PRIOR TO COMMENCEMENT

    14/5/15

    LINK ROOF DETAILS

    NEW CLASSROOM BLOCK

    GOLDFIELDS PRIMARY SCHOOL5195.2.4

    A13APRIL 2015

    1:10 @ A2

    SM

    Verandah spouting & fascia continuous above linnk roof

    MEMBRANE LINK ROOF CROSS SECTIONScale: 1:102

    Prolam timber verandah post

    50

    1.5mm butynol membrane roofing with 2° fall installed by approved applicators on 17mm Ecoply H3 NOT LOSP CD grade face grain across rafters

    0.55mm Colorsteel flashing to match verandah fascia

    25x25 H3.2 timber fillet both sides

    Butynol membrane dressed down over beam & returned at ends

    Prolam link roof beam

    90x45 link roof rafters @ 400crs max. fixed to beam with 47x90 S/S joist hangers fully nailed with 30x3.15 annular grooved nails

    PLVR12H3 200PP GL12 190x63 Prolam link roof beam on 12mm H3.2 packer on EPDM fixed to existing timber studs or new blocking to existing framing with M12 coach bolt & washer @ 600crs max. complete with MS silicon sealant applied to pilot hole

    Chamfer inside edge of beam

    Existing soild plaster stucco

    90x45 blocking shown dashed for ply substrate perimeter fixing

    2° fall

    12 min.

    LINK ROOF BEAM CONNECTION TO POSTSScale: 1:103

    8030

    Verandah spouting & fascia continuous above linnk roof

    8030

    Prolam timber verandah post

    50

    12

    PLVR12H3 200PP GL12 190x63 Prolam link roof beam fixed to verandah posts with 2/M12 bolts & washers

    90x45 link roof rafters @ 400crs max.

    Chamfer inside edge of beam

    90x45 blocking shown dashed for ply substrate perimeter fixing

    2° fall

    1.5mm butynol membrane roofing with 2° fall installed by approved applicators on 17mm Ecoply H3 NOT LOSP CD grade face grain across rafters

    0.55mm Colorsteel flashing to match verandah fascia

    25x25 H3.2 timber fillet both sides

    Butynol membrane dressed down over beam & returned at ends

    Existing timber verandah post to existing building

    PLVR12H3 200PP GL12 190x63 Prolam link roof beam on H3.2 packer to suit fixed to existing post with 2/M12 bolts & washers

    Chamfer inside edge of beam

    high point

    3

    -

    2

    -

    Extend spouting to match existing

    19mm H3.2 timber fascia board to align with existing, paint to match existing

    1.5mm membrane roofing with 2° fall on 17mm Ecoply H3 NOT LOSP CD grade on 90x45 rafters @ 400mm crs.

    Pre-painted 0.7mm Aluminium under flashing rebated to chamfered end of ply.

    MEMBRANE LINK ROOF LONG SECTIONScale: 1:101

    Line of verandah post beyond

    SPOUTING

    FASCIA

    VERANDAH ROOFING

    Line of verandah beam beyond

    45x45 chamfered upstand & 25x25mm timber fillet

    0.55mm Colorsteel flashing on Butynol membrane dressed down over verge board50

    19mm thick H3.2 verge board, paint finish

    1.5mm membrane roofing with 2° fall on 17mm Ecoply H3 NOT LOSP CD grade on 90x45 rafters @ 400mm crs.

    90x45 link roof rafters @ 400crs max. fixed to beam with 47x90 S/S joist hangers fully nailed with 30x3.15 annular grooved nails

    Line of 90x45 blocking for ply substrate perimeter fixing shown dashed

    Line of verandah post beyond

    140x45 end rafters ripped down to suit & fixed to beam with Lumberlok multi-grip fully nailed with 30x.3.15 annular grooved nails

    Diagrammatic only, not for construction purposes

    LINK ROOF 3D PERSPECTIVESNTS4

  • postal: 47 Tyne Street offices: 3rd Floor, Imperial Building contact: 03-477-0462 office 021-294-7430 mobileRoslyn, Dunedin 1 Dowling Street, Dunedin [email protected]

    PROJECT

    CLIENT

    DWG

    ISSUE DATE REVISION

    PROJECT #

    DWG #

    REVISION

    DATE #

    SCALE

    DRAWN

    PLOT DATE

    CONTRACTOR MUST CONFIRM CRITICAL DIMENSIONS ON SITE PRIOR TO COMMENCEMENT

    14/5/15

    DETAILS

    NEW CLASSROOM BLOCK

    GOLDFIELDS PRIMARY SCHOOL5195.2.4

    A14March 2015

    1:5 @ A2

    SM

    1 A u g u s t 2 0 1 1 D E PA R T M E N T O F B U I L D I N G A N D H O U S I N G146

    E X T E R N A L M O I S T U R E Acceptable Solution E2/AS1

    Figure 100:

    Window and door flashings for profiled metal Paragraphs 9.6.8.6 and 9.6.9.7, Figures 95 and 99

    Amend 2 Jul 2005 Amend 5

    Aug 2011

    AL. SLIDING WINDOW HEAD TO VERT. METALScale: 1:55

    Double glazed aluminium sliding window joinery with awning window above

    5 m

    in g

    ap

    0.55mm colorsteel head flashing with 15° fall, hem to top, kick out to bottom & 20mm stop-ends extends over jamb flashing each end

    35 m

    in.

    10mm min. cover

    10m

    m g

    ap

    Install flexible flashing tape continuous around entire opening, lap 50mm min. over Rab boardThermakraft 403F foil tape to cover raw bituminous edge of Thermakraft Aluband flexible flashing tapeSika AT Fascade sealant wet seal on PEF backing rod continuous around opening

    Vertical corrugate cladding on horiz. 45x18 Cavibat cavity battens on JH Rab board on 90x45 framing @ 400crs with wall insulation

    Flexible flashing tape over head flashing upstand

    Horiz. Cavibat & cavity closure positioned to give 15mm drip edge to claddingCompressible bitumen impregnanted foam seal

    10mm min cover

    5 gap

    65 apx10mm min cover

    5 gap

    line of head flashing over continuous along windows & door

    AL. SLIDING WINDOW / DOOR JAMB TO VERT. METALScale: 1:56

    Sika AT Fascade sealant wet seal on PEF backing rod continuous around opening

    Install flexible flashing tape continuous around entire opening, lap 50mm min. over Rab board rigid air barrier

    Thermakraft 403F foil tape to cover raw bituminous edge of Thermakraft Aluband flexible flashing tape

    10mm gap between framing & reveal

    0.55 Colorsteel box flashing with hems to both edges on rigid extruded polystyrene on Cavibat battens

    Continuous compressable foam seal.

    AL. SLIDING WINDOW SILL TO VERT. METALScale: 1:57

    50mm cover

    5 ga

    p

    10mm cover

    Compressible bitumen impregnanted foam seal

    Colorsteel sill flashing with 10° slope, end of sill closed

    Vertical corrugate cladding on horiz. Cavibat cavity battens on Jh Rab board

    Double glazed aluminium window joinery with frame block

    Install flexible flashing tape continuous around entire opening, lap 50mm min. over Rab board

    Sika AT Fascade sealant wet seal on PEF backing rod continuous around openingThermakraft 403F foil tape to cover raw bituminous edge of Thermakraft Aluband flexible flashing tape

    Wanz support bar along entire sill

    AL. WINDOW HEAD TO VERT. METALScale: 1:51

    5 m

    in g

    ap

    0.55mm colorsteel head flashing with 15° fall, hem to top, kick out to bottom & 20mm stop-ends extends over jamb flashing each end

    35 m

    in.

    10mm min. cover

    10m

    m g

    ap

    Double glazed aluminium window joinery, refer window/door scheduleInstall flexible flashing tape continuous around entire opening, lap 50mm min. over Rab boardThermakraft 403F foil tape to cover raw bituminous edge of Thermakraft Aluband flexible flashing tapeSika AT Fascade sealant wet seal on PEF backing rod continuous around opening

    Vertical corrugate cladding on horiz. 45x18 Cavibat cavity battens on JH Rab board on 90x45 framing @ 400crs with wall insulation

    Flexible flashing tape over head flashing upstand

    Horiz. Cavibat & cavity closure positioned to give 15mm drip edge to claddingCompressible bitumen impregnanted foam seal

    AL. WINDOW JAMB TO VERT. METALScale: 1:52

    10mm min cover

    5 gap

    650.55 Colorsteel box flashing with hem, kick out and fixing bracket

    RivetVertical corrugate cladding on horiz. Cavibat cavity battens

    10mm gap between framing & reveal

    Sika AT Fascade sealant wet seal on PEF backing rod continuous around opening

    Install flexible flashing tape continuous around entire opening, lap 50mm min. over Rab board rigid air barrier

    Continuous compressable foam seal.

    Thermakraft 403F foil tape to cover raw bituminous edge of Thermakraft Aluband flexible flashing tape

    Line of sill flashing below

    line of head flashing over

    4.5mm JH HomeRab rigid air barrier

    50mm cover

    AL. WINDOW SILL TO VERT. METALScale: 1:53

    5 ga

    p

    Colorsteel sill flashing with 10° slope, end of sill closed

    Vertical corrugate cladding on horiz. Cavibat cavity battens on JH Rab board

    10mm cover

    10m

    m g

    ap

    Double glazed aluminium window joinery with frame block

    Install flexible flashing tape continuous around entire opening, lap 50mm min. over Rab board

    Sika AT Fascade sealant wet seal on PEF backing rod continuous around opening

    Wanz support bar along entire sill

    Compressible bitumen impregnanted foam seal

    Thermakraft 403F foil tape to cover raw bituminous edge of Thermakraft Aluband flexible flashing tape

    Line of jamb flashing

    Double glazed aluminium window joinery with frame block

    Concrete slab

    AL. WINDOW SILL TO SLAB4

    Verandah concrete slab

    Carpet tiles

    Proprietry Al. sill liner on continuous compressible seal tape

    WANZ support bar

    FSL

    Thermakraft Aluband flexible flashing tape along entire sill & 50mm down face

    Sill flashing with 10° slope, upstand with hem & end of sill closed

  • Concrete slab

    NOTE: Recess all brace straps in wall framing to allow flush GIB installation

    MITEK TYPE G (7.5kN) LINTEL FIXINGScale: 1:108

    GIB HandiBrac hold down bracket fixed to stud with 5/8mm AF tek screws & to bottom plate with 3/8mm AF tek screws & Bowmac screw bolt to slab

    90

    400x1mm sheet brace to one side fixed with 6/30x3.15mm nails to lintel & wall framing

    2/90x3.15 skew nails directly below lintel

    90x3.15 nails @ 250mm crs. both sides

    6/90x3.15 nails end fixed into lintel

    Top plate to stud connection fixed with James Hardie HomeRAB Pre-cladding (Type B 4.7kN fixing) to manu. spec.

    90x45 understud

    90x45 double trimming stud

    90x3.15 nails @ 250mm crs. both sides

    Concrete slab

    NOTE: Recess all brace straps in wall framing to allow flush GIB installation

    MITEK TYPE F (4.0kN) LINTEL FIXINGScale: 1:107

    Tylok 4T5 to one side

    2/90x3.15 skew nails directly below lintel

    90x3.15 nails trimmer to doubling stud @ 250mm crs.

    6/90x3.15 nails end fixed into lintel

    NOTE: Bottom plate lintel hold downs not required.

    Lintel

    2x Tylok 2T4 to one side

    90x45 understud

    90x45 double trimming stud90

    Top plate to stud connection fixed with James Hardie HomeRAB Pre-cladding (Type B 4.7kN fixing) to manu. spec.

    90x3.15 nails @ 250mm crs. both sides

    Concrete slab

    90x45 understud

    NOTE: Recess all brace straps in wall framing to allow flush GIB installation

    90x45 double trimming stud

    2/90x3.15 skew nails directly below lintel

    90x3.15 nails trimmer to doubling stud @ 250mm crs.

    4/90x3.15 nails end fixed into lintel

    NOTE: Bottom plate lintel hold downs not required.

    Lintel

    Tylok 2T4 to one side

    90

    MITEK TYPE E (1.4kN) LINTEL FIXINGScale: 1:106

    Top plate to stud connection fixed with James Hardie HomeRAB Pre-cladding (Type B 4.7kN fixing) to manu. spec.

    postal: 47 Tyne Street offices: 3rd Floor, Imperial Building contact: 03-477-0462 office 021-294-7430 mobileRoslyn, Dunedin 1 Dowling Street, Dunedin [email protected]

    PROJECT

    CLIENT

    DWG

    ISSUE DATE REVISION

    PROJECT #

    DWG #

    REVISION

    DATE #

    SCALE

    DRAWN

    PLOT DATE

    CONTRACTOR MUST CONFIRM CRITICAL DIMENSIONS ON SITE PRIOR TO COMMENCEMENT

    14/5/15

    DETAILS / LINTEL FIXING

    NEW CLASSROOM BLOCK

    GOLDFIELDS PRIMARY SCHOOL5195.2.4

    A15April 2015

    1:5, 1:10 @ A2

    SM

    2 cr

    ests

    min

    .

    0.55mm Colorsteel corner flashing

    Vertical corrugate cladding on horiz. 45x18 Cavibat cavity battens on 4.5mm JH Rab board on 90x45 framing @ 400crs with wall insulation

    VERT. CORRUGATE EXTERNAL CORNERScale: 1:55

    2 crests min.

    10mm

    gap

    5mm

    gap

    10mm gap

    5mm

    gap

    Rivet

    Rivet

    Line of jamb flashing

    90

    New aluminium door joinery shown diagramatic

    Concrete slab 100

    AL. SLIDING DOOR THRESHOLD Scale: 1:53

    line of rebate outside width of door to allow clearance off metal cladding

    Line of verandah slab beyond

    Verandah concrete ramp

    Carpet tiles

    15

    10 gap

    High point, create falls each side of door

    WANZ support bar 55

    35

    Cement grout fill

    Form rebate to door threshold to create accessible entry, remove block face & form with temporary formwork

    Thermakraft Aluband flexible flashing tape along entire sil l& 50mm down face

    AL. SLIDING DOOR JAMB BELOW WINDOWScale: 1:52

    10mm min cover

    5 gap

    650.55 Colorsteel box flashing with hem, kick out and fixing bracket

    RivetVertical corrugate cladding on horiz. Cavibat cavity battens

    10mm gap between framing & reveal

    4.5mm JH HomeRab rigid air barrier

    Sika AT Fascade sealant wet seal on PEF backing rod continuous around opening

    Install flexible flashing tape continuous around entire opening, lap 50mm min. over Rab board rigid air barrier

    Continuous compressable foam seal.

    Thermakraft 403F foil tape to cover raw bituminous edge of Thermakraft Aluband flexible flashing tape

    Line of sill flashing below

    line of head flashing over

    5 m

    in g

    ap

    35 m

    in.

    AL. SLIDING DOOR / WINDOW HEAD Scale: 1:51

    10mm min. cover

    Double glazed aluminium sliding door joinery with fixed window above

    Vertical corrugate cladding on horiz. 45x18 Cavibat cavity battens on JH Rab board on 90x45 framing @ 400crs with wall insulation

    0.55mm colorsteel head flashing with 15° fall, hem to top, kick out to bottom & 20mm stop-ends extends over jamb flashing each end

    Flexible flashing tape over head flashing upstand

    Horiz. Cavibat & cavity closure positioned to give 15mm drip edge to cladding

    Install flexible flashing tape continuous around entire opening, lap 50mm min. over Rab boardThermakraft 403F foil tape to cover raw bituminous edge of Thermakraft Aluband flexible flashing tapeSika AT Fascade sealant wet seal on PEF backing rod continuous around opening

    Compressible bitumen impregnanted foam seal

    Line of jamb flashing

    Line of jamb flashing

    75

    New aluminium door joinery shown diagramatic

    Concrete slab 100

    AL. HIGNED DOOR THRESHOLDScale: 1:54

    45

    Verandah concrete slab

    Carpet tiles

    15

    Cement grout fill

    Proprietry Al. sill liner on plastic shims to level

    WANZ support bar

    FSL

    FVL

    Thermakraft Aluband flexible flashing tape along entire sill & 50mm down face

  • postal: 47 Tyne Street offices: 3rd Floor, Imperial Building contact: 03-477-0462 office 021-294-7430 mobileRoslyn, Dunedin 1 Dowling Street, Dunedin [email protected]

    PROJECT

    CLIENT

    DWG

    ISSUE DATE REVISION

    PROJECT #

    DWG #

    REVISION

    DATE #

    SCALE

    DRAWN

    PLOT DATE

    CONTRACTOR MUST CONFIRM CRITICAL DIMENSIONS ON SITE PRIOR TO COMMENCEMENT

    14/5/15

    WINDOW / DOOR SCHEDULE

    NEW CLASSROOM BLOCK

    GOLDFIELDS PRIMARY SCHOOL5195.2.4

    A16March 2015

    1:50 @ A2

    SM

    INTERNAL DOOR JOINERY:

    DOOR #: D08 & D09TYPE: CS for Doors cavity sliderCAVITY MODEL: BraceWallDOOR STYLE: Overtaking New YorkerREVEAL: 19mm No. 1 clears timber reveals, Paint finishHARDWARE: CS for doors standard hardwareGLAZING: Laminated single glass to meet NZS4223FINISH: Alum. - Powdercoated to match exterior joinery

    Reveals - Semi gloss enamel paint

    DOOR #: D10TYPE: CS for Doors DOOR STYLE: Hinged New YorkerREVEAL: 19mm No. 1 clears timber reveals, Paint finishHARDWARE: To match exterior doors with door lockGLAZING: Laminated single glass to meet NZS4223FINISH: Alum. - Powdercoated to match exterior joinery

    Reveals - Semi gloss enamel paint

    IMPORTANT:ALUMINIUM JOINER TO CHECK OPENING SIZES ON SITE PRIOR TO MANUFACTURE, ALL DIMENSIONS ARE NOMINAL TRIM OUT SIZE ONLY

    FFL

    545

    1980

    doo

    r lea

    fFFL

    W01, W02, W06, W07

    D01, D03 W05, W12 D02, D06 mirrored

    W04, W11Also separate windowsW03, W08

    W17, W18

    2010

    910

    1100

    SF, sg

    INTERNAL TIMBER WINDOW JOINERY:

    WINDOW #: W17 & W18REVEAL: 19mm No.1 clears radiata timber reveals

    with timber glazing beads both sidesHARDWARE: NoneGLAZING: Laminated single glass to meet NZS4223FINISH: Paint - colour TBC

    CS for Doors- New Yorker aluminium framed / laminated single glazed hinged door to match Cavity slidersHold back latch stopHardware to match exterior doors

    Timber reveal & glazing beads

    KEY:SF = safety glass to NZS4223sg = Laminated single glazingr = restrictor stays

    GENERAL JOINERY / GLAZING NOTES:

    1. All Door & Window joinery to be Aluminium unless noted otherwise2. All aluminium joinery comply with NZS 3504 Aluminium Windows &NZS 4211 : 1985 Performance of Windows3. All glazing to comply with NZS4223 requirements4. External glazing to be double glazed safety glass with exterior pane laminated safety glass & interior pane toughened safety glass5. All internal glazing to be single glazed laminated safety glass to meet NZS42236. Also refer specification & details for installation

    SF, r SF, r45

    5

    SF

    1280

    2010

    OA

    / 19

    80 d

    oor l

    eaf

    2400 with 2 equal divisions 970 OA / 910 leaf

    2010

    OA

    / 19

    80 d

    oor l

    ea

    2400 with 2 equal divisions

    SF SF

    SF

    SF SF SF

    slide slide

    SF

    slide

    SF

    SF, r SF, r SF, r SF, rSF545

    1525

    1000

    545

    2565

    1980

    doo

    r lea

    f

    2565

    545

    D05, D07W10, W14 W09, W13

    W15, W16

    1980

    doo

    r lea

    f54

    5

    2565

    1000

    D08, D09 D10

    1825

    700

    90 90 90 901500 with 2 eq. div. 1500 with 2 eq. div.2000 with 2 eq. div.1500 with 2 eq. div. 2000 with 2 eq. div.2000 with 2 eq. div.2000 with 2 eq. div.1000

    Continuous lintel

    Continuouslintel over

    adjacent window Continuous lintel

    D04

    2000 with 2 eq. div.

    D02

    CS for Doors - BraceWall overtaking New Yorker aluminium framed / laminated single glazed cavity sliding door

    slide

    SF

    SF

    SF

    Hold back latch stop

    SF SF

    SF

    SF SF SF

    slide slide

    SF

    slide

    SF

    SF, r SF, r SF, r SF, rSF

    SF

    SF

    SF

    SF

    SF

    SF, r

    SF

    SF, sg

    SF, sg SF, sg

    SF, sg SF, sg

    slideslide

    SF

    SF

    wall cavity

    40

    4040

    DOOR HEIGHTS WINDOWS

    Laminated

    ALUMINIUM WINDOW JOINERY:

    TYPE: Powdercoated aluminiumSUITE: Residential - thermally brokenREVEAL: 19mm H3.1 No.1 clears timber reveals,

    paint finish ARCHITRAVES: 40x12mm bevelled MDF, pant finishHARDWARE: Standard or similar approved

    Operable electric opening system for high windowsPowdercoat to match joinery

    GLAZING: Double glazed to meet NZS4223Argon gas filled

    FINISH: Alum - Duralloy powder coated finish with an average of 80 microns with a minimum of 50 micronsReveals - Semi gloss enamel paint

    COLOUR: To match school existing alum. joineryFLASHINGS: As detailed

    ALUMINIUM DOOR JOINERY:

    TYPE: Powdercoated aluminiumSUITE: Residential - thermally brokenREVEAL: 19mm H3.1 No.1 clears timber reveals, paint finish

    NO timber sill reveals, provide aluminium sill liners as detailed

    ARCHITRAVES: 40x12mm bevelled MDF, pant finishHARDWARE: Standard or similar approved

    Powdercoat to match joineryLocks to keyed to school master key

    GLAZING: Double glazed to meet NZS4223Argon gas filled

    FINISH: Alum - Duralloy powder coated finish with an average of 80 microns with a minimum of 50 micronsReveals - Semi gloss enamel paint

    COLOUR: To match school existing alum. joinery FLASHINGS: As detailed

    DOOR HARDWARE:

    Door hardware refer Allegion door schedule in Specification appendix

    CS for Doors - overtaking cavity slider, refer Specification - 5231CS CS FOR DOORS® SPECIALISED

    WINDOW HARDWARE:

    Refer Specification - 4521AR APL RESIDENTIAL ALUMINIUM WINDOWS AND DOORS

  • CONSTRUCTION NOTES: Details derived from best assumptions of existing, if find construction method unsuitable with details drawn inform designer immediately for alternative solution.

    All work to comply with NZS 3604: 2011 amendments 1&2

    All glazing to comply with NZS4223: 1999

    All materials & products installed to manu. spec. and best trade practice

    FIXINGS SCHEDULE: Site requirements Cromwell Altitude 200m above sea levelSnow Zone = N5Snowloading = 1.0kPaWind Zone= HIGHEarthquake Zone = 2Exposure zone = B

    Bottom plate to block foundation concrete slab Bottom plate on DPC fixed with Bowmac M10 x140 blue head screw bolt @ 600mm crs max..

    Bottom plate to studBottom plate fixed to stud with 3/90x3.15 nails end nailedBottom plate to stud fixing must also comply with Bracing element system & Lintel fixing requirements

    Bottom plate at Braceline bracing elements GIB HandiBrac hold down bracket fixed to stud with 5/8mm AF tek screws & to bottom plate with 3/8mm AF tek screws & Bowmac screw bolt to slab

    Lintel fixing to framing Lintel fixing installed to Mitek typical lintel fixing details as per lintel / beam schedule & Sheet A13 details 1,2&3

    Top plate to studs Top plate fixed to stud with James Hardie HomeRAB Pre-cladding board (Type B 4.7kN fixing) installed to manu. spec., refer specification appendix

    Truss to top plateTrusses fixed as per truss manu. specification, refer Truss Design in appendix

    Verandah rafters to verandah beam Rafters fixed to stringer/verandah beam with multigrips each side nailed with 6/30x3.15 annular grooved nails each flange

    Verandah beam to postProlam verandah beam fixed to post with 2/M12 bolts & washers

    Verandah post to slabBowmac BS197 Stainless steel post bracket cast-in to verandah slab, post fixed with 2/M12 S/S bolts & washers

    Purlins to trusses Purlins fixed to trusses/rafters with 2/90x3.15 skew nails & 1/10g 80mm long self drilling screw.

    Link roof beam to existing studsBeam fixed to each existing stud with M12 coach bolt & 50x50x3mm washer

    Link roof rafters to beam Rafters fixed to beam with 90x47 joist hangers fully nailed with 30x3.15 annular grooved nails

    General fixing notesFixing requirements installed as per fixing schdule & NZS3604:2011. Also refer to drawings All exterior bolt connections to be stainless steel complete with 50x50x3mm S/S washers to timber.All straps/fixings rebated for flush GIB installation as required.

    postal: 47 Tyne Street offices: 3rd Floor, Imperial Building contact: 03-477-0462 office 021-294-7430 mobileRoslyn, Dunedin 1 Dowling Street, Dunedin [email protected]

    PROJECT

    CLIENT

    DWG

    ISSUE DATE REVISION

    PROJECT #

    DWG #

    REVISION

    DATE #

    SCALE

    DRAWN

    PLOT DATE

    CONTRACTOR MUST CONFIRM CRITICAL DIMENSIONS ON SITE PRIOR TO COMMENCEMENT

    14/5/15

    FIXING /SELECTIONS/PLUMBING

    NEW CLASSROOM BLOCK

    GOLDFIELDS PRIMARY SCHOOL5195.2.4

    A17March 2015

    N/A

    SM

    GENERAL SELECTIONS: 1. CONCRETE SLAB:Strength to be 20 MPa at 28 days.Powerfloat machine finish CCANZ level U4 specification to internal concrete slabsBroom finish level CCANZ level U5 specification to verandah and covered courtyard slabs

    2. TIMBER FRAMING:

    Internal structural framing timber H1.2 SG8External structural framing timber H3.2 SG8Verandah Prolam posts H3.2 SG8 dressed no.1 clearsTimber trusses H1.2 SG8Timber verandah beam H3.2 SG8Timber battens/packers to claddings H3.2 SG8Internal finishing timber Pine dressed no.1 clearsInternal architraves/skirting MDF

    All other materials & sizes as specified in drawings

    Place continuous full width DPC between all:-timber & concrete, -Steel members & concrete.

    3. EXTERIOR CLADDING: -0.55mm Colorsteel longrun vertical corrugate cladding on horizontal CaviBat cavity battens-colour to match existing classroom block

    4. ROOFING:Main roof

    - 0.55mm Colorsteel longrun profiled metal roofing to match existing- 0.55mm Colorsteel flashings to match existing

    Vernadah roof- 0.55mm Colorsteel longrun profiled metal roofing to match existing- Clearlite polycarbonate profiled roofing to match metal profile, refer spec.- 0.55mm Colorsteel flashings to match existing

    Membrane link roof- 1.5mm thick Butynol membrane roofing, colour black- 0.55mm Colorsteel flashings to match verandah

    5. INSULATION: Refer Design Navigator H1 report in specification

    Walls - 90mm R2.8 Earthwool wall insulation Roof space -210mm R5.2 Earthwool ceiling insulationUnder slab -50mm R1.3 Expol S polystyrene insulation installed above DPM

    6. LININGS: a) New classroom & resource room

    - 10mm GIB standard lining to walls- Suspended grid ceiling

    b) Bracing elements-Install GIB bracing elements to manu. spec's as per bracing plan & schedule

    c) General lining notes-GIB linings installed to manu. spec.-GIB stopping to level 4 finish for paint finish-GIB Stopping to level 3 finish behind composition wall coverings-Use GIb paper tape & GIB Goldline Platinum tape on trims

    1 D e c e m b e r 2 0 0 7 D E PA R T M E N T O F B U I L D I N G A N D H O U S I N G

    w At e r S u p p l i e S Acceptable Solution G12/AS1

    �0

    Mains pressure Storage water Heater System (unvented) Paragraphs 6.1.2 and 6.2.1 b)

    low pressure Valve – Vented water Heater System – temperature and pressure relief Valve Paragraphs 6.1.2 and 6.2.1 b)

    Figure 8:

    Figure 9:

    D E PA R T M E N T O F B U I L D I N G A N D H O U S I N G

    w At e r S u p p l i e S Acceptable Solution G12/AS1

    ��

    6.11.4 Structural Support

    NZBC B1.3.2 requires building elements (including storage water heaters) to be adequately supported including support against earthquake forces. The method illustrated in Figure 14 is acceptable for water heaters up to 360 litre capacity. Where fittings and pipework are attached to the water heater through the supporting platform or floor a 50 mm minimum clearance shall be provided between the fitting and the support structure.

    6.11.5 Another acceptable solution for securing storage water heaters against seismic forces is given in Section 203 of NZS 4603.

    6.12 Hot water pipe sizes

    6.12.1 The diameter of hot water supply pipes from storage water heaters and to sanitary fixtures shall be no less than those required by Table 4.

    6.13 wet-back water heaters

    6.13.1 Wet-back water heaters shall be:

    a) Connected only to open vented storage water heaters, or a water storage vessel (see Figure 15), and

    b) Made of copper.

    6.13.2 Copper pipework shall be used between the wet-back and the water tank.

    1 D e c e m b e r 2 0 0 7

    Figure 14:

    Seismic restraint of Storage water Heaters 90 – 360 litres Paragraph 6.11.4

    Amend 5 Feb 2004

    Amend 5 Feb 2004

    Amend 5 Feb 2004

    Third Edition Dec 2007

    D E PA R T M E N T O F B U I L D I N G A N D H O U S I N G

    w At e r S u p p l i e S Acceptable Solution G12/AS1

    �2

    6.4 Safety devices

    6.4.1 Valve vented (unvented) systems shall have in addition to Paragraph 6.3.3 the following safety devices:

    a) Combined temperature/pressure relief valve for systems with a working pressure greater than 120 kPa,

    b) Combined temperature/pressure relief valve or a pressure relief valve for systems with a working pressure less than 120 kPa,

    c) An energy cut-off for each heating unit on gas and electric systems, and

    d) Valves complying with Table 6.

    6.4.2 Free outlet (push through) water heaters shall have a relief valve. No relief valve drain is required.

    6.5 temperature control devices

    6.5.1 Electric thermostats and energy cut-off devices shall comply with NZS 6214 or AS 1308.

    6.5.2 Energy cut-off devices shall be designed to:

    a) Be reset manually, and

    b) Disconnect the energy supply before the water temperature exceeds 95°C.

    6.6 relief valves

    6.6.1 All valves shall have flow rates, pressure and diameter compatible with the system they serve.

    6.6.2 Pressure relief valves and expansion control valves shall have:

    a) A flow rate capacity of no less than the rate of cold water supply, and

    b) A maximum pressure rating of no more than the working pressure of the hot water storage vessel.

    COMMeNt:

    The provision of cold water expansion valves satisfies two objectives of the New Zealand Building Code:

    1. Safety: Protects the pressure relief or combined temperature/pressure relief valve from blockage due to calcium and other similar deposits where hard water is frequently discharged through the valve.

    2. Energy Efficiency (NZBC H1): Cold water instead of hot water is discharged to waste during the frequent warm up cycles.

    6.6.3 Expansion control valves shall have a pressure rating of no less than that of the water supply pressure to the storage water heater, but less than the pressure rating of the relief valve.

    3 0 S e p t e m b e r 2 0 1 0

    table 6:

    Storage water Heater Valves Paragraph 6.3.3 c) and 6.4.1 d)

    Valve type Standard

    Cold water expansion valves NZS 4608 BS EN 1491 AS 1357: Part 1

    Temperature/pressure relief valve NZS 4608 BS EN 1490 AS 1357: Part 1

    Non-return valves NZS 4608 AS 1357: Part 1

    Vacuum relief valves NZS 4608 AS 1357: Part 2

    Pressure reducing valves and pressure limiting valves NZS 4608 BS 6283: Part 4 AS 1357: Part 2

    Pressure relief valves NZS 4608

    Amend 5 Feb 2004

    Amend 5 Feb 2004

    Amend 5 Feb 2004

    Third Edition Dec 2007

    Amend 7Sep 2010

    Amend 7Sep 2010

    D E PA R T M E N T O F B U I L D I N G A N D H O U S I N G

    w At e r S u p p l i e S Acceptable Solution G12/AS1

    ��

    COMMeNt:

    This paragraph applies to storage water heaters located inside the building’s thermal envelope with relief valve drains discharging where freezing of the drain is likely.

    6.7.6 Closed cell foam polymer insulation or fibre glass insulation which is preformed to the shape of the pipe and not less than 13 mm thick, is acceptable material for preventing pipes less than or equal to 40 mm diameter from freezing. Any insulation material that absorbs moisture shall be protected in a waterproof membrane.

    6.8 Vent pipes

    6.8.1 Vent pipes for open vented storage water heaters shall comply with the provisions of Paragraphs 6.8.2 and 6.8.3.

    6.8.2 installation

    a) Materials: The pipe material shall be copper complying with Table 1,

    b) Diameter: The diameter of the vent pipe shall be no less than that of the hot water outlet fitting on the storage water heater and no less than 20 mm where the energy input rating is greater than 3 Kw,

    c) Termination: The vent pipe (see Figure 6) shall terminate either:

    i) outside the building, or

    ii) over a water tank supplying the storage water heater, and

    d) Height: The vent pipe height, measured in metres from the base of the storage water heater, shall not exceed the height (in metres) that equates to the maximum pressure rating of the storage water heater, and

    e) Water level: The normal standing water level in the vent pipe shall be a minimum of 3.0 metres above the highest outlet. The height of the vent pipe shall be:

    i) 300 mm above the standing water level of the vent pipe, for tank fed systems, and

    ii) 1.0 m above the standing water level, for pressure reducing valve fed systems.

    COMMeNt:

    a) The 1.0 m height has been found to prevent hot water loss due to the pressure reducing valve creeping.

    b) The 3.0 m height is measured from the highest fitting in order to ensure sufficient working head to that fitting.

    c) 9.81 kPa = 1 metre in head = 1 metre in height.

    1 D e c e m b e r 2 0 0 7

    Figure 12:

    relief Valve Drains – Freezing protection Paragraphs 6.7.1, 6.7.4 and 6.7.5

    Amend 5 Feb 2004

    Amend 5 Feb 2004

    Amend 5 Feb 2004

    w At e r S u p p l i e S

    D E PA R T M E N T O F B U I L D I N G A N D H O U S I N G

    Acceptable Solution G12/AS1

    ��

    6.8.3 insulation

    a) Where the vent pipe is likely to be subjected to freezing, it shall be insulated between the top of the storage water heater, and a point no less than 300 mm above the normal standing water level in the vent pipe.

    b) Insulation material is to comply with Paragraph 6.7.6.

    6.9 Another acceptable solution for the installation of open vented storage water heaters

    6.9.1 NZS 4603 is an acceptable solution for open vented low pressure storage water heaters, but may exceed the performance criteria of NZBC G12.

    6.10 Another acceptable solution for the installation of unvented (valve vented) storage water heaters.

    6.10.1 NZS 4607 is an acceptable solution for unvented (valve vented) storage water heaters, but may exceed the performance criteria of NZBC G12.

    6.11 water heater installation

    6.11.1 Water heaters shall be installed in accordance with the manufacturer’s instructions.

    6.11.2 Where heating units, sacrificial anodes, thermostats, pipework connections, valves, or other accessories being components of a storage water heater are installed, they shall be accessible for inspection, maintenance and removal.

    6.11.3 Storage water heaters shall have:

    a) Safe trays complying with Paragraph 5.2.3 where water could penetrate another household unit within the same building.

    b) Connections compatible with the pipe material used, and

    c) Drain pipes (for every storage water heater of more than 45 litres capacity) which:

    i) have a conveniently located isolating valve, and terminate with a cap or plug suitably located to easily empty the vessel for maintenance, or

    ii) terminate outside the building with a cap only.

    1 D e c e m b e r 2 0 0 7

    Figure 13:

    relief Valve Drains – Combined Paragraphs 6.7.1, 6.7.2 f) and 6.7.3

    Amend 5 Feb 2004

    Amend 5 Feb 2004

    Amend 5 Feb 2004

    Third Edition Dec 2007

    Third Edition Dec 2007

    w At e r S u p p l i e S

    D E PA R T M E N T O F B U I L D I N G A N D H O U S I N G

    Acceptable Solution G12/AS1

    ��

    6.14 Safe water temperatures

    6.14.1 Maximum temperatures

    The delivered hot water temperature at any sanitary fixture used for personal hygiene shall not exceed:

    a) 45°C for early childhood centres, schools, old people’s homes, institutions for people with psychiatric or physical disabilities, hospitals, and

    b) 55°C for all other buildings.

    COMMeNt:

    1. At greatest risk from scalding are children, the elderly, and people with physical or intellectual disabilities, particularly those in institutional care.

    2. Sanitary fixtures used for personal hygiene includes showers, baths, hand basins and bidets.

    6.14.2 Hot water delivered from storage water heaters

    a) An acceptable method of limiting hot water temperature delivered from storage water heaters is to install a mixing device between the outlet of the water heater and the sanitary fixture (see Figure 16).

    b) Tempering valves shall comply with NZS 4617 or AS 1357.2.

    6.14.3 legionella bacteria

    Irrespective of whether a mixing device is installed, the storage water heater control thermostat shall be set at a temperature of not less than 60°C to prevent the growth of Legionella bacteria.

    1 D e c e m b e r 2 0 0 7

    Figure 15:

    wet-back installation – Open Vented System Paragraph 6.13.1 a)

    Figure 16:

    tempering Valve installation Paragraph 6.14.2 a)

    Amend 5 Feb 2004

    Amend 5 Feb 2004

    Amend 5 Feb 2004

    Amend 5 Feb 2004

    Third Edition Dec 2007

    A01 [TITLE]SOUTH WEST PERSPECTIVE-3NORTH WEST PERSPECTIVE-2SOUTH EAST PERSPECTIVE-2

    A02 [SITE PLAN]site-2

    A03 [PROPOSED FLOOR PLAN]proposed plan

    A04 SLAB PLAN [SLAB PLAN]SLAB PLAN

    A05 ROOF FRAMING & ROOF PLAN [ROOF FRAMING & ROOF PLAN]propo plan-8SLAB PLAN-2

    A06 BRACING & DRAINAGE PLAN [BRACING & DRAINAGE PLAN]propo plan-9propo plan-13

    A07 REFLECTED CEILING & ELECTRICAL PLAN [REFLECTED CEILING & ELECTRICAL PLAN]REFLECTED CEILING PLANpropo plan-10

    A08 SECTIONS [SECTION]CLASSROOM CROSS SECTIONLONG SECTIONLONG SECTION-2

    A09 ELEVATIONS [ELEVATIONS]SOUTH ELEVATION-6NORTH ELEVATION-8WEST ELEVATION-6EAST ELEVATION-8

    A10 INTERNAL ELEVATIONS-2 [INTERNAL ELEVATIONS]Section-2BREAKOUT SPACE 1BREAKOUT SPACE 2BREAKOUT SPACE 3Section-3CLASSROOM RM13 1CLASSROOM RM13 2INTERNAL ELEVATION 8

    A11 INTERNAL ELEVATIONS [INTERNAL ELEVATIONS]Section-1INTERNAL ELEVATION 2INTERNAL ELEVATION 3INTERNAL ELEVATION 4RESOURCE ROOM INTERNAL ELEVATIONS

    A12 [DETAILS]SLAB DETAILS

    A13 [DETAILS]SLAB DETAILS-2LINK ROOF PERSPECTIVE 1LINK ROOF PERSPECTIVE 2LINK ROOF PERSPECTIVE 3

    A14 [DETAILS]SLAB DETAILS-5

    A15 [DETAILS]SLAB DETAILS-3SLAB DETAILS-6

    A16 [WINDOW / DOOR SCHEDULE]WINDOW / DOOR SCHEDULE